I want to search for...
Permit #2021070616
Permit Details
Status: COED
| Parcel Id: 07-11-31-7010-00100-0150 |
| CONDITIONED SPACE: 1876 sqft |
| GARAGE: 414 sqft |
| OPENED PORCH (WITH ROOF) : 68 sqft |
| Total Square Footage: 2358 sqft |
| Block: 00100 |
| Subdivision: - |
| Job Phone: 904-268-7730 |
| Location Address: 11 FIFER LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/27/2021 |
| NOC: RECORDED |
| Applicant name: DALE ALAN DUBBERLY |
| Owner: MARONDA HOMES LLC |
|
Address 5220 SHAD RD JACKSONVILLE, FL 32257 |
|
Address STE 202 JACKSONVILLE, FL 32257 |
| Lot: 0150 |
| Contracted Stated Job Value: ¤165,000.00 |
| Job Description: NEW SINGLE FAMILY DWELLING |
| Type: CN |
Contractor
MARONDA HOMES INC
| Status | Location Address | State License Number | Phone |
| CANCEL |
5220 SHAD ROAD JACKSONVILLE , FL 32257 |
CGC1504922 (Exp: 08/31/2022) | 904-268-7730 |
Sub Contractors
ANDREW SCOTT DIGAETANO JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
44 FORT CAROLINE PALM COAST, FL 32137 |
CCC1331606 (Exp: 08/31/2026) | 386-302-9063 |
CLINTON J HULSLANDER SR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
4005 MARONDA WAY SANFORD, FL 32771 |
CFC1430632 (Exp: 08/31/2026) | 407-321-0064 | 407-688-8534 |
RONALD KEVIN HAUPT
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4005 MARONDA WAY SANFORD, FL 32771 |
CAC058534 (Exp: 08/31/2026) | 407-321-0064 |
JAMES M GREENSLADE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
311 S BAY ST BUNNELL, FL 32110 |
EC13006083 (Exp: 08/31/2026) | 386-263-2960 | 386-263-2980 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 07/28/2022 | CANCELLED BY APPLICANT | WEB |
| Note: THIS IS A REINSPECTION 1. Guest bath shower head leaks. 2. Shock arrestor not installed in kitchen sink. 3. Dryer vent open. | |||
| BLD - BUILDING FINAL | 07/28/2022 | FINAL APPROVED | AGAETANO |
| Note: New inspection due to canceled inspection THIS IS A REINSPECTION 1. Guest bath shower head leaks. 2. Shock arrestor not installed in kitchen sink. 3. Dryer vent open. | |||
| BLD - BUILDING FINAL | 07/26/2022 | Disapproved - NO FEE | AGAETANO |
| Note: 1. Guest bath shower head leaks. 2. Shock arrestor not installed in kitchen sink. 3. Dryer vent open. | |||
| ROW - FINAL APRON (AFTER POUR) | 07/25/2022 | APPROVED - AS NOTED | EMADISON |
| Note: Inspector Notes from Inspection 9270 ** 07/25/22 EVERYTHING LOOKS GOOOD AT THE TIME OF THE INSPECTION THIS IS A REINSPECTION ** DRIVEWAY HAS BEEN POURED PRIOR TO HAVING THE ROW-PRE-APRON (PRE-POUR) INSPECTION. * ELEVATIONS WERE GOOD AT THE TIME OF THE INSPECTION, NEED TO RECHECKED AFTER CORRECTIONS MADE * THE CULVERT IS NOT 8' FROM THE EDGE OF ROAD TO CENTER OF PIPE. * FACE BOARD NEEDS TO BE RESET LOOK AT ALIGNMENT WITH ADJACENT DRIVEWAY. 6/30/22 - Section paver removed to check the base depth. First time offense by this builder. Next time full driveway will be removed for a full depth inspection. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/25/2022 | APPROVED - AS NOTED | EMADISON |
| Note: THIS IS A REINSPECTION ** 07/25/22 CORRECTIONS HAVE BEEN MADE ** LEFT REAR CORNER OF PROPERTY DROPS AND WILL PUSH STORMWATER ONTO THE ADJACENT PROPERTY HAVING A NEGATIVE IMPACT, THE GRADE DOES NOT MATCH THE SITE PLAN AND FINAL SURVEY. ** ENSURE THAT ALL TRASH IS PICKED UP AND BARE AREAS SEEDED AND STRAW IF NEEDED SODDED THIS IS A REINSPECTION ** DRIVEWAY HAS BEEN POURED PRIOR TO HAVING THE ROW-PRE-APRON (PRE-POUR) INSPECTION. * ELEVATIONS WERE GOOD AT THE TIME OF THE INSPECTION, NEED TO RECHECKED AFTER CORRECTIONS MADE * THE CULVERT IS NOT 8' FROM THE EDGE OF ROAD TO CENTER OF PIPE. * FACE BOARD NEEDS TO BE RESET LOOK AT ALIGNMENT WITH ADJACENT DRIVEWAY. 6/30/22 - Section paver removed to check the base depth. First time offense by this builder. Next time full driveway will be removed for a full depth inspection. | |||
| ROW - STORMWATER FINAL | 07/25/2022 | APPROVED - AS NOTED | EMADISON |
| Note: Inspector Notes from Inspection 9465 THIS IS A REINSPECTION ** 07/25/22 CORRECTIONS HAVE BEEN MADE EVERYTHING LOOKS GOOD AT THE TIME OF THE INSPECTION ** LEFT REAR CORNER OF PROPERTY DROPS AND WILL PUSH STORMWATER ONTO THE ADJACENT PROPERTY HAVING A NEGATIVE IMPACT, THE GRADE DOES NOT MATCH THE SITE PLAN AND FINAL SURVEY. ** ENSURE THAT ALL TRASH IS PICKED UP AND BARE AREAS SEEDED AND STRAW IF NEEDED SODDED THIS IS A REINSPECTION ** DRIVEWAY HAS BEEN POURED PRIOR TO HAVING THE ROW-PRE-APRON (PRE-POUR) INSPECTION. * ELEVATIONS WERE GOOD AT THE TIME OF THE INSPECTION, NEED TO RECHECKED AFTER CORRECTIONS MADE * THE CULVERT IS NOT 8' FROM THE EDGE OF ROAD TO CENTER OF PIPE. * FACE BOARD NEEDS TO BE RESET LOOK AT ALIGNMENT WITH ADJACENT DRIVEWAY. 6/30/22 - Section paver removed to check the base depth. First time offense by this builder. Next time full driveway will be removed for a full depth inspection. | |||
| U -UTILITY RESIDENTIAL FINAL | 07/25/2022 | FINAL APPROVED | JHARDING |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/22/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** LEFT REAR CORNER OF PROPERTY DROPS AND WILL PUSH STORMWATER ONTO THE ADJACENT PROPERTY HAVING A NEGATIVE IMPACT, THE GRADE DOES NOT MATCH THE SITE PLAN AND FINAL SURVEY. ** ENSURE THAT ALL TRASH IS PICKED UP AND BARE AREAS SEEDED AND STRAW IF NEEDED SODDED THIS IS A REINSPECTION ** DRIVEWAY HAS BEEN POURED PRIOR TO HAVING THE ROW-PRE-APRON (PRE-POUR) INSPECTION. * ELEVATIONS WERE GOOD AT THE TIME OF THE INSPECTION, NEED TO RECHECKED AFTER CORRECTIONS MADE * THE CULVERT IS NOT 8' FROM THE EDGE OF ROAD TO CENTER OF PIPE. * FACE BOARD NEEDS TO BE RESET LOOK AT ALIGNMENT WITH ADJACENT DRIVEWAY. 6/30/22 - Section paver removed to check the base depth. First time offense by this builder. Next time full driveway will be removed for a full depth inspection. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 07/22/2022 | APPROVED | EMADISON |
| ELECTRIC-TUG | 07/08/2022 | APPROVED - AS NOTED | JMUNSON |
| Note: THIS IS A REINSPECTION No inspection, doors locked, need access for inspection. FBC R110.1. 7/8/22 Emailed FPL at 11:07 am | |||
| ELECTRIC-TUG | 07/06/2022 | Disapproved - NO FEE | AGAETANO |
| Note: No inspection, doors locked, need access for inspection. FBC R110.1. | |||
| ROW- PRE-APRON (PRE-POUR) | 06/30/2022 | APPROVED - AS NOTED | RGROSS |
| Note: THIS IS A REINSPECTION ** DRIVEWAY HAS BEEN POURED PRIOR TO HAVING THE ROW-PRE-APRON (PRE-POUR) INSPECTION. * ELEVATIONS WERE GOOD AT THE TIME OF THE INSPECTION, NEED TO RECHECKED AFTER CORRECTIONS MADE * THE CULVERT IS NOT 8' FROM THE EDGE OF ROAD TO CENTER OF PIPE. * FACE BOARD NEEDS TO BE RESET LOOK AT ALIGNMENT WITH ADJACENT DRIVEWAY. 6/30/22 - Section paver removed to check the base depth. First time offense by this builder. Next time full driveway will be removed for a full depth inspection. | |||
| ROW- PRE-APRON (PRE-POUR) | 06/16/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** DRIVEWAY HAS BEEN POURED PRIOR TO HAVING THE ROW-PRE-APRON (PRE-POUR) INSPECTION. * ELEVATIONS WERE GOOD AT THE TIME OF THE INSPECTION, NEED TO RECHECKED AFTER CORRECTIONS MADE * THE CULVERT IS NOT 8' FROM THE EDGE OF ROAD TO CENTER OF PIPE. * FACE BOARD NEEDS TO BE RESET LOOK AT ALIGNMENT WITH ADJACENT DRIVEWAY. | |||
| ELECTRIC - EARLY POWER | 06/10/2022 | APPROVED | AGAETANO |
| Note: FPL notified at 8:54 am | |||
| U-CROSS CONNECTION | 06/07/2022 | APPROVED | DHANEY |
| U-CROSS CONNECTION | 06/06/2022 | CANCELLED BY APPLICANT | WEB |
| ROW- PROJECT STATUS | 06/03/2022 | APPROVED | GBERTOLA |
| Note: check the form board at the edge of the road | |||
| ROW- PRE-APRON (PRE-POUR) | 06/03/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: * ELEVATIONS WERE GOOD AT THE TIME OF THE INSPECTION, NEED TO RECHECKED AFTER CORRECTIONS MADE * THE CULVERT IS NOT 8' FROM THE EDGE OF ROAD TO CENTER OF PIPE. * FACE BOARD NEEDS TO BE RESET LOOK AT ALIGNMENT WITH ADJACENT DRIVEWAY. | |||
| LATH/BRICK/ WATER BARRIER | 05/12/2022 | APPROVED | AGAETANO |
| INSULATION | 05/10/2022 | APPROVED | AGAETANO |
| ALL ROUGH | 05/05/2022 | APPROVED | AGAETANO |
| ROOF VALLEY & METAL | 05/02/2022 | APPROVED | AGAETANO |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/28/2022 | APPROVED - AS NOTED | AGAETANO |
| Note: 2 straps not nailed properly at T 45 ( right side of home, second bedroom on the rigth above the window). | |||
| FOUND SURVEY APPROVED (OFFICE) | 04/27/2022 | APPROVED | TBAKER |
| WALL SHEATHING | 04/22/2022 | APPROVED | RMARTIN |
| TIE BEAM / LINTEL | 04/04/2022 | APPROVED | AGAETANO |
| MONOLITHIC SLAB | 02/03/2022 | APPROVED | AGAETANO |
| PLUMBING 1ST ROUGH UNDERGROUND | 01/25/2022 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 01/25/2022 | APPROVED | MGIBSON |
| U - SEWER TIE IN | 01/25/2022 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 12/30/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| SWALE | COMPLETE | 07/14/2021 | 10/04/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/13/2021 | 07/18/2021 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 07/13/2021 | 07/21/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 07/13/2021 | 07/14/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/13/2021 | 07/14/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 07/13/2021 | 07/14/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 07/13/2021 | 07/14/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/13/2021 | 07/20/2021 |
| Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/13/2021 | 07/22/2021 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 07/25/2022 |
| SW ENG REINSPECTION 20 | ¤20.00 | 07/25/2022 |
| SW ENG REINSPECTION 30 | ¤30.00 | 07/25/2022 |
| SW ENG REINSPECTION 30 | ¤30.00 | 07/25/2022 |
| STORM WATER PERMIT FEES | ¤80.00 | 07/27/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 07/27/2021 |
| SEWER CREDIT | (¤1,342.00) | 07/27/2021 |
| SEWER INSPECTION | ¤25.00 | 07/27/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 07/27/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 07/27/2021 |
| METER - DEPOSIT | ¤60.00 | 07/27/2021 |
| WATER- TURN ON | ¤25.00 | 07/27/2021 |
| ADMIN FEE | ¤20.00 | 07/27/2021 |
| CONNECTION FEES | ¤1,017.83 | 07/27/2021 |
| BUILDING DISCOUNT 100% | (¤1,157.60) | 07/27/2021 |
| ELECTRIC FEE | ¤196.80 | 07/27/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 07/27/2021 |
| IMPACT FEE FIRE | ¤367.00 | 07/27/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 07/27/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 07/27/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 07/27/2021 |
| MECHANICAL FEE | ¤196.80 | 07/27/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 07/27/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 07/27/2021 |
| PLAN CHECK FEE | ¤91.20 | 07/27/2021 |
| PLUMBING FEE | ¤196.80 | 07/27/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤456.00 | 07/27/2021 |
| SITE PLAN 20 | ¤20.00 | 07/27/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 07/27/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 07/27/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤14,909.43 |