I want to search for...
Permit #2021070494
Permit Details
Status: COED
| Parcel Id: 07-11-31-7024-00120-0010 |
| CONDITIONED SPACE: 2154 sqft |
| GARAGE: 436 sqft |
| OPENED PORCH (WITH ROOF) : 157 sqft |
| OPENED PORCH (WITH ROOF) : 27 sqft |
| Total Square Footage: 2774 sqft |
| Block: 00120 |
| Subdivision: 2167 - SECTION 24-PINE GROVE |
| Job Phone: 904-268-7730 |
| Location Address: 57 PRINCE ERIC LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/26/2021 |
| NOC: RECORDED |
| Applicant name: DALE ALAN DUBBERLY |
| Owner: MARONDA HOMES, LLC |
|
Address 5220 SHAD RD JACKSONVILLE, FL 32257 |
|
Address STE 202 JACKSONVILLE, FL 32257 |
| Lot: 0010 |
| Contracted Stated Job Value: ¤165,000.00 |
| Job Description: NEW SINGLE FAMILY DWELLING |
| Type: CN |
Contractor
MARONDA HOMES INC
| Status | Location Address | State License Number | Phone |
| CANCEL |
5220 SHAD ROAD JACKSONVILLE , FL 32257 |
CGC1504922 (Exp: 08/31/2022) | 904-268-7730 |
Sub Contractors
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
ANDREW SCOTT DIGAETANO JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
44 FORT CAROLINE PALM COAST, FL 32137 |
CCC1331606 (Exp: 08/31/2026) | 386-302-9063 |
MICHAEL LEE RAFFENSBERGER
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
7725 SANDSCOVE CT WINTER PARK, FL 32792 |
CAC1819723 (Exp: 08/31/2024) | 407-629-6920 | 407-629-9307 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 06/15/2022 | FINAL APPROVED | KSANDOE |
| U -UTILITY RESIDENTIAL FINAL | 06/15/2022 | APPROVED - AS NOTED | LFITZGERALD |
| Note: please switch out square nut sewer clean out cap with a flush mount that is flush to grade | |||
| ROW - STORMWATER FINAL | 06/14/2022 | APPROVED - AS NOTED | RGROSS |
| Note: THIS IS A REINSPECTION THINGS NEED TO BE CORRECTED BEFORE YOU PASS (1) NEED TO GET PORTER JOHN PICKED UP (2) NEED SEED AND STRAW ON VACANT LOT BEHIND HOME (3) NEED TO HAVE SOD LAYED IN SWALE ON PRINCE ANTHONY LANE AND ALL RUTTS FIXED 6/14/22 - Port o let to be picked up tomorrow. | |||
| ROW - STORMWATER FINAL | 06/13/2022 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: THINGS NEED TO BE CORRECTED BEFORE YOU PASS (1) NEED TO GET PORTER JOHN PICKED UP (2) NEED SEED AND STRAW ON VACANT LOT BEHIND HOME (3) NEED TO HAVE SOD LAYED IN SWALE ON PRINCE ANTHONY LANE AND ALL RUTTS FIXED | |||
| ROW - FINAL APRON (AFTER POUR) | 06/13/2022 | APPROVED | PFLANAGAN |
| U - SEWER TIE IN | 06/03/2022 | APPROVED | MGIBSON |
| ELECTRIC - EARLY POWER | 05/05/2022 | APPROVED - AS NOTED | KSANDOE |
| Note: Emailed FPL @0956. Release Power | |||
| ELECTRIC-TUG | 05/02/2022 | APPROVED - AS NOTED | JMUNSON |
| Note: THIS IS A REINSPECTION Panel painted shut. Cannot access for inspection 5/2/22 Emailed FPL at 10:05 am | |||
| ELECTRIC-TUG | 04/27/2022 | Disapproved - NO FEE | KSANDOE |
| Note: Panel painted shut. Cannot access for inspection | |||
| FINAL SURVEY (OFFICE USE ONLY) | 04/26/2022 | APPROVED | RGROSS |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/26/2022 | APPROVED | RGROSS |
| U-CROSS CONNECTION | 03/23/2022 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation, no cross connections. | |||
| ROW- PRE-APRON (PRE-POUR) | 03/23/2022 | APPROVED - AS NOTED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. | |||
| INSULATION | 02/04/2022 | APPROVED | KSANDOE |
| WALL SHEATHING | 01/25/2022 | APPROVED | KSANDOE |
| LATH/BRICK/ WATER BARRIER | 01/24/2022 | APPROVED | KSANDOE |
| ALL ROUGH | 01/21/2022 | APPROVED - AS NOTED | KSANDOE |
| Note: Wiring along right side CMU wall needs to be strapped. leave exposed at insulation inspection. | |||
| ROOF VALLEY & METAL | 01/05/2022 | APPROVED | KSANDOE |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/29/2021 | APPROVED | KSANDOE |
| TIE BEAM / LINTEL | 11/23/2021 | APPROVED | KSANDOE |
| FOUND SURVEY APPROVED (OFFICE) | 11/17/2021 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 10/12/2021 | APPROVED | KSANDOE |
| PLUMBING 1ST ROUGH UNDERGROUND | 10/07/2021 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 10/07/2021 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 08/31/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 06/13/2022 | 06/13/2022 |
| Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM RENAME TO 'BLOWER DOOR.PDF' | |||
| ENGIN1 | COMPLETE | 11/17/2021 | 11/17/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/17/2021 | 11/17/2021 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/12/2021 | 07/13/2021 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 07/12/2021 | 07/13/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 07/12/2021 | 07/14/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/12/2021 | 07/12/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 07/12/2021 | 07/14/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 07/12/2021 | 07/13/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/12/2021 | 07/19/2021 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/12/2021 | 07/21/2021 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 07/12/2021 | 09/28/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 20 | ¤20.00 | 06/16/2022 |
| CONTRACTOR CHANGE | ¤40.00 | 06/13/2022 |
| BUILDING DISCOUNT 100% | (¤1,308.80) | 07/26/2021 |
| ELECTRIC FEE | ¤218.40 | 07/26/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 07/26/2021 |
| IMPACT FEE FIRE | ¤367.00 | 07/26/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 07/26/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 07/26/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 07/26/2021 |
| MECHANICAL FEE | ¤218.40 | 07/26/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 07/26/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 07/26/2021 |
| PLAN CHECK FEE | ¤105.60 | 07/26/2021 |
| PLUMBING FEE | ¤218.40 | 07/26/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤528.00 | 07/26/2021 |
| SITE PLAN 20 | ¤20.00 | 07/26/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 07/26/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 07/26/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 07/26/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 07/26/2021 |
| SEWER CREDIT | (¤1,342.00) | 07/26/2021 |
| SEWER INSPECTION | ¤25.00 | 07/26/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 07/26/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 07/26/2021 |
| METER - DEPOSIT | ¤60.00 | 07/26/2021 |
| WATER- TURN ON | ¤25.00 | 07/26/2021 |
| ADMIN FEE | ¤20.00 | 07/26/2021 |
| CONNECTION FEES | ¤1,017.83 | 07/26/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤14,849.43 |