I want to search for...
Permit #2021060231
Permit Details
Status: COED
| Parcel Id: 07-11-31-7023-00240-0200 |
| CONDITIONED SPACE: 2023 sqft |
| GARAGE: 724 sqft |
| OPENED PORCH (WITH ROOF) : 150 sqft |
| OPENED PORCH (WITH ROOF) : 60 sqft |
| Total Square Footage: 2957 sqft |
| Block: 00240 |
| Subdivision: 2191 - SECTION 23-WYNNFIELD |
| Job Phone: 386-445-3405 |
| Location Address: 27 WHITTLESEY LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/25/2021 |
| NOC: RECORDED |
| Applicant name: JAY DARREN CURBOW |
| Owner: BLUE WATER HOMES INC |
|
Address STE #1 PALM COAST, FL 32137 |
|
Address 4881 PALM COAST PKWY NW PALM COAST, FL 32137 |
| Lot: 0200 |
| Contracted Stated Job Value: ¤224,831.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
BLUE WATER HOMES INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4881 PALM COAST PARKWAY NW UNIT 1 PALM COAST, FL 32137 |
CBC1258679 (Exp: 08/31/2026) | 386-445-3405 |
Sub Contractors
JACK DOUGLAS LANIER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
485 COMMERCE WAY LONGWOOD , FL 32750 |
CCC058022 (Exp: 08/31/2026) | (321)441-2300 | (321)441-2313 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
GREGG A MCANALLY
| Status | Location Address | State License Number | Phone |
| INACTIVE |
3370 AGRICULTURAL CENTER DRIVE PALM COAST, FL 32092 |
CAC1815760 (Exp: 08/31/2022) | 904-829-8898 |
Inspection History
| Type | Request Date | Result | Inspector |
| WALL SHEATHING | 04/06/2022 | APPROVED - AS NOTED | RMARTIN |
| Note: CONTRACTOR MET ON SITE AND OPENED UP STUCCO | |||
| BLD - BUILDING FINAL | 04/04/2022 | FINAL APPROVED | MKRASKI |
| BLD - BUILDING FINAL | 03/30/2022 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: No insulation in attic, stopped inspection | |||
| U-CROSS CONNECTION | 03/30/2022 | APPROVED | DHANEY |
| ROW - FINAL APRON (AFTER POUR) | 03/30/2022 | APPROVED | KRUTH |
| ROW - STORMWATER FINAL | 03/30/2022 | APPROVED | KRUTH |
| U -UTILITY RESIDENTIAL FINAL | 03/30/2022 | FINAL APPROVED | DHANEY |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/28/2022 | APPROVED | RGROSS |
| FINAL SURVEY (OFFICE USE ONLY) | 03/28/2022 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION The tolerance along side lot lines is no more than 20 feet flat, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. The minimum fall from the rear property line to the front is 0.50 feet. Drainage along the right and left side property line does not consistently flow from rear to front. Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) | |||
| FINAL SURVEY (OFFICE USE ONLY) | 03/14/2022 | Disapproved - NO FEE | GBERTOLA |
| Note: The tolerance along side lot lines is no more than 20 feet flat, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. The minimum fall from the rear property line to the front is 0.50 feet. Drainage along the right and left side property line does not consistently flow from rear to front. Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) | |||
| ROW- PRE-APRON (PRE-POUR) | 02/10/2022 | APPROVED - AS NOTED | KRUTH |
| Note: pipe is good at the time of the inspection It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. | |||
| ELECTRIC - EARLY POWER | 02/09/2022 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 10:06 am | |||
| TUB SET | 01/27/2022 | APPROVED | MGIBSON |
| U - SEWER TIE IN | 01/11/2022 | APPROVED | MGIBSON |
| PEP TANK INSTALLATION REQUEST | 12/10/2021 | APPROVED | CSTONE |
| INSULATION | 12/08/2021 | APPROVED - AS NOTED | KSANDOE |
| Note: Tub set inspection added for garden tub | |||
| ALL ROUGH | 11/30/2021 | APPROVED - AS NOTED | KSANDOE |
| Note: Need to install tub and close up concrete in owner bath. Guest tub plumbing drain is leaking | |||
| LATH/BRICK/ WATER BARRIER | 11/29/2021 | APPROVED | KSANDOE |
| ROOF VALLEY & METAL | 11/29/2021 | APPROVED | KSANDOE |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/28/2021 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/27/2021 | CANCELLED BY APPLICANT | WEB |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/27/2021 | CANCELLED BY APPLICANT | WEB |
| TIE BEAM / LINTEL | 10/08/2021 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION | |||
| TIE BEAM / LINTEL | 10/07/2021 | CANCELLED BY APPLICANT | JWALKER |
| FOUND SURVEY APPROVED (OFFICE) | 09/27/2021 | APPROVED | TDOAK |
| MONOLITHIC SLAB | 08/17/2021 | APPROVED | FWILLIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 08/05/2021 | APPROVED - AS NOTED | JGIBSON |
| Note: THIS IS A REINSPECTION Purple primer not visible at several fittings and coupling. PLUMBING CONTRACTOR PROVED TO ME THAT THE GLUE HE USED WAS ASTM STANARD 2564 AND COMPLIES WITH ALL REQUIREMENTS | |||
| GRAVITY SEWER TEST | 08/04/2021 | APPROVED | PBUCKLEY |
| PLUMBING 1ST ROUGH UNDERGROUND | 08/04/2021 | Disapproved -FEE REQUIRED | PBUCKLEY |
| Note: Purple primer not visible at several fittings and coupling. | |||
| WATER METER INSTALLATION REQUEST | 06/30/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 09/24/2021 | 09/27/2021 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/24/2021 | 09/24/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/21/2021 | 09/22/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 09/21/2021 | 09/22/2021 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Mechanical equipment pad is in the 5' easement. | |||
| BLD | COMPLETE | 06/21/2021 | 06/24/2021 |
| Note: Released By: JPI | |||
| ZON | COMPLETE | 06/21/2021 | 06/21/2021 |
| Note: Released By: ESTELLE LENS - (386)986-3751 - | |||
| SW1 | COMPLETE | 06/09/2021 | 06/09/2021 |
| Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM | |||
| ZON | HOLD | 06/03/2021 | 06/11/2021 |
| Note: Held By: ESTELLE LENS - (386)986-3751 - Please provide the setback to the A/C pad on the site plan to demonstrate that it is not encroaching in the 5'. If it is, either relocate it, or provide a 2' encroachment agreement for review/approval. Four foundation plantings are required on the left side of the residence. | |||
| BLD | HOLD | 06/03/2021 | 06/07/2021 |
| Note: Held By: JPI 1. Detail C on page S-3 indicates a knee wall. Provide structural construction details for knee wall including all attachments. 2. Interior bearing wall detail H on page S-3 does not indicate continuous load path. Top plate does not illustrate fastening. 3. On overbuilt framing detail, please provide attachment of ridge to structural members. 4. Provide details for garage door buck attachment. R301. | |||
| CUSVC | COMPLETE | 06/03/2021 | 06/07/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 06/03/2021 | 06/04/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/03/2021 | 06/03/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 06/03/2021 | 06/10/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 06/03/2021 | 06/04/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 06/03/2021 | 08/13/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/04/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/30/2022 |
| METER - DEPOSIT | ¤60.00 | 06/25/2021 |
| WATER- TURN ON | ¤25.00 | 06/25/2021 |
| ADMIN FEE | ¤20.00 | 06/25/2021 |
| CONNECTION FEES | ¤1,017.83 | 06/25/2021 |
| BUILDING DISCOUNT 100% | (¤1,304.60) | 06/25/2021 |
| ELECTRIC FEE | ¤217.80 | 06/25/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 06/25/2021 |
| IMPACT FEE FIRE | ¤367.00 | 06/25/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 06/25/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 06/25/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 06/25/2021 |
| MECHANICAL FEE | ¤217.80 | 06/25/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 06/25/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 06/25/2021 |
| PLAN CHECK FEE | ¤105.20 | 06/25/2021 |
| PLUMBING FEE | ¤217.80 | 06/25/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤526.00 | 06/25/2021 |
| SITE PLAN 20 | ¤20.00 | 06/25/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 06/25/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 06/25/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 06/25/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 06/25/2021 |
| SEWER CREDIT | (¤1,147.00) | 06/25/2021 |
| SEWER INSPECTION | ¤25.00 | 06/25/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 06/25/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 06/25/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,064.43 |