I want to search for...

Permit #2021070616

Permit Details

Status: COED

Parcel Id: 07-11-31-7010-00100-0150
CONDITIONED SPACE: 1876 sqft
GARAGE: 414 sqft
OPENED PORCH (WITH ROOF) : 68 sqft
Total Square Footage: 2358 sqft
Block: 00100
Subdivision: -
Job Phone: 904-268-7730
Location Address: 11 FIFER LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 07/27/2021
NOC: RECORDED
Applicant name: DALE ALAN DUBBERLY
Owner: MARONDA HOMES LLC

Address

5220 SHAD RD

JACKSONVILLE, FL 32257

Address

STE 202

JACKSONVILLE, FL 32257

Lot: 0150
Contracted Stated Job Value: ¤165,000.00
Job Description: NEW SINGLE FAMILY DWELLING
Type: CN

Contractor

MARONDA HOMES INC
Status Location Address State License Number Phone
CANCEL

5220 SHAD ROAD

JACKSONVILLE , FL 32257

CGC1504922 (Exp: 08/31/2022) 904-268-7730

Sub Contractors

ANDREW SCOTT DIGAETANO JR
Status Location Address State License Number Phone
ACTIVE

44 FORT CAROLINE

PALM COAST, FL 32137

CCC1331606 (Exp: 08/31/2026) 386-302-9063
CLINTON J HULSLANDER SR
Status Location Address State License Number Phone Fax
ACTIVE

4005 MARONDA WAY

SANFORD, FL 32771

CFC1430632 (Exp: 08/31/2026) 407-321-0064 407-688-8534
RONALD KEVIN HAUPT
Status Location Address State License Number Phone
ACTIVE

4005 MARONDA WAY

SANFORD, FL 32771

CAC058534 (Exp: 08/31/2026) 407-321-0064
JAMES M GREENSLADE
Status Location Address State License Number Phone Fax
ACTIVE

311 S BAY ST

BUNNELL, FL 32110

EC13006083 (Exp: 08/31/2026) 386-263-2960 386-263-2980

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 07/28/2022 CANCELLED BY APPLICANT WEB
Note: THIS IS A REINSPECTION 1. Guest bath shower head leaks. 2. Shock arrestor not installed in kitchen sink. 3. Dryer vent open.
BLD - BUILDING FINAL 07/28/2022 FINAL APPROVED AGAETANO
Note: New inspection due to canceled inspection THIS IS A REINSPECTION 1. Guest bath shower head leaks. 2. Shock arrestor not installed in kitchen sink. 3. Dryer vent open.
BLD - BUILDING FINAL 07/26/2022 Disapproved - NO FEE AGAETANO
Note: 1. Guest bath shower head leaks. 2. Shock arrestor not installed in kitchen sink. 3. Dryer vent open.
ROW - FINAL APRON (AFTER POUR) 07/25/2022 APPROVED - AS NOTED EMADISON
Note: Inspector Notes from Inspection 9270 ** 07/25/22 EVERYTHING LOOKS GOOOD AT THE TIME OF THE INSPECTION THIS IS A REINSPECTION ** DRIVEWAY HAS BEEN POURED PRIOR TO HAVING THE ROW-PRE-APRON (PRE-POUR) INSPECTION. * ELEVATIONS WERE GOOD AT THE TIME OF THE INSPECTION, NEED TO RECHECKED AFTER CORRECTIONS MADE * THE CULVERT IS NOT 8' FROM THE EDGE OF ROAD TO CENTER OF PIPE. * FACE BOARD NEEDS TO BE RESET LOOK AT ALIGNMENT WITH ADJACENT DRIVEWAY. 6/30/22 - Section paver removed to check the base depth. First time offense by this builder. Next time full driveway will be removed for a full depth inspection.
ROW FIELD SURVEY /GRADING CERTIFICATION 07/25/2022 APPROVED - AS NOTED EMADISON
Note: THIS IS A REINSPECTION ** 07/25/22 CORRECTIONS HAVE BEEN MADE ** LEFT REAR CORNER OF PROPERTY DROPS AND WILL PUSH STORMWATER ONTO THE ADJACENT PROPERTY HAVING A NEGATIVE IMPACT, THE GRADE DOES NOT MATCH THE SITE PLAN AND FINAL SURVEY. ** ENSURE THAT ALL TRASH IS PICKED UP AND BARE AREAS SEEDED AND STRAW IF NEEDED SODDED THIS IS A REINSPECTION ** DRIVEWAY HAS BEEN POURED PRIOR TO HAVING THE ROW-PRE-APRON (PRE-POUR) INSPECTION. * ELEVATIONS WERE GOOD AT THE TIME OF THE INSPECTION, NEED TO RECHECKED AFTER CORRECTIONS MADE * THE CULVERT IS NOT 8' FROM THE EDGE OF ROAD TO CENTER OF PIPE. * FACE BOARD NEEDS TO BE RESET LOOK AT ALIGNMENT WITH ADJACENT DRIVEWAY. 6/30/22 - Section paver removed to check the base depth. First time offense by this builder. Next time full driveway will be removed for a full depth inspection.
ROW - STORMWATER FINAL 07/25/2022 APPROVED - AS NOTED EMADISON
Note: Inspector Notes from Inspection 9465 THIS IS A REINSPECTION ** 07/25/22 CORRECTIONS HAVE BEEN MADE EVERYTHING LOOKS GOOD AT THE TIME OF THE INSPECTION ** LEFT REAR CORNER OF PROPERTY DROPS AND WILL PUSH STORMWATER ONTO THE ADJACENT PROPERTY HAVING A NEGATIVE IMPACT, THE GRADE DOES NOT MATCH THE SITE PLAN AND FINAL SURVEY. ** ENSURE THAT ALL TRASH IS PICKED UP AND BARE AREAS SEEDED AND STRAW IF NEEDED SODDED THIS IS A REINSPECTION ** DRIVEWAY HAS BEEN POURED PRIOR TO HAVING THE ROW-PRE-APRON (PRE-POUR) INSPECTION. * ELEVATIONS WERE GOOD AT THE TIME OF THE INSPECTION, NEED TO RECHECKED AFTER CORRECTIONS MADE * THE CULVERT IS NOT 8' FROM THE EDGE OF ROAD TO CENTER OF PIPE. * FACE BOARD NEEDS TO BE RESET LOOK AT ALIGNMENT WITH ADJACENT DRIVEWAY. 6/30/22 - Section paver removed to check the base depth. First time offense by this builder. Next time full driveway will be removed for a full depth inspection.
U -UTILITY RESIDENTIAL FINAL 07/25/2022 FINAL APPROVED JHARDING
ROW FIELD SURVEY /GRADING CERTIFICATION 07/22/2022 Disapproved -FEE REQUIRED EMADISON
Note: ** LEFT REAR CORNER OF PROPERTY DROPS AND WILL PUSH STORMWATER ONTO THE ADJACENT PROPERTY HAVING A NEGATIVE IMPACT, THE GRADE DOES NOT MATCH THE SITE PLAN AND FINAL SURVEY. ** ENSURE THAT ALL TRASH IS PICKED UP AND BARE AREAS SEEDED AND STRAW IF NEEDED SODDED THIS IS A REINSPECTION ** DRIVEWAY HAS BEEN POURED PRIOR TO HAVING THE ROW-PRE-APRON (PRE-POUR) INSPECTION. * ELEVATIONS WERE GOOD AT THE TIME OF THE INSPECTION, NEED TO RECHECKED AFTER CORRECTIONS MADE * THE CULVERT IS NOT 8' FROM THE EDGE OF ROAD TO CENTER OF PIPE. * FACE BOARD NEEDS TO BE RESET LOOK AT ALIGNMENT WITH ADJACENT DRIVEWAY. 6/30/22 - Section paver removed to check the base depth. First time offense by this builder. Next time full driveway will be removed for a full depth inspection.
FINAL SURVEY (OFFICE USE ONLY) 07/22/2022 APPROVED EMADISON
ELECTRIC-TUG 07/08/2022 APPROVED - AS NOTED JMUNSON
Note: THIS IS A REINSPECTION No inspection, doors locked, need access for inspection. FBC R110.1. 7/8/22 Emailed FPL at 11:07 am
ELECTRIC-TUG 07/06/2022 Disapproved - NO FEE AGAETANO
Note: No inspection, doors locked, need access for inspection. FBC R110.1.
ROW- PRE-APRON (PRE-POUR) 06/30/2022 APPROVED - AS NOTED RGROSS
Note: THIS IS A REINSPECTION ** DRIVEWAY HAS BEEN POURED PRIOR TO HAVING THE ROW-PRE-APRON (PRE-POUR) INSPECTION. * ELEVATIONS WERE GOOD AT THE TIME OF THE INSPECTION, NEED TO RECHECKED AFTER CORRECTIONS MADE * THE CULVERT IS NOT 8' FROM THE EDGE OF ROAD TO CENTER OF PIPE. * FACE BOARD NEEDS TO BE RESET LOOK AT ALIGNMENT WITH ADJACENT DRIVEWAY. 6/30/22 - Section paver removed to check the base depth. First time offense by this builder. Next time full driveway will be removed for a full depth inspection.
ROW- PRE-APRON (PRE-POUR) 06/16/2022 Disapproved -FEE REQUIRED EMADISON
Note: ** DRIVEWAY HAS BEEN POURED PRIOR TO HAVING THE ROW-PRE-APRON (PRE-POUR) INSPECTION. * ELEVATIONS WERE GOOD AT THE TIME OF THE INSPECTION, NEED TO RECHECKED AFTER CORRECTIONS MADE * THE CULVERT IS NOT 8' FROM THE EDGE OF ROAD TO CENTER OF PIPE. * FACE BOARD NEEDS TO BE RESET LOOK AT ALIGNMENT WITH ADJACENT DRIVEWAY.
ELECTRIC - EARLY POWER 06/10/2022 APPROVED AGAETANO
Note: FPL notified at 8:54 am
U-CROSS CONNECTION 06/07/2022 APPROVED DHANEY
U-CROSS CONNECTION 06/06/2022 CANCELLED BY APPLICANT WEB
ROW- PROJECT STATUS 06/03/2022 APPROVED GBERTOLA
Note: check the form board at the edge of the road
ROW- PRE-APRON (PRE-POUR) 06/03/2022 Disapproved -FEE REQUIRED EMADISON
Note: * ELEVATIONS WERE GOOD AT THE TIME OF THE INSPECTION, NEED TO RECHECKED AFTER CORRECTIONS MADE * THE CULVERT IS NOT 8' FROM THE EDGE OF ROAD TO CENTER OF PIPE. * FACE BOARD NEEDS TO BE RESET LOOK AT ALIGNMENT WITH ADJACENT DRIVEWAY.
LATH/BRICK/ WATER BARRIER 05/12/2022 APPROVED AGAETANO
INSULATION 05/10/2022 APPROVED AGAETANO
ALL ROUGH 05/05/2022 APPROVED AGAETANO
ROOF VALLEY & METAL 05/02/2022 APPROVED AGAETANO
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/28/2022 APPROVED - AS NOTED AGAETANO
Note: 2 straps not nailed properly at T 45 ( right side of home, second bedroom on the rigth above the window).
FOUND SURVEY APPROVED (OFFICE) 04/27/2022 APPROVED TBAKER
WALL SHEATHING 04/22/2022 APPROVED RMARTIN
TIE BEAM / LINTEL 04/04/2022 APPROVED AGAETANO
MONOLITHIC SLAB 02/03/2022 APPROVED AGAETANO
PLUMBING 1ST ROUGH UNDERGROUND 01/25/2022 APPROVED MGIBSON
GRAVITY SEWER TEST 01/25/2022 APPROVED MGIBSON
U - SEWER TIE IN 01/25/2022 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 12/30/2021 APPROVED CSTONE

Review History

Department Status Date In Date Out
SWALE COMPLETE 07/14/2021 10/04/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD COMPLETE 07/13/2021 07/18/2021
Note: Released By: JPI
CUSVC COMPLETE 07/13/2021 07/21/2021
Note: Released By: HALEIGH HAND - -
ELEC COMPLETE 07/13/2021 07/14/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/13/2021 07/14/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 07/13/2021 07/14/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 07/13/2021 07/14/2021
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 07/13/2021 07/20/2021
Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM
ZON COMPLETE 07/13/2021 07/22/2021
Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 07/25/2022
SW ENG REINSPECTION 20 ¤20.00 07/25/2022
SW ENG REINSPECTION 30 ¤30.00 07/25/2022
SW ENG REINSPECTION 30 ¤30.00 07/25/2022
STORM WATER PERMIT FEES ¤80.00 07/27/2021
3% TRANS IMPACT FEE CREDIT (¤51.54) 07/27/2021
SEWER CREDIT (¤1,342.00) 07/27/2021
SEWER INSPECTION ¤25.00 07/27/2021
SEWER CAPITAL FACILITY ¤4,664.55 07/27/2021
WATER CAPITAL FACILITY FEE ¤3,424.45 07/27/2021
METER - DEPOSIT ¤60.00 07/27/2021
WATER- TURN ON ¤25.00 07/27/2021
ADMIN FEE ¤20.00 07/27/2021
CONNECTION FEES ¤1,017.83 07/27/2021
BUILDING DISCOUNT 100% (¤1,157.60) 07/27/2021
ELECTRIC FEE ¤196.80 07/27/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 07/27/2021
IMPACT FEE FIRE ¤367.00 07/27/2021
IMPACT FEE PARKS ¤1,199.12 07/27/2021
IMPACT FEE SCHOOL ¤3,600.00 07/27/2021
IMPACT FEE TRANSPORTATION ¤1,718.00 07/27/2021
MECHANICAL FEE ¤196.80 07/27/2021
WATER -IRRIGATION INSPECTION ¤25.00 07/27/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 07/27/2021
PLAN CHECK FEE ¤91.20 07/27/2021
PLUMBING FEE ¤196.80 07/27/2021
NEW RESIDENTIAL INSPECTIONS ¤456.00 07/27/2021
SITE PLAN 20 ¤20.00 07/27/2021
SURCHARGE FS 533.721 ¤2.00 07/27/2021
SURCHARGE - FS 468.631 ¤2.00 07/27/2021
Fees Total Due: ¤0.00 Total Paid: ¤14,909.43