I want to search for...

Permit #2021070380

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7031-00190-0040
Total Square Footage: 2524 sqft
Block: 00190
Subdivision: 2166 - SECTION 31-ROYAL PALMS
Job Phone: 850-877-5516
Location Address: 4 RIDING PL
Type: RF - REROOF
Issue Date: 07/13/2021
NOC: RECORDED
Applicant name: DALE KENT TADLOCK
Owner: GERONIMO REYNALDO A & VICTORIA F H&W

Address

4 RIDING PLACE

PALM COAST, FL 32164

Lot: 0040
Contracted Stated Job Value: ¤11,408.00
Job Description: Roof Replacement Shingle System, 10674.1
Type: CN

Contractor

TADLOCK ROOFING INC
Status Location Address State License Number Phone
INACTIVE

7999 PHILLIPS HWY UNIT 211

JACKSONVILLE, FL 32256

CCC1328417 (Exp: 08/31/2024) 904-236-5200

Inspection History

Type Request Date Result Inspector
ROOF AFFIDAVIT 09/15/2021 APPROVED DCUSHING
ROOF FINAL 09/15/2021 FINAL APPROVED DCUSHING
ROOF IN PROGRESS- MIDROOF 09/14/2021 APPROVED - AS NOTED DCUSHING
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION ADDED ON 9/3/2021 4:04:08 PM THIS IS A REINSPECTION Roof is not ready for a midroof inspection. No underlayment installed, No drip, Please have roof ready for inspection before scheduling an inspection. THIS IS A REINSPECTION Courtesy return for inspection, roof was not ready for a midroof inspection at 12:00 Noon. No Drip installed, Underlayment just started, no shingles, 1/2 demoed 9/8/21 Upon demo of two areas to check for proper installation of underlayment drip edge valley and fastening system used. It was shown that two different types of underlayment were used a rino gaurd and a UDL 30 The roofing worksheet called for owens corning. FL# 10674.1 Demo of the two areas also showed the underlyment has not been fastened as per code 905.1.1.1. The entire roof will need to have the shingles and underlayment removed down to roof decking and reroofed as per 7th edition Residential codes. PREVIOUS ISSUES RESOLVED - DDC 9.14.21
ROOF IN PROGRESS- MIDROOF 09/09/2021 CANCELLED BY APPLICANT JWALKER
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION ADDED ON 9/3/2021 4:04:08 PM THIS IS A REINSPECTION Roof is not ready for a midroof inspection. No underlayment installed, No drip, Please have roof ready for inspection before scheduling an inspection. THIS IS A REINSPECTION Courtesy return for inspection, roof was not ready for a midroof inspection at 12:00 Noon. No Drip installed, Underlayment just started, no shingles, 1/2 demoed 9/8/21 Upon demo of two areas to check for proper installation of underlayment drip edge valley and fastening system used. It was shown that two different types of underlayment were used a rino gaurd and a UDL 30 The roofing worksheet called for owens corning. FL# 10674.1 Demo of the two areas also showed the underlyment has not been fastened as per code 905.1.1.1. The entire roof will need to have the shingles and underlayment removed down to roof decking and reroofed as per 7th edition Residential codes.
ROOF IN PROGRESS- MIDROOF 09/08/2021 Disapproved - NO FEE JWALKER
Note: THIS IS A REINSPECTION ADDED ON 9/3/2021 4:04:08 PM THIS IS A REINSPECTION Roof is not ready for a midroof inspection. No underlayment installed, No drip, Please have roof ready for inspection before scheduling an inspection. THIS IS A REINSPECTION Courtesy return for inspection, roof was not ready for a midroof inspection at 12:00 Noon. No Drip installed, Underlayment just started, no shingles, 1/2 demoed 9/8/21 Upon demo of two areas to check for proper installation of underlayment drip edge valley and fastening system used. It was shown that two different types of underlayment were used a rino gaurd and a UDL 30 The roofing worksheet called for owens corning. FL# 10674.1 Demo of the two areas also showed the underlyment has not been fastened as per code 905.1.1.1. The entire roof will need to have the shingles and underlayment removed down to roof decking and reroofed as per 7th edition Residential codes.
ROOF IN PROGRESS- MIDROOF 09/03/2021 Disapproved -FEE REQUIRED JWALKER
Note: Roof is not ready for a midroof inspection. No underlayment installed, No drip, Please have roof ready for inspection before scheduling an inspection.
ROOF IN PROGRESS- MIDROOF 09/03/2021 Disapproved - NO FEE DCUSHING
Note: THIS IS A REINSPECTION Roof is not ready for a midroof inspection. No underlayment installed, No drip, Please have roof ready for inspection before scheduling an inspection. THIS IS A REINSPECTION Courtesy return for inspection, roof was not ready for a midroof inspection at 12:00 Noon. No Drip installed, Underlayment just started, no shingles, 1/2 demoed.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 09/13/2021
BUILDING DISCOUNT 100% (¤60.00) 07/13/2021
INSPECTION 40 ¤40.00 07/13/2021
SURCHARGE FS 533.721 ¤2.00 07/13/2021
SURCHARGE - FS 468.631 ¤2.00 07/13/2021
ADMIN FEE ¤20.00 07/13/2021
Fees Total Due: ¤0.00 Total Paid: ¤44.00