I want to search for...

Permit #2021060618

Permit Details

Status: COED

Parcel Id: 07-11-31-7030-00570-0080
CONDITIONED SPACE: 1527 sqft
GARAGE: 410 sqft
OPENED PORCH (WITH ROOF) : 120 sqft
OPENED PORCH (WITH ROOF) : 54 sqft
Total Square Footage: 2111 sqft
Block: 00570
Subdivision: 2154 - SECTION 30-ROYAL PALMS
Job Phone: (386)437-1508
Location Address: 63 RANDOLPH DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 08/02/2021
NOC: RECORDED
Applicant name: TAMMI SUE MARQUIS
Owner: JM PROPERTIES X LLC

Address

PO BOX 9

CISSNA PARK, IL 60924

Lot: 0080
Contracted Stated Job Value: ¤180,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

GULFSTREAM HOMES & CONSTRUCTION, LLC
Status Location Address State License Number Phone Fax
INACTIVE

PO BOX 1092

BUNNELL, FL 32110

CRC1326418 (Exp: 08/31/2026) (386)437-1508 386-437-9769

Sub Contractors

JAMES CRAIG FISHER
Status Location Address State License Number Phone
ACTIVE

PO BOX 451

BUNNELL, FL 32110

CAC1819807 (Exp: 08/31/2026) 386-222-9549
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
ARTHUR J PASCOE
Status Location Address State License Number Phone
ACTIVE

PO BOX 730007

ORMOND BEACH, FL 32174

EC13007168 (Exp: 08/31/2026) 386-547-6439
DANIEL DAVID RUTKOWSKI III
Status Location Address State License Number Phone Fax
ACTIVE

1687 STATE AVENUE

HOLLY HILL, FL 32117

CCC1328639 (Exp: 08/31/2026) 386-290-7490 386-256-0001
MICHAEL MATTHEW SANKOSWSKI
Status Location Address State License Number Phone
ACTIVE

3 SEAMANSHIP TRAIL

PALM COAST, FL 32164

CAC1818816 (Exp: 08/31/2026) 386-316-4401

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 09/01/2022 Disapproved - NO FEE JWALKER
Note: Outdoor outlets need to be GFIC protected. Smoke detector in the hall between the 2 bedroom is to have 4" clearance from the wall. Manufacture specs.
BLD - BUILDING FINAL 09/01/2022 FINAL APPROVED JWALKER
Note: THIS IS A REINSPECTION Outdoor outlets need to be GFIC protected. Smoke detector in the hall between the 2 bedroom is to have 4" clearance from the wall. Manufacture specs.
U -UTILITY RESIDENTIAL FINAL 09/01/2022 FINAL APPROVED JHARDING
ROW- FINAL SURVEY/GRADING CERTIFICATION 08/31/2022 APPROVED GBERTOLA
Note:
ROW FIELD SURVEY /GRADING CERTIFICATION 08/31/2022 APPROVED GBERTOLA
ROW - STORMWATER FINAL 08/31/2022 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD
U-CROSS CONNECTION 08/31/2022 APPROVED - AS NOTED JHARDING
Note: No irrigation, no cross connections.
ROW- PROJECT STATUS 08/31/2022 APPROVED GBERTOLA
Note: MEETING WITH THE BUILDER i did it same elevation with the laser and vthe water is flowing
ROW - FINAL APRON (AFTER POUR) 08/31/2022 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD
ROW- PROJECT STATUS 08/30/2022 CANCELLED BY INSPECTOR GBERTOLA
Note: MEETING WITH THE BUILDER
U-CROSS CONNECTION 08/30/2022 CANCELLED BY APPLICANT WEB
ROW- FINAL SURVEY/GRADING CERTIFICATION 08/30/2022 Disapproved -FEE REQUIRED GBERTOLA
Note: 08/30/22=NEED TO READ THE INSPECTOR NOTE PROPERTY FRONT LINE AND THE SIDE LINE ARE BELOW THE CROWN OF THE ROAD. 08/29/22=The front property line/right away elevation are to be equal to or greater than the centerline of the road elevation. (I) I.Land Development Code Technical Manual, Section 300, Drawing 300.D, CHECK FINAL SURVEY FOR REMARKS.
ROW- FINAL SURVEY/GRADING CERTIFICATION 08/29/2022 Disapproved - NO FEE GBERTOLA
Note: 08/29/22=The front property line/right away elevation are to be equal to or greater than the centerline of the road elevation. (I) I.Land Development Code Technical Manual, Section 300, Drawing 300.D, CHECK FINAL SURVEY FOR REMARKS.
ELECTRIC - EARLY POWER 08/03/2022 APPROVED - AS NOTED JWALKER
Note: Emailed FPL 11:41 am
ROW- PRE-APRON (PRE-POUR) 07/19/2022 APPROVED RGROSS
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION WATER INSIDE THE CULVERT FROM LAST NIGHTS RAIN.APRON SOFT WATER IS RUNNING UNDER THE CULVER PIPE 7/18/22 - No swale plan doncument uploaded to permit documents. 7/19/22 - Pump out any water in the ends before pouring. Heavy rain in the forecast. Recommending checking elevations before pouring.
ROW- PRE-APRON (PRE-POUR) 07/18/2022 Disapproved - NO FEE RGROSS
Note: THIS IS A REINSPECTION WATER INSIDE THE CULVERT FROM LAST NIGHTS RAIN.APRON SOFT WATER IS RUNNING UNDER THE CULVER PIPE 7/18/22 - No swale plan doncument uploaded to permit documents.
ROW- PRE-APRON (PRE-POUR) 07/15/2022 Disapproved - NO FEE GBERTOLA
Note: WATER INSIDE THE CULVERT FROM LAST NIGHTS RAIN.APRON SOFT WATER IS RUNNING UNDER THE CULVER PIPE
ELECTRIC - EARLY POWER 07/13/2022 Disapproved -FEE REQUIRED JMUNSON
Note: Coach lights, A/C, and AHU need to be safed off in a box
GRAVITY SEWER TEST 07/06/2022 APPROVED MGIBSON
U - SEWER TIE IN 07/06/2022 APPROVED MGIBSON
PEP TANK INSTALLATION REQUEST 06/10/2022 APPROVED CSTONE
Note: THIS IS A REINSPECTION ADDED ON 4/19/2022 11:59:54 AM Interior (sheet rock) please email rhand@palmcoastgov.com with questions
INSULATION 05/03/2022 APPROVED JWALKER
PEP TANK INSTALLATION REQUEST 04/19/2022 Disapproved - NO FEE CSTONE
Note: Interior (sheet rock) please email rhand@palmcoastgov.com with questions
ALL ROUGH 04/11/2022 APPROVED - AS NOTED JWALKER
Note: Dryer needs to be sealed at fitting completely. Raise Large flex duct up off ceiling joist to allow for proper blowin insulation depth.
LATH/BRICK/ WATER BARRIER 04/07/2022 APPROVED JWALKER
ROOF VALLEY & METAL 04/04/2022 APPROVED JWALKER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/24/2022 APPROVED JWALKER
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Roof sheating passes, Down cells pass. Unable to complete the inspection. The prints and engineering packet do not match up with the installed trusses and layout. 2/24/22 Above listed correction has not been made. Suggest a meeting with contractor on site. 2/28/22 The incorrect engineering packet that was in the job box has been removed. And not replaced. Please have the full set of approved drawings and engineering packet on site for the inspection. 3/22/22 3/22/22 Meet on site with contractor, Contractor will take care of the mismatched engineering and the truss layout plan. Down cells pass. Roof sheating was inspected and passes. Contractor may finish roof valley metal for inspection so as to keep the job moving
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/22/2022 Disapproved - NO FEE JWALKER
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Roof sheating passes, Down cells pass. Unable to complete the inspection. The prints and engineering packet do not match up with the installed trusses and layout. 2/24/22 Above listed correction has not been made. Suggest a meeting with contractor on site. 2/28/22 The incorrect engineering packet that was in the job box has been removed. And not replaced. Please have the full set of approved drawings and engineering packet on site for the inspection. 3/22/22 3/22/22 Meet on site with contractor, Contractor will take care of the mismatched engineering and the truss layout plan. Down cells pass. Roof sheating was inspected and passes. Contractor may finish roof valley metal for inspection so as to keep the job moving
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/28/2022 Disapproved -FEE REQUIRED JWALKER
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Roof sheating passes, Down cells pass. Unable to complete the inspection. The prints and engineering packet do not match up with the installed trusses and layout. 2/24/22 Above listed correction has not been made. Suggest a meeting with contractor on site. 2/28/22 The incorrect engineering packet that was in the job box has been removed. And not replaced. Please have the full set of approved drawings and engineering packet on site for the inspection.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/24/2022 Disapproved - NO FEE JWALKER
Note: THIS IS A REINSPECTION Roof sheating passes, Down cells pass. Unable to complete the inspection. The prints and engineering packet do not match up with the installed trusses and layout. 2/24/22 Above listed correction has not been made. Suggest a meeting with contractor on site.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/25/2022 Disapproved - NO FEE JWALKER
Note: Roof sheating passes, Down cells pass. Unable to complete the inspection. The prints and engineering packet do not match up with the installed trusses and layout.
WALL SHEATHING 12/17/2021 APPROVED JWALKER
FOUND SURVEY APPROVED (OFFICE) 12/13/2021 APPROVED TBAKER
WALL SHEATHING 12/09/2021 CANCELLED BY APPLICANT WEB
TIE BEAM / LINTEL 11/10/2021 APPROVED JWALKER
MONOLITHIC SLAB 10/18/2021 APPROVED JWALKER
PLUMBING 1ST ROUGH UNDERGROUND 10/12/2021 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 08/25/2021 APPROVED TCHURCHILL
PROJECT STATUS (OFFICE USE) 08/23/2021 APPROVED - AS NOTED GBERTOLA
Note: meeting with the super they need to submit a new site plan

Review History

Department Status Date In Date Out
MECH COMPLETE 04/14/2022 04/18/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 02/24/2022 02/24/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ZON HOLD 02/23/2022 02/23/2022
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Revised site plan is for a garage right. Everything submitted and approved is for a garage left.
ZON CANCEL 02/23/2022 02/23/2022
BLD COMPLETE 02/18/2022 02/22/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ZON COMPLETE 01/14/2022 01/14/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 12/15/2021 12/16/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 12/15/2021 12/16/2021
Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM
ENGIN1 HOLD 12/14/2021 12/14/2021
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Slab elevation on foundation survey (12-14-21) is 1.8' higher than approved site plan. Please revise and resubmit appropriate drawing.
ZON COMPLETE 12/14/2021 12/14/2021
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 12/13/2021 12/13/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 12/13/2021 12/13/2021
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ENGIN1 COMPLETE 08/23/2021 08/23/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 08/23/2021 08/27/2021
Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM
ZON COMPLETE 08/23/2021 08/23/2021
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SWALE COMPLETE 08/23/2021 07/18/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/26/2021 07/26/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 07/26/2021 08/02/2021
Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM
ZON COMPLETE 07/26/2021 07/26/2021
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ENGIN1 HOLD 07/09/2021 07/09/2021
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM New survey is the same as previous survey. Elevations off by 2'
ZON COMPLETE 07/09/2021 07/19/2021
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ZON COMPLETE 06/22/2021 06/23/2021
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 06/22/2021 06/24/2021
Note: Released By: JPI
ENGIN1 HOLD 06/22/2021 06/23/2021
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Survey elevations differ from ITT as-builts by 2' +/-
BLD COMPLETE 06/17/2021 06/17/2021
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Using performance method
SW1 COMPLETE 06/15/2021 06/15/2021
Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM
ENGIN1 HOLD 06/11/2021 06/11/2021
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Survey elevations differ from ITT as-builts by 2' +/-
ZON HOLD 06/09/2021 06/17/2021
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Plant descriptions cut off on landscape plan This house backs to a street so additional foundation plantings required along rear Banding required on windows and doors on the back facing the street
BLD HOLD 06/09/2021 06/16/2021
Note: Held By: JPI 1. Ceiling Insulation shall be R-38 per 2020- FBC Energy Conservation Code, 7th Edition, Tables R301.1 & R402.1.2 (Flagler County is designated as Climate Zone 2A).
CUSVC COMPLETE 06/09/2021 06/11/2021
Note: Released By: HALEIGH HAND - -
ELEC COMPLETE 06/09/2021 06/10/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 06/09/2021 06/09/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 06/09/2021 06/15/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 06/09/2021 06/10/2021
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SWALE COMPLETE 06/09/2021 08/23/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 08/31/2022
PLAN REVIEW - REVISION ¤32.50 08/31/2022
PLAN REVIEW - REVISION ¤32.50 08/31/2022
PLAN REVIEW - REVISION ¤32.50 08/31/2022
REINSPECTION RESIDENTIAL ¤40.00 08/31/2022
REINSPECTION RESIDENTIAL ¤40.00 08/31/2022
SW ENG - INSPECTION 20 ¤20.00 08/31/2022
STORM WATER PERMIT FEES ¤80.00 08/02/2021
3% TRANS IMPACT FEE CREDIT (¤51.54) 08/02/2021
SEWER CREDIT (¤1,342.00) 08/02/2021
SEWER INSPECTION ¤25.00 08/02/2021
SEWER CAPITAL FACILITY ¤4,664.55 08/02/2021
WATER CAPITAL FACILITY FEE ¤3,424.45 08/02/2021
CONNECTION FEES ¤1,017.83 08/02/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 08/02/2021
IMPACT FEE FIRE ¤367.00 08/02/2021
IMPACT FEE PARKS ¤1,199.12 08/02/2021
IMPACT FEE SCHOOL ¤3,600.00 08/02/2021
IMPACT FEE TRANSPORTATION ¤1,718.00 08/02/2021
WATER -IRRIGATION INSPECTION ¤25.00 08/02/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 08/02/2021
SITE PLAN 20 ¤20.00 08/02/2021
SURCHARGE FS 533.721 ¤2.00 08/02/2021
SURCHARGE - FS 468.631 ¤2.00 08/02/2021
METER - DEPOSIT ¤60.00 08/02/2021
WATER- TURN ON ¤25.00 08/02/2021
ADMINISTRATIVE RESIDENTIAL ¤20.00 08/02/2021
Fees Total Due: ¤0.00 Total Paid: ¤15,046.93