Permit #2021061221
Permit Details
Status: COED
| Parcel Id: 07-11-31-7063-00630-0010 |
| CONDITIONED SPACE: 2495 sqft |
| GARAGE: 470 sqft |
| OPENED PORCH (WITH ROOF) : 158 sqft |
| OPENED PORCH (WITH ROOF) : 83 sqft |
| Total Square Footage: 3206 sqft |
| Block: 00630 |
| Subdivision: 2174 - SECTION 63-ZEBULAHS TRAIL |
| Job Phone: 386-569-7882 |
| Location Address: 17 ZEPHYR LILY PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/20/2021 |
| NOC: RECORDED |
| Applicant name: VLADIMIR V PEREPECHKIN |
| Owner: SHMAKOV ANDREY & LYUBOV SHMAKOV H&W |
|
Address 15 ZEPHYR LILY PLACE PALM COAST, FL 32137 |
| Lot: 0010 |
| Contracted Stated Job Value: ¤350,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
WISE CHOICE CUSTOM HOMES, INC.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
77 SOUTHLAKE DR PALM COAST, FL 32137 |
CRC1328738 (Exp: 08/31/2026) | 386-569-7882 |
Sub Contractors
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
GLEN WILLIAM KEHLE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
P. O. Box 353511 BUNNELL, FL 32110 |
CFC057241 (Exp: 08/31/2026) | (386) 447-4249 | (386) 437-8488 |
MAXIM BUDNIK
| Status | Location Address | State License Number |
| ACTIVE |
3 WAVECREST PL PALM COAST, FL 32164 |
CAC1818445 (Exp: 08/31/2026) |
MAXIM BUDNIK
| Status | Location Address | State License Number | Phone |
| ACTIVE |
9788 HALSEY RD JACKSONVILLE, FL 32246 |
EC13007415 (Exp: 08/31/2026) | 904-509-7306 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 09/01/2022 | FINAL APPROVED | TSTAUFFACHER |
| ROW - STORMWATER FINAL | 08/26/2022 | FINAL APPROVED | PFLANAGAN |
| Note: NOTE TO INSPECTOR : NEED TO FIX WASH OUT ON THE RIGHT SIDE ALONG DRAINAGE DITCH BEFORE FINAL ROW INSPECTION IS PASSED | |||
| U -UTILITY RESIDENTIAL FINAL | 08/26/2022 | FINAL APPROVED | LFITZGERALD |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/25/2022 | APPROVED | PFLANAGAN |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/25/2022 | APPROVED | PFLANAGAN |
| Note: NEED TO FIX WASH OUT ON THE RIGHT SIDE ALONG DRAINAGE DITCH BEFORE FINAL ROW INSPECTION | |||
| ROW - FINAL APRON (AFTER POUR) | 08/25/2022 | APPROVED | PFLANAGAN |
| FINAL SURVEY (OFFICE USE ONLY) | 08/25/2022 | APPROVED | PFLANAGAN |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/24/2022 | CANCELLED BY APPLICANT | WEB |
| Note: Inspector Notes from Inspection 9270 IT'S THE CONTRACTOR RESPONSIBILITY TO CHECK THE CULVERT PIPE ELEVATION BEFORE POURING THE CONCRETE FOR THE DRIVEWAY | |||
| ELECTRIC - EARLY POWER | 08/01/2022 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 8:16 am | |||
| ROW- PRE-APRON (PRE-POUR) | 07/27/2022 | APPROVED - AS NOTED | PFLANAGAN |
| Note: IT'S THE CONTRACTOR RESPONSIBILITY TO CHECK THE CULVERT PIPE ELEVATION BEFORE POURING THE CONCRETE FOR THE DRIVEWAY | |||
| U-CROSS CONNECTION | 07/11/2022 | APPROVED - AS NOTED | DHANEY |
| Note: Yard/IRR. not installed yet - no cross CN. . | |||
| U - SEWER TIE IN | 06/30/2022 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 06/30/2022 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 MASTER SHOWER HAS STEEM UNIT | |||
| WALL SHEATHING | 05/17/2022 | APPROVED | TSTAUFFACHER |
| Note: Passed with roof deck and ties | |||
| PEP TANK INSTALLATION REQUEST | 05/13/2022 | APPROVED | CSTONE |
| INSULATION | 05/09/2022 | APPROVED | RMARTIN |
| INSULATION | 05/06/2022 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: Gaps in fireblocking at range vent and to the side Missed hole in top plate in utility room | |||
| ALL ROUGH | 04/28/2022 | APPROVED | DCUSHING |
| Note: THIS IS A REINSPECTION Install Nail plates at all exterior wall furring strips for the electrical wire running horizontally along all walls missing. Check all exterior walls with furring strips. Missing nail plate top chord at dryer duct. Rear bathroom the 2" pvc vent needs to be supported 4' o.c. The 3/4" Pex needs to be secured. 2.67 horizontal and 4' vertical. Replace the cut 12-2 wire running into the bottom of the electrical panel Fill the unused punched out hole in the electrical panel with an approved fill plug. Check distance of toilet from shower edge in rear bathroom to ensure minimum 15" distance. | |||
| LATH/BRICK/ WATER BARRIER | 04/28/2022 | APPROVED | DCUSHING |
| ALL ROUGH | 04/27/2022 | Disapproved - NO FEE | JWALKER |
| Note: Install Nail plates at all exterior wall furring strips for the electrical wire running horizontally along all walls missing. Check all exterior walls with furring strips. Missing nail plate top chord at dryer duct. Rear bathroom the 2" pvc vent needs to be supported 4' o.c. The 3/4" Pex needs to be secured. 2.67 horizontal and 4' vertical. Replace the cut 12-2 wire running into the bottom of the electrical panel Fill the unused punched out hole in the electrical panel with an approved fill plug. Check distance of toilet from shower edge in rear bathroom to ensure minimum 15" distance. | |||
| ROOF VALLEY & METAL | 03/25/2022 | APPROVED | TSTAUFFACHER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/07/2022 | APPROVED | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Plans in box not marked as COPC approved Plans in box are incomplete. no framing detail page or tie down page Truss plans incomplete Truss GA6/G5/GA2 missing engineering This is not a complete inspection, only inspected what was available on plans 03/02/2022: Cancelled by phone 9:10 AM | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/02/2022 | CANCELLED BY APPLICANT | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION Plans in box not marked as COPC approved Plans in box are incomplete. no framing detail page or tie down page Truss plans incomplete Truss GA6/G5/GA2 missing engineering This is not a complete inspection, only inspected what was available on plans 03/02/2022: Cancelled by phone 9:10 AM | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/01/2022 | Disapproved -FEE REQUIRED | TSTAUFFACHER |
| Note: Plans in box not marked as COPC approved Plans in box are incomplete. no framing detail page or tie down page Truss plans incomplete Truss GA6/G5/GA2 missing engineering This is not a complete inspection, only inspected what was available on plans | |||
| TIE BEAM / LINTEL | 11/10/2021 | APPROVED | TSTAUFFACHER |
| FOUND SURVEY APPROVED (OFFICE) | 10/22/2021 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 10/06/2021 | APPROVED | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION No compaction certificate posted No pressure on water supply | |||
| MONOLITHIC SLAB | 10/05/2021 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: No compaction certificate posted No pressure on water supply | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 09/22/2021 | APPROVED - AS NOTED | MGIBSON |
| Note: MASTER SHOWER HAS STEEM UNIT | |||
| WATER METER INSTALLATION REQUEST | 09/08/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | COMPLETE | 08/31/2022 | 08/31/2022 |
| Note: Released By: LIBBY MUSGROVE - - LMUSGROVE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/13/2022 | 05/13/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 04/11/2022 | 04/11/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/03/2022 | 03/04/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/07/2022 | 01/10/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/22/2021 | 10/22/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/22/2021 | 10/22/2021 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/15/2021 | 07/16/2021 |
| Note: Released By: ESTELLE LENS - (386)986-3751 - | |||
| BLD | COMPLETE | 07/15/2021 | 07/18/2021 |
| Note: Released By: JPI | |||
| MECH | COMPLETE | 07/15/2021 | 07/15/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | HOLD | 06/24/2021 | 06/24/2021 |
| Note: Held By: ESTELLE LENS - (386)986-3751 - One of the required trees must be a shade tree. Four foundation plantings are required on the right side of the residence. Need provide the roof material and color where requested on the color sheet. The exterior paint is not an earth tone nor a pastel. Please see the land development code (or the color sheet which was uploaded with the permit) for acceptable paint colors. There are two bedrooms labeled as bedroom #3 on the floor plan. The area calculations are not correct on the floor plan. (Total 3206, not 3161) | |||
| SW1 | COMPLETE | 06/24/2021 | 06/24/2021 |
| Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 06/21/2021 | 09/02/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | HOLD | 06/21/2021 | 06/24/2021 |
| Note: Held By: JPI 1. Provide roof zone nailing pattern summary (107.3.5) 2. Provide door and window summary scheduled (107.3.5) | |||
| CUSVC | COMPLETE | 06/21/2021 | 06/28/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 06/21/2021 | 06/22/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/21/2021 | 06/21/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 06/21/2021 | 06/24/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 06/21/2021 | 06/22/2021 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM 1. Energy calcs and EPL card need to be signed by the builder 2. Duct layout needs to be signed by AC contractor |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 08/28/2022 |
| PLAN REVIEW - REVISION | ¤32.50 | 08/28/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 08/28/2022 |
| CONNECTION FEES | ¤1,017.83 | 07/20/2021 |
| BUILDING DISCOUNT 100% | (¤1,670.00) | 07/20/2021 |
| ELECTRIC FEE | ¤270.00 | 07/20/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 07/20/2021 |
| IMPACT FEE FIRE | ¤367.00 | 07/20/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 07/20/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 07/20/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 07/20/2021 |
| MECHANICAL FEE | ¤270.00 | 07/20/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 07/20/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 07/20/2021 |
| PLAN CHECK FEE | ¤140.00 | 07/20/2021 |
| PLUMBING FEE | ¤270.00 | 07/20/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤700.00 | 07/20/2021 |
| SITE PLAN 20 | ¤20.00 | 07/20/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 07/20/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 07/20/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 07/20/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 07/20/2021 |
| SEWER CREDIT | (¤850.00) | 07/20/2021 |
| SEWER INSPECTION | ¤25.00 | 07/20/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 07/20/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 07/20/2021 |
| METER - DEPOSIT | ¤60.00 | 07/20/2021 |
| WATER- TURN ON | ¤25.00 | 07/20/2021 |
| ADMIN FEE | ¤20.00 | 07/20/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,386.43 |