Permit #2021070563
Permit Details
Status: COED
| Parcel Id: 07-11-31-7035-00860-0060 |
| CONDITIONED SPACE: 1867 sqft |
| GARAGE: 409 sqft |
| OPENED PORCH (WITH ROOF) : 28 sqft |
| Total Square Footage: 2304 sqft |
| Block: 00860 |
| Subdivision: 2172 - SECTION 35-BELLE TERRE |
| Job Phone: 904-268-7730 |
| Location Address: 15 BUD HOLLOW DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/27/2021 |
| NOC: RECORDED |
| Applicant name: DALE ALAN DUBBERLY |
| Owner: MARONDA HOMES INC |
|
Address 5220 SHAD ROAD JACKSONVILLE, FL32257 11021 |
|
Address STE 202 JACKSONVILLE, FL32257 11021 |
| Lot: 0060 |
| Contracted Stated Job Value: ¤160,000.00 |
| Job Description: NEW SINGLE FAMILY DWELLING |
| Type: CN |
Contractor
MARONDA HOMES INC
| Status | Location Address | State License Number | Phone |
| CANCEL |
5220 SHAD ROAD JACKSONVILLE , FL 32257 |
CGC1504922 (Exp: 08/31/2022) | 904-268-7730 |
Sub Contractors
RONALD KEVIN HAUPT
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4005 MARONDA WAY SANFORD, FL 32771 |
CAC058534 (Exp: 08/31/2026) | 407-321-0064 |
CLINTON J HULSLANDER SR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
4005 MARONDA WAY SANFORD, FL 32771 |
CFC1430632 (Exp: 08/31/2026) | 407-321-0064 | 407-688-8534 |
ANDREW SCOTT DIGAETANO JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
44 FORT CAROLINE PALM COAST, FL 32137 |
CCC1331606 (Exp: 08/31/2026) | 386-302-9063 |
JAMES M GREENSLADE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
311 S BAY ST BUNNELL, FL 32110 |
EC13006083 (Exp: 08/31/2026) | 386-263-2960 | 386-263-2980 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - STORMWATER FINAL | 08/30/2022 | FINAL APPROVED | EMADISON |
| Note: THIS IS A REINSPECTION ** 08/30/22 ALL CORRECTIONS HAVE BEEN MADE THIS IS A REINSPECTION ** 08/29/22 INSPECTION CANCELED BY APPLICANT ** 08/26/22 INSPECTION CANCELED BY APPLICANT ** 08/23/22 CORRECTIONS TO BE MADE IN LEFT REAR CORNER AS WELL AS SOD TO MATCH EXITING GRADE IN IN SWALE ** CLEAN OUT CULVERT PIPE ENDS | |||
| ROW - STORMWATER FINAL | 08/29/2022 | CANCELLED BY APPLICANT | EMADISON |
| Note: THIS IS A REINSPECTION ** 08/29/22 INSPECTION CANCELED BY APPLICANT ** 08/26/22 INSPECTION CANCELED BY APPLICANT ** 08/23/22 CORRECTIONS TO BE MADE IN LEFT REAR CORNER AS WELL AS SOD TO MATCH EXITING GRADE IN IN SWALE ** CLEAN OUT CULVERT PIPE ENDS | |||
| ROW - STORMWATER FINAL | 08/26/2022 | CANCELLED BY APPLICANT | EMADISON |
| Note: ** 08/26/22 INSPECTION CANCELED BY APPLICANT ** 08/23/22 CORRECTIONS TO BE MADE IN LEFT REAR CORNER AS WELL AS SOD TO MATCH EXITING GRADE IN IN SWALE ** CLEAN OUT CULVERT PIPE ENDS | |||
| BLD - BUILDING FINAL | 08/25/2022 | FINAL APPROVED | DCUSHING |
| Note: Inspector Notes from Inspection 2420 ** 08/23/22 CORRECTIONS TO BE MADE IN LEFT REAR CORNER AS WELL AS SOD TO MATCH EXITING GRADE IN IN SWALE ** CLEAN OUT CULVERT PIPE ENDS | |||
| U -UTILITY RESIDENTIAL FINAL | 08/24/2022 | FINAL APPROVED | DHANEY |
| ROW - FINAL APRON (AFTER POUR) | 08/24/2022 | APPROVED | EMADISON |
| Note: THIS IS A REINSPECTION ** BUILDER NEEDS TO READ NOTES FROM PREVIOUS INSPECTION, INSPECTOR MISTAKE RESULTED WRONG INSPECTION. YOU NEED TO DO THE FINAL SURVEY READ NOTES FROM FAILED FINAL SURVEY AND TAKE CORRECTIVE ACTION. BEFORE SUBMITTING ROW FINAL APRON. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/23/2022 | APPROVED | EMADISON |
| Note: THIS IS A REINSPECTION ** 08/11/22 SITE PLAN INDICATES A COMMON SWALE ON RIGHT SIDE PROPERTY LINE WITH VACANT LOT BUILDER NEEDS TO DO A COMMON SWALE ON RIGHT SIDE | |||
| ALL ROUGH | 08/23/2022 | APPROVED - AS NOTED | EMADISON |
| Note: ** 08/23/22 CORRECTIONS TO BE MADE IN LEFT REAR CORNER AS WELL AS SOD TO MATCH EXITING GRADE IN IN SWALE ** CLEAN OUT CULVERT PIPE ENDS | |||
| ROW - FINAL APRON (AFTER POUR) | 08/15/2022 | Disapproved - NO FEE | EMADISON |
| Note: ** BUILDER NEEDS TO READ NOTES FROM PREVIOUS INSPECTION, INSPECTOR MISTAKE RESULTED WRONG INSPECTION. YOU NEED TO DO THE FINAL SURVEY READ NOTES FROM FAILED FINAL SURVEY AND TAKE CORRECTIVE ACTION. BEFORE SUBMITTING ROW FINAL APRON. | |||
| ROW - FINAL APRON (AFTER POUR) | 08/11/2022 | Disapproved - NO FEE | EMADISON |
| Note: ** 08/11/22 RIGHT SIDE PROPERTY LINE INDICATES A COMMON SWALE WITH THE VACANT LOT ON SITE PLAN *** DIREGARD THIS INSPECTION AS IT WAS A TYPO BY INSPECTOR THIS WAS MEANT FOR THE ROW FINAL SURVEY **** | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/11/2022 | Disapproved - NO FEE | EMADISON |
| Note: ** 08/11/22 SITE PLAN INDICATES A COMMON SWALE ON RIGHT SIDE PROPERTY LINE WITH VACANT LOT | |||
| FINAL SURVEY (OFFICE USE ONLY) | 08/11/2022 | CANCELLED BY INSPECTOR | EMADISON |
| Note: ** 08/11/22 THIS IS A DUPLICATE INSPECTION FOR THE ROW FINAL SURVEY INSPECTION | |||
| ELECTRIC - EARLY POWER | 08/10/2022 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 9:54 am | |||
| U - SEWER TIE IN | 08/10/2022 | APPROVED | MGIBSON |
| PEP TANK INSTALLATION REQUEST | 06/29/2022 | APPROVED | CSTONE |
| ROW- PRE-APRON (PRE-POUR) | 06/29/2022 | APPROVED | RGROSS |
| Note: READY TO POUR | |||
| INSULATION | 06/17/2022 | APPROVED | FWILLIS |
| U-CROSS CONNECTION | 06/16/2022 | APPROVED | DHANEY |
| LATH/BRICK/ WATER BARRIER | 06/15/2022 | APPROVED | RMARTIN |
| ALL ROUGH | 06/14/2022 | APPROVED - AS NOTED | MKRASKI |
| Note: 1. 5' head pressure test failed 2. Supply duct goin into AHU plenum needs to be sealed with mastic | |||
| ROOF VALLEY & METAL | 06/10/2022 | APPROVED | FWILLIS |
| WALL SHEATHING | 06/02/2022 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/02/2022 | APPROVED | FWILLIS |
| FOUND SURVEY APPROVED (OFFICE) | 05/31/2022 | APPROVED | AMOBLEY |
| ELECTRIC-TUG | 05/24/2022 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 9:37 am | |||
| TIE BEAM / LINTEL | 05/03/2022 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Dowel missing inside corner, left of front door opening, D&E dowel into slab | |||
| TIE BEAM / LINTEL | 05/02/2022 | Disapproved - NO FEE | DCUSHING |
| Note: THIS IS A REINSPECTION Dowel missing inside corner, left of front door opening, D&E dowel into slab | |||
| TIE BEAM / LINTEL | 04/29/2022 | CANCELLED BY APPLICANT | FWILLIS |
| MONOLITHIC SLAB | 03/03/2022 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION NO PLASTIC NO REBAR NO COMPACTION.........NO WORKERS!!!!! | |||
| MONOLITHIC SLAB | 02/18/2022 | Disapproved -FEE REQUIRED | FWILLIS |
| Note: NO PLASTIC NO REBAR NO COMPACTION.........NO WORKERS!!!!! | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 02/14/2022 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 02/14/2022 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 12/30/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 05/31/2022 | 05/31/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/31/2022 | 05/31/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/19/2022 | 01/19/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/13/2021 | 07/13/2021 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 07/13/2021 | 07/20/2021 |
| Note: Released By: ALYSSA ROSCOE - - | |||
| ELEC | COMPLETE | 07/13/2021 | 07/14/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/13/2021 | 07/13/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 07/13/2021 | 07/14/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 07/13/2021 | 07/14/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/13/2021 | 07/20/2021 |
| Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/13/2021 | 07/22/2021 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 07/13/2021 | 10/01/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 08/26/2022 |
| PLAN REVIEW - REVISION | ¤32.50 | 08/26/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 08/26/2022 |
| CONNECTION FEES | ¤1,017.83 | 07/27/2021 |
| METER - DEPOSIT | ¤60.00 | 07/27/2021 |
| WATER- TURN ON | ¤25.00 | 07/27/2021 |
| ADMIN FEE | ¤20.00 | 07/27/2021 |
| BUILDING DISCOUNT 100% | (¤1,145.00) | 07/27/2021 |
| ELECTRIC FEE | ¤195.00 | 07/27/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 07/27/2021 |
| IMPACT FEE FIRE | ¤367.00 | 07/27/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 07/27/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 07/27/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 07/27/2021 |
| MECHANICAL FEE | ¤195.00 | 07/27/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 07/27/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 07/27/2021 |
| PLAN CHECK FEE | ¤90.00 | 07/27/2021 |
| PLUMBING FEE | ¤195.00 | 07/27/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤450.00 | 07/27/2021 |
| SITE PLAN 20 | ¤20.00 | 07/27/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 07/27/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 07/27/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 07/27/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 07/27/2021 |
| SEWER CREDIT | (¤850.00) | 07/27/2021 |
| SEWER INSPECTION | ¤25.00 | 07/27/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 07/27/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 07/27/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,393.93 |