I want to search for...
Permit #2021061354
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7010-00050-0520 |
| Total Square Footage: 2678 sqft |
| Block: 00050 |
| Subdivision: 2137 - SECTION 10-FLORIDA PARK |
| Job Phone: 386-338-1755 |
| Location Address: 2 FERNMILL LN |
| Type: BA - BUILDING ADDITION |
| Issue Date: 07/22/2021 |
| NOC: RECORDED |
| Applicant name: SOPHAN KES |
| Owner: PAYTON RALPH & KATHY H&W |
|
Address 2 FERNMILL LANE PALM COAST, FL 32137 |
| Lot: 0520 |
| Contracted Stated Job Value: ¤55,800.00 |
| Job Description: DETACHED GARAGE |
| Type: CN |
Contractor
KES CONSTRUCTION INC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
107 BURROUGHS PALM COAST, FL 32164 |
CRC1332024 (Exp: 08/31/2022) | 386-338-1755 |
Sub Contractors
CHRISTOPHER I HALL
| Status | Location Address | State License Number | Phone |
| ACTIVE |
60 COOPER LANE PALM COAST, FL 32137 |
EC13008029 (Exp: 08/31/2028) | 386-225-1937 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 11/24/2021 | FINAL APPROVED | DCUSHING |
| U -UTILITY RESIDENTIAL FINAL | 11/24/2021 | FINAL APPROVED | DHANEY |
| ROW - FINAL INSPECTION | 11/22/2021 | APPROVED | RGROSS |
| ROW- PRE-APRON (PRE-POUR) | 11/15/2021 | APPROVED - AS NOTED | KRUTH |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION pouring the top half first 11/12/21 - Pipe appeared to be set but not formed at the time of the inspection. pipe is good at the time of the inspection It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. | |||
| ROW- PRE-APRON (PRE-POUR) | 11/12/2021 | Disapproved - NO FEE | RGROSS |
| Note: THIS IS A REINSPECTION pouring the top half first 11/12/21 - Pipe appeared to be set but not formed at the time of the inspection. | |||
| ROW- PRE-APRON (PRE-POUR) | 11/10/2021 | PARTIALLY APPROVED | KRUTH |
| Note: pouring the top half first | |||
| INSULATION | 10/25/2021 | APPROVED | DCUSHING |
| LATH/BRICK/ WATER BARRIER | 10/22/2021 | APPROVED | RMARTIN |
| ALL ROUGH | 10/18/2021 | APPROVED | DCUSHING |
| ALL ROUGH | 10/13/2021 | APPROVED | DCUSHING |
| Note: DOOR AND WINDOW | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/11/2021 | APPROVED | DCUSHING |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/06/2021 | CANCELLED BY INSPECTOR | DCUSHING |
| Note: NOT READY, CALL IN WHEN ROOF FRAMING AND SHEATHING ARE IN PLACE | |||
| FOUND SURVEY APPROVED (OFFICE) | 10/05/2021 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 09/21/2021 | APPROVED | DCUSHING |
| Note: THIS IS A REINSPECTION revision needed for added window | |||
| TIE BEAM / LINTEL | 09/20/2021 | Disapproved - NO FEE | LMILLER |
| Note: revision needed for added window | |||
| MONOLITHIC SLAB | 09/03/2021 | APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION 1. Missing UFER ground .NEC..250.52(3) 2. need compaction report on site. | |||
| MONOLITHIC SLAB | 09/02/2021 | Disapproved - NO FEE | WMILLER |
| Note: 1. Missing UFER ground .NEC..250.52(3) 2. need compaction report on site. |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 10/05/2021 | 10/05/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/05/2021 | 10/05/2021 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 08/25/2021 | 08/27/2021 |
| Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/25/2021 | 08/25/2021 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/20/2021 | 07/21/2021 |
| Note: Released By: ESTELLE LENS - (386)986-3751 - | |||
| ZON | HOLD | 07/09/2021 | 07/12/2021 |
| Note: Held By: ESTELLE LENS - (386)986-3751 - Minimum driveway is 16' for at least 20' from the garage door to the street. | |||
| ELEC | COMPLETE | 07/09/2021 | 07/12/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/09/2021 | 07/15/2021 |
| Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/29/2021 | 06/29/2021 |
| Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM | |||
| ZON | HOLD | 06/23/2021 | 06/24/2021 |
| Note: Held By: ESTELLE LENS - (386)986-3751 - Need to show proposed addition on the site plan with dimensions and setbacks, along with any proposed/required landscaping. | |||
| BLD | HOLD | 06/23/2021 | 06/30/2021 |
| Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM Provide product approval of garage door, soffits, exterior door, windows and lintel per F.S. 553.842. | |||
| ELEC | HOLD | 06/23/2021 | 06/25/2021 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM List electrical sub contractor |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADMIN FEE | ¤20.00 | 07/22/2021 |
| CONTRACTOR CHANGE | ¤40.00 | 07/22/2021 |
| BUILDING DISCOUNT 100% | (¤376.68) | 07/22/2021 |
| ELECTRIC FEE | ¤93.48 | 07/22/2021 |
| PLAN CHECK FEE | ¤40.00 | 07/22/2021 |
| REMODEL/ADDITION/ACCES INSPECT | ¤223.20 | 07/22/2021 |
| SITE PLAN 20 | ¤20.00 | 07/22/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 07/22/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 07/22/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 07/22/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤144.00 |