Permit #2021060345

Permit Details

Status: COED

Parcel Id: 07-11-31-7011-00120-0070
CONDITIONED SPACE: 2052 sqft
GARAGE: 407 sqft
OPENED PORCH (WITH ROOF) : 16 sqft
Total Square Footage: 2475 sqft
Block: 00120
Subdivision: 2193 - SECTION 11-BELLE TERRE
Job Phone: 904-268-7730
Location Address: 24 BEACON MILL LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 06/16/2021
NOC: RECORDED
Applicant name: DALE ALAN DUBBERLY
Owner: MARONDA HOMES LLC OF FLORIDA

Address

SUITE 202

JACKSONVILLE, FL 32257

Address

5220 SHAD ROAD

JACKSONVILLE, FL 32257

Lot: 0070
Contracted Stated Job Value: ¤150,000.00
Job Description: SINGLE FAMILY DWELLING
Type: CN

Contractor

MARONDA HOMES INC
Status Location Address State License Number Phone
CANCEL

5220 SHAD ROAD

JACKSONVILLE , FL 32257

CGC1504922 (Exp: 08/31/2022) 904-268-7730

Sub Contractors

RONALD KEVIN HAUPT
Status Location Address State License Number Phone
ACTIVE

4005 MARONDA WAY

SANFORD, FL 32771

CAC058534 (Exp: 08/31/2026) 407-321-0064
ANDREW SCOTT DIGAETANO JR
Status Location Address State License Number Phone
ACTIVE

44 FORT CAROLINE

PALM COAST, FL 32137

CCC1331606 (Exp: 08/31/2026) 386-302-9063
JEFFREY TROY SABAKA
Status Location Address State License Number Phone Fax
ACTIVE

2191 DEERWOOD ACRES DR

ST AUGUSTINE, FL 32084

CFC1427439 (Exp: 08/31/2026) 904-838-2218 904-819-0965
JAMES M GREENSLADE
Status Location Address State License Number Phone Fax
ACTIVE

311 S BAY ST

BUNNELL, FL 32110

EC13006083 (Exp: 08/31/2026) 386-263-2960 386-263-2980

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 07/15/2022 FINAL APPROVED MKRASKI
ROW - FINAL APRON (AFTER POUR) 07/15/2022 APPROVED RGROSS
Note: HOT PATCH NEED IT
U -UTILITY RESIDENTIAL FINAL 07/15/2022 FINAL APPROVED DHANEY
ROW FIELD SURVEY /GRADING CERTIFICATION 07/14/2022 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD
ROW - STORMWATER FINAL 07/14/2022 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD
FINAL SURVEY (OFFICE USE ONLY) 07/14/2022 APPROVED GBERTOLA
ROW- PRE-APRON (PRE-POUR) 06/17/2022 APPROVED - AS NOTED EMADISON
Note: ** EVERYTHING LOOKS GOOD AT THE TIME OF THE INSPECTION, READY TO POUR ** CHECK THAT MATERIAL IS COMPACTED IN THE ENTIRE AREA TO BE POURED. MATERIAL SHOULD BE COMPACTED AROUND PIPE ABOUT 1/2 WAY UP BOTH SIDES OF THE PIPE. ** ELEVATIONS OF PIPE WERE GOOD AT TIME OF INSPECTION, NEED TO BE RECHECK AFTER MATERAIL IS ADDED AND COMPACTED
ROW- PRE-APRON (PRE-POUR) 06/16/2022 Disapproved -FEE REQUIRED EMADISON
Note: ** CHECK THAT MATERIAL IS COMPACTED IN THE ENTIRE AREA TO BE POURED. MATERIAL SHOULD BE COMPACTED AROUND PIPE ABOUT 1/2 WAY UP BOTH SIDES OF THE PIPE. ** ELEVATIONS OF PIPE WERE GOOD AT TIME OF INSPECTION, NEED TO BE RECHECK AFTER MATERAIL IS ADDED AND COMPACTED
ELECTRIC - EARLY POWER 06/16/2022 APPROVED - AS NOTED JMUNSON
Note: THIS IS A REINSPECTION wires at air handler need to be safed off in a box 6/16/22 Emailed FPL at 9:30 am
ELECTRIC - EARLY POWER 06/15/2022 Disapproved -FEE REQUIRED LMILLER
Note: wires at air handler need to be safed off in a box
U - SEWER TIE IN 06/03/2022 APPROVED MGIBSON
INSULATION 05/10/2022 APPROVED JWALKER
LATH/BRICK/ WATER BARRIER 05/09/2022 APPROVED FWILLIS
ALL ROUGH 05/03/2022 APPROVED RMARTIN
U-CROSS CONNECTION 05/03/2022 APPROVED - AS NOTED DHANEY
Note: Yard/IRR. not installed yet, no cross cn.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/02/2022 APPROVED RMARTIN
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION No approved plans on site, approved docs must be on site 107.3.1 4/26/22 - TRUSS H17 DAMAGED AT THE GUSSETTR PLATE. CURRENT REPAIR IS NOT AN APPROVED FIELD REPAIR.
ROOF VALLEY & METAL 05/02/2022 APPROVED RMARTIN
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/26/2022 Disapproved - NO FEE FWILLIS
Note: THIS IS A REINSPECTION No approved plans on site, approved docs must be on site 107.3.1 4/26/22 - TRUSS H17 DAMAGED AT THE GUSSETT PLATE. CURRENT REPAIR IS NOT AN APPROVED FIELD REPAIR.
WALL SHEATHING 04/22/2022 APPROVED MKRASKI
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/22/2022 Disapproved -FEE REQUIRED MKRASKI
Note: No approved plans on site, approved docs must be on site 107.3.1
ELECTRIC-TUG 04/22/2022 APPROVED - AS NOTED JMUNSON
Note: Emailed FPL at 10:00 am
TIE BEAM / LINTEL 04/05/2022 APPROVED KSANDOE
FOUND SURVEY APPROVED (OFFICE) 04/05/2022 APPROVED TBAKER
MONOLITHIC SLAB 12/20/2021 APPROVED FWILLIS
PLUMBING 1ST ROUGH UNDERGROUND 12/15/2021 APPROVED KSANDOE
GRAVITY SEWER TEST 12/15/2021 APPROVED KSANDOE
WATER METER INSTALLATION REQUEST 10/28/2021 APPROVED CSTONE

Review History

Department Status Date In Date Out
BADMIN INFORMATION 07/12/2022 07/12/2022
Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM RENAME TO FINAL SURVEY.PDF
ZON COMPLETE 04/05/2022 04/05/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 04/05/2022 04/05/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ENGIN1 HOLD 01/19/2022 01/20/2022
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Wrong foundation survey submitted.
ZON HOLD 01/19/2022 01/19/2022
Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Foundation survey is for a different address. Please submit the correct one
BLD COMPLETE 11/17/2021 11/17/2021
Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM
SW1 COMPLETE 06/11/2021 06/11/2021
Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM
ZON COMPLETE 06/04/2021 06/15/2021
Note: Released By: ESTELLE LENS - (386)986-3751 -
BLD COMPLETE 06/04/2021 06/07/2021
Note: Released By: JPI
CUSVC COMPLETE 06/04/2021 06/07/2021
Note: Released By: HALEIGH HAND - -
ELEC COMPLETE 06/04/2021 06/07/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 06/04/2021 06/04/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 06/04/2021 06/10/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 06/04/2021 06/07/2021
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SWALE COMPLETE 06/04/2021 08/18/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 07/15/2022
CONTRACTOR CHANGE ¤40.00 07/15/2022
REINSPECTION RESIDENTIAL ¤40.00 07/15/2022
REINSPECTION RESIDENTIAL ¤40.00 07/15/2022
SW ENG REINSPECTION 30 ¤30.00 07/15/2022
STORM WATER PERMIT FEES ¤80.00 06/16/2021
3% TRANS IMPACT FEE CREDIT (¤51.54) 06/16/2021
SEWER CREDIT (¤1,466.00) 06/16/2021
SEWER INSPECTION ¤25.00 06/16/2021
SEWER CAPITAL FACILITY ¤4,664.55 06/16/2021
WATER CAPITAL FACILITY FEE ¤3,424.45 06/16/2021
CONNECTION FEES ¤1,017.83 06/16/2021
METER - DEPOSIT ¤60.00 06/16/2021
WATER- TURN ON ¤25.00 06/16/2021
ADMIN FEE ¤20.00 06/16/2021
BUILDING DISCOUNT 100% (¤1,229.00) 06/16/2021
ELECTRIC FEE ¤207.00 06/16/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 06/16/2021
IMPACT FEE FIRE ¤367.00 06/16/2021
IMPACT FEE PARKS ¤1,199.12 06/16/2021
IMPACT FEE SCHOOL ¤3,600.00 06/16/2021
IMPACT FEE TRANSPORTATION ¤1,718.00 06/16/2021
MECHANICAL FEE ¤207.00 06/16/2021
WATER -IRRIGATION INSPECTION ¤25.00 06/16/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 06/16/2021
PLAN CHECK FEE ¤98.00 06/16/2021
PLUMBING FEE ¤207.00 06/16/2021
NEW RESIDENTIAL INSPECTIONS ¤490.00 06/16/2021
SITE PLAN 20 ¤20.00 06/16/2021
SURCHARGE FS 533.721 ¤2.00 06/16/2021
SURCHARGE - FS 468.631 ¤2.00 06/16/2021
Fees Total Due: ¤0.00 Total Paid: ¤14,855.43