Permit Details
Status: COED
| Parcel Id: 07-11-31-7059-00120-0070 |
| CONDITIONED SPACE: 3130 sqft |
| GARAGE: 560 sqft |
| OPENED PORCH (WITH ROOF) : 400 sqft |
| OPENED PORCH (WITH ROOF) : 36 sqft |
| Total Square Footage: 4126 sqft |
| Block: 00120 |
| Subdivision: 2211 - SECTION 59-SEMINOLE PARK |
| Job Phone: 904-268-7730 |
| Location Address: 29 SEA SPIRAL PATH |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/30/2021 |
| NOC: RECORDED |
| Applicant name: DALE ALAN DUBBERLY |
| Owner: MARONDA HOMES LLC OF FLORIDA |
|
Address SUITE 202 JACKSONVILLE, FL 32257 |
|
Address 5220 SHAD ROAD JACKSONVILLE, FL 32257 |
| Lot: 0070 |
| Contracted Stated Job Value: ¤195,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
MARONDA HOMES INC
| Status | Location Address | State License Number | Phone |
| CANCEL |
5220 SHAD ROAD JACKSONVILLE , FL 32257 |
CGC1504922 (Exp: 08/31/2022) | 904-268-7730 |
Sub Contractors
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
MICHAEL LEE RAFFENSBERGER
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
7725 SANDSCOVE CT WINTER PARK, FL 32792 |
CAC1819723 (Exp: 08/31/2024) | 407-629-6920 | 407-629-9307 |
CLINTON J HULSLANDER SR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
4005 MARONDA WAY SANFORD, FL 32771 |
CFC1430632 (Exp: 08/31/2026) | 407-321-0064 | 407-688-8534 |
ANDREW SCOTT DIGAETANO JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
44 FORT CAROLINE PALM COAST, FL 32137 |
CCC1331606 (Exp: 08/31/2026) | 386-302-9063 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 04/28/2022 | FINAL APPROVED | DCUSHING |
| U-CROSS CONNECTION | 04/28/2022 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation, no cross connections. | |||
| U -UTILITY RESIDENTIAL FINAL | 04/28/2022 | APPROVED - AS NOTED | JHARDING |
| Note: Utility has to install pump assembly in pep tank. Spoke to Eric with utilities and he is going to have it done. | |||
| ROW - FINAL APRON (AFTER POUR) | 04/27/2022 | APPROVED | PFLANAGAN |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/27/2022 | APPROVED | PFLANAGAN |
| ROW - STORMWATER FINAL | 04/27/2022 | APPROVED | PFLANAGAN |
| FINAL SURVEY (OFFICE USE ONLY) | 04/27/2022 | APPROVED | PFLANAGAN |
| Note: THIS IS A REINSPECTION SWALE ALONG SEA SERPRENT E. TRAIL NEED MORE ELEVATION TO SHOW DRAINAGE BETTER ON FINAL SURVEY THE HIGH POINT IS AT THE CORNER NEED TO HAVE IT HIGHER AT CORNER THEN FLOW DOWN SEA SERPENT E. TRAIL TOWARDS SEA SHARK PATH | |||
| FINAL SURVEY (OFFICE USE ONLY) | 04/26/2022 | Disapproved - NO FEE | PFLANAGAN |
| Note: SWALE ALONG SEA SERPRENT E. TRAIL NEED MORE ELEVATION TO SHOW DRAINAGE BETTER ON FINAL SURVEY THE HIGH POINT IS AT THE CORNER NEED TO HAVE IT HIGHER AT CORNER THEN FLOW DOWN SEA SERPENT E. TRAIL TOWARDS SEA SHARK PATH | |||
| ELECTRIC - EARLY POWER | 04/22/2022 | APPROVED - AS NOTED | JMUNSON |
| Note: THIS IS A REINSPECTION 1. Everything needs to mbe safed off. 2. Romex can not be exposed. NEC 2017 334.15 4/22/22 Emailed FPL at 1:07 pm | |||
| ELECTRIC - EARLY POWER | 04/21/2022 | Disapproved -FEE REQUIRED | JMUNSON |
| Note: 1. Everything needs to mbe safed off. 2. Romex can not be exposed. NEC 2017 334.15 | |||
| U - SEWER TIE IN | 04/21/2022 | APPROVED | MGIBSON |
| ELECTRIC-TUG | 04/07/2022 | APPROVED - AS NOTED | JMUNSON |
| Note: THIS IS A REINSPECTION No job box or address posted on site, email was sent out saying addresses need to be posted and visible. 4/7/22 Emailed FPL at 8:15 am | |||
| ROW- PRE-APRON (PRE-POUR) | 03/29/2022 | APPROVED - AS NOTED | PFLANAGAN |
| Note: It is contractors responsibility to check pipe elevations before pouring concrete | |||
| PEP TANK INSTALLATION REQUEST | 03/18/2022 | APPROVED - AS NOTED | CSTONE |
| Note: THIS IS A REINSPECTION ADDED ON 2/2/2022 8:42:54 AM int., ext., and no electrical stub out for PEP panel (sheet rock, stucco or siding email rhand@palmcoastgov.com with questions note still no electrical stub out on side of house where tank goes) email rhand@palmcoastgov.com with questions | |||
| LATH/BRICK/ WATER BARRIER | 02/14/2022 | APPROVED | TSTAUFFACHER |
| INSULATION | 02/07/2022 | APPROVED | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION Make openings weather tight or install windows and doors | |||
| PEP TANK INSTALLATION REQUEST | 02/01/2022 | Disapproved - NO FEE | CSTONE |
| Note: int., ext., and no electrical stub out for PEP panel (sheet rock, stucco or siding email rhand@palmcoastgov.com with questions | |||
| INSULATION | 02/01/2022 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: Make openings weather tight or install windows and doors | |||
| ELECTRIC-TUG | 01/25/2022 | Disapproved -FEE REQUIRED | JMUNSON |
| Note: No job box or address posted on site, email was sent out saying addresses need to be posted and visible. | |||
| ALL ROUGH | 01/18/2022 | APPROVED - AS NOTED | RMARTIN |
| Note: NEED RISER AND UFER CONNECTED BY EARLY POWER | |||
| ROOF VALLEY & METAL | 12/28/2021 | APPROVED | TSTAUFFACHER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/13/2021 | APPROVED | DCUSHING |
| Note: THIS IS A REINSPECTION Roof sheathing is passed Rest of tie downs incomplete. Not ready | |||
| WALL SHEATHING | 12/09/2021 | APPROVED | TSTAUFFACHER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/09/2021 | PARTIALLY APPROVED | TSTAUFFACHER |
| Note: Roof sheathing is passed Rest of tie downs incomplete. Not ready | |||
| FOUND SURVEY APPROVED (OFFICE) | 11/17/2021 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 10/22/2021 | APPROVED | TSTAUFFACHER |
| MONOLITHIC SLAB | 10/08/2021 | APPROVED | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Areas on slab where plumbing was covered have not been compacted. Please compact fill inside mono. 10/07/2021--Areas on slab where plumbing was covered have not been compacted. Please compact fill inside mono. | |||
| MONOLITHIC SLAB | 10/07/2021 | Disapproved -FEE REQUIRED | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION Areas on slab where plumbing was covered have not been compacted. Please compact fill inside mono. 10/07/2021--Areas on slab where plumbing was covered have not been compacted. Please compact fill inside mono. | |||
| MONOLITHIC SLAB | 10/06/2021 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: Areas on slab where plumbing was covered have not been compacted. Please compact fill inside mono. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 10/01/2021 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 10/01/2021 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 08/31/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 11/17/2021 | 11/17/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/17/2021 | 11/17/2021 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/25/2021 | 06/25/2021 |
| Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/24/2021 | 06/24/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/24/2021 | 06/24/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 06/21/2021 | 06/21/2021 |
| Note: Held By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM Refer to stormwater checklist to make the corrections needed to meet the city minimums stormwater requirements specifically stated the subject lot must drain from back to front or a portion may be drained to an adjacent City drainage feature. (B) | |||
| SW1 | HOLD | 06/11/2021 | 06/11/2021 |
| Note: Held By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM See uploaded Stormwater checklist in attachments for correction. Make corrections on all unchecked items. | |||
| ZON | COMPLETE | 06/11/2021 | 06/14/2021 |
| Note: Released By: ESTELLE LENS - (386)986-3751 - | |||
| SW1 | HOLD | 06/09/2021 | 06/09/2021 |
| Note: Held By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM See uploaded Stormwater checklist in attachments for correction. Make corrections on all unchecked items. Unless specifically stated the subject lot must drain from back to front or a portion may be drained to an adjacent City drainage feature. (B) | |||
| ZON | HOLD | 06/03/2021 | 06/11/2021 |
| Note: Held By: ESTELLE LENS - (386)986-3751 - Site plan must show the A/C pad with the setback. It is on the left side on the landscape plan and floor plan. If located there, it appears it may encroach in the 5' easement. Please demonstrate that it does not, or if it does, provide a 2' encroachment agreement for review/approval. | |||
| BLD | COMPLETE | 06/03/2021 | 06/03/2021 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 06/03/2021 | 06/08/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 06/03/2021 | 06/04/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/03/2021 | 06/03/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 06/03/2021 | 06/10/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 06/03/2021 | 06/04/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 06/03/2021 | 08/12/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/27/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/27/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/27/2022 |
| CONNECTION FEES | ¤1,017.83 | 06/30/2021 |
| BUILDING DISCOUNT 100% | (¤1,829.60) | 06/30/2021 |
| ELECTRIC FEE | ¤292.80 | 06/30/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 06/30/2021 |
| IMPACT FEE FIRE | ¤367.00 | 06/30/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 06/30/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 06/30/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 06/30/2021 |
| MECHANICAL FEE | ¤292.80 | 06/30/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 06/30/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 06/30/2021 |
| PLAN CHECK FEE | ¤155.20 | 06/30/2021 |
| PLUMBING FEE | ¤292.80 | 06/30/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤776.00 | 06/30/2021 |
| SITE PLAN 20 | ¤20.00 | 06/30/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 06/30/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 06/30/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 06/30/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 06/30/2021 |
| SEWER CREDIT | (¤1,147.00) | 06/30/2021 |
| SEWER INSPECTION | ¤25.00 | 06/30/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 06/30/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 06/30/2021 |
| METER - DEPOSIT | ¤60.00 | 06/30/2021 |
| WATER- TURN ON | ¤25.00 | 06/30/2021 |
| ADMIN FEE | ¤20.00 | 06/30/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,104.43 |