I want to search for...
Permit #2021070509
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7032-00410-0200 |
| Total Square Footage: 300 sqft |
| Block: 00410 |
| Subdivision: 2155 - SECTION 32-ROYAL PALMS |
| Job Phone: 407-549-2627 |
| Location Address: 36 RUSSELL DR |
| Type: AS - ACCESSORY STRUCTURE |
| Issue Date: 08/02/2021 |
| NOC: RECORDED |
| Applicant name: GARY D WEST |
| Owner: MILES STANLEY & PATRICIA H&W |
|
Address 36 RUSSELL DRIVE PALM COAST, FL 32164 |
| Lot: 0200 |
| Contracted Stated Job Value: ¤16,700.00 |
| Job Description: PREFABRICATED PERGOAL - 015' X 20' ( 13' X 18' FOOTPRINT) |
| Type: CN |
Contractor
BACKYARD STORAGE SOLUTIONS LLC
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
3440 SAINT JOHNS PARKWAY SANFORD, FL 32771 |
CRC1329856 (Exp: 08/31/2026) | 407-549-2627 | 407-549-2629 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 06/21/2022 | FINAL APPROVED | JWALKER |
| FINAL - BUILDING MISC | 03/16/2022 | Disapproved - NO FEE | JWALKER |
| Note: THIS IS A REINSPECTION The post base anchors installed at the 8x8 post are simpon RPBZ's 2 each have been installed at the 8x8 post. The details call for simpson ABU88RZ post base anchors. Please submitt an engineers worksheet for new anchoring system installed or install approved anchors. Multiple nuts are loose and easily twisted off. Tighten and tourqe all loose nuts. CHECK ALL The metal roofing has not been fastened as per details. Detail page of proper fastening is in the permit packet. 3/16/22 The engineers letter specifies 4 RPBZ anchors per post. Only 2 RPBZ anchors have been istalled on each of the 4 post. | |||
| FOOTER | 01/06/2022 | APPROVED | JWALKER |
| FINAL - BUILDING MISC | 01/06/2022 | Disapproved - NO FEE | JWALKER |
| Note: The post base anchors installed at the 8x8 post are simpon RPBZ's 2 each have been installed at the 8x8 post. The details call for simpson ABU88RZ post base anchors. Please submitt an engineers worksheet for new anchoring system installed or install approved anchors. Multiple nuts are loose and easily twisted off. Tighten and tourqe all loose nuts. CHECK ALL The metal roofing has not been fastened as per details. Detail page of proper fastening is in the permit packet. |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 06/14/2022 | 06/15/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | HOLD | 03/25/2022 | 03/25/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM REVIEW COMMENTS: 1. Digital signature could not be verified. FS 471.025 | |||
| BLD | COMPLETE | 03/10/2022 | 03/10/2022 |
| Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM | |||
| BLD | HOLD | 01/20/2022 | 01/21/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code-Residential REVIEW COMMENTS: 1. Engineer’s letter is to be signed and sealed by the engineer. Digital signature is required to be verifiable. Copies of an engineer’s letter and signature are not accepted per S 61G15-29.001. 2. Engineer’s letter is to certify the installation of the Simpson RPBZ Tie. Engineer’s certification is to site 69G15-29.001 and 69G15-18.011. | |||
| BLD | COMPLETE | 07/26/2021 | 07/30/2021 |
| Note: Released By: HAROLD ALLEN - - HALLEN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/20/2021 | 07/20/2021 |
| Note: Released By: ESTELLE LENS - (386)986-3751 - | |||
| ZON | HOLD | 07/19/2021 | 07/19/2021 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Metal roof panels must be 3" insulated panels. Unable to verify that the roof material you are installing meets this criteria. | |||
| BLD | HOLD | 07/19/2021 | 07/26/2021 |
| Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM Repeat commentt: Plans submitted appear to be copies of a digitally signed plans. Please submit digitally signed plans that the digital signature can be verified. | |||
| BLD | HOLD | 07/12/2021 | 07/16/2021 |
| Note: Held By: HAROLD ALLEN - - HALLEN@PALMCOASTGOV.COM Plans submitted appear to be copies of a digitally signed plans. Please submit digitally signed plans that the digital signature can be verified. | |||
| ZON | HOLD | 07/12/2021 | 07/16/2021 |
| Note: Held By: JACQUELINE GONZALEZ - (386)986-3751 - JGONZALEZ@PALMCOASTGOV.COM Submitt information regarding the type of metal roof being placed on the exsisting structure.. Corrurgated roof panel are not allowed under our code. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 06/17/2022 |
| BUILDING DISCOUNT 100% | (¤126.80) | 08/02/2021 |
| PLAN CHECK FEE | ¤40.00 | 08/02/2021 |
| REMODEL/ADDITION/ACCES INSPECT | ¤66.80 | 08/02/2021 |
| SITE PLAN 20 | ¤20.00 | 08/02/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 08/02/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 08/02/2021 |
| ADMIN FEE | ¤20.00 | 08/02/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤56.50 |