Permit #2021060723
Permit Details
Status: COED
| Parcel Id: 07-11-31-7060-00370-0110 |
| CONDITIONED SPACE: 823 sqft |
| CONDITIONED SPACE: 1118 sqft |
| GARAGE: 409 sqft |
| OPENED PORCH (WITH ROOF) : 80 sqft |
| OPENED PORCH (WITH ROOF) : 31 sqft |
| Total Square Footage: 2461 sqft |
| Block: 00370 |
| Subdivision: 2200 - SECTION 60-SEMINOLE PARK |
| Job Phone: 321-249-3126 |
| Location Address: 5 SLOGAN PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/30/2021 |
| NOC: RECORDED |
| Applicant name: MOREY C DOYLE |
| Owner: WJHFL LLC |
|
Address 3091 GOVERNORS LAKE DR NORCROSS, GA 30071 |
|
Address STE 300 NORCROSS, GA 30071 |
| Lot: 0110 |
| Contracted Stated Job Value: ¤116,460.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
WADE JURNEY HOMES
| Status | Location Address | State License Number | Phone |
| CANCEL |
3091 GOVERNORS LAKE DRIVE NORCROSS, GA 30071 |
CGC1517458 (Exp: 08/31/2022) | 321-249-3126 |
Sub Contractors
MICHAEL LEE RAFFENSBERGER
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
7725 SANDSCOVE CT WINTER PARK, FL 32792 |
CAC1819723 (Exp: 08/31/2024) | 407-629-6920 | 407-629-9307 |
EDWIN R INSALACO
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| CANCEL |
3191 MAGUIRE BLVD ORLANDO, FL 32803 |
STE 200 ORLANDO, FL 32803 |
EC13001310 (Exp: 08/31/2024) | 321-441-7990 | 407-426-9741 |
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
DANIEL P GREGOIRE
| Status | Location Address | State License Number | Phone |
| INACTIVE |
64 W. CENTRAL AVENUE LAKE WALES, FL 33853 |
CFC057378 (Exp: 08/31/2024) | (863)696-3737 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 06/30/2022 | Approval - Private Provider | PPROVIDER |
| ROW - STORMWATER FINAL | 06/30/2022 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 6/30/22 CAN NOT USE COLD PATCH NEED HOT PATCH NEED TO FIX THE CRACKED APRON ON THE RIGHT CORNER ------------------------------------------------------------------------------------------------------------------------------ 6/29/22 PATCH NOT DONE AT TIME OF INSPECTION. BUT THE CONTRACTOR WAS THERE TO DO THE PATCH AND HE HAD COLD PATCH. CANT HAVE COLD PATCH NEED TO BE HOT PATCH PLEASE CALL THIS INSPECTION BACK IN WHEN YOU HAVE HOT PATCH DONE. ----------------------------------------------------------------------------------------------------------------------------------- NEED TO HAVE THE ASPHALT PATCH DONE | |||
| ROW - STORMWATER FINAL | 06/30/2022 | APPROVED - AS NOTED | PFLANAGAN |
| Note: 6/30/22 CM SAID THAT THEY GOT THERE HOT PATCH DOWN ------------------------------------------------------------------------------------------------------------------------------ 6/30/22 CAN NOT USE COLD PATCH NEED HOT PATCH NEED TO FIX THE CRACKED APRON ON THE RIGHT CORNER ------------------------------------------------------------------------------------------------------------------------------ 6/29/22 PATCH NOT DONE AT TIME OF INSPECTION. BUT THE CONTRACTOR WAS THERE TO DO THE PATCH AND HE HAD COLD PATCH. CANT HAVE COLD PATCH NEED TO BE HOT PATCH PLEASE CALL THIS INSPECTION BACK IN WHEN YOU HAVE HOT PATCH DONE. ----------------------------------------------------------------------------------------------------------------------------------- NEED TO HAVE THE ASPHALT PATCH DONE | |||
| ROW - STORMWATER FINAL | 06/29/2022 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 6/29/22 PATCH NOT DONE AT TIME OF INSPECTION. BUT THE CONTRACTOR WAS THERE TO DO THE PATCH AND HE HAD COLD PATCH. CANT HAVE COLD PATCH NEED TO BE HOT PATCH PLEASE CALL THIS INSPECTION BACK IN WHEN YOU HAVE HOT PATCH DONE. ----------------------------------------------------------------------------------------------------------------------------------- NEED TO HAVE THE ASPHALT PATCH DONE | |||
| U -UTILITY RESIDENTIAL FINAL | 06/24/2022 | FINAL APPROVED | JHARDING |
| ROW - FINAL APRON (AFTER POUR) | 06/24/2022 | APPROVED | PFLANAGAN |
| ROW - STORMWATER FINAL | 06/24/2022 | CANCELLED BY APPLICANT | PFLANAGAN |
| Note: NEED TO HAVE THE ASPHALT PATCH DONE | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/16/2022 | APPROVED | PFLANAGAN |
| FINAL SURVEY (OFFICE USE ONLY) | 06/16/2022 | APPROVED | PFLANAGAN |
| ELECTRIC - EARLY POWER | 06/15/2022 | Approval - Private Provider | PPROVIDER |
| ROW- PRE-APRON (PRE-POUR) | 05/18/2022 | APPROVED - AS NOTED | PFLANAGAN |
| Note: 5/18/22 ITS THE CONTRACTOR RESPONSIBILITY TO CHECK CULVERT PIPE ELEVATION BEFORE POURING CONCRETE MAKE SURE YOU DIG OUT FOOTERS ON MITERED END THEY HAVE SOME DIRT THAT WASHED IN THEM NEED TO CHIP CONCRETE FROM GARAGE TO GIVE THE MINIMUM AMOUNT OF CONCRETE | |||
| ROW- PRE-APRON (PRE-POUR) | 05/11/2022 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: NEED TO CHIP CONCRETE FROM GARAGE TO GIVE THE MINIMUM AMOUNT OF CONCRETE | |||
| U - SEWER TIE IN | 05/05/2022 | APPROVED | MGIBSON |
| Note: New inspection due to canceled inspection THIS IS A REINSPECTION NO TAP MADE, PEP TANK NOT INSTALLED YET!!!!! | |||
| U - SEWER TIE IN | 04/28/2022 | CANCELLED BY APPLICANT | WEB |
| Note: THIS IS A REINSPECTION NO TAP MADE, PEP TANK NOT INSTALLED YET!!!!! | |||
| U - SEWER TIE IN | 04/21/2022 | Disapproved -FEE REQUIRED | MGIBSON |
| Note: NO TAP MADE, PEP TANK NOT INSTALLED YET!!!!! | |||
| GRAVITY SEWER TEST | 04/20/2022 | Approval - Private Provider | PPROVIDER |
| PEP TANK INSTALLATION REQUEST | 04/19/2022 | APPROVED | CSTONE |
| ALL ROUGH | 04/15/2022 | Approval - Private Provider | PPROVIDER |
| INSULATION | 04/15/2022 | Approval - Private Provider | PPROVIDER |
| U-CROSS CONNECTION | 03/23/2022 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation, no cross connections. | |||
| FOUND SURVEY APPROVED (OFFICE) | 03/21/2022 | APPROVED | TBAKER |
| LATH/BRICK/ WATER BARRIER | 03/08/2022 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 02/02/2022 | APPROVED | BBEMBRY |
| WALL SHEATHING | 02/01/2022 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/01/2022 | Approval - Private Provider | PPROVIDER |
| TIE BEAM / LINTEL | 01/10/2022 | Approval - Private Provider | PPROVIDER |
| MONOLITHIC SLAB | 12/22/2021 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 12/13/2021 | Approval - Private Provider | PPROVIDER |
| WATER METER INSTALLATION REQUEST | 11/15/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 03/21/2022 | 03/21/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/21/2022 | 03/21/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/29/2021 | 06/29/2021 |
| Note: Released By: JPI | |||
| ZON | COMPLETE | 06/29/2021 | 06/29/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/16/2021 | 06/16/2021 |
| Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM | |||
| ZON | HOLD | 06/11/2021 | 06/18/2021 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Rear patio missing from site plan/survey | |||
| BLD | HOLD | 06/11/2021 | 06/14/2021 |
| Note: Held By: JPI 1. Product Approval Specification Sheet: a. Swinging Exterior Doors (Therm Tru) are described/specified as “non-impact”. b. Storm Panels/Shutter omitted; provide approved product, product description& type, manufacturer, and product approval number. c. Single/Double Hung and Fixed Windows (Plygem) are described/specified as “non-impact”. Please provide FBC reference. d. Structural Components, Wood Connectors & Wood Anchors product approval numbers omitted; provide approved product with appropriate product approval numbers. e. Corrosion Resistant Screen Louvered Vents (identified on Front Elevation, Sht. 1.1-A.5) omitted; provide approved product, product description & type, manufacturer, and product approval number. f. Shutters (identified on Front Elevation, Sht. 1.1-A.5) omitted; provide approved product, product description & type, manufacturer, and product approval number. 2. Provide full architectural details for stairs including but not limited to riser heights, tread depths (with nosings) and handrails. 3. Provide roof pressure zone nailing schedule. FBC-R301.2(7). | |||
| CUSVC | COMPLETE | 06/11/2021 | 06/16/2021 |
| Note: Released By: ALYSSA ROSCOE - - | |||
| ELEC | COMPLETE | 06/11/2021 | 06/14/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/11/2021 | 06/11/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 06/11/2021 | 06/16/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 06/11/2021 | 06/11/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 06/11/2021 | 08/24/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 20 | ¤20.00 | 06/30/2022 |
| SW ENG REINSPECTION 20 | ¤20.00 | 06/30/2022 |
| SW ENG REINSPECTION 30 | ¤30.00 | 06/30/2022 |
| REINSPECTION FEE | ¤40.00 | 06/30/2022 |
| NEW RESIDENTIAL INSPECTIONS | ¤472.00 | 06/30/2021 |
| SITE PLAN 20 | ¤20.00 | 06/30/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 06/30/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 06/30/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 06/30/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 06/30/2021 |
| SEWER CREDIT | (¤2,465.75) | 06/30/2021 |
| SEWER INSPECTION | ¤25.00 | 06/30/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 06/30/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 06/30/2021 |
| METER - DEPOSIT | ¤60.00 | 06/30/2021 |
| WATER- TURN ON | ¤25.00 | 06/30/2021 |
| ADMIN FEE | ¤20.00 | 06/30/2021 |
| CONNECTION FEES | ¤1,017.83 | 06/30/2021 |
| BUILDING DISCOUNT 100% | (¤1,191.20) | 06/30/2021 |
| ELECTRIC FEE | ¤201.60 | 06/30/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 06/30/2021 |
| IMPACT FEE FIRE | ¤367.00 | 06/30/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 06/30/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 06/30/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 06/30/2021 |
| MECHANICAL FEE | ¤201.60 | 06/30/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 06/30/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 06/30/2021 |
| PLAN CHECK FEE | ¤94.40 | 06/30/2021 |
| PLUMBING FEE | ¤201.60 | 06/30/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤13,775.68 |