I want to search for...
Permit #2021070380
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7031-00190-0040 |
| Total Square Footage: 2524 sqft |
| Block: 00190 |
| Subdivision: 2166 - SECTION 31-ROYAL PALMS |
| Job Phone: 850-877-5516 |
| Location Address: 4 RIDING PL |
| Type: RF - REROOF |
| Issue Date: 07/13/2021 |
| NOC: RECORDED |
| Applicant name: DALE KENT TADLOCK |
| Owner: GERONIMO REYNALDO A & VICTORIA F H&W |
|
Address 4 RIDING PLACE PALM COAST, FL 32164 |
| Lot: 0040 |
| Contracted Stated Job Value: ¤11,408.00 |
| Job Description: Roof Replacement Shingle System, 10674.1 |
| Type: CN |
Contractor
TADLOCK ROOFING INC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
7999 PHILLIPS HWY UNIT 211 JACKSONVILLE, FL 32256 |
CCC1328417 (Exp: 08/31/2024) | 904-236-5200 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROOF AFFIDAVIT | 09/15/2021 | APPROVED | DCUSHING |
| ROOF FINAL | 09/15/2021 | FINAL APPROVED | DCUSHING |
| ROOF IN PROGRESS- MIDROOF | 09/14/2021 | APPROVED - AS NOTED | DCUSHING |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION ADDED ON 9/3/2021 4:04:08 PM THIS IS A REINSPECTION Roof is not ready for a midroof inspection. No underlayment installed, No drip, Please have roof ready for inspection before scheduling an inspection. THIS IS A REINSPECTION Courtesy return for inspection, roof was not ready for a midroof inspection at 12:00 Noon. No Drip installed, Underlayment just started, no shingles, 1/2 demoed 9/8/21 Upon demo of two areas to check for proper installation of underlayment drip edge valley and fastening system used. It was shown that two different types of underlayment were used a rino gaurd and a UDL 30 The roofing worksheet called for owens corning. FL# 10674.1 Demo of the two areas also showed the underlyment has not been fastened as per code 905.1.1.1. The entire roof will need to have the shingles and underlayment removed down to roof decking and reroofed as per 7th edition Residential codes. PREVIOUS ISSUES RESOLVED - DDC 9.14.21 | |||
| ROOF IN PROGRESS- MIDROOF | 09/09/2021 | CANCELLED BY APPLICANT | JWALKER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION ADDED ON 9/3/2021 4:04:08 PM THIS IS A REINSPECTION Roof is not ready for a midroof inspection. No underlayment installed, No drip, Please have roof ready for inspection before scheduling an inspection. THIS IS A REINSPECTION Courtesy return for inspection, roof was not ready for a midroof inspection at 12:00 Noon. No Drip installed, Underlayment just started, no shingles, 1/2 demoed 9/8/21 Upon demo of two areas to check for proper installation of underlayment drip edge valley and fastening system used. It was shown that two different types of underlayment were used a rino gaurd and a UDL 30 The roofing worksheet called for owens corning. FL# 10674.1 Demo of the two areas also showed the underlyment has not been fastened as per code 905.1.1.1. The entire roof will need to have the shingles and underlayment removed down to roof decking and reroofed as per 7th edition Residential codes. | |||
| ROOF IN PROGRESS- MIDROOF | 09/08/2021 | Disapproved - NO FEE | JWALKER |
| Note: THIS IS A REINSPECTION ADDED ON 9/3/2021 4:04:08 PM THIS IS A REINSPECTION Roof is not ready for a midroof inspection. No underlayment installed, No drip, Please have roof ready for inspection before scheduling an inspection. THIS IS A REINSPECTION Courtesy return for inspection, roof was not ready for a midroof inspection at 12:00 Noon. No Drip installed, Underlayment just started, no shingles, 1/2 demoed 9/8/21 Upon demo of two areas to check for proper installation of underlayment drip edge valley and fastening system used. It was shown that two different types of underlayment were used a rino gaurd and a UDL 30 The roofing worksheet called for owens corning. FL# 10674.1 Demo of the two areas also showed the underlyment has not been fastened as per code 905.1.1.1. The entire roof will need to have the shingles and underlayment removed down to roof decking and reroofed as per 7th edition Residential codes. | |||
| ROOF IN PROGRESS- MIDROOF | 09/03/2021 | Disapproved -FEE REQUIRED | JWALKER |
| Note: Roof is not ready for a midroof inspection. No underlayment installed, No drip, Please have roof ready for inspection before scheduling an inspection. | |||
| ROOF IN PROGRESS- MIDROOF | 09/03/2021 | Disapproved - NO FEE | DCUSHING |
| Note: THIS IS A REINSPECTION Roof is not ready for a midroof inspection. No underlayment installed, No drip, Please have roof ready for inspection before scheduling an inspection. THIS IS A REINSPECTION Courtesy return for inspection, roof was not ready for a midroof inspection at 12:00 Noon. No Drip installed, Underlayment just started, no shingles, 1/2 demoed. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/13/2021 |
| BUILDING DISCOUNT 100% | (¤60.00) | 07/13/2021 |
| INSPECTION 40 | ¤40.00 | 07/13/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 07/13/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 07/13/2021 |
| ADMIN FEE | ¤20.00 | 07/13/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤44.00 |