Permit #2021060865

Permit Details

Status: COED

Parcel Id: 07-11-31-7035-01260-0060
CONDITIONED SPACE: 2052 sqft
GARAGE: 407 sqft
OPENED PORCH (WITH ROOF) : 16 sqft
Total Square Footage: 2475 sqft
Block: 01260
Subdivision: 2172 - SECTION 35-BELLE TERRE
Job Phone: 904-268-7730
Location Address: 210 BIRD OF PARADISE DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 06/30/2021
NOC: RECORDED
Applicant name: DALE ALAN DUBBERLY
Owner: MARONDA HOMES LLC OF FLORIDA

Address

5220 SHAD ROAD

JACKSONVILLE, FL 32257

Address

SUITE 202

JACKSONVILLE, FL 32257

Lot: 0060
Contracted Stated Job Value: ¤150,000.00
Job Description: SINGLE FAMILY DWELLING
Type: CN

Contractor

MARONDA HOMES INC
Status Location Address State License Number Phone
CANCEL

5220 SHAD ROAD

JACKSONVILLE , FL 32257

CGC1504922 (Exp: 08/31/2022) 904-268-7730

Sub Contractors

JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113
RONALD KEVIN HAUPT
Status Location Address State License Number Phone
ACTIVE

4005 MARONDA WAY

SANFORD, FL 32771

CAC058534 (Exp: 08/31/2026) 407-321-0064
CLINTON J HULSLANDER SR
Status Location Address State License Number Phone Fax
ACTIVE

4005 MARONDA WAY

SANFORD, FL 32771

CFC1430632 (Exp: 08/31/2026) 407-321-0064 407-688-8534
ANDREW SCOTT DIGAETANO JR
Status Location Address State License Number Phone
ACTIVE

44 FORT CAROLINE

PALM COAST, FL 32137

CCC1331606 (Exp: 08/31/2026) 386-302-9063

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 03/23/2022 FINAL APPROVED MKRASKI
BLD - BUILDING FINAL 03/22/2022 Disapproved -FEE REQUIRED MKRASKI
Note: 1. Energy cals do not match installed equipment 2. Master toilet supply line not hooked up 3. No hot water at vanity sinks in guest bathroom 4. Master shower not draining 5. Guest bathroom toilet not flushing
ROW - STORMWATER FINAL 03/22/2022 APPROVED - AS NOTED KRUTH
Note: THIS IS A REINSPECTION Pile of dirt in the back left hand corner of the property and tires need to be removed and Swale needs to be fixed add sod corrections made
U -UTILITY RESIDENTIAL FINAL 03/22/2022 FINAL APPROVED DHANEY
ROW - FINAL APRON (AFTER POUR) 03/21/2022 APPROVED KRUTH
ROW FIELD SURVEY /GRADING CERTIFICATION 03/21/2022 APPROVED KRUTH
ROW - STORMWATER FINAL 03/21/2022 Disapproved - NO FEE KRUTH
Note: Pile of dirt in the back left hand corner of the property and tires need to be removed and Swale needs to be fixed add sod
FINAL SURVEY (OFFICE USE ONLY) 03/21/2022 APPROVED KRUTH
U - SEWER TIE IN 03/16/2022 APPROVED MGIBSON
Note: THIS IS A REINSPECTION PEP TANK AREA PEP TANK NOT INSTALLED YET
ELECTRIC - EARLY POWER 03/02/2022 APPROVED - AS NOTED JMUNSON
Note: 1.Sealtight can not be exposed to physical damage. NEC 2017 356.12 Fix by final 2. Emailed FPL at 10:11 am
ROW- PRE-APRON (PRE-POUR) 02/28/2022 APPROVED - AS NOTED KRUTH
ELECTRIC - EARLY POWER 02/25/2022 CANCELLED BY APPLICANT WEB
WINDOW NAILING 02/08/2022 APPROVED FWILLIS
Note: All rough was passed with no windows installed.
PEP TANK INSTALLATION REQUEST 02/07/2022 APPROVED CSTONE
Note: THIS IS A REINSPECTION ADDED ON 2/3/2022 11:24:52 AM THIS IS A REINSPECTION ADDED ON 1/21/2022 3:48:11 PM THIS IS A REINSPECTION ADDED ON 1/19/2022 4:00:32 PM THIS IS A REINSPECTION ADDED ON 1/11/2022 9:48:06 AM Not ready - interior & exterior does not meet minimum requirements Porta Jon and debris pile 1/19/2022 1/21/22 Porta Jon Please email RHand@palmcoastgov.com with questions Porta Jon 6th site visit, will need proof of readiness before next site visit
PEP TANK INSTALLATION REQUEST 02/03/2022 Disapproved -FEE REQUIRED CSTONE
Note: THIS IS A REINSPECTION ADDED ON 1/21/2022 3:48:11 PM THIS IS A REINSPECTION ADDED ON 1/19/2022 4:00:32 PM THIS IS A REINSPECTION ADDED ON 1/11/2022 9:48:06 AM Not ready - interior & exterior does not meet minimum requirements Porta Jon and debris pile 1/19/2022 1/21/22 Porta Jon Please email RHand@palmcoastgov.com with questions Porta Jon 6th site visit, will need proof of readiness before next site visit
PEP TANK INSTALLATION REQUEST 01/21/2022 Disapproved -FEE REQUIRED CSTONE
Note: THIS IS A REINSPECTION ADDED ON 1/19/2022 4:00:32 PM THIS IS A REINSPECTION ADDED ON 1/11/2022 9:48:06 AM Not ready - interior & exterior does not meet minimum requirements Porta Jon and debris pile 1/19/2022 1/21/22 Porta Jon
PEP TANK INSTALLATION REQUEST 01/18/2022 Disapproved - NO FEE CSTONE
Note: THIS IS A REINSPECTION ADDED ON 1/11/2022 9:48:06 AM Not ready - interior & exterior does not meet minimum requirements Porta Jon and debris pile 1/19/2022
LATH/BRICK/ WATER BARRIER 01/05/2022 APPROVED FWILLIS
PEP TANK INSTALLATION REQUEST 01/04/2022 Disapproved - NO FEE CSTONE
Note: Not ready - interior & exterior does not meet minimum requirements
INSULATION 01/04/2022 APPROVED FWILLIS
Note: Left from all rough 12-21-2021--Head test still empty//from all rough. Permission was given to insulate TS 1/4/22 - Insulation Inspection Only!!
ALL ROUGH 01/03/2022 APPROVED AGAETANO
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION NAIL GUARD, DEN @ TOP FURRING, FIX FURRING AND PROPERLY INSTALL NAIL GUARD OR USE LONGER NAIL GUARD 5' HEAD TEST IS EMPTY 12-21-2021--Head test still empty
ALL ROUGH 12/21/2021 Disapproved -FEE REQUIRED TSTAUFFACHER
Note: THIS IS A REINSPECTION NAIL GUARD, DEN @ TOP FURRING, FIX FURRING AND PROPERLY INSTALL NAIL GUARD OR USE LONGER NAIL GUARD 5' HEAD TEST IS EMPTY 12-21-2021--Head test still empty
WALL SHEATHING 12/21/2021 APPROVED TSTAUFFACHER
U-CROSS CONNECTION 12/21/2021 APPROVED - AS NOTED DHANEY
Note: Approved Yard/IRR. not installed yet no cross CN.
ALL ROUGH 12/20/2021 Disapproved - NO FEE DCUSHING
Note: NAIL GUARD, DEN @ TOP FURRING, FIX FURRING AND PROPERLY INSTALL NAIL GUARD OR USE LONGER NAIL GUARD 5' HEAD TEST IS EMPTY
ROOF VALLEY & METAL 12/17/2021 APPROVED FWILLIS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/06/2021 APPROVED FWILLIS
FOUND SURVEY APPROVED (OFFICE) 11/12/2021 APPROVED TBAKER
ELECTRIC-TUG 11/02/2021 APPROVED - AS NOTED JMUNSON
Note: 1. A/C pad is to close to service, need to have proper working clearance by rough. NEC 2017 110.26 2. Emailed FPL at 10:40 am
TIE BEAM / LINTEL 10/18/2021 APPROVED RMARTIN
MONOLITHIC SLAB 09/20/2021 APPROVED FWILLIS
GRAVITY SEWER TEST 09/20/2021 APPROVED MGIBSON
Note: THIS IS A REINSPECTION SEE FIRST ROUGH NOTE
PLUMBING 1ST ROUGH UNDERGROUND 09/17/2021 APPROVED MGIBSON
Note: THIS IS A REINSPECTION NOT HOLDING 5'HEAD TEST
GRAVITY SEWER TEST 09/16/2021 Disapproved - NO FEE MGIBSON
Note: SEE FIRST ROUGH NOTE
PLUMBING 1ST ROUGH UNDERGROUND 09/16/2021 Disapproved -FEE REQUIRED MGIBSON
Note: NOT HOLDING 5'HEAD TEST
U - SEWER TIE IN 09/16/2021 Disapproved - NO FEE MGIBSON
Note: PEP TANK AREA PEP TANK NOT INSTALLED YET
WATER METER INSTALLATION REQUEST 08/26/2021 APPROVED CSTONE

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 11/12/2021 11/12/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 11/12/2021 11/12/2021
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SW1 COMPLETE 06/25/2021 06/25/2021
Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM
ZON COMPLETE 06/23/2021 06/23/2021
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ENGIN1 COMPLETE 06/23/2021 06/23/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD COMPLETE 06/23/2021 06/23/2021
Note: Released By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM approved per updated product approval sheet ceiling insulation comment not valid.
SW1 HOLD 06/21/2021 06/21/2021
Note: Held By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM Refer to stormwater checklist to make the corrections needed to meet the city minimums stormwater requirements
ZON HOLD 06/15/2021 06/21/2021
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM This lot has two fema map numbers. Both must be listed on survey/site plan
BLD HOLD 06/15/2021 06/16/2021
Note: Held By: JPI 1. Product Approval Information Sheet. Update ALL expiration dates. 2. Ceiling Insulation shall be R-38 per 2020- FBC Energy Conservation Code, 7th Edition, Tables R301.1 & R402.1.2 (Flagler County is designated as Climate Zone 2A).
CUSVC COMPLETE 06/15/2021 06/21/2021
Note: Released By: ALYSSA ROSCOE - -
ELEC COMPLETE 06/15/2021 06/16/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 06/15/2021 06/15/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 06/15/2021 06/22/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 06/15/2021 06/16/2021
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SWALE COMPLETE 06/15/2021 08/27/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 03/23/2022
REINSPECTION RESIDENTIAL ¤40.00 03/21/2022
REINSPECTION RESIDENTIAL ¤40.00 03/21/2022
UTILITY PEP REINSPECTION ¤40.00 03/21/2022
UTILITY PEP REINSPECTION ¤40.00 03/21/2022
SEWER CREDIT (¤1,466.00) 06/30/2021
SEWER INSPECTION ¤25.00 06/30/2021
SEWER CAPITAL FACILITY ¤4,664.55 06/30/2021
WATER CAPITAL FACILITY FEE ¤3,424.45 06/30/2021
METER - DEPOSIT ¤60.00 06/30/2021
WATER- TURN ON ¤25.00 06/30/2021
ADMIN FEE ¤20.00 06/30/2021
CONNECTION FEES ¤1,017.83 06/30/2021
BUILDING DISCOUNT 100% (¤1,229.00) 06/30/2021
ELECTRIC FEE ¤207.00 06/30/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 06/30/2021
IMPACT FEE FIRE ¤367.00 06/30/2021
IMPACT FEE PARKS ¤1,199.12 06/30/2021
IMPACT FEE SCHOOL ¤3,600.00 06/30/2021
IMPACT FEE TRANSPORTATION ¤1,718.00 06/30/2021
MECHANICAL FEE ¤207.00 06/30/2021
WATER -IRRIGATION INSPECTION ¤25.00 06/30/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 06/30/2021
PLAN CHECK FEE ¤98.00 06/30/2021
PLUMBING FEE ¤207.00 06/30/2021
NEW RESIDENTIAL INSPECTIONS ¤490.00 06/30/2021
SITE PLAN 20 ¤20.00 06/30/2021
SURCHARGE FS 533.721 ¤2.00 06/30/2021
SURCHARGE - FS 468.631 ¤2.00 06/30/2021
STORM WATER PERMIT FEES ¤80.00 06/30/2021
3% TRANS IMPACT FEE CREDIT (¤51.54) 06/30/2021
Fees Total Due: ¤0.00 Total Paid: ¤14,865.43