Permit #2021051826

Permit Details

Status: COED

Parcel Id: 07-11-31-7063-00320-0110
CONDITIONED SPACE: 2023 sqft
GARAGE: 724 sqft
OPENED PORCH (WITH ROOF) : 60 sqft
OPENED PORCH (WITH ROOF) : 150 sqft
Total Square Footage: 2957 sqft
Block: 00320
Subdivision: 2174 - SECTION 63-ZEBULAHS TRAIL
Job Phone: 386-445-3405
Location Address: 7 ZANZIBAR CT
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 06/18/2021
NOC: RECORDED
Applicant name: JAY DARREN CURBOW
Owner: BLUE WATER HOMES INC

Address

STE #1

PALM COAST, FL 32137

Address

4881 PALM COAST PKWY NW

PALM COAST, FL 32137

Lot: 0110
Contracted Stated Job Value: ¤222,589.00
Job Description: Single Family Residence
Type: CN

Contractor

BLUE WATER HOMES INC
Status Location Address State License Number Phone
ACTIVE

4881 PALM COAST PARKWAY NW UNIT 1

PALM COAST, FL 32137

CBC1258679 (Exp: 08/31/2026) 386-445-3405

Sub Contractors

JEFFREY TROY SABAKA
Status Location Address State License Number Phone Fax
ACTIVE

2191 DEERWOOD ACRES DR

ST AUGUSTINE, FL 32084

CFC1427439 (Exp: 08/31/2026) 904-838-2218 904-819-0965
JACK DOUGLAS LANIER
Status Location Address State License Number Phone Fax
ACTIVE

485 COMMERCE WAY

LONGWOOD , FL 32750

CCC058022 (Exp: 08/31/2026) (321)441-2300 (321)441-2313
WILLIAM FRANK DUDLEY JR.
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 978

Bunnell, FL 32110

EC0003177 (Exp: 08/31/2026) (386)437-3068
BRETT CHRISTIAN GIBSON
Status Location Address State License Number Phone
ACTIVE

250 SEGOVIA RD

ST AUGUSTINE, FL 32086

CAC1818423 (Exp: 08/31/2026) 904-229-8131

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 05/09/2022 FINAL APPROVED RMARTIN
U -UTILITY RESIDENTIAL FINAL 05/09/2022 FINAL APPROVED JHARDING
ROW - STORMWATER FINAL 05/06/2022 APPROVED EMADISON
U-CROSS CONNECTION 05/06/2022 APPROVED - AS NOTED JHARDING
Note: No cross connections.
ROW - FINAL APRON (AFTER POUR) 05/05/2022 APPROVED EMADISON
ROW FIELD SURVEY /GRADING CERTIFICATION 05/05/2022 APPROVED EMADISON
FINAL SURVEY (OFFICE USE ONLY) 05/05/2022 APPROVED EMADISON
ELECTRIC - EARLY POWER 03/17/2022 APPROVED - AS NOTED JMUNSON
Note: Emailed FPL at 8:38 am
TUB SET 03/04/2022 APPROVED - AS NOTED MGIBSON
Note: NEED NAIL PLATE ON WATER LINE WHERE DRYWALL IS TO BE PUT
ROW- PRE-APRON (PRE-POUR) 02/24/2022 APPROVED RGROSS
Note: READY TO POUR
U - SEWER TIE IN 01/27/2022 APPROVED MGIBSON
PEP TANK INSTALLATION REQUEST 01/05/2022 APPROVED CSTONE
LATH/BRICK/ WATER BARRIER 12/27/2021 APPROVED FWILLIS
INSULATION 12/13/2021 APPROVED RMARTIN
Note: Left from all rough 12/7/2021: Head pressure missing, check at insulation CPVC shower head piping in master lacking support-Check at insulation Horizontal vent from utility to roof missing support bracing--over 8' distance -Check at insulation
ALL ROUGH 12/07/2021 APPROVED - AS NOTED TSTAUFFACHER
Note: Head pressure missing, check at insulation CPVC shower head piping in master lacking support-Check at insulation Horizontal vent from utility to roof missing support bracing--over 8' distance -Check at insulation
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/10/2021 APPROVED TSTAUFFACHER
Note: THIS IS A REINSPECTION Areas where continious load path is installed, spruce was used ILO of yellow pine. Cross bracing that is holding straps from framing above.--
ROOF VALLEY & METAL 11/10/2021 APPROVED TSTAUFFACHER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/03/2021 Disapproved - NO FEE TSTAUFFACHER
Note: Areas where continious load path is installed, spruce was used ILO of yellow pine. Cross bracing that is holding straps from framing above.--
TIE BEAM / LINTEL 09/13/2021 APPROVED TSTAUFFACHER
FOUND SURVEY APPROVED (OFFICE) 09/08/2021 APPROVED TDOAK
MONOLITHIC SLAB 08/26/2021 APPROVED TSTAUFFACHER
PLUMBING 1ST ROUGH UNDERGROUND 08/18/2021 APPROVED JGIBSON
GRAVITY SEWER TEST 08/18/2021 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 07/20/2021 APPROVED CSTONE

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 09/08/2021 09/08/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 09/08/2021 09/08/2021
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
SW1 COMPLETE 06/17/2021 06/17/2021
Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM
ZON COMPLETE 06/14/2021 06/14/2021
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SW1 HOLD 06/07/2021 06/07/2021
Note: Held By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM See uploaded Stormwater checklist in attachments for correction. Make corrections on all unchecked items.
SWALE COMPLETE 06/01/2021 08/09/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON HOLD 05/28/2021 06/09/2021
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Landscape plan ac pad location does not match site plan. Please specify type of magnolias being used Foundation plantings must wrap corners and must have a total of four shrubs along each side
BLD COMPLETE 05/28/2021 05/31/2021
Note: Released By: JPI 1. Advisory note. Shower in bath would be recessed slab by note.
CUSVC COMPLETE 05/28/2021 06/07/2021
Note: Released By: HALEIGH HAND - -
ELEC COMPLETE 05/28/2021 06/01/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/28/2021 06/01/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 05/28/2021 06/09/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 05/28/2021 06/01/2021
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 05/09/2022
BUILDING DISCOUNT 100% (¤1,304.60) 06/18/2021
ELECTRIC FEE ¤217.80 06/18/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 06/18/2021
IMPACT FEE FIRE ¤367.00 06/18/2021
IMPACT FEE PARKS ¤1,199.12 06/18/2021
IMPACT FEE SCHOOL ¤3,600.00 06/18/2021
IMPACT FEE TRANSPORTATION ¤1,718.00 06/18/2021
MECHANICAL FEE ¤217.80 06/18/2021
WATER -IRRIGATION INSPECTION ¤25.00 06/18/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 06/18/2021
PLAN CHECK FEE ¤105.20 06/18/2021
PLUMBING FEE ¤217.80 06/18/2021
NEW RESIDENTIAL INSPECTIONS ¤526.00 06/18/2021
SITE PLAN 20 ¤20.00 06/18/2021
SURCHARGE FS 533.721 ¤2.00 06/18/2021
SURCHARGE - FS 468.631 ¤2.00 06/18/2021
STORM WATER PERMIT FEES ¤80.00 06/18/2021
3% TRANS IMPACT FEE CREDIT (¤51.54) 06/18/2021
SEWER CREDIT (¤1,147.00) 06/18/2021
SEWER INSPECTION ¤25.00 06/18/2021
SEWER CAPITAL FACILITY ¤4,664.55 06/18/2021
WATER CAPITAL FACILITY FEE ¤3,424.45 06/18/2021
METER - DEPOSIT ¤60.00 06/18/2021
WATER- TURN ON ¤25.00 06/18/2021
ADMIN FEE ¤20.00 06/18/2021
CONNECTION FEES ¤1,017.83 06/18/2021
Fees Total Due: ¤0.00 Total Paid: ¤15,024.43