I want to search for...
Permit #2021060677
Permit Details
Status: COED
| Parcel Id: 07-11-31-7020-00040-0420 |
| CONDITIONED SPACE: 1997 sqft |
| GARAGE: 544 sqft |
| OPENED PORCH (WITH ROOF) : 296 sqft |
| OPENED PORCH (WITH ROOF) : 167 sqft |
| Total Square Footage: 3004 sqft |
| Block: 00040 |
| Subdivision: 2182 - SECTION 20-WYNNFIELD |
| Job Phone: 386-585-2654 |
| Location Address: 31 WEBWOOD PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 09/17/2021 |
| NOC: RECORDED |
| Applicant name: DESIDERIO CARLOS CARREIRO |
| Owner: TAYLOR RODNEY T |
|
Address PO BOX 353132 PALM COAST, FL 32135 |
| Lot: 0420 |
| Contracted Stated Job Value: ¤300,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
RED LINE CONSTRUCTION CO
| Status | Location Address | State License Number | Phone |
| ACTIVE |
6 COMMERCIAL CT PALM COAST, FL 32137 |
CGC1527392 (Exp: 08/31/2026) | 386-585-2654 |
Sub Contractors
FERNANDO M FARIA
| Status | Location Address | State License Number | Phone |
| ACTIVE |
23 FREELAND LANE PALM COAST, FL 32137 |
RF11067823 (Exp: 08/31/2027) | 386-569-4336 |
MISHA ROMANOVSKIY
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
77 PEBBLE BEACH DRIVE PALM COAST, FL 32164 |
ER13015548 (Exp: 08/31/2024) | 386-793-5553 | 386-961-4388 |
DANIEL GOULDNER
| Status | Location Address | State License Number |
| ACTIVE |
400 OLD HAW CREEK RD BUNNELL, FL 32110 |
CAC1818907 (Exp: 08/31/2026) |
Inspection History
| Type | Request Date | Result | Inspector |
| WATER METER INSTALLATION REQUEST | 05/18/2023 | APPROVED | CSTONE |
| BLD - BUILDING FINAL | 05/17/2023 | FINAL APPROVED | MKRASKI |
| Note: New inspection due to canceled inspection 5/12/2023 - PREVIOUS INSPECTION NOTES 5/12/23 1. Energy cals do not match equipment installed, Revision must be submitted and approved by building dept. before final can be approved 5/11/2023 - PREVIOUS INSPECTION NOTES 5/11/23 1. No energy cals on site 2. Anti tip bracket for range missing 3. Smoke detector dust covers must be removed 4. No water @ spare bathroom vanity sink 5/10/2023 - PREVIOUS INSPECTION NOTES 5/10/23 1. No paperwork cirs, or plans on site Stopped inspection 5/5/2023 - PREVIOUS INSPECTION NOTES 1. AHU leaking in garage 2. Garge ceiling needs to be sealed 100% (behind AHU) 3. A switch and light is required for garage door leading outside 4. Future sink in garage is required to have sch 40 cap (noT test cap) 5. All wall penitrations in garage are required to be sealed Stopped inspection only looked at garage | |||
| BLD - BUILDING FINAL | 05/16/2023 | CANCELLED BY APPLICANT | WEB |
| Note: 5/12/2023 - PREVIOUS INSPECTION NOTES 5/12/23 1. Energy cals do not match equipment installed, Revision must be submitted and approved by building dept. before final can be approved 5/11/2023 - PREVIOUS INSPECTION NOTES 5/11/23 1. No energy cals on site 2. Anti tip bracket for range missing 3. Smoke detector dust covers must be removed 4. No water @ spare bathroom vanity sink 5/10/2023 - PREVIOUS INSPECTION NOTES 5/10/23 1. No paperwork cirs, or plans on site Stopped inspection 5/5/2023 - PREVIOUS INSPECTION NOTES 1. AHU leaking in garage 2. Garge ceiling needs to be sealed 100% (behind AHU) 3. A switch and light is required for garage door leading outside 4. Future sink in garage is required to have sch 40 cap (noT test cap) 5. All wall penitrations in garage are required to be sealed Stopped inspection only looked at garage | |||
| BLD - BUILDING FINAL | 05/12/2023 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 5/12/23 1. Energy cals do not match equipment installed, Revision must be submitted and approved by building dept. before final can be approved 5/11/2023 - PREVIOUS INSPECTION NOTES 5/11/23 1. No energy cals on site 2. Anti tip bracket for range missing 3. Smoke detector dust covers must be removed 4. No water @ spare bathroom vanity sink 5/10/2023 - PREVIOUS INSPECTION NOTES 5/10/23 1. No paperwork cirs, or plans on site Stopped inspection 5/5/2023 - PREVIOUS INSPECTION NOTES 1. AHU leaking in garage 2. Garge ceiling needs to be sealed 100% (behind AHU) 3. A switch and light is required for garage door leading outside 4. Future sink in garage is required to have sch 40 cap (noT test cap) 5. All wall penitrations in garage are required to be sealed Stopped inspection only looked at garage | |||
| BLD - BUILDING FINAL | 05/11/2023 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 5/11/23 1. No energy cals on site 2. Anti tip bracket for range missing 3. Smoke detector dust covers must be removed 4. No water @ spare bathroom vanity sink 5/10/2023 - PREVIOUS INSPECTION NOTES 5/10/23 1. No paperwork cirs, or plans on site Stopped inspection 5/5/2023 - PREVIOUS INSPECTION NOTES 1. AHU leaking in garage 2. Garge ceiling needs to be sealed 100% (behind AHU) 3. A switch and light is required for garage door leading outside 4. Future sink in garage is required to have sch 40 cap (noT test cap) 5. All wall penitrations in garage are required to be sealed Stopped inspection only looked at garage | |||
| BLD - BUILDING FINAL | 05/10/2023 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 5/10/23 1. No paperwork cirs, or plans on site Stopped inspection 5/5/2023 - PREVIOUS INSPECTION NOTES 1. AHU leaking in garage 2. Garge ceiling needs to be sealed 100% (behind AHU) 3. A switch and light is required for garage door leading outside 4. Future sink in garage is required to have sch 40 cap (noT test cap) 5. All wall penitrations in garage are required to be sealed Stopped inspection only looked at garage | |||
| BLD - BUILDING FINAL | 05/09/2023 | CANCELLED BY APPLICANT | WEB |
| Note: 5/5/2023 - PREVIOUS INSPECTION NOTES 1. AHU leaking in garage 2. Garge ceiling needs to be sealed 100% (behind AHU) 3. A switch and light is required for garage door leading outside 4. Future sink in garage is required to have sch 40 cap (noT test cap) 5. All wall penitrations in garage are required to be sealed Stopped inspection only looked at garage | |||
| BLD - BUILDING FINAL | 05/05/2023 | Disapproved - NO FEE | MKRASKI |
| Note: 1. AHU leaking in garage 2. Garge ceiling needs to be sealed 100% (behind AHU) 3. A switch and light is required for garage door leading outside 4. Future sink in garage is required to have sch 40 cap (noT test cap) 5. All wall penitrations in garage are required to be sealed Stopped inspection only looked at garage | |||
| ROW - STORMWATER FINAL | 05/04/2023 | APPROVED | GBERTOLA |
| Note: 5/4/23=CORRECTION WERE MADE AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD _____________________________________________________________________________________________________________________ 5/3/2023 - PREVIOUS INSPECTION NOTES 5/3/23= ON THE LEFT SIDE PROPERTY LINE STILL MISSING SOD. ON THE LEFT SIDE CORNER FRONT YARD IS A LOW SPOT (AREA MARKED WITH WHITE PAINT) CLEAN THE CULVERT AND REMOVE THE CONCRETE INSIDE. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 5/1/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9465 05/01/23 NEED TO SOD AREA ALONG ADJOINING PROPERTY WHERE THERE IS BARE EARTH TO PREVENT EROSION AND RETURN DISTURBED AREA TO AS GOOD OR BETTER CONDITION. MAINTAIN AS BEST AS POSSIBLE A 2:1 SLOPE DUE TO ELEVATION DIFFERENCE. PLEASE SEE PHOTS FOR REFERENCE. ___________________________________________________________________________________________________________________________ 4/28/2023 - PREVIOUS INSPECTION NOTES 04/28/23 Need to build up and berm right side property line behind water meter to drain to the front, so drainage does not negatively affect propery owner on the right. Need to build a berm in the rear left at the property line where drainage starts to run to the rear to have drainage run down your property line as it shows on your site plan, not onto the adjoining property owner on the left. | |||
| U -UTILITY RESIDENTIAL FINAL | 05/04/2023 | FINAL APPROVED | LFITZGERALD |
| Note: 5/3/2023 - PREVIOUS INSPECTION NOTES remove soils to bottom of check valves/expose assembly -confirmation of work orderfor raising of water box 5/1/2023 - PREVIOUS INSPECTION NOTES clean out exceess soils in ater meter pit/ ALSO CONTACT CUSTOMERSERVICE@PALMCOASTGOV.COM TO HAVE WATER PIT RAISED FLUSH OR LITTLE HIGH-PLEASE CONTACT THEM EARLIER IN FUTUREWHEN YOU SEE PIT IS TOO LOW SO IT IS COMLETED BY FINAL INSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL | 05/03/2023 | Disapproved - NO FEE | LFITZGERALD |
| Note: remove soils to bottom of check valves/expose assembly -confirmation of work orderfor raising of water box 5/1/2023 - PREVIOUS INSPECTION NOTES clean out exceess soils in ater meter pit/ ALSO CONTACT CUSTOMERSERVICE@PALMCOASTGOV.COM TO HAVE WATER PIT RAISED FLUSH OR LITTLE HIGH-PLEASE CONTACT THEM EARLIER IN FUTUREWHEN YOU SEE PIT IS TOO LOW SO IT IS COMLETED BY FINAL INSPECTION | |||
| ROW - STORMWATER FINAL | 05/03/2023 | Disapproved - NO FEE | GBERTOLA |
| Note: 5/3/23= ON THE LEFT SIDE PROPERTY LINE STILL MISSING SOD. ON THE LEFT SIDE CORNER FRONT YARD IS A LOW SPOT (AREA MARKED WITH WHITE PAINT) CLEAN THE CULVERT AND REMOVE THE CONCRETE INSIDE. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 5/1/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9465 05/01/23 NEED TO SOD AREA ALONG ADJOINING PROPERTY WHERE THERE IS BARE EARTH TO PREVENT EROSION AND RETURN DISTURBED AREA TO AS GOOD OR BETTER CONDITION. MAINTAIN AS BEST AS POSSIBLE A 2:1 SLOPE DUE TO ELEVATION DIFFERENCE. PLEASE SEE PHOTS FOR REFERENCE. ___________________________________________________________________________________________________________________________ 4/28/2023 - PREVIOUS INSPECTION NOTES 04/28/23 Need to build up and berm right side property line behind water meter to drain to the front, so drainage does not negatively affect propery owner on the right. Need to build a berm in the rear left at the property line where drainage starts to run to the rear to have drainage run down your property line as it shows on your site plan, not onto the adjoining property owner on the left. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 05/01/2023 | APPROVED - AS NOTED | FSLADISH |
| Note: 05/01/23 NEED TO SOD AREA ALONG ADJOINING PROPERTY WHERE THERE IS BARE EARTH. MAINTAIN AS BEST AS POSSIBLE A 2:1 SLOPE. PLEASE SEE PHOTS FOR REFERENCE. ___________________________________________________________________________________________________________________________ 4/28/2023 - PREVIOUS INSPECTION NOTES 04/28/23 Need to build up and berm right side property line behind water meter to drain to the front, so drainage does not negatively affect propery owner on the right. Need to build a berm in the rear left at the property line where drainage starts to run to the rear to have drainage run down your property line as it shows on your site plan, not onto the adjoining property owner on the left. | |||
| ROW - STORMWATER FINAL | 05/01/2023 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: Inspector Notes from Inspection 9465 05/01/23 NEED TO SOD AREA ALONG ADJOINING PROPERTY WHERE THERE IS BARE EARTH TO PREVENT EROSION AND RETURN DISTURBED AREA TO AS GOOD OR BETTER CONDITION. MAINTAIN AS BEST AS POSSIBLE A 2:1 SLOPE DUE TO ELEVATION DIFFERENCE. PLEASE SEE PHOTS FOR REFERENCE. ___________________________________________________________________________________________________________________________ 4/28/2023 - PREVIOUS INSPECTION NOTES 04/28/23 Need to build up and berm right side property line behind water meter to drain to the front, so drainage does not negatively affect propery owner on the right. Need to build a berm in the rear left at the property line where drainage starts to run to the rear to have drainage run down your property line as it shows on your site plan, not onto the adjoining property owner on the left. | |||
| ROW - FINAL APRON (AFTER POUR) | 05/01/2023 | APPROVED | FSLADISH |
| Note: Inspector Notes from Inspection 9465 05/01/23 NEED TO SOD AREA ALONG ADJOINING PROPERTY WHERE THERE IS BARE EARTH. MAINTAIN AS BEST AS POSSIBLE A 2:1 SLOPE. PLEASE SEE PHOTS FOR REFERENCE. ___________________________________________________________________________________________________________________________ 4/28/2023 - PREVIOUS INSPECTION NOTES 04/28/23 Need to build up and berm right side property line behind water meter to drain to the front, so drainage does not negatively affect propery owner on the right. Need to build a berm in the rear left at the property line where drainage starts to run to the rear to have drainage run down your property line as it shows on your site plan, not onto the adjoining property owner on the left. | |||
| U -UTILITY RESIDENTIAL FINAL | 05/01/2023 | Disapproved - NO FEE | LFITZGERALD |
| Note: clean out exceess soils in ater meter pit/ ALSO CONTACT CUSTOMERSERVICE@PALMCOASTGOV.COM TO HAVE WATER PIT RAISED FLUSH OR LITTLE HIGH-PLEASE CONTACT THEM EARLIER IN FUTUREWHEN YOU SEE PIT IS TOO LOW SO IT IS COMLETED BY FINAL INSPECTION | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 04/28/2023 | APPROVED | FSLADISH |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/28/2023 | Disapproved - NO FEE | FSLADISH |
| Note: 04/28/23 Need to build up and berm right side property line behind water meter to drain to the front, so drainage does not negatively affect propery owner on the right. Need to build a berm in the rear left at the property line where drainage starts to run to the rear to have drainage run down your property line as it shows on your site plan, not onto the adjoining property owner on the left. | |||
| U-CROSS CONNECTION | 04/17/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: well irrigation-no cross connection | |||
| ROW- PRE-APRON (PRE-POUR) | 03/22/2023 | APPROVED | GBERTOLA |
| Note: 03/22/23=READY FOR PAVERS +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 3/21/2023 - PREVIOUS INSPECTION NOTES 03/21/23= the base is on site need to spread it and compacted +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 3/16/2023 - PREVIOUS INSPECTION NOTES 3/16/23=AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL NEED TO CALL FOR A NEW INSPECTION WHEN YOU INSTALL THE SUB BASE OR PAVER BASE SAND, AND COMPACTION IS DONE BASE CAN NO LONGER BE ON SITE IN A PILE. BASE MUST BE SPREAD AND COMPACTED FOR THE SECOND PART OF A PRE-POUR FOR PAVER’S TO BE APPROVED. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 3/15/2023 - PREVIOUS INSPECTION NOTES 3/15/23= i need city survey check the BM YOU CAN NOT POUR THE DRIVEWAY +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 3/13/2023 - PREVIOUS INSPECTION NOTES. Not ready for inspection. Not formed. | |||
| ROW- PRE-APRON (PRE-POUR) | 03/21/2023 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: 03/21/23= the base is on site need to spread it and compacted +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 3/16/2023 - PREVIOUS INSPECTION NOTES 3/16/23=AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL NEED TO CALL FOR A NEW INSPECTION WHEN YOU INSTALL THE SUB BASE OR PAVER BASE SAND, AND COMPACTION IS DONE BASE CAN NO LONGER BE ON SITE IN A PILE. BASE MUST BE SPREAD AND COMPACTED FOR THE SECOND PART OF A PRE-POUR FOR PAVER’S TO BE APPROVED. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 3/15/2023 - PREVIOUS INSPECTION NOTES 3/15/23= i need city survey check the BM YOU CAN NOT POUR THE DRIVEWAY +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 3/13/2023 - PREVIOUS INSPECTION NOTES. Not ready for inspection. Not formed. | |||
| ROW- PRE-APRON (PRE-POUR) | 03/16/2023 | PARTIALLY APPROVED | GBERTOLA |
| Note: 3/16/23=AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL NEED TO CALL FOR A NEW INSPECTION WHEN YOU INSTALL THE SUB BASE OR PAVER BASE SAND, AND COMPACTION IS DONE BASE CAN NO LONGER BE ON SITE IN A PILE. BASE MUST BE SPREAD AND COMPACTED FOR THE SECOND PART OF A PRE-POUR FOR PAVER’S TO BE APPROVED. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 3/15/2023 - PREVIOUS INSPECTION NOTES 3/15/23= i need city survey check the BM YOU CAN NOT POUR THE DRIVEWAY +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 3/13/2023 - PREVIOUS INSPECTION NOTES. Not ready for inspection. Not formed. | |||
| ROW- PRE-APRON (PRE-POUR) | 03/15/2023 | Disapproved - NO FEE | GBERTOLA |
| Note: 3/15/23= i need city survey check the BM YOU CAN NOT POUR THE DRIVEWAY +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 3/13/2023 - PREVIOUS INSPECTION NOTES. Not ready for inspection. Not formed. | |||
| ROW- PRE-APRON (PRE-POUR) | 03/13/2023 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: Not ready for inspection. Not formed. | |||
| U - SEWER TIE IN | 02/13/2023 | APPROVED | MGIBSON |
| Note: 2/10/2023 - PREVIOUS INSPECTION NOTES | |||
| GRAVITY SEWER TEST | 02/13/2023 | APPROVED | MGIBSON |
| Note: 2/10/2023 - PREVIOUS INSPECTION NOTES | |||
| GRAVITY SEWER TEST | 02/10/2023 | CANCELLED BY APPLICANT | JSTEWART |
| U - SEWER TIE IN | 02/10/2023 | CANCELLED BY APPLICANT | JSTEWART |
| ELECTRIC - EARLY POWER | 11/03/2022 | APPROVED - AS NOTED | MKRASKI |
| Note: Emailed FPL @ 9:30 AM | |||
| ELECTRIC-TUG | 10/04/2022 | Disapproved - NO FEE | MKRASKI |
| Note: Ufer ground needs to be accessable | |||
| ELECTRIC-TUG | 10/04/2022 | APPROVED - AS NOTED | MKRASKI |
| Note: emailed FPL @ 4:05 PM | |||
| INSULATION | 09/06/2022 | APPROVED | MKRASKI |
| INSULATION | 08/26/2022 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Dryer vent stack needs to be sealed with fire foam at top plate | |||
| LATH/BRICK/ WATER BARRIER | 08/17/2022 | APPROVED | MKRASKI |
| ALL ROUGH | 08/05/2022 | APPROVED - AS NOTED | MKRASKI |
| Note: Plumber was finishing up nail plates on top plate and base plate. Check on insulation | |||
| ALL ROUGH | 08/04/2022 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: THIS IS A REINSPECTION 1. Electrical panel 220v circuits not phased 2. Dryer duct needs nail plates need to be 2'' above and below where it goes through top plate FBC M1502.5 3. Plumbing nail plates are incorrect nail plates the are required to protect 2'' above base plate and 2'' below top plate FBC P2603.1 | |||
| ALL ROUGH | 08/01/2022 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Front door and slider not installed 2. Dryer duct needs nail plates 3. Plumbing nail plates are incorrect nail plates 4. No feeder wires ran from meter main to main electrical panel | |||
| ROOF VALLEY & METAL | 05/25/2022 | APPROVED | MKRASKI |
| WALL SHEATHING | 05/13/2022 | APPROVED | MKRASKI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/13/2022 | APPROVED | MKRASKI |
| Note: | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/11/2022 | Disapproved -FEE REQUIRED | DCUSHING |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Need framing detail and truss layout detail, Full set of prints need to be onsite. 5/10/22 No truss layout print on site 5/11/22 - Truss T01 missing strap at front end of house | |||
| WALL SHEATHING | 05/11/2022 | Disapproved -FEE REQUIRED | DCUSHING |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Check nail spacing on wall sheathing max 12'' in the feild R703.4 5/10/22 No repairs have been made 5/11/22 - Still missing fasteners in wall sheathing above front door, not nailed to vertical framing members | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/10/2022 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: THIS IS A REINSPECTION Need framing detail and truss layout detail, Full set of prints need to be onsite. 5/10/22 No truss layout print on site | |||
| WALL SHEATHING | 05/10/2022 | Disapproved - NO FEE | MKRASKI |
| Note: THIS IS A REINSPECTION Check nail spacing on wall sheathing max 12'' in the feild R703.4 5/10/22 No repairs have been made | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/06/2022 | Disapproved - NO FEE | MKRASKI |
| Note: Need framing detail and truss layout detail, Full set of prints need to be onsite. | |||
| WALL SHEATHING | 05/06/2022 | Disapproved - NO FEE | MKRASKI |
| Note: Check nail spacing on wall sheathing max 12'' in the feild R703.4 | |||
| TIE BEAM / LINTEL | 04/13/2022 | APPROVED | MKRASKI |
| Note: THIS IS A REINSPECTION No plans on site, needs plans for inspection. | |||
| TIE BEAM / LINTEL | 04/12/2022 | Disapproved - NO FEE | MKRASKI |
| Note: No plans on site, needs plans for inspection. | |||
| FOUND SURVEY APPROVED (OFFICE) | 03/22/2022 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 02/25/2022 | APPROVED | MKRASKI |
| MONOLITHIC SLAB | 02/24/2022 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: THIS IS A REINSPECTION 1. No foundation details on site. 2. Plumbing going through footer needs to be sleeved. 1/24/22 PIPES PASSING THROUGH FOUNDATION WALLS P2603.4 SLEEVES… (SLEEVES MUST BE 2 PIPE SIZES GREATER THAN THE PIPE PASSING THROUGH THE WALL | |||
| MONOLITHIC SLAB | 02/24/2022 | CANCELLED BY APPLICANT | MKRASKI |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 1. No foundation details on site. 2. Plumbing going through footer needs to be sleeved. 1/24/22 PIPES PASSING THROUGH FOUNDATION WALLS P2603.4 SLEEVES… (SLEEVES MUST BE 2 PIPE SIZES GREATER THAN THE PIPE PASSING THROUGH THE WALL | |||
| MONOLITHIC SLAB | 02/23/2022 | Disapproved - NO FEE | MKRASKI |
| Note: 1. No foundation details on site. 2. Plumbing going through footer needs to be sleeved. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 02/15/2022 | APPROVED | MGIBSON |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 05/16/2023 | 05/16/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 05/15/2023 | 05/15/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Design location on Heatload needs to be Daytona Beach. 2. Update mechanical subcontractor 3. Provide duct layout signed by AC contractor | |||
| ZON | COMPLETE | 03/07/2023 | 03/07/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | HOLD | 03/06/2023 | 03/06/2023 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM REPEAT COMMENTS: Please provide revised site plan to reflect the change to paver driveway. Also, a fully completed, signed and notarized Right-of-Way Utilization Agreement must be submitted for review. This Agreement must be signed by all persons on deed to property and all owners signatures must be notarized. Please submit an electronic copy for staff review and once approved, the original will be requested. - PLEASE SUBMIT ORIGINAL AGREEMENT EITHER BY MAIL OR DROP OFF TO ZONING DEPARTMENT. Landscape plan must also designate that irrigation will be installed since sod type is changing to St Augustine. | |||
| ZON | HOLD | 03/06/2023 | 03/06/2023 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Please submit original Right of Way Utiilization Agreement for Paver Driveway. | |||
| ENGIN1 | COMPLETE | 03/06/2023 | 03/07/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 03/06/2023 | 03/13/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 02/23/2023 | 02/23/2023 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Please provide revised site plan to reflect the change to paver driveway. Also, a fully completed, signed and notarized Right-of-Way Utilization Agreement must be submitted for review. This Agreement must be signed by all persons on deed to property and all owners signatures must be notarized. Please submit an electronic copy for staff review and once approved, the original will be requested. | |||
| ZON | HOLD | 02/23/2023 | 02/23/2023 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Please provide revised site plan to reflect the change to paver driveway. Also, a fully completed, signed and notarized Right-of-Way Utilization Agreement must be submitted for review. This Agreement must be signed by all persons on deed to property and all owners signatures must be notarized. Please submit an electronic copy for staff review and once approved, the original will be requested. Landscape plan must also designate that irrigation will be installed since sod type is changing to St Augustine. | |||
| ENGIN1 | COMPLETE | 03/22/2022 | 03/22/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/22/2022 | 03/22/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BADMIN | HOLD | 01/27/2022 | 01/27/2022 |
| Note: Held By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM CHANGE TO CONTRACTOR MUST BE DONE USING ONLINE PORTAL, OR SUPPLED STATE LICENSE NUMBER FOR CHANGE ON REVISION/CORRECTION SHEET. | |||
| BADMIN | COMPLETE | 01/27/2022 | 01/27/2022 |
| Note: Released By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 08/03/2021 | 08/03/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 08/02/2021 | 08/02/2021 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Submit riser diagram for generator | |||
| BLD | COMPLETE | 08/02/2021 | 08/03/2021 |
| Note: Released By: JPI | |||
| ZON | COMPLETE | 07/19/2021 | 07/19/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 07/19/2021 | 07/20/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 07/19/2021 | 07/20/2021 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 2. Submit riser diagram and manufactured specs for generator. 3. If generator is LP you need to submit a gas riser diagram and list gas subcontractor 2nd Request | |||
| BLD | HOLD | 07/19/2021 | 07/27/2021 |
| Note: Held By: JPI 1. REPEATING COMMENT. Product Approval Information Sheet: does NOT include ALL products being utilized on the project; these include but not limited to Exterior Doors (swinging, sliding & sectional roll-up), Windows (single/double hung, horizontal slider, fixed & mullion), Exterior Wall (soffits), Roofing Products (shingles, underlayment & roof vents). Per the City, you may exclude a complete list of Structural Components (wood connectors, wood anchors, truss plates & insulated concrete forms/lintels) and Exterior Envelope (hurricane shutters). | |||
| PLFM | COMPLETE | 06/17/2021 | 06/18/2021 |
| Note: Released By: JORDAN MYERS, C.F.M - (904)562-0045 - JMYERS@PALMCOASTGOV.COM According to the Survey submitted on 6/9/21, the structure will be outside of the Special Flood Hazard Area. No elevation certificates will be required. | |||
| SW1 | COMPLETE | 06/16/2021 | 06/16/2021 |
| Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM | |||
| ZON | HOLD | 06/10/2021 | 06/17/2021 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Driveways on the flag pole part of this lot must be 10ft in width and have a 5ft setback on each side | |||
| BLD | HOLD | 06/10/2021 | 06/14/2021 |
| Note: Held By: JPI 1. Product Approval Information Sheet: does NOT include ALL products being utilized on the project; these include but not limited to Exterior Doors (swinging, sliding & sectional roll-up), Windows (single/double hung, horizontal slider, fixed & mullion), Exterior Wall (soffits), Roofing Products (shingles, underlayment & roof vents), Structural Components (wood connectors, wood anchors, truss plates & insulated concrete forms/lintels) and Exterior Envelope (hurricane shutters). 2. Ceiling Insulation on detail 1/F: TYP. 1-STORY C.M.U. WALL SECTION specifies “R-30”; Ceiling Insulation shall be R-38 per 2020- FBC Energy Conservation Code, 7th Edition, Tables R301.1 & R402.1.2 (Flagler County is designated as Climate Zone 2A). ALL Drawings and Energy shall be revised to reflect this code requirement. 3. Identify “Egress” windows on Floor Plan, Sht. 2 which meets 2020- FBC Residential Building Code, Section R310.1. | |||
| CUSVC | COMPLETE | 06/10/2021 | 06/14/2021 |
| Note: Released By: ALYSSA ROSCOE - - | |||
| ELEC | HOLD | 06/10/2021 | 06/11/2021 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need light and switch by exterior garage door. NEC 2017 210.70 2. Submit riser diagram and manufactured specs for generator. 3. If generator is LP you need to submit a gas riser diagram and list gas subcontractor | |||
| ENGIN1 | COMPLETE | 06/10/2021 | 06/10/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 06/10/2021 | 06/15/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 06/10/2021 | 06/11/2021 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs say R38 insulation in attic. Plans show R30. Revise to match | |||
| SWALE | COMPLETE | 06/10/2021 | 08/23/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 05/19/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 05/19/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/19/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/19/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/19/2023 |
| CONTRACTOR CHANGE | ¤40.00 | 05/04/2023 |
| CONTRACTOR CHANGE | ¤40.00 | 05/04/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/04/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/04/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/04/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/04/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/04/2023 |
| RECORDING FEE REIMBURSE DOC | ¤44.00 | 05/04/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 05/04/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 05/04/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 05/04/2023 |
| STORM WATER PERMIT FEES | ¤80.00 | 09/17/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 09/17/2021 |
| SEWER CREDIT | (¤2,465.75) | 09/17/2021 |
| SEWER INSPECTION | ¤25.00 | 09/17/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 09/17/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 09/17/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 09/17/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 09/17/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 09/17/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤600.00 | 09/17/2021 |
| SITE PLAN 20 | ¤20.00 | 09/17/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 09/17/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 09/17/2021 |
| METER - DEPOSIT | ¤60.00 | 09/17/2021 |
| WATER- TURN ON | ¤25.00 | 09/17/2021 |
| ADMINISTRATIVE RESIDENTIAL | ¤20.00 | 09/17/2021 |
| INSPECTION- ELECTRICAL | ¤240.00 | 09/17/2021 |
| INSPECTION - MECHANICAL | ¤240.00 | 09/17/2021 |
| INSPECTION - PLUMBING | ¤240.00 | 09/17/2021 |
| PLAN REVIEW - RESIDENTIAL | ¤120.00 | 09/17/2021 |
| BUILDING DISCOUNT 100% | (¤1,460.00) | 09/17/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 09/17/2021 |
| IMPACT FEE FIRE | ¤367.00 | 09/17/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 09/17/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 09/17/2021 |
| CONNECTION FEES | ¤1,017.83 | 09/17/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤14,242.18 |