I want to search for...
Permit #2021060618
Permit Details
Status: COED
| Parcel Id: 07-11-31-7030-00570-0080 |
| CONDITIONED SPACE: 1527 sqft |
| GARAGE: 410 sqft |
| OPENED PORCH (WITH ROOF) : 120 sqft |
| OPENED PORCH (WITH ROOF) : 54 sqft |
| Total Square Footage: 2111 sqft |
| Block: 00570 |
| Subdivision: 2154 - SECTION 30-ROYAL PALMS |
| Job Phone: (386)437-1508 |
| Location Address: 63 RANDOLPH DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 08/02/2021 |
| NOC: RECORDED |
| Applicant name: TAMMI SUE MARQUIS |
| Owner: JM PROPERTIES X LLC |
|
Address PO BOX 9 CISSNA PARK, IL 60924 |
| Lot: 0080 |
| Contracted Stated Job Value: ¤180,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
GULFSTREAM HOMES & CONSTRUCTION, LLC
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
PO BOX 1092 BUNNELL, FL 32110 |
CRC1326418 (Exp: 08/31/2026) | (386)437-1508 | 386-437-9769 |
Sub Contractors
JAMES CRAIG FISHER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 451 BUNNELL, FL 32110 |
CAC1819807 (Exp: 08/31/2026) | 386-222-9549 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
ARTHUR J PASCOE
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 730007 ORMOND BEACH, FL 32174 |
EC13007168 (Exp: 08/31/2026) | 386-547-6439 |
DANIEL DAVID RUTKOWSKI III
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1687 STATE AVENUE HOLLY HILL, FL 32117 |
CCC1328639 (Exp: 08/31/2026) | 386-290-7490 | 386-256-0001 |
MICHAEL MATTHEW SANKOSWSKI
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3 SEAMANSHIP TRAIL PALM COAST, FL 32164 |
CAC1818816 (Exp: 08/31/2026) | 386-316-4401 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 09/01/2022 | Disapproved - NO FEE | JWALKER |
| Note: Outdoor outlets need to be GFIC protected. Smoke detector in the hall between the 2 bedroom is to have 4" clearance from the wall. Manufacture specs. | |||
| BLD - BUILDING FINAL | 09/01/2022 | FINAL APPROVED | JWALKER |
| Note: THIS IS A REINSPECTION Outdoor outlets need to be GFIC protected. Smoke detector in the hall between the 2 bedroom is to have 4" clearance from the wall. Manufacture specs. | |||
| U -UTILITY RESIDENTIAL FINAL | 09/01/2022 | FINAL APPROVED | JHARDING |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/31/2022 | APPROVED | GBERTOLA |
| Note: | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/31/2022 | APPROVED | GBERTOLA |
| ROW - STORMWATER FINAL | 08/31/2022 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| U-CROSS CONNECTION | 08/31/2022 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation, no cross connections. | |||
| ROW- PROJECT STATUS | 08/31/2022 | APPROVED | GBERTOLA |
| Note: MEETING WITH THE BUILDER i did it same elevation with the laser and vthe water is flowing | |||
| ROW - FINAL APRON (AFTER POUR) | 08/31/2022 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| ROW- PROJECT STATUS | 08/30/2022 | CANCELLED BY INSPECTOR | GBERTOLA |
| Note: MEETING WITH THE BUILDER | |||
| U-CROSS CONNECTION | 08/30/2022 | CANCELLED BY APPLICANT | WEB |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/30/2022 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: 08/30/22=NEED TO READ THE INSPECTOR NOTE PROPERTY FRONT LINE AND THE SIDE LINE ARE BELOW THE CROWN OF THE ROAD. 08/29/22=The front property line/right away elevation are to be equal to or greater than the centerline of the road elevation. (I) I.Land Development Code Technical Manual, Section 300, Drawing 300.D, CHECK FINAL SURVEY FOR REMARKS. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/29/2022 | Disapproved - NO FEE | GBERTOLA |
| Note: 08/29/22=The front property line/right away elevation are to be equal to or greater than the centerline of the road elevation. (I) I.Land Development Code Technical Manual, Section 300, Drawing 300.D, CHECK FINAL SURVEY FOR REMARKS. | |||
| ELECTRIC - EARLY POWER | 08/03/2022 | APPROVED - AS NOTED | JWALKER |
| Note: Emailed FPL 11:41 am | |||
| ROW- PRE-APRON (PRE-POUR) | 07/19/2022 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION WATER INSIDE THE CULVERT FROM LAST NIGHTS RAIN.APRON SOFT WATER IS RUNNING UNDER THE CULVER PIPE 7/18/22 - No swale plan doncument uploaded to permit documents. 7/19/22 - Pump out any water in the ends before pouring. Heavy rain in the forecast. Recommending checking elevations before pouring. | |||
| ROW- PRE-APRON (PRE-POUR) | 07/18/2022 | Disapproved - NO FEE | RGROSS |
| Note: THIS IS A REINSPECTION WATER INSIDE THE CULVERT FROM LAST NIGHTS RAIN.APRON SOFT WATER IS RUNNING UNDER THE CULVER PIPE 7/18/22 - No swale plan doncument uploaded to permit documents. | |||
| ROW- PRE-APRON (PRE-POUR) | 07/15/2022 | Disapproved - NO FEE | GBERTOLA |
| Note: WATER INSIDE THE CULVERT FROM LAST NIGHTS RAIN.APRON SOFT WATER IS RUNNING UNDER THE CULVER PIPE | |||
| ELECTRIC - EARLY POWER | 07/13/2022 | Disapproved -FEE REQUIRED | JMUNSON |
| Note: Coach lights, A/C, and AHU need to be safed off in a box | |||
| GRAVITY SEWER TEST | 07/06/2022 | APPROVED | MGIBSON |
| U - SEWER TIE IN | 07/06/2022 | APPROVED | MGIBSON |
| PEP TANK INSTALLATION REQUEST | 06/10/2022 | APPROVED | CSTONE |
| Note: THIS IS A REINSPECTION ADDED ON 4/19/2022 11:59:54 AM Interior (sheet rock) please email rhand@palmcoastgov.com with questions | |||
| INSULATION | 05/03/2022 | APPROVED | JWALKER |
| PEP TANK INSTALLATION REQUEST | 04/19/2022 | Disapproved - NO FEE | CSTONE |
| Note: Interior (sheet rock) please email rhand@palmcoastgov.com with questions | |||
| ALL ROUGH | 04/11/2022 | APPROVED - AS NOTED | JWALKER |
| Note: Dryer needs to be sealed at fitting completely. Raise Large flex duct up off ceiling joist to allow for proper blowin insulation depth. | |||
| LATH/BRICK/ WATER BARRIER | 04/07/2022 | APPROVED | JWALKER |
| ROOF VALLEY & METAL | 04/04/2022 | APPROVED | JWALKER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/24/2022 | APPROVED | JWALKER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Roof sheating passes, Down cells pass. Unable to complete the inspection. The prints and engineering packet do not match up with the installed trusses and layout. 2/24/22 Above listed correction has not been made. Suggest a meeting with contractor on site. 2/28/22 The incorrect engineering packet that was in the job box has been removed. And not replaced. Please have the full set of approved drawings and engineering packet on site for the inspection. 3/22/22 3/22/22 Meet on site with contractor, Contractor will take care of the mismatched engineering and the truss layout plan. Down cells pass. Roof sheating was inspected and passes. Contractor may finish roof valley metal for inspection so as to keep the job moving | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/22/2022 | Disapproved - NO FEE | JWALKER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Roof sheating passes, Down cells pass. Unable to complete the inspection. The prints and engineering packet do not match up with the installed trusses and layout. 2/24/22 Above listed correction has not been made. Suggest a meeting with contractor on site. 2/28/22 The incorrect engineering packet that was in the job box has been removed. And not replaced. Please have the full set of approved drawings and engineering packet on site for the inspection. 3/22/22 3/22/22 Meet on site with contractor, Contractor will take care of the mismatched engineering and the truss layout plan. Down cells pass. Roof sheating was inspected and passes. Contractor may finish roof valley metal for inspection so as to keep the job moving | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/28/2022 | Disapproved -FEE REQUIRED | JWALKER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Roof sheating passes, Down cells pass. Unable to complete the inspection. The prints and engineering packet do not match up with the installed trusses and layout. 2/24/22 Above listed correction has not been made. Suggest a meeting with contractor on site. 2/28/22 The incorrect engineering packet that was in the job box has been removed. And not replaced. Please have the full set of approved drawings and engineering packet on site for the inspection. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/24/2022 | Disapproved - NO FEE | JWALKER |
| Note: THIS IS A REINSPECTION Roof sheating passes, Down cells pass. Unable to complete the inspection. The prints and engineering packet do not match up with the installed trusses and layout. 2/24/22 Above listed correction has not been made. Suggest a meeting with contractor on site. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/25/2022 | Disapproved - NO FEE | JWALKER |
| Note: Roof sheating passes, Down cells pass. Unable to complete the inspection. The prints and engineering packet do not match up with the installed trusses and layout. | |||
| WALL SHEATHING | 12/17/2021 | APPROVED | JWALKER |
| FOUND SURVEY APPROVED (OFFICE) | 12/13/2021 | APPROVED | TBAKER |
| WALL SHEATHING | 12/09/2021 | CANCELLED BY APPLICANT | WEB |
| TIE BEAM / LINTEL | 11/10/2021 | APPROVED | JWALKER |
| MONOLITHIC SLAB | 10/18/2021 | APPROVED | JWALKER |
| PLUMBING 1ST ROUGH UNDERGROUND | 10/12/2021 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 08/25/2021 | APPROVED | TCHURCHILL |
| PROJECT STATUS (OFFICE USE) | 08/23/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: meeting with the super they need to submit a new site plan |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 04/14/2022 | 04/18/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/24/2022 | 02/24/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 02/23/2022 | 02/23/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Revised site plan is for a garage right. Everything submitted and approved is for a garage left. | |||
| ZON | CANCEL | 02/23/2022 | 02/23/2022 |
| BLD | COMPLETE | 02/18/2022 | 02/22/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/14/2022 | 01/14/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 12/15/2021 | 12/16/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/15/2021 | 12/16/2021 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 12/14/2021 | 12/14/2021 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Slab elevation on foundation survey (12-14-21) is 1.8' higher than approved site plan. Please revise and resubmit appropriate drawing. | |||
| ZON | COMPLETE | 12/14/2021 | 12/14/2021 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 12/13/2021 | 12/13/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/13/2021 | 12/13/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/23/2021 | 08/23/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 08/23/2021 | 08/27/2021 |
| Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/23/2021 | 08/23/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 08/23/2021 | 07/18/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/26/2021 | 07/26/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/26/2021 | 08/02/2021 |
| Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/26/2021 | 07/26/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 07/09/2021 | 07/09/2021 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM New survey is the same as previous survey. Elevations off by 2' | |||
| ZON | COMPLETE | 07/09/2021 | 07/19/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/22/2021 | 06/23/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/22/2021 | 06/24/2021 |
| Note: Released By: JPI | |||
| ENGIN1 | HOLD | 06/22/2021 | 06/23/2021 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Survey elevations differ from ITT as-builts by 2' +/- | |||
| BLD | COMPLETE | 06/17/2021 | 06/17/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Using performance method | |||
| SW1 | COMPLETE | 06/15/2021 | 06/15/2021 |
| Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 06/11/2021 | 06/11/2021 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Survey elevations differ from ITT as-builts by 2' +/- | |||
| ZON | HOLD | 06/09/2021 | 06/17/2021 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Plant descriptions cut off on landscape plan This house backs to a street so additional foundation plantings required along rear Banding required on windows and doors on the back facing the street | |||
| BLD | HOLD | 06/09/2021 | 06/16/2021 |
| Note: Held By: JPI 1. Ceiling Insulation shall be R-38 per 2020- FBC Energy Conservation Code, 7th Edition, Tables R301.1 & R402.1.2 (Flagler County is designated as Climate Zone 2A). | |||
| CUSVC | COMPLETE | 06/09/2021 | 06/11/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 06/09/2021 | 06/10/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/09/2021 | 06/09/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 06/09/2021 | 06/15/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 06/09/2021 | 06/10/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 06/09/2021 | 08/23/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 08/31/2022 |
| PLAN REVIEW - REVISION | ¤32.50 | 08/31/2022 |
| PLAN REVIEW - REVISION | ¤32.50 | 08/31/2022 |
| PLAN REVIEW - REVISION | ¤32.50 | 08/31/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 08/31/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 08/31/2022 |
| SW ENG - INSPECTION 20 | ¤20.00 | 08/31/2022 |
| STORM WATER PERMIT FEES | ¤80.00 | 08/02/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 08/02/2021 |
| SEWER CREDIT | (¤1,342.00) | 08/02/2021 |
| SEWER INSPECTION | ¤25.00 | 08/02/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 08/02/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 08/02/2021 |
| CONNECTION FEES | ¤1,017.83 | 08/02/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 08/02/2021 |
| IMPACT FEE FIRE | ¤367.00 | 08/02/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 08/02/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 08/02/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 08/02/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 08/02/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 08/02/2021 |
| SITE PLAN 20 | ¤20.00 | 08/02/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 08/02/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 08/02/2021 |
| METER - DEPOSIT | ¤60.00 | 08/02/2021 |
| WATER- TURN ON | ¤25.00 | 08/02/2021 |
| ADMINISTRATIVE RESIDENTIAL | ¤20.00 | 08/02/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,046.93 |