I want to search for...

Permit #2021070620

Permit Details

Status: COED

Parcel Id: 07-11-31-7007-00050-0270
CONDITIONED SPACE: 2066 sqft
GARAGE: 595 sqft
OPENED PORCH (WITH ROOF) : 203 sqft
OPENED PORCH (WITH ROOF) : 61 sqft
Total Square Footage: 2925 sqft
Block: 00050
Subdivision: 2185 - SECTION 7-FLORIDA PARK
Job Phone: 904-268-7730
Location Address: 88 FOUNTAIN GATE LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 07/27/2021
NOC: RECORDED
Applicant name: DALE ALAN DUBBERLY
Owner: MARONDA HOMES LLC

Address

5220 SHAD RD

JACKSONVILLE, FL 32257

Address

STE 202

JACKSONVILLE, FL 32257

Lot: 0270
Contracted Stated Job Value: ¤175,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

MARONDA HOMES INC
Status Location Address State License Number Phone
CANCEL

5220 SHAD ROAD

JACKSONVILLE , FL 32257

CGC1504922 (Exp: 08/31/2022) 904-268-7730

Sub Contractors

JEFFREY TROY SABAKA
Status Location Address State License Number Phone Fax
ACTIVE

2191 DEERWOOD ACRES DR

ST AUGUSTINE, FL 32084

CFC1427439 (Exp: 08/31/2026) 904-838-2218 904-819-0965
ANDREW SCOTT DIGAETANO JR
Status Location Address State License Number Phone
ACTIVE

44 FORT CAROLINE

PALM COAST, FL 32137

CCC1331606 (Exp: 08/31/2026) 386-302-9063
JAMES M GREENSLADE
Status Location Address State License Number Phone Fax
ACTIVE

311 S BAY ST

BUNNELL, FL 32110

EC13006083 (Exp: 08/31/2026) 386-263-2960 386-263-2980
RANDALL SCOTT ROSENFELD
Status Location Address State License Number Phone
ACTIVE

234 N WHITNEY ST

PALM COAST, FL 32084

CAC1816641 (Exp: 08/31/2026) 904-599-0082

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 08/30/2022 FINAL APPROVED AGAETANO
Note: THIS IS A REINSPECTION 08-29-2022 1. Water heater is leaking in the garage. 2. Garage light needs to be installed.
BLD - BUILDING FINAL 08/29/2022 Disapproved - NO FEE AGAETANO
Note: 08-29-2022 1. Water heater is leaking in the garage. 2. Garage light needs to be installed.
U-CROSS CONNECTION 08/29/2022 APPROVED - AS NOTED LFITZGERALD
Note: no irrigation-no cross connection
ROW - STORMWATER FINAL 08/11/2022 APPROVED EMADISON
Note: Inspector Notes from Inspection 9272 Inspector Notes from Inspection 9465 ** 08/10/22 EVERYTHING LOOKS GOOD AT THE TIME OF THIS INSPECTION Inspector Notes from Inspection 9270 ** 08/10/22 MAKE SURE CULVERT ENDS ARE CLEANED OUT FOR FINAL ROW INSPECTION ** AT THE TIME OF THE INSPECTION EVERYTHING LOOKS GOOD.
U -UTILITY RESIDENTIAL FINAL 08/11/2022 FINAL APPROVED DHANEY
ROW FIELD SURVEY /GRADING CERTIFICATION 08/10/2022 APPROVED - AS NOTED EMADISON
Note: Inspector Notes from Inspection 9270 ** 08/10/22 MAKE SURE CULVERT ENDS ARE CLEANED OUT FOR FINAL ROW INSPECTION ** AT THE TIME OF THE INSPECTION EVERYTHING LOOKS GOOD.
ROW - FINAL APRON (AFTER POUR) 08/10/2022 APPROVED - AS NOTED EMADISON
Note: Inspector Notes from Inspection 9465 ** 08/10/22 EVERYTHING LOOKS GOOD AT THE TIME OF THIS INSPECTION Inspector Notes from Inspection 9270 ** 08/10/22 MAKE SURE CULVERT ENDS ARE CLEANED OUT FOR FINAL ROW INSPECTION ** AT THE TIME OF THE INSPECTION EVERYTHING LOOKS GOOD.
FINAL SURVEY (OFFICE USE ONLY) 08/10/2022 APPROVED EMADISON
ELECTRIC - EARLY POWER 08/02/2022 APPROVED AGAETANO
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Coach lights need to be safed off in a box 07-27-2022 - Above issue has not been resolved. 07-29-2022 - Coach lights need to have covers on them in the box as noted above. 08-02-2022 - FPL notified at 1:06pm
ELECTRIC - EARLY POWER 07/29/2022 Disapproved -FEE REQUIRED AGAETANO
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Coach lights need to be safed off in a box 07-27-2022 - Above issue has not been resolved. 07-29-2022 - Coach lights need to have covers on them in the box as noted above.
ELECTRIC - EARLY POWER 07/27/2022 Disapproved -FEE REQUIRED AGAETANO
Note: THIS IS A REINSPECTION Coach lights need to be safed off in a box 07-27-2022 - Above issue has not been resolved.
ELECTRIC - EARLY POWER 07/26/2022 Disapproved -FEE REQUIRED JMUNSON
Note: Coach lights need to be safed off in a box
U - SEWER TIE IN 07/21/2022 APPROVED MGIBSON
ROW- PRE-APRON (PRE-POUR) 06/23/2022 APPROVED - AS NOTED EMADISON
Note: ** AT THE TIME OF THE INSPECTION EVERYTHING LOOKS GOOD.
INSULATION 06/22/2022 APPROVED DCUSHING
ALL ROUGH 06/15/2022 APPROVED AGAETANO
Note: THIS IS A REINSPECTION 1. Guest bath in back has missing nail plate at ceiling, right of the door. Check all. 2. Dryer vent not sealed completely at roof deck.
ALL ROUGH 06/14/2022 Disapproved - NO FEE AGAETANO
Note: 1. Guest bath in back has missing nail plate at ceiling, right of the door. Check all. 2. Dryer vent not sealed completely at roof deck.
LATH/BRICK/ WATER BARRIER 06/01/2022 APPROVED LMILLER
ELECTRIC-TUG 05/20/2022 APPROVED AGAETANO
ROOF VALLEY & METAL 05/16/2022 APPROVED AGAETANO
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/10/2022 APPROVED AGAETANO
Note: THIS IS A REINSPECTION WS-S3 Detail 5 Bracing detail not installed as per plans. Blocking and bracing missed. Noted on drawings
WALL SHEATHING 05/10/2022 APPROVED AGAETANO
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/06/2022 Disapproved - NO FEE AGAETANO
Note: WS-S3 Detail 5 Bracing detail not installed as per plans. Blocking and bracing missed. Noted on drawings
FOUND SURVEY APPROVED (OFFICE) 04/27/2022 APPROVED TBAKER
TIE BEAM / LINTEL 04/14/2022 APPROVED DCUSHING
MONOLITHIC SLAB 01/13/2022 APPROVED AGAETANO
Note: THIS IS A REINSPECTION Slab area needs to be tamped down.
MONOLITHIC SLAB 01/12/2022 Disapproved - NO FEE AGAETANO
Note: Slab area needs to be tamped down.
PLUMBING 1ST ROUGH UNDERGROUND 01/05/2022 APPROVED MGIBSON
GRAVITY SEWER TEST 01/05/2022 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 11/03/2021 APPROVED CSTONE

Review History

Department Status Date In Date Out
MECH COMPLETE 08/26/2022 08/26/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
MECH COMPLETE 08/26/2022 08/26/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
MECH COMPLETE 08/25/2022 08/25/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
MECH HOLD 08/24/2022 08/24/2022
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Duct layout needs to be signed by the AC contractor
ENGIN1 COMPLETE 04/27/2022 04/27/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 04/27/2022 04/27/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
SWALE COMPLETE 07/14/2021 10/04/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD COMPLETE 07/13/2021 07/18/2021
Note: Released By: JPI
CUSVC COMPLETE 07/13/2021 07/20/2021
Note: Released By: ALYSSA ROSCOE - -
ELEC COMPLETE 07/13/2021 07/14/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/13/2021 07/14/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 07/13/2021 07/15/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 07/13/2021 07/14/2021
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 07/13/2021 07/20/2021
Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM
ZON COMPLETE 07/13/2021 07/23/2021
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 08/29/2022
PLAN REVIEW - REVISION ¤32.50 08/29/2022
PLAN REVIEW - REVISION ¤32.50 08/26/2022
CONTRACTOR CHANGE ¤40.00 08/26/2022
CONTRACTOR CHANGE ¤40.00 08/24/2022
REINSPECTION RESIDENTIAL ¤40.00 08/24/2022
REINSPECTION RESIDENTIAL ¤40.00 08/24/2022
REINSPECTION RESIDENTIAL ¤40.00 08/24/2022
CONNECTION FEES ¤1,017.83 07/27/2021
METER - DEPOSIT ¤60.00 07/27/2021
WATER- TURN ON ¤25.00 07/27/2021
ADMIN FEE ¤20.00 07/27/2021
BUILDING DISCOUNT 100% (¤1,308.80) 07/27/2021
ELECTRIC FEE ¤218.40 07/27/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 07/27/2021
IMPACT FEE FIRE ¤367.00 07/27/2021
IMPACT FEE PARKS ¤1,199.12 07/27/2021
IMPACT FEE SCHOOL ¤3,600.00 07/27/2021
IMPACT FEE TRANSPORTATION ¤1,718.00 07/27/2021
MECHANICAL FEE ¤218.40 07/27/2021
WATER -IRRIGATION INSPECTION ¤25.00 07/27/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 07/27/2021
PLAN CHECK FEE ¤105.60 07/27/2021
PLUMBING FEE ¤218.40 07/27/2021
NEW RESIDENTIAL INSPECTIONS ¤528.00 07/27/2021
SITE PLAN 20 ¤20.00 07/27/2021
SURCHARGE FS 533.721 ¤2.00 07/27/2021
SURCHARGE - FS 468.631 ¤2.00 07/27/2021
STORM WATER PERMIT FEES ¤80.00 07/27/2021
3% TRANS IMPACT FEE CREDIT (¤51.54) 07/27/2021
SEWER INSPECTION ¤25.00 07/27/2021
SEWER CAPITAL FACILITY ¤4,664.55 07/27/2021
WATER CAPITAL FACILITY FEE ¤3,424.45 07/27/2021
Fees Total Due: ¤0.00 Total Paid: ¤16,428.93