Permit #2021060746

Permit Details

Status: COED

Parcel Id: 07-11-31-7016-00100-0400
CONDITIONED SPACE: 2449 sqft
GARAGE: 745 sqft
OPENED PORCH (WITH ROOF) : 718 sqft
OPENED PORCH (WITH ROOF) : 93 sqft
Total Square Footage: 4005 sqft
Block: 00100
Subdivision: 2201 - SECTION 16-COUNTRY CLUB COVE
Job Phone: 386-447-4151
Location Address: 6 CHERRYTREE CT
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 07/19/2021
NOC: RECORDED
Applicant name: GENE WARREN SLONE
Owner: BRILLANT GREG & THERESA H&W

Address

13001 SW 16TH COURT

DAVIE, FL 33325

Lot: 0400
Contracted Stated Job Value: ¤300,000.00
Job Description: single family residence
Type: CN

Contractor

FLORIDA GREEN CONSTRUCTION INC.
Status Location Address State License Number Phone
INACTIVE

870 E RETTA STREET

DELEON SPRINGS, FL 32130

CBC1260957 (Exp: 08/31/2026) 407-580-2657

Sub Contractors

JOHN EDWARD GAMBONE
Status Location Address Mailing Address State License Number Phone
ACTIVE

15 HARGROVE LN

PALM COAST, FL 32137

1G

PALM COAST, FL 32137

EC13006037 (Exp: 08/31/2026) 386-586-9144
GREGG A MCANALLY
Status Location Address State License Number Phone
INACTIVE

3370 AGRICULTURAL CENTER DRIVE

PALM COAST, FL 32092

CAC1815760 (Exp: 08/31/2022) 904-829-8898
ERIC FRANCO
Status Location Address Mailing Address State License Number Phone
INACTIVE

840 DELTONA BLVD

DELTONA, FL 32725

STE F2

DELTONA, FL 32725

CCC1327280 (Exp: 08/31/2026) 386-575-4007
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996

Inspection History

Type Request Date Result Inspector
WALL SHEATHING 03/30/2023 APPROVED - AS NOTED PBUCKLEY
Note: THIS IS A REINSPECTION Wrong inspection called in by Joe. Inspection administratively approved by CBO.
BLD - BUILDING FINAL 03/23/2023 FINAL APPROVED TSTAUFFACHER
Note: 3/22/2023 - PREVIOUS INSPECTION NOTES 03/22/2023- Energy calcs do match installed units. 3/16/2023 - PREVIOUS INSPECTION NOTES 03-16-2023 1. Energy calcs not on site. 2. Master bedroom handle not installed. 3. Back bedroom switches not fastened to box. Electricians are working on the wiring. Inspection stopped. A complete reinspection will be required.
BLD - BUILDING FINAL 03/22/2023 Disapproved - NO FEE TSTAUFFACHER
Note: 03/22/2023- Energy calcs do match installed units. 3/16/2023 - PREVIOUS INSPECTION NOTES 03-16-2023 1. Energy calcs not on site. 2. Master bedroom handle not installed. 3. Back bedroom switches not fastened to box. Electricians are working on the wiring. Inspection stopped. A complete reinspection will be required.
BLD - BUILDING FINAL 03/16/2023 Disapproved - NO FEE AGAETANO
Note: 03-16-2023 1. Energy calcs not on site. 2. Master bedroom handle not installed. 3. Back bedroom switches not fastened to box. Electricians are working on the wiring. Inspection stopped. A complete reinspection will be required.
U-CROSS CONNECTION 03/15/2023 APPROVED DHANEY
ROW - FINAL APRON (AFTER POUR) 03/15/2023 APPROVED PFLANAGAN
ROW - STORMWATER FINAL 03/15/2023 FINAL APPROVED PFLANAGAN
U -UTILITY RESIDENTIAL FINAL 03/15/2023 FINAL APPROVED DHANEY
FINAL SURVEY (OFFICE USE ONLY) 03/14/2023 APPROVED PFLANAGAN
ELEVATION CERTIFICATE-FINAL APPROVAL 02/23/2023 APPROVED JMYERS
FRAMING 01/12/2023 APPROVED FWILLIS
Note: Inspector Notes from Inspection 2270 12/21/2022 - PREVIOUS INSPECTION NOTES For Deck footings 1.NEED THE APPROVED DOCUMENTS ON SITE FOR INSPECTION 107.3,1. 2. ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2. R319.1 Residential 01-030-2023 Footing approved. Framing not installed as per plans. Sheet 5 Figure 19 Ledger and HUSC210-2.
ROW- PRE-APRON (PRE-POUR) 01/06/2023 APPROVED GBERTOLA
Note: READY FOR PAVERS
ROW- PRE-APRON (PRE-POUR) 01/04/2023 APPROVED GBERTOLA
Note: 1/4/23=AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL 1/3/2023 - PREVIOUS INSPECTION NOTES 01/3/23= CULVERT TILTED IN THE WRONG DIRECTION, PLEASE RESET THE PIPE ACCORDING SWALE PLAN –
ROW- PAVER RESTRAINTS 01/03/2023 APPROVED GBERTOLA
Note: POUR ONLY THE PAVERS RESTRAINTS
ROW- PRE-APRON (PRE-POUR) 01/03/2023 Disapproved -FEE REQUIRED GBERTOLA
Note: 01/3/23= CULVERT TILTED IN THE WRONG DIRECTION, PLEASE RESET THE PIPE ACCORDING SWALE PLAN –
FOOTER 01/03/2023 APPROVED - AS NOTED AGAETANO
Note: 12/21/2022 - PREVIOUS INSPECTION NOTES For Deck footings 1.NEED THE APPROVED DOCUMENTS ON SITE FOR INSPECTION 107.3,1. 2. ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2. R319.1 Residential 01-030-2023 Footing approved. Framing not installed as per plans. Sheet 5 Figure 19 Ledger and HUSC210-2.
FRAMING 12/22/2022 Disapproved -FEE REQUIRED AGAETANO
Note: 12/21/2022 - PREVIOUS INSPECTION NOTES Framing inspection for deck 12-21-2022 1.NEED THE APPROVED DOCUMENTS ON SITE FOR INSPECTION 107.3,1. 2. ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2. R319.1 Residential 12-22-2022 1. Ledger board not installed as per plans. See R507 table. 2. HUSC210-2 not installed as per plans. 3. Address numbers not posted. ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2. R319.1 Residential R319.1 Address identification. Buildings shall be provided with approved address identification Inspection stopped.
FRAMING 12/21/2022 Disapproved - NO FEE AGAETANO
Note: Framing inspection for deck 12-21-2022 1.NEED THE APPROVED DOCUMENTS ON SITE FOR INSPECTION 107.3,1. 2. ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2. R319.1 Residential
FOOTER 12/21/2022 Disapproved - NO FEE AGAETANO
Note: For Deck footings 1.NEED THE APPROVED DOCUMENTS ON SITE FOR INSPECTION 107.3,1. 2. ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2. R319.1 Residential
ELECTRIC - EARLY POWER 12/16/2022 APPROVED AGAETANO
Note: 12-16-2022 FPL notified at 9:28 am
GRAVITY SEWER TEST 10/31/2022 APPROVED MGIBSON
U - SEWER TIE IN 10/31/2022 APPROVED MGIBSON
LATH/BRICK/ WATER BARRIER 09/15/2022 APPROVED AGAETANO
INSULATION 09/06/2022 APPROVED AGAETANO
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 08-25-2022 Windows and doors jambs, tops, and bottoms are not insulated. Please provide engineering documentation that states otherwise or insulate. Front left window glass is cracked. 08-31-2022 Multiple windows and doors jambs are not insulated.
INSULATION 08/31/2022 Disapproved -FEE REQUIRED AGAETANO
Note: THIS IS A REINSPECTION 08-25-2022 Windows and doors jambs, tops, and bottoms are not insulated. Please provide engineering documentation that states otherwise or insulate. Front left window glass is cracked. 08-31-2022 Multiple windows and doors jambs are not insulated.
INSULATION 08/25/2022 Disapproved - NO FEE AGAETANO
Note: 08-25-2022 Windows and doors jambs, tops, and bottoms are not insulated. Please provide engineering documentation that states otherwise or insulate. Front left window glass is cracked.
ALL ROUGH 08/11/2022 APPROVED BTAYLOR
WINDOW NAILING 08/11/2022 APPROVED BTAYLOR
ROW - DRAINAGE 05/12/2022 APPROVED RGROSS
Note: THIS IS A REINSPECTION Inspect for silt in the canal per code and take appropriate action 5/9/22 - Silt fence repaired. Next Inspection. 5/12/22.
ROOF VALLEY & METAL 05/10/2022 APPROVED AGAETANO
ROW - DRAINAGE 05/09/2022 PARTIALLY APPROVED RGROSS
Note: Inspect for silt in the canal per code and take appropriate action 5/9/22 - Silt fence repaired. Next Inspection. 5/12/22.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/28/2022 APPROVED AGAETANO
Note: THIS IS A REINSPECTION 1. J7 #7 missing strap. (Right side of home above the bedroom window next to the garage). 2. Conventional framing at lanai just outside of lanai. No straps fastened at top or bottom. Engineer packet does not indicate conventional framing. Please submit a revision to the building department. 3. Strap at front window left side not fastened. 4. Entry truss at left side strap is not fastened. 5. T02 framing members nails are showing. Fastenen properly. 6. T10 framing member missing. 7. Truss layout shows 2 T26 and Engineereing packet shows only 1. Please provide a revision.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/21/2022 Disapproved - NO FEE AGAETANO
Note: 1. J7 #7 missing strap. (Right side of home above the bedroom window next to the garage). 2. Conventional framing at lanai just outside of lanai. No straps fastened at top or bottom. Engineer packet does not indicate conventional framing. Please submit a revision to the building department. 3. Strap at front window left side not fastened. 4. Entry truss at left side strap is not fastened. 5. T02 framing members nails are showing. Fastenen properly. 6. T10 framing member missing. 7. Truss layout shows 2 T26 and Engineereing packet shows only 1. Please provide a revision.
ELEV CERT-FOUNDATION APPROVAL 04/20/2022 APPROVED JMYERS
ELECTRIC TEMP POLE 04/18/2022 CANCELLED BY APPLICANT WEB
Note: THIS IS A REINSPECTION No work done
WALL SHEATHING 04/18/2022 CANCELLED BY APPLICANT AGAETANO
Note: Wrong inspection called in by Joe.
TIE BEAM / LINTEL 02/22/2022 APPROVED AGAETANO
FOUND SURVEY APPROVED (OFFICE) 02/14/2022 APPROVED TBAKER
MONOLITHIC SLAB 01/18/2022 APPROVED AGAETANO
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS WAS FOR THE APPROVED STEM WALL FOOTER AT REAR OF HOUSE ONLY 1-13-2022. Please provide all drfawings. Foundation drawings, sheet 5, does not match layout of building.
MONOLITHIC SLAB 01/13/2022 Disapproved - NO FEE AGAETANO
Note: THIS IS A REINSPECTION THIS WAS FOR THE APPROVED STEM WALL FOOTER AT REAR OF HOUSE ONLY 1-13-2022. Please provide all drfawings. Foundation drawings, sheet 5, does not match layout of building.
PLUMBING 1ST ROUGH UNDERGROUND 01/04/2022 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 12/01/2021 APPROVED CSTONE
Note: THIS IS A REINSPECTION ADDED ON 11/29/2021 9:11:59 AM lot not cleared
WATER METER INSTALLATION REQUEST 11/23/2021 Disapproved - NO FEE CSTONE
Note: lot not cleared
ELECTRIC TEMP POLE 11/23/2021 Disapproved -FEE REQUIRED JMUNSON
Note: No work done
STEM WALL FOUNDATION 11/19/2021 APPROVED DCUSHING
Note: THIS IS A REINSPECTION nee details for stemwall
STEM WALL FOUNDATION 11/16/2021 Disapproved - NO FEE LMILLER
Note: nee details for stemwall
MONOLITHIC SLAB 10/22/2021 PARTIALLY APPROVED RMARTIN
Note: THIS WAS FOR THE APPROVED STEM WALL FOOTER AT REAR OF HOUSE ONLY

Review History

Department Status Date In Date Out
MECH COMPLETE 03/23/2023 03/23/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH HOLD 03/22/2023 03/23/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Project summary page showing equipment info is not readable. Resubmit Energy calcs
BLD COMPLETE 03/13/2023 03/13/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD HOLD 02/23/2023 02/23/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: 1. Per the Building Inspectors comments, proposed ledger board was not installed per R507. Architects letter allows for alternate method. If choosing this method, revise the detail on sheet 5 and provide compliance with section R507. (Second Request)
PLFM COMPLETE 02/23/2023 02/23/2023
Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The Final elevation certificate has been approved.
BLD HOLD 01/04/2023 01/05/2023
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: 1. Per the Building Inspectors comments, proposed ledger board was not installed per R507. Architects letter allows for alternate method. If choosing this method, revise the detail on sheet 5 and provide compliance with section R507.
BLD COMPLETE 12/19/2022 12/20/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ZON COMPLETE 12/19/2022 12/19/2022
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
BLD COMPLETE 12/16/2022 12/19/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ZON COMPLETE 12/16/2022 12/16/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BADMIN INFORMATION 12/14/2022 12/14/2022
Note: Marked INFORMATION By: MARGA DEFREITAS - - MDEFREITAS@PALMCOASTGOV.COM i dont have a new site plan you just submitted the revision sheet
ZON HOLD 12/07/2022 12/07/2022
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Repeat comment: Please remove lattice as it is not allowed.Remove that from the plans
ENGIN1 COMPLETE 12/07/2022 12/07/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 12/07/2022 12/14/2022
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
BLD COMPLETE 11/22/2022 11/23/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ZON HOLD 11/22/2022 11/22/2022
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please provide a new proposed site plan/survey showing the changes being made. Please provide deck dimensions and setbacks. Please remove lattice as it is not allowed.
BLD HOLD 11/13/2022 11/14/2022
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code PLAN REVIEW COMMENTS: 1. Provide Ledger to house attachment per R507.8 2. Proposed Trex decking is to be installed on joist at 24 inches on center. Provide manufactures speciation’s showing that the decking can be installed on this spacing. 3. Proposed 2 x 12 floor joist span is broken by a double joist. The double joist is attached to a rim joist. Provide how the proposed rim joist can support the proposed loads from double and isn’t over spanned.
SW1 COMPLETE 11/13/2022 11/21/2022
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON HOLD 11/13/2022 11/14/2022
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please provide a new proposed site plan/survey showing the changes being made. Please provide deck dimensions and setbacks.
BLD COMPLETE 04/25/2022 04/26/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
PLFM COMPLETE 04/20/2022 04/20/2022
Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The Foundation elevation certificate has bee approved. Please provide final prior to CO.
PLFM HOLD 04/18/2022 04/18/2022
Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The following comments are in regards to the elevation certificate: A3 needs more information. C1 states construction drawings, if this is intended for foundation the building under construction needs to be checked. Section D is missing signature in box and on top of seal as well as the date on top of seal.
ENGIN1 COMPLETE 01/27/2022 01/28/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 01/27/2022 01/27/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 09/21/2021 09/22/2021
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
PLFM COMPLETE 07/15/2021 07/16/2021
Note: Released By: JORDAN MYERS, C.F.M - (904)562-0045 - JMYERS@PALMCOASTGOV.COM The construction elevation certificate has been approved. Please provide foundation and final prior to receiving CO.
ZON COMPLETE 07/12/2021 07/12/2021
Note: Released By: ESTELLE LENS - (386)986-3751 -
PLFM HOLD 07/12/2021 07/12/2021
Note: Held By: JORDAN MYERS, C.F.M - (904)562-0045 - JMYERS@PALMCOASTGOV.COM Not all comments addressed. In Section D the box for latitude and longitude needs to be checked and the surveyor needs to sign and date on top of their seal. On the Survey it notes a FFE of 8.6 for the garage but on the elevation certificate it notes 9.2. Please correct either the survey or the elevation certificate to be consistent.
PLFM HOLD 06/21/2021 06/21/2021
Note: Held By: JORDAN MYERS, C.F.M - (904)562-0045 - JMYERS@PALMCOASTGOV.COM In section A2. the address is 6 Cherrytree Court not Cherry Tree. Section A4 needs to say Residential. A7, all of A8, and all of A9 need to be filled out. Please list the BFE in B9 as 7.0'. C2d is missing an elevation and measurement box checked. In Section D the box for latitude and longitude needs to be checked and the machinery in C2e needs to be listed in the comments of section D. Please provide all pages of the elevation certificate.
ZON HOLD 06/21/2021 06/21/2021
Note: Held By: ESTELLE LENS - (386)986-3751 - Please provide the driveway width at the garage door. Four foundation plantings are required on the left side of the residence. Four foundation plantings are required in the rear facing the public right of way. Banding is required in the rear facing the public right of way.
SW1 COMPLETE 06/16/2021 06/16/2021
Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM
BLD COMPLETE 06/11/2021 06/16/2021
Note: Released By: JPI
CUSVC COMPLETE 06/11/2021 06/18/2021
Note: Released By: ALYSSA ROSCOE - -
ELEC COMPLETE 06/11/2021 06/14/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 06/11/2021 06/11/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 06/11/2021 06/14/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 06/11/2021 06/15/2021
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SWALE COMPLETE 06/11/2021 08/25/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 03/27/2023
PLAN REVIEW - REVISION ¤32.50 03/27/2023
PLAN REVIEW - REVISION ¤32.50 03/27/2023
PLAN REVIEW - REVISION ¤32.50 03/27/2023
PLAN REVIEW - REVISION ¤32.50 03/27/2023
REINSPECTION RESIDENTIAL ¤40.00 03/27/2023
REINSPECTION RESIDENTIAL ¤40.00 03/27/2023
REINSPECTION RESIDENTIAL ¤40.00 03/27/2023
SW ENG - INSPECTION 20 ¤20.00 03/27/2023
SW ENG - INSPECTION 20 ¤20.00 03/27/2023
SW ENG REINSPECTION 30 ¤30.00 03/27/2023
STORM WATER PERMIT FEES ¤80.00 07/19/2021
3% TRANS IMPACT FEE CREDIT (¤51.54) 07/19/2021
SEWER CREDIT (¤1,147.00) 07/19/2021
SEWER INSPECTION ¤25.00 07/19/2021
SEWER CAPITAL FACILITY ¤4,664.55 07/19/2021
WATER CAPITAL FACILITY FEE ¤3,424.45 07/19/2021
METER - DEPOSIT ¤60.00 07/19/2021
METER - DEPOSIT ¤60.00 07/19/2021
WATER-METER ¤441.07 07/19/2021
WATER- TURN ON ¤25.00 07/19/2021
WATER- TURN ON ¤25.00 07/19/2021
ADMIN FEE ¤20.00 07/19/2021
CONNECTION FEES ¤1,017.83 07/19/2021
BUILDING DISCOUNT 100% (¤1,611.20) 07/19/2021
ELECTRIC FEE ¤261.60 07/19/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 07/19/2021
IMPACT FEE FIRE ¤367.00 07/19/2021
IMPACT FEE PARKS ¤1,199.12 07/19/2021
IMPACT FEE SCHOOL ¤3,600.00 07/19/2021
IMPACT FEE TRANSPORTATION ¤1,718.00 07/19/2021
MECHANICAL FEE ¤261.60 07/19/2021
WATER -IRRIGATION INSPECTION ¤25.00 07/19/2021
WATER -IRRIGATION INSPECTION ¤25.00 07/19/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 07/19/2021
PLAN CHECK FEE ¤134.40 07/19/2021
PLUMBING FEE ¤261.60 07/19/2021
NEW RESIDENTIAL INSPECTIONS ¤672.00 07/19/2021
SITE PLAN 20 ¤20.00 07/19/2021
SURCHARGE FS 533.721 ¤2.00 07/19/2021
SURCHARGE - FS 468.631 ¤2.00 07/19/2021
Fees Total Due: ¤0.00 Total Paid: ¤15,888.00