I want to search for...
Permit #2021070416
Permit Details
Status: COED
| Parcel Id: 07-11-31-7029-00610-0010 |
| CONDITIONED SPACE: 1281 sqft |
| CONDITIONED SPACE: 1281 sqft |
| GARAGE: 222 sqft |
| GARAGE: 238 sqft |
| OPENED PORCH (WITH ROOF) : 90 sqft |
| OPENED PORCH (WITH ROOF) : 90 sqft |
| OPENED PORCH (WITH ROOF) : 30 sqft |
| OPENED PORCH (WITH ROOF) : 30 sqft |
| Total Square Footage: 3262 sqft |
| Block: 00610 |
| Subdivision: 2209 - SECTION 29-ROYAL PALMS |
| Job Phone: 904-667-3599 |
| Location Address: 1 RYALL LN |
| Type: DU - DUPLEX |
| Issue Date: 10/07/2021 |
| NOC: RECORDED |
| Applicant name: TONY S JACKSON |
| Owner: 3DRE LLC |
|
Address APT 1104 JACKSONVILLE, FL 32224 |
|
Address 3544 ST JOHNS BLUFF RD S JACKSONVILLE, FL 32224 |
| Lot: 0010 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: DUPLEX |
| Type: CN |
Contractor
T-DAWG CONSTRUCTION LLC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
6821 SOUTH POINT DR N NEPTUNE , FL 32266 |
CGC1523419 (Exp: 08/31/2024) | 904-667-3599 |
Sub Contractors
JACK RICHARD SHEKIRA
| Status | Location Address | State License Number | Phone |
| INACTIVE |
1833 LIVE OAK DR JACKSONVILLE, FL 32246 |
CCC048193 (Exp: 08/31/2026) | 904-725-4089 |
RUSSELL J CARTER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 302 DELAND, FL 32721 |
CFC1425938 (Exp: 08/31/2026) | 386-736-4220 | 386-736-4219 |
MAXIM BUDNIK
| Status | Location Address | State License Number | Phone |
| ACTIVE |
9788 HALSEY RD JACKSONVILLE, FL 32246 |
EC13007415 (Exp: 08/31/2026) | 904-509-7306 |
MAXIM BUDNIK
| Status | Location Address | State License Number |
| ACTIVE |
3 WAVECREST PL PALM COAST, FL 32164 |
CAC1818445 (Exp: 08/31/2026) |
JAMES MCGOVERN
| Status | Location Address | Phone | Fax |
| ACTIVE |
PO BOX 354295 PALM COAST, FL 32137 |
(386)931-8940 | (386)986-4835 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 06/10/2022 | APPROVED - AS NOTED | LFITZGERALD |
| Note: THIS IS A REINSPECTION pep panels required to be installed on the front corner of house-no more than 3feet in and no more than 5 feet to top of panel, also sewer clean out cap in grass areas(this one is next to the house) required to be a flush mount cap flush with sod grades This is a PEP Tank area. The panel and pep tank is to be placed on the same side of the building based on the Utility Marked Locations. Pep Panel will be placed 5 feet from the front corner of the building on the same side of the building as the PEP tank that is marked on the Utility marked Site plan. Make sure the electrician places the PEP power wire between 3 feet and 5 feet from the ground. The plumber should exit the slab with the sewer pipe on the side of the building the tank will be on and matching the utility marked site plan, this will reduce any piping under driveways or sidewalks and minimize the fall required. The sewer tie-in inspection must be called in the day before the tie-in. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in visual inspection so he can witness the tie-in. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits, sewer clean caps or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap IT IS HIGHLY SUGGESTIVE THAT MOVING FORWARD , THE PEP PANELS ARE TO BE INSTALLED TO THE FRONT CORNER OF THE PROPOSED RESIDENCE SO THAT THE HOME OWNER HAS THE OPTON TO INSTALL A FENCE. THIS INSPECTION IS BEING APPROVED AFTER CONSULTING WITH OTHER CONSTRUCTION SITE INSPECTORS WHO HAVE BEEN APPROVING THESE CORNER LOT ISSUES AND TOLD ME TO APPROVE EVEN THOUGH THE CITY UTILITY DEPT. HAS A STADARD THAT THEY TRY TO MAKE ALL BUILDERS TO ADHERE TOO. ALSO AS STATED PREVIOUSLY, PLEASE CHANGE OUT SQURE NUT TOP CAP FOR SEWER CLEAN OUT NEXT TO THE HOUSE AND EXSPOSE THE BALL VALVE PLASTIC ROUND CONTAINER THAT IT SITS IN THAT IS TO THE SIDE OF THE PEP TANKS-THIS IS A SHUT OFF FOR THE TANKS IN ORDER TO WORK ON IF NECESSARY.PLEASE CALL WHEN BOTH ITEMS HAVE BEEN COMPLETED SO I CAN VERIFY.THAK YOU | |||
| U -UTILITY RESIDENTIAL FINAL | 06/07/2022 | Disapproved -FEE REQUIRED | LFITZGERALD |
| Note: pep panels required to be installed on the front corner of house-no more than 3feet in and no more than 5 feet to top of panel, also sewer clean out cap in grass areas(this one is next to the house) required to be a flush mount cap flush with sod gradesAlso, PLEASE make observable the ball valve (round plastic housing)for the pep valves, usually located to the property line of the tanks | |||
| BLD - BUILDING FINAL | 06/07/2022 | Approval - Private Provider | PPROVIDER |
| ROW - FINAL INSPECTION | 06/06/2022 | APPROVED | GBERTOLA |
| Note: 06/06/22 CORRECTION WERE MADE AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD .............................................................................................................................................................................................................................. NEED ROAD REPAIR ALL AROUND THE PROPERTY WHERE THE ROAD IS BROKEN NEED TO PICK UP THE TRASH FROM THE SWALE AND REPAIR THE SWALE | |||
| ROW - FINAL APRON (AFTER POUR) | 06/06/2022 | APPROVED | GBERTOLA |
| Note: 06/06/22=AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| ROW - FINAL INSPECTION | 05/25/2022 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: NEED ROAD REPAIR ALL AROUND THE PROPERTY WHERE THE ROAD IS BROKEN NEED TO PICK UP THE TRASH FROM THE SWALE AND REPAIR THE SWALE NEED HOT PATCH ROAD REPAIR | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 05/23/2022 | APPROVED | RGROSS |
| FINAL SURVEY (OFFICE USE ONLY) | 05/23/2022 | APPROVED | RGROSS |
| U - SEWER TIE IN | 04/22/2022 | APPROVED | MGIBSON |
| Note: New inspection due to canceled inspection THIS IS A REINSPECTION Unit A tie in is buried. unable to view. Unit B passed. | |||
| ROW- PRE-APRON (PRE-POUR) | 04/18/2022 | APPROVED - AS NOTED | GBERTOLA |
| U - SEWER TIE IN | 04/18/2022 | CANCELLED BY APPLICANT | WEB |
| Note: THIS IS A REINSPECTION Unit A tie in is buried. unable to view. Unit B passed. | |||
| U - SEWER TIE IN | 04/13/2022 | Disapproved - NO FEE | JWALKER |
| Note: Unit A tie in is buried. unable to view. Unit B passed. | |||
| U-CROSS CONNECTION | 04/13/2022 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation, no cross connections. | |||
| GRAVITY SEWER TEST | 04/11/2022 | Approval - Private Provider | PPROVIDER |
| SEWER SERVICE | 04/11/2022 | Approval - Private Provider | PPROVIDER |
| ELECTRIC - EARLY POWER | 03/10/2022 | Approval - Private Provider | PPROVIDER |
| PEP TANK INSTALLATION REQUEST | 02/17/2022 | APPROVED | CSTONE |
| Note: New inspection due to canceled inspection THIS IS A REINSPECTION ADDED ON 2/10/2022 2:08:56 PM Dumpster will need to move | |||
| PEP TANK INSTALLATION REQUEST | 02/11/2022 | CANCELLED BY APPLICANT | WEB |
| Note: THIS IS A REINSPECTION ADDED ON 2/10/2022 2:08:56 PM Dumpster will need to move | |||
| PEP TANK INSTALLATION REQUEST | 02/09/2022 | Disapproved - NO FEE | CSTONE |
| Note: Dumpster will need to move | |||
| INSULATION | 02/07/2022 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 01/24/2022 | Approval - Private Provider | PPROVIDER |
| WALL SHEATHING | 12/17/2021 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/17/2021 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 12/17/2021 | Approval - Private Provider | PPROVIDER |
| FOUND SURVEY APPROVED (OFFICE) | 11/09/2021 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 11/01/2021 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 10/27/2021 | Approval - Private Provider | PPROVIDER |
| WATER METER INSTALLATION REQUEST | 10/12/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 11/09/2021 | 11/09/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/09/2021 | 11/09/2021 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/04/2021 | 08/04/2021 |
| Note: Released By: JPI | |||
| BLD | HOLD | 07/30/2021 | 08/02/2021 |
| Note: Held By: JPI 1. Product Approval Information Sheet: a. Off Ridge Vent (Roof Plan) omitted; provide approved product, product description, manufacturer, and product approval number. 4. Provide roof pressure zone nailing schedule- FBC-R301.2(7). REPEAT COMMENT 5. Identify/Specify rating of door from garage to interior of the home- FBC-R302.5.1. REPEAT COMMENT | |||
| BLD | HOLD | 07/22/2021 | 07/27/2021 |
| Note: Held By: JPI 1. Product Approval Specification Sheet: a. For ALL products on the Product Approval Specification Sheet, identify the product with the full Approval Number (i.e. 20461.#-R6) that corresponds with the product being used. Products could not be reviewed or verified without the complete product approval number. b. Exterior Swinging Doors omitted; provide product description& type, manufacturer, and product approval number. c. Roofing underlayment is not what is specified on the Roofing Worksheet- coordinate. e. Roofing Worksheet: a. Provide specific Florida Product Approval number for roofing underlayment and coordinate with Product Approval Specification Sheet. 3. Identify roof vents on Roof Plan, Sht. “a4” and their locations. 4. Provide roof pressure zone nailing schedule- FBC-R301.2(7). 5. Identify/Specify rating of door from garage to interior of the home- FBC-R302.5.1. 6. Detail 4/a5, Unit Separating Wall Section does not match U.L. #U309 as specified on the drawing. Provide correct UL Design numbers for ALL rated assemblies along with UL Design cut sheets. Specify on drawings that penetrations through rated assemblies must be per FBC R302.4.1.1 and R302.4.1.2. | |||
| ELEC | COMPLETE | 07/22/2021 | 07/23/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 07/22/2021 | 07/23/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | HOLD | 07/09/2021 | 07/09/2021 |
| Note: Held By: JPI 1. We noticed that certain product approvals have expired. Please verify that all product approvals are current and resubmit to continue the review. Code Version 2020 FL# 14396 Application Type ALL Product Manufacturer ALL Category ALL Subcategory ALL Application Status ALL Compliance Method ALL Quality Assurance Entity ALL Quality Assurance Entity Contract Expired ALL Product Model, Number or Name ALL Product Description ALL Approved for use in HVHZ ALL Approved for use outside HVHZ ALL Impact Resistant ALL Design Pressure ALL Other ALL Search Results - Applications There are no records that match the search criteria | |||
| CUSVC | COMPLETE | 07/09/2021 | 07/16/2021 |
| Note: Released By: ALYSSA ROSCOE - - | |||
| ELEC | HOLD | 07/09/2021 | 07/12/2021 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Need outlet in master bath. NEC 2017 210.52 (D) | |||
| ENGIN1 | COMPLETE | 07/09/2021 | 07/09/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 07/09/2021 | 07/12/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 07/09/2021 | 07/12/2021 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Orientation of Eneergy Calcs does not match the site plan. Revise to match | |||
| SW1 | COMPLETE | 07/09/2021 | 07/16/2021 |
| Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/09/2021 | 07/20/2021 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 07/09/2021 | 09/24/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 06/10/2022 |
| SW ENG REINSPECTION 20 | ¤20.00 | 06/06/2022 |
| ADMINISTRATIVE - RESID PP | ¤225.00 | 06/06/2022 |
| INSPECTION- ELECTRICAL | ¤247.80 | 10/07/2021 |
| INSPECTION - MECHANICAL | ¤247.80 | 10/07/2021 |
| INSPECTION - PLUMBING | ¤247.80 | 10/07/2021 |
| PLAN REVIEW - RESIDENTIAL | ¤125.20 | 10/07/2021 |
| CONNECTION FEES | ¤2,035.66 | 10/07/2021 |
| BUILDING DISCOUNT 100% | (¤1,514.60) | 10/07/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤22.02) | 10/07/2021 |
| IMPACT FEE FIRE | ¤734.00 | 10/07/2021 |
| IMPACT FEE PARKS | ¤2,398.24 | 10/07/2021 |
| IMPACT FEE SCHOOL | ¤7,200.00 | 10/07/2021 |
| IMPACT FEE TRANSPORTATION | ¤2,666.00 | 10/07/2021 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 10/07/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤71.95) | 10/07/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 10/07/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤79.98) | 10/07/2021 |
| SEWER CREDIT | (¤2,015.95) | 10/07/2021 |
| SEWER INSPECTION | ¤25.00 | 10/07/2021 |
| SEWER CAPITAL FACILITY | ¤9,329.10 | 10/07/2021 |
| WATER CAPITAL FACILITY FEE | ¤6,848.90 | 10/07/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤626.00 | 10/07/2021 |
| SITE PLAN 20 | ¤20.00 | 10/07/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 10/07/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 10/07/2021 |
| METER - DEPOSIT | ¤120.00 | 10/07/2021 |
| WATER- TURN ON | ¤50.00 | 10/07/2021 |
| ADMINISTRATIVE RESIDENTIAL | ¤20.00 | 10/07/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤29,656.00 |