I want to search for...
Permit #2021060318
Permit Details
Status: COED
| Parcel Id: 07-11-31-7058-00550-0150 |
| CONDITIONED SPACE: 1006 sqft |
| CONDITIONED SPACE: 1213 sqft |
| GARAGE: 367 sqft |
| OPENED PORCH (WITH ROOF) : 46 sqft |
| OPENED PORCH (WITH ROOF) : 260 sqft |
| Total Square Footage: 2892 sqft |
| Block: 00550 |
| Subdivision: 2215 - SECTION 58-SEMINOLE PARK |
| Job Phone: 904-268-7730 |
| Location Address: 3 SEPTEMBER PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/23/2021 |
| NOC: RECORDED |
| Applicant name: DALE ALAN DUBBERLY |
| Owner: MARONDA HOMES LLC OF FLORIDA |
|
Address SUITE 202 JACKSONVILLE, FL 32257 |
|
Address 5220 SHAD ROAD JACKSONVILLE, FL 32257 |
| Lot: 0150 |
| Contracted Stated Job Value: ¤165,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
MARONDA HOMES INC
| Status | Location Address | State License Number | Phone |
| CANCEL |
5220 SHAD ROAD JACKSONVILLE , FL 32257 |
CGC1504922 (Exp: 08/31/2022) | 904-268-7730 |
Sub Contractors
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
MICHAEL LEE RAFFENSBERGER
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
7725 SANDSCOVE CT WINTER PARK, FL 32792 |
CAC1819723 (Exp: 08/31/2024) | 407-629-6920 | 407-629-9307 |
ANDREW SCOTT DIGAETANO JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
44 FORT CAROLINE PALM COAST, FL 32137 |
CCC1331606 (Exp: 08/31/2026) | 386-302-9063 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 03/29/2022 | FINAL APPROVED | TSTAUFFACHER |
| ROW - FINAL APRON (AFTER POUR) | 03/29/2022 | APPROVED | PFLANAGAN |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/29/2022 | APPROVED | PFLANAGAN |
| ROW - STORMWATER FINAL | 03/29/2022 | APPROVED - AS NOTED | PFLANAGAN |
| Note: Cm on site talked to him seed and straw needed on vacant lots said he was going to take care of it | |||
| U -UTILITY RESIDENTIAL FINAL | 03/29/2022 | FINAL APPROVED | JHARDING |
| FINAL SURVEY (OFFICE USE ONLY) | 03/28/2022 | APPROVED | PFLANAGAN |
| Note: THIS IS A REINSPECTION Driveway culvert is pitched the wrong way from swale diagram water is Supposed to flow from left to right of lot | |||
| FINAL SURVEY (OFFICE USE ONLY) | 03/25/2022 | Disapproved - NO FEE | PFLANAGAN |
| Note: Driveway culvert is pitched the wrong way from swale diagram water is Supposed to flow from left to right of lot | |||
| U - SEWER TIE IN | 03/24/2022 | APPROVED - AS NOTED | RMARTIN |
| Note: GOOGLE DUO | |||
| ELECTRIC - EARLY POWER | 03/14/2022 | APPROVED - AS NOTED | TSTAUFFACHER |
| Note: 03/14/2022: emailed FPL released power at 12:45 PM | |||
| ROW- PRE-APRON (PRE-POUR) | 03/07/2022 | APPROVED - AS NOTED | PFLANAGAN |
| Note: It is the contractors responsibility to check pipe elevation before pouring concrete | |||
| ROW- PROJECT STATUS | 03/03/2022 | APPROVED | CTROHA |
| LATH/BRICK/ WATER BARRIER | 02/14/2022 | APPROVED | TSTAUFFACHER |
| INSULATION | 02/03/2022 | APPROVED | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION NOT READY, NEED TO WALK JOB BEFORE SCHEDULING ANY INSPECTION TO VERIFY WORK IS DONE | |||
| INSULATION | 02/02/2022 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: NOT READY, NEED TO WALK JOB BEFORE SCHEDULING ANY INSPECTION TO VERIFY WORK IS DONE | |||
| ALL ROUGH | 02/01/2022 | APPROVED | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION Windows not installed or covered Roof not installed All trades are approved | |||
| ELECTRIC-TUG | 01/25/2022 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 8:37 am | |||
| ALL ROUGH | 01/20/2022 | PARTIALLY APPROVED | TSTAUFFACHER |
| Note: Windows not installed or covered Roof not installed All trades are approved | |||
| ROOF VALLEY & METAL | 01/19/2022 | APPROVED | TSTAUFFACHER |
| WALL SHEATHING | 12/14/2021 | APPROVED | RMARTIN |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/14/2021 | APPROVED | RMARTIN |
| U-CROSS CONNECTION | 10/14/2021 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation, no cross connections. | |||
| TIE BEAM / LINTEL | 10/13/2021 | APPROVED | TSTAUFFACHER |
| FOUND SURVEY APPROVED (OFFICE) | 09/27/2021 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 09/03/2021 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: No compaction certificate posted | |||
| MONOLITHIC SLAB | 09/03/2021 | APPROVED | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION No compaction certificate posted Certificate provided-- | |||
| MONOLITHIC SLAB | 09/02/2021 | CANCELLED BY APPLICANT | WEB |
| PLUMBING 1ST ROUGH UNDERGROUND | 08/26/2021 | APPROVED - AS NOTED | JGIBSON |
| Note: NEED TO CHANGE PLUMBING CONTRACTOR | |||
| GRAVITY SEWER TEST | 08/26/2021 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 07/06/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 09/27/2021 | 09/27/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/27/2021 | 09/27/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/22/2021 | 06/22/2021 |
| Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/16/2021 | 06/16/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 06/10/2021 | 06/10/2021 |
| Note: Held By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM See uploaded Stormwater checklist in attachments for correction. Make corrections on all unchecked items Unless specifically stated the subject lot must drain from back to front or a portion may be drained to an adjacent City drainage feature. (B) | |||
| ZON | HOLD | 06/04/2021 | 06/14/2021 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Plans are for a two story. Site plan/survey states one story | |||
| BLD | COMPLETE | 06/04/2021 | 06/07/2021 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 06/04/2021 | 06/08/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 06/04/2021 | 06/04/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/04/2021 | 06/04/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 06/04/2021 | 06/10/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 06/04/2021 | 06/07/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 06/04/2021 | 08/17/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 03/21/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/21/2022 |
| CONNECTION FEES | ¤1,017.83 | 06/23/2021 |
| METER - DEPOSIT | ¤60.00 | 06/23/2021 |
| WATER- TURN ON | ¤25.00 | 06/23/2021 |
| ADMIN FEE | ¤20.00 | 06/23/2021 |
| BUILDING DISCOUNT 100% | (¤1,350.80) | 06/23/2021 |
| ELECTRIC FEE | ¤224.40 | 06/23/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 06/23/2021 |
| IMPACT FEE FIRE | ¤367.00 | 06/23/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 06/23/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 06/23/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 06/23/2021 |
| MECHANICAL FEE | ¤224.40 | 06/23/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 06/23/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 06/23/2021 |
| PLAN CHECK FEE | ¤109.60 | 06/23/2021 |
| PLUMBING FEE | ¤224.40 | 06/23/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤548.00 | 06/23/2021 |
| SITE PLAN 20 | ¤20.00 | 06/23/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 06/23/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 06/23/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 06/23/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 06/23/2021 |
| SEWER CREDIT | (¤1,700.00) | 06/23/2021 |
| SEWER INSPECTION | ¤25.00 | 06/23/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 06/23/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 06/23/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤14,511.43 |