I want to search for...

Permit #2021070731

Permit Details

Status: COED

CONDITIONED SPACE: 1775 sqft
CONDITIONED SPACE: 2300 sqft
GARAGE: 680 sqft
OPENED PORCH (WITH ROOF) : 350 sqft
OPENED PORCH (WITH ROOF) : 191 sqft
Total Square Footage: 5296 sqft
Subdivision: 2176 - SECTION 37-LAKEVIEW
Job Phone: 904-268-7730
Location Address: 21 LONG PL
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 08/10/2021
NOC: RECORDED
Applicant name: DALE ALAN DUBBERLY
Owner: MARONDA HOMES LLC OF FLORIDA

Address

5220 SHAD ROAD SUITE 202

JACKSONVILLE, FL 32257

Contracted Stated Job Value: ¤250,000.00
Job Description: SINGLE FAMILY DWELLING
Type: CN

Contractor

MARONDA HOMES INC
Status Location Address State License Number Phone
CANCEL

5220 SHAD ROAD

JACKSONVILLE , FL 32257

CGC1504922 (Exp: 08/31/2022) 904-268-7730

Sub Contractors

JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113
ANDREW SCOTT DIGAETANO JR
Status Location Address State License Number Phone
ACTIVE

44 FORT CAROLINE

PALM COAST, FL 32137

CCC1331606 (Exp: 08/31/2026) 386-302-9063
MICHAEL LEE RAFFENSBERGER
Status Location Address State License Number Phone Fax
CANCEL

7725 SANDSCOVE CT

WINTER PARK, FL 32792

CAC1819723 (Exp: 08/31/2024) 407-629-6920 407-629-9307
CLINTON J HULSLANDER SR
Status Location Address State License Number Phone Fax
ACTIVE

4005 MARONDA WAY

SANFORD, FL 32771

CFC1430632 (Exp: 08/31/2026) 407-321-0064 407-688-8534
JAMES M GREENSLADE
Status Location Address State License Number Phone Fax
ACTIVE

311 S BAY ST

BUNNELL, FL 32110

EC13006083 (Exp: 08/31/2026) 386-263-2960 386-263-2980

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 06/24/2022 FINAL APPROVED MKRASKI
ROW - FINAL APRON (AFTER POUR) 06/24/2022 APPROVED - AS NOTED EMADISON
Note: ** ALL CORRECTIONS MADE EVERYTHING LOOKS GOOD AT THE TIME OF THE INSPECTION ** THIS IS A REINSPECTION Inspector Notes from Inspection 9465 ** SWALE ON RIGHT SIDE OF DRIVEWAY NEEDS TO BE REGRADED AND SODDED TO MATCH THE EXISTING GRADE TO WHERE IT MEETS UP WITH THE DITCH LINE ON BOTH SIDES OF SWALW ** SEDIMENT NEEDS TO BE REMOVED FROM DITCH THAT HAS ERODED INTO IT TO MATCH EXISTING GRADE ** BEFORE THE STORMWATER ROW FINAL IS APPROVED / SEE ATTACHED PHOTOS
ROW - STORMWATER FINAL 06/24/2022 APPROVED - AS NOTED EMADISON
Note: ** ALL CORRECTIONS MADE EVERYTHING LOOKS GOOD AT THE TIME OF THE INSPECTION Inspector Notes from Inspection 9465 ** SWALE ON RIGHT SIDE OF DRIVEWAY NEEDS TO BE REGRADED AND SODDED TO MATCH THE EXISTING GRADE TO WHERE IT MEETS UP WITH THE DITCH LINE ON BOTH SIDES OF SWALW ** SEDIMENT NEEDS TO BE REMOVED FROM DITCH THAT HAS ERODED INTO IT TO MATCH EXISTING GRADE ** BEFORE THE STORMWATER ROW FINAL IS APPROVED / SEE ATTACHED PHOTOS
U -UTILITY RESIDENTIAL FINAL 06/23/2022 FINAL APPROVED JHARDING
ROW - STORMWATER FINAL 06/23/2022 CANCELLED BY APPLICANT EMADISON
Note: Inspector Notes from Inspection 9465 ** SWALE ON RIGHT SIDE OF DRIVEWAY NEEDS TO BE REGRADED AND SODDED TO MATCH THE EXISTING GRADE TO WHERE IT MEETS UP WITH THE DITCH LINE ON BOTH SIDES OF SWALW ** SEDIMENT NEEDS TO BE REMOVED FROM DITCH THAT HAS ERODED INTO IT TO MATCH EXISTING GRADE ** BEFORE THE STORMWATER ROW FINAL IS APPROVED / SEE ATTACHED PHOTOS
ROW - FINAL APRON (AFTER POUR) 06/23/2022 CANCELLED BY APPLICANT EMADISON
Note: Inspector Notes from Inspection 9465 ** SWALE ON RIGHT SIDE OF DRIVEWAY NEEDS TO BE REGRADED AND SODDED TO MATCH THE EXISTING GRADE TO WHERE IT MEETS UP WITH THE DITCH LINE ON BOTH SIDES OF SWALW ** SEDIMENT NEEDS TO BE REMOVED FROM DITCH THAT HAS ERODED INTO IT TO MATCH EXISTING GRADE ** BEFORE THE STORMWATER ROW FINAL IS APPROVED / SEE ATTACHED PHOTOS
BLD - BUILDING FINAL 06/23/2022 Disapproved - NO FEE RMARTIN
Note: MOST OF THE BREAKERS IN PANEL ARE OFF, NEED TO TEST ALL EQUIPMENT FOR FINAL
ROW FIELD SURVEY /GRADING CERTIFICATION 06/22/2022 APPROVED - AS NOTED EMADISON
Note: ** SWALE ON RIGHT SIDE OF DRIVEWAY NEEDS TO BE REGRADED AND SODDED TO MATCH THE EXISTING GRADE TO WHERE IT MEETS UP WITH THE DITCH LINE ON BOTH SIDES OF SWALW ** SEDIMENT NEEDS TO BE REMOVED FROM DITCH THAT HAS ERODED INTO IT TO MATCH EXISTING GRADE ** BEFORE THE STORMWATER ROW FINAL IS APPROVED / SEE ATTACHED PHOTOS
FINAL SURVEY (OFFICE USE ONLY) 06/22/2022 APPROVED EMADISON
U - SEWER TIE IN 06/01/2022 APPROVED MGIBSON
U-CROSS CONNECTION 06/01/2022 APPROVED - AS NOTED DHANEY
Note: Yard/IRR. not installed yet , no cross cn. .
ELECTRIC - EARLY POWER 05/27/2022 APPROVED - AS NOTED MKRASKI
Note: Emailed FPL @ 8:40 AM
ROW- PRE-APRON (PRE-POUR) 05/05/2022 APPROVED RGROSS
Note: READY TO POUR
PEP TANK INSTALLATION REQUEST 05/05/2022 APPROVED CSTONE
INSULATION 03/25/2022 APPROVED FWILLIS
ALL ROUGH 03/24/2022 APPROVED MKRASKI
LATH/BRICK/ WATER BARRIER 03/22/2022 APPROVED FWILLIS
ALL ROUGH 03/22/2022 CANCELLED BY APPLICANT WEB
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/21/2022 APPROVED FWILLIS
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION 1. All thread not connected up stairs for continuious load path 2. Continuious load path screws on exterior wall not screwed down on second story 3/4/22 - *PLANS ON SECOND FLOOR ARE RIPPED, BALLED UP, OUT OF ORDER AND MISSING PAGES. 107.3.1 **LEFT SIDE OF DOOR SECOND FLOOR (inside facing the door) ALL THREAD IS MISSING A COUPLING SECURING BOTH ALL THREADS TOGETHER. **SDW SCREWS , ON THE RIGHT SIDE SECOND FLOOR, NOT SCREWED DOWN TO BOTTOM PLATE. 3/16/22 - SAME AS BEFORE, ALL THREAD UPSTAIRS LEFT SIDE NOT CONNECTED. 3/17/22 - SAME AS YESTERDAY, ALL THREAD UPSTAIRS LEFT SIDE NOT CONNECTED.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/17/2022 Disapproved -FEE REQUIRED FWILLIS
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION 1. All thread not connected up stairs for continuious load path 2. Continuious load path screws on exterior wall not screwed down on second story 3/4/22 - *PLANS ON SECOND FLOOR ARE RIPPED, BALLED UP, OUT OF ORDER AND MISSING PAGES. 107.3.1 **LEFT SIDE OF DOOR SECOND FLOOR (inside facing the door) ALL THREAD IS MISSING A COUPLING SECURING BOTH ALL THREADS TOGETHER. **SDW SCREWS , ON THE RIGHT SIDE SECOND FLOOR, NOT SCREWED DOWN TO BOTTOM PLATE. 3/16/22 - SAME AS BEFORE, ALL THREAD UPSTAIRS LEFT SIDE NOT CONNECTED. 3/17/22 - SAME AS YESTERDAY, ALL THREAD UPSTAIRS LEFT SIDE NOT CONNECTED.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/16/2022 Disapproved -FEE REQUIRED FWILLIS
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 1. All thread not connected up stairs for continuious load path 2. Continuious load path screws on exterior wall not screwed down on second story 3/4/22 - *PLANS ON SECOND FLOOR ARE RIPPED, BALLED UP, OUT OF ORDER AND MISSING PAGES. 107.3.1 **LEFT SIDE OF DOOR SECOND FLOOR (inside facing the door) ALL THREAD IS MISSING A COUPLING SECURING BOTH ALL THREADS TOGETHER. **SDW SCREWS , ON THE RIGHT SIDE SECOND FLOOR, NOT SCREWED DOWN TO BOTTOM PLATE. 3/16/22 - SAME AS BEFORE, ALL THREAD UPSTAIRS LEFT SIDE NOT CONNECTED.
WALL SHEATHING 03/15/2022 APPROVED FWILLIS
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Nails missing above garage on Seams in several places. 3/4/22 - left panel above garage at the seam has no nails.
WALL SHEATHING 03/04/2022 Disapproved -FEE REQUIRED FWILLIS
Note: THIS IS A REINSPECTION Nails missing above garage on Seams in several places. 3/4/22 - left panel above garage at the seam has no nails.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/04/2022 Disapproved -FEE REQUIRED FWILLIS
Note: THIS IS A REINSPECTION 1. All thread not connected up stairs for continuious load path 2. Continuious load path screws on exterior wall not screwed down on second story 3/4/22 - *PLANS ON SECOND FLOOR ARE RIPPED, BALLED UP, OUT OF ORDER AND MISSING PAGES. 107.3.1 **LEFT SIDE OF DOOR SECOND FLOOR (inside facing the door) ALL THREAD IS MISSING A COUPLING SECURING BOTH ALL THREADS TOGETHER. **SDW SCREWS , ON THE RIGHT SIDE SECOND FLOOR, NOT SCREWED DOWN TO BOTTOM PLATE.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/01/2022 Disapproved -FEE REQUIRED MKRASKI
Note: 1. All thread not connected up stairs for continuious load path 2. Continuious load path screws on exterior wall not screwed down on second story
ROOF VALLEY & METAL 02/28/2022 APPROVED FWILLIS
FOUND SURVEY APPROVED (OFFICE) 02/25/2022 APPROVED TBAKER
WALL SHEATHING 02/24/2022 Disapproved - NO FEE FWILLIS
Note: Nails missing above garage on Seams in several places.
ROW - DRAINAGE 01/24/2022 CANCELLED BY INSPECTOR KRUTH
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION the swale is blocked and dirt needs to be removed so the swale can flow or a pipe needs to be installed next inspection tues 1/18/22
ROW - DRAINAGE 01/20/2022 Disapproved -FEE REQUIRED KRUTH
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION the swale is blocked and dirt needs to be removed so the swale can flow or a pipe needs to be installed next inspection tues 1/18/22
ROW - DRAINAGE 01/18/2022 Disapproved -FEE REQUIRED KRUTH
Note: THIS IS A REINSPECTION the swale is blocked and dirt needs to be removed so the swale can flow or a pipe needs to be installed next inspection tues 1/18/22
ROW - DRAINAGE 01/13/2022 Disapproved -FEE REQUIRED KRUTH
Note: the swale is blocked and dirt needs to be removed so the swale can flow or a pipe needs to be installed next inspection tues 1/18/22
ELECTRIC-TUG 01/10/2022 APPROVED - AS NOTED JMUNSON
Note: Emailed FPL at 10:13 am
TIE BEAM / LINTEL 12/15/2021 APPROVED DCUSHING
MONOLITHIC SLAB 11/15/2021 APPROVED FWILLIS
PLUMBING 1ST ROUGH UNDERGROUND 11/03/2021 APPROVED - AS NOTED MGIBSON
Note: PROVIDE PORTA POTTY BY MONOLITHIC SLAB INSPECTIO
GRAVITY SEWER TEST 11/03/2021 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 09/30/2021 APPROVED CSTONE

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 02/25/2022 02/25/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 02/25/2022 02/25/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ZON COMPLETE 07/28/2021 07/29/2021
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/28/2021 07/28/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 07/28/2021 08/03/2021
Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM
BLD COMPLETE 07/15/2021 07/18/2021
Note: Released By: JPI
CUSVC COMPLETE 07/15/2021 07/23/2021
Note: Released By: HALEIGH HAND - -
ELEC COMPLETE 07/15/2021 07/16/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/15/2021 07/15/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 07/15/2021 07/21/2021
Note: Released By: TONI CHURCHILL - -
MECH COMPLETE 07/15/2021 07/16/2021
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 07/15/2021 07/22/2021
Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM
ZON HOLD 07/15/2021 07/26/2021
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Plans are for a two story but site plan/survey only state one story. Plans are for a three car garage. Site plan/survey and landscape plans show a two car garage. Please correct whichever is wrong.
SWALE COMPLETE 07/15/2021 10/06/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 06/14/2022
REINSPECTION RESIDENTIAL ¤40.00 06/14/2022
REINSPECTION RESIDENTIAL ¤40.00 06/14/2022
REINSPECTION RESIDENTIAL ¤40.00 06/14/2022
REINSPECTION RESIDENTIAL ¤40.00 06/14/2022
CONTRACTOR CHANGE ¤40.00 06/14/2022
SW ENG - INSPECTION 20 ¤20.00 06/14/2022
SW ENG - INSPECTION 20 ¤20.00 06/14/2022
SW ENG - INSPECTION 20 ¤20.00 06/14/2022
SW ENG - INSPECTION 20 ¤20.00 06/14/2022
STORM WATER PERMIT FEES ¤80.00 08/10/2021
3% TRANS IMPACT FEE CREDIT (¤51.54) 08/10/2021
SEWER INSPECTION ¤25.00 08/10/2021
SEWER CAPITAL FACILITY ¤4,664.55 08/10/2021
WATER CAPITAL FACILITY FEE ¤3,424.45 08/10/2021
BUILDING DISCOUNT 100% (¤2,304.20) 08/10/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 08/10/2021
IMPACT FEE FIRE ¤367.00 08/10/2021
IMPACT FEE PARKS ¤1,199.12 08/10/2021
IMPACT FEE SCHOOL ¤3,600.00 08/10/2021
IMPACT FEE TRANSPORTATION ¤1,718.00 08/10/2021
WATER -IRRIGATION INSPECTION ¤25.00 08/10/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 08/10/2021
NEW RESIDENTIAL INSPECTIONS ¤1,002.00 08/10/2021
SITE PLAN 20 ¤20.00 08/10/2021
SURCHARGE FS 533.721 ¤2.00 08/10/2021
SURCHARGE - FS 468.631 ¤2.00 08/10/2021
CONNECTION FEES ¤1,017.83 08/10/2021
METER - DEPOSIT ¤60.00 08/10/2021
WATER- TURN ON ¤25.00 08/10/2021
ADMINISTRATIVE RESIDENTIAL ¤20.00 08/10/2021
INSPECTION- ELECTRICAL ¤360.60 08/10/2021
INSPECTION - MECHANICAL ¤360.60 08/10/2021
INSPECTION - PLUMBING ¤360.60 08/10/2021
PLAN REVIEW - RESIDENTIAL ¤200.40 08/10/2021
Fees Total Due: ¤0.00 Total Paid: ¤16,451.43