Permit #2021060245
Permit Details
Status: COED
| Parcel Id: 07-11-31-7063-00220-0060 |
| CONDITIONED SPACE: 2023 sqft |
| GARAGE: 724 sqft |
| OPENED PORCH (WITH ROOF) : 150 sqft |
| OPENED PORCH (WITH ROOF) : 60 sqft |
| Total Square Footage: 2957 sqft |
| Block: 00220 |
| Subdivision: - |
| Job Phone: 386-445-3405 |
| Location Address: 21 ZINNIA TR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/11/2021 |
| NOC: RECORDED |
| Applicant name: JAY DARREN CURBOW |
| Owner: BLUE WATER HOMES INC |
|
Address UNIT #1 PALM COAST, FL 32137 |
|
Address 4881 PALMPKWY NW COAST PALM COAST, FL 32137 |
| Lot: 0060 |
| Contracted Stated Job Value: ¤257,269.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
BLUE WATER HOMES INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4881 PALM COAST PARKWAY NW UNIT 1 PALM COAST, FL 32137 |
CBC1258679 (Exp: 08/31/2026) | 386-445-3405 |
Sub Contractors
JACK DOUGLAS LANIER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
485 COMMERCE WAY LONGWOOD , FL 32750 |
CCC058022 (Exp: 08/31/2026) | (321)441-2300 | (321)441-2313 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
BRETT CHRISTIAN GIBSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
250 SEGOVIA RD ST AUGUSTINE, FL 32086 |
CAC1818423 (Exp: 08/31/2026) | 904-229-8131 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 05/02/2022 | FINAL APPROVED | TSTAUFFACHER |
| U -UTILITY RESIDENTIAL FINAL | 05/02/2022 | FINAL APPROVED | JHARDING |
| ROW - STORMWATER FINAL | 04/28/2022 | APPROVED - AS NOTED | PFLANAGAN |
| Note: 4/28/22 LOOKS GOOD AT TIME OF INSPECTION NEED TO PICK UP ALL TRASH AND CONSTRUCTION TRASH IN VACANT LOT BEHIND HOUSE NEED TO HAVE SEED AND STRAW ON VACANT | |||
| ROW - STORMWATER FINAL | 04/27/2022 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: NEED TO PICK UP ALL TRASH AND CONSTRUCTION TRASH IN VACANT LOT BEHIND HOUSE NEED TO HAVE SEED AND STRAW ON VACANT | |||
| ROW - FINAL APRON (AFTER POUR) | 04/27/2022 | APPROVED | PFLANAGAN |
| U-CROSS CONNECTION | 04/26/2022 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation, no cross connections. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/25/2022 | APPROVED | PFLANAGAN |
| ROW - DRAINAGE | 04/25/2022 | APPROVED | PFLANAGAN |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Drainage across the swale needs to remain open at all times during construction. 8/16/21 - Swale drainage still not able to flow. Next inspection 8/26/21 8/26/21 - Swale drainage still not able to flow. Next inspection 9/2/21. 9/2/21 - Swale drainage still not able to flow. Next inspection 9/16/21 | |||
| FINAL SURVEY (OFFICE USE ONLY) | 04/25/2022 | APPROVED | PFLANAGAN |
| WALL SHEATHING | 04/20/2022 | APPROVED | TSTAUFFACHER |
| ELECTRIC - EARLY POWER | 04/01/2022 | APPROVED - AS NOTED | JWALKER |
| Note: The dish washer receptacle cannot be located behind the built in dishwasher. Relocate is the space adjacent to the space occupied by the dishwasher. NEC 422.16 EMAILED FPL RELEASED POWER 1:59 | |||
| TUB SET | 03/04/2022 | APPROVED | MGIBSON |
| ROW- PRE-APRON (PRE-POUR) | 03/04/2022 | APPROVED | RGROSS |
| U - SEWER TIE IN | 02/18/2022 | APPROVED | MGIBSON |
| PEP TANK INSTALLATION REQUEST | 02/02/2022 | APPROVED | CSTONE |
| Note: THIS IS A REINSPECTION ADDED ON 1/27/2022 8:39:06 AM THIS IS A REINSPECTION ADDED ON 1/19/2022 4:07:20 PM interior and exterior (sheet rock & stucco or siding) 1/27 exterior (stucco), trailer, sand pile, and pallets of mortar. | |||
| PEP TANK INSTALLATION REQUEST | 01/26/2022 | Disapproved -FEE REQUIRED | CSTONE |
| Note: THIS IS A REINSPECTION ADDED ON 1/19/2022 4:07:20 PM interior and exterior (sheet rock & stucco or siding) 1/27 exterior (stucco), trailer, sand pile, and pallets of mortar. | |||
| LATH/BRICK/ WATER BARRIER | 01/26/2022 | APPROVED - AS NOTED | TSTAUFFACHER |
| Note: Please provide dumpster on jobsite | |||
| INSULATION | 01/18/2022 | APPROVED | RMARTIN |
| PEP TANK INSTALLATION REQUEST | 01/18/2022 | Disapproved - NO FEE | CSTONE |
| Note: interior and exterior (sheet rock & stucco or siding) | |||
| ALL ROUGH | 01/13/2022 | APPROVED | TSTAUFFACHER |
| ROOF VALLEY & METAL | 12/08/2021 | APPROVED | TSTAUFFACHER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/07/2021 | APPROVED | RMARTIN |
| TIE BEAM / LINTEL | 10/22/2021 | APPROVED | TSTAUFFACHER |
| FOUND SURVEY APPROVED (OFFICE) | 09/20/2021 | APPROVED | TBAKER |
| ROW - DRAINAGE | 09/02/2021 | Disapproved -FEE REQUIRED | RGROSS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Drainage across the swale needs to remain open at all times during construction. 8/16/21 - Swale drainage still not able to flow. Next inspection 8/26/21 8/26/21 - Swale drainage still not able to flow. Next inspection 9/2/21. 9/2/21 - Swale drainage still not able to flow. Next inspection 9/16/21 | |||
| MONOLITHIC SLAB | 08/31/2021 | APPROVED | TSTAUFFACHER |
| ROW - DRAINAGE | 08/26/2021 | Disapproved -FEE REQUIRED | RGROSS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Drainage across the swale needs to remain open at all times during construction. 8/16/21 - Swale drainage still not able to flow. Next inspection 8/26/21 8/26/21 - Swale drainage still not able to flow. Next inspection 9/2/21. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 08/18/2021 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 08/18/2021 | APPROVED | JGIBSON |
| ROW - DRAINAGE | 08/16/2021 | Disapproved -FEE REQUIRED | RGROSS |
| Note: THIS IS A REINSPECTION Drainage across the swale needs to remain open at all times during construction. 8/16/21 - Swale drainage still not able to flow. Next inspection 8/26/21 | |||
| ROW - DRAINAGE | 08/09/2021 | Disapproved - NO FEE | RGROSS |
| Note: Drainage across the swale needs to remain open at all times during construction. Next inspection 8/16/21 | |||
| WATER METER INSTALLATION REQUEST | 07/20/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 04/18/2022 | 04/18/2022 |
| Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM CAN NOT SCHEDULE FINAL SURVEY INSPECTION. OUTSTANDING INSPECTIONS ABOVE. | |||
| ENGIN1 | COMPLETE | 09/20/2021 | 09/20/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/20/2021 | 09/20/2021 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/10/2021 | 06/10/2021 |
| Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/03/2021 | 06/11/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/03/2021 | 06/10/2021 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 06/03/2021 | 06/07/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 06/03/2021 | 06/04/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/03/2021 | 06/03/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 06/03/2021 | 06/10/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 06/03/2021 | 06/04/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 06/03/2021 | 08/13/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 05/05/2022 |
| CONTRACTOR CHANGE | ¤40.00 | 05/05/2022 |
| SW ENG - INSPECTION 20 | ¤20.00 | 05/05/2022 |
| SW ENG - INSPECTION 20 | ¤20.00 | 05/05/2022 |
| SW ENG - INSPECTION 20 | ¤20.00 | 05/05/2022 |
| SW ENG - INSPECTION 20 | ¤20.00 | 05/05/2022 |
| SW ENG - INSPECTION 20 | ¤20.00 | 05/05/2022 |
| SW ENG REINSPECTION 20 | ¤20.00 | 05/05/2022 |
| UTILITY PEP REINSPECTION | ¤40.00 | 05/05/2022 |
| SEWER CREDIT | (¤1,710.38) | 06/11/2021 |
| SEWER INSPECTION | ¤25.00 | 06/11/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 06/11/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 06/11/2021 |
| METER - DEPOSIT | ¤60.00 | 06/11/2021 |
| WATER- TURN ON | ¤25.00 | 06/11/2021 |
| ADMIN FEE | ¤20.00 | 06/11/2021 |
| CONNECTION FEES | ¤1,017.83 | 06/11/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 06/11/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 06/11/2021 |
| BUILDING DISCOUNT 100% | (¤1,304.60) | 06/11/2021 |
| ELECTRIC FEE | ¤217.80 | 06/11/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 06/11/2021 |
| IMPACT FEE FIRE | ¤367.00 | 06/11/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 06/11/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 06/11/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 06/11/2021 |
| MECHANICAL FEE | ¤217.80 | 06/11/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 06/11/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 06/11/2021 |
| PLAN CHECK FEE | ¤105.20 | 06/11/2021 |
| PLUMBING FEE | ¤217.80 | 06/11/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤526.00 | 06/11/2021 |
| SITE PLAN 20 | ¤20.00 | 06/11/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 06/11/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 06/11/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤14,661.05 |