I want to search for...
Permit #2021070731
Permit Details
Status: COED
| CONDITIONED SPACE: 1775 sqft |
| CONDITIONED SPACE: 2300 sqft |
| GARAGE: 680 sqft |
| OPENED PORCH (WITH ROOF) : 350 sqft |
| OPENED PORCH (WITH ROOF) : 191 sqft |
| Total Square Footage: 5296 sqft |
| Subdivision: 2176 - SECTION 37-LAKEVIEW |
| Job Phone: 904-268-7730 |
| Location Address: 21 LONG PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 08/10/2021 |
| NOC: RECORDED |
| Applicant name: DALE ALAN DUBBERLY |
| Owner: MARONDA HOMES LLC OF FLORIDA |
|
Address 5220 SHAD ROAD SUITE 202 JACKSONVILLE, FL 32257 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: SINGLE FAMILY DWELLING |
| Type: CN |
Contractor
MARONDA HOMES INC
| Status | Location Address | State License Number | Phone |
| CANCEL |
5220 SHAD ROAD JACKSONVILLE , FL 32257 |
CGC1504922 (Exp: 08/31/2022) | 904-268-7730 |
Sub Contractors
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
ANDREW SCOTT DIGAETANO JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
44 FORT CAROLINE PALM COAST, FL 32137 |
CCC1331606 (Exp: 08/31/2026) | 386-302-9063 |
MICHAEL LEE RAFFENSBERGER
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
7725 SANDSCOVE CT WINTER PARK, FL 32792 |
CAC1819723 (Exp: 08/31/2024) | 407-629-6920 | 407-629-9307 |
CLINTON J HULSLANDER SR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
4005 MARONDA WAY SANFORD, FL 32771 |
CFC1430632 (Exp: 08/31/2026) | 407-321-0064 | 407-688-8534 |
JAMES M GREENSLADE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
311 S BAY ST BUNNELL, FL 32110 |
EC13006083 (Exp: 08/31/2026) | 386-263-2960 | 386-263-2980 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 06/24/2022 | FINAL APPROVED | MKRASKI |
| ROW - FINAL APRON (AFTER POUR) | 06/24/2022 | APPROVED - AS NOTED | EMADISON |
| Note: ** ALL CORRECTIONS MADE EVERYTHING LOOKS GOOD AT THE TIME OF THE INSPECTION ** THIS IS A REINSPECTION Inspector Notes from Inspection 9465 ** SWALE ON RIGHT SIDE OF DRIVEWAY NEEDS TO BE REGRADED AND SODDED TO MATCH THE EXISTING GRADE TO WHERE IT MEETS UP WITH THE DITCH LINE ON BOTH SIDES OF SWALW ** SEDIMENT NEEDS TO BE REMOVED FROM DITCH THAT HAS ERODED INTO IT TO MATCH EXISTING GRADE ** BEFORE THE STORMWATER ROW FINAL IS APPROVED / SEE ATTACHED PHOTOS | |||
| ROW - STORMWATER FINAL | 06/24/2022 | APPROVED - AS NOTED | EMADISON |
| Note: ** ALL CORRECTIONS MADE EVERYTHING LOOKS GOOD AT THE TIME OF THE INSPECTION Inspector Notes from Inspection 9465 ** SWALE ON RIGHT SIDE OF DRIVEWAY NEEDS TO BE REGRADED AND SODDED TO MATCH THE EXISTING GRADE TO WHERE IT MEETS UP WITH THE DITCH LINE ON BOTH SIDES OF SWALW ** SEDIMENT NEEDS TO BE REMOVED FROM DITCH THAT HAS ERODED INTO IT TO MATCH EXISTING GRADE ** BEFORE THE STORMWATER ROW FINAL IS APPROVED / SEE ATTACHED PHOTOS | |||
| U -UTILITY RESIDENTIAL FINAL | 06/23/2022 | FINAL APPROVED | JHARDING |
| ROW - STORMWATER FINAL | 06/23/2022 | CANCELLED BY APPLICANT | EMADISON |
| Note: Inspector Notes from Inspection 9465 ** SWALE ON RIGHT SIDE OF DRIVEWAY NEEDS TO BE REGRADED AND SODDED TO MATCH THE EXISTING GRADE TO WHERE IT MEETS UP WITH THE DITCH LINE ON BOTH SIDES OF SWALW ** SEDIMENT NEEDS TO BE REMOVED FROM DITCH THAT HAS ERODED INTO IT TO MATCH EXISTING GRADE ** BEFORE THE STORMWATER ROW FINAL IS APPROVED / SEE ATTACHED PHOTOS | |||
| ROW - FINAL APRON (AFTER POUR) | 06/23/2022 | CANCELLED BY APPLICANT | EMADISON |
| Note: Inspector Notes from Inspection 9465 ** SWALE ON RIGHT SIDE OF DRIVEWAY NEEDS TO BE REGRADED AND SODDED TO MATCH THE EXISTING GRADE TO WHERE IT MEETS UP WITH THE DITCH LINE ON BOTH SIDES OF SWALW ** SEDIMENT NEEDS TO BE REMOVED FROM DITCH THAT HAS ERODED INTO IT TO MATCH EXISTING GRADE ** BEFORE THE STORMWATER ROW FINAL IS APPROVED / SEE ATTACHED PHOTOS | |||
| BLD - BUILDING FINAL | 06/23/2022 | Disapproved - NO FEE | RMARTIN |
| Note: MOST OF THE BREAKERS IN PANEL ARE OFF, NEED TO TEST ALL EQUIPMENT FOR FINAL | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/22/2022 | APPROVED - AS NOTED | EMADISON |
| Note: ** SWALE ON RIGHT SIDE OF DRIVEWAY NEEDS TO BE REGRADED AND SODDED TO MATCH THE EXISTING GRADE TO WHERE IT MEETS UP WITH THE DITCH LINE ON BOTH SIDES OF SWALW ** SEDIMENT NEEDS TO BE REMOVED FROM DITCH THAT HAS ERODED INTO IT TO MATCH EXISTING GRADE ** BEFORE THE STORMWATER ROW FINAL IS APPROVED / SEE ATTACHED PHOTOS | |||
| FINAL SURVEY (OFFICE USE ONLY) | 06/22/2022 | APPROVED | EMADISON |
| U - SEWER TIE IN | 06/01/2022 | APPROVED | MGIBSON |
| U-CROSS CONNECTION | 06/01/2022 | APPROVED - AS NOTED | DHANEY |
| Note: Yard/IRR. not installed yet , no cross cn. . | |||
| ELECTRIC - EARLY POWER | 05/27/2022 | APPROVED - AS NOTED | MKRASKI |
| Note: Emailed FPL @ 8:40 AM | |||
| ROW- PRE-APRON (PRE-POUR) | 05/05/2022 | APPROVED | RGROSS |
| Note: READY TO POUR | |||
| PEP TANK INSTALLATION REQUEST | 05/05/2022 | APPROVED | CSTONE |
| INSULATION | 03/25/2022 | APPROVED | FWILLIS |
| ALL ROUGH | 03/24/2022 | APPROVED | MKRASKI |
| LATH/BRICK/ WATER BARRIER | 03/22/2022 | APPROVED | FWILLIS |
| ALL ROUGH | 03/22/2022 | CANCELLED BY APPLICANT | WEB |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/21/2022 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION 1. All thread not connected up stairs for continuious load path 2. Continuious load path screws on exterior wall not screwed down on second story 3/4/22 - *PLANS ON SECOND FLOOR ARE RIPPED, BALLED UP, OUT OF ORDER AND MISSING PAGES. 107.3.1 **LEFT SIDE OF DOOR SECOND FLOOR (inside facing the door) ALL THREAD IS MISSING A COUPLING SECURING BOTH ALL THREADS TOGETHER. **SDW SCREWS , ON THE RIGHT SIDE SECOND FLOOR, NOT SCREWED DOWN TO BOTTOM PLATE. 3/16/22 - SAME AS BEFORE, ALL THREAD UPSTAIRS LEFT SIDE NOT CONNECTED. 3/17/22 - SAME AS YESTERDAY, ALL THREAD UPSTAIRS LEFT SIDE NOT CONNECTED. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/17/2022 | Disapproved -FEE REQUIRED | FWILLIS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION 1. All thread not connected up stairs for continuious load path 2. Continuious load path screws on exterior wall not screwed down on second story 3/4/22 - *PLANS ON SECOND FLOOR ARE RIPPED, BALLED UP, OUT OF ORDER AND MISSING PAGES. 107.3.1 **LEFT SIDE OF DOOR SECOND FLOOR (inside facing the door) ALL THREAD IS MISSING A COUPLING SECURING BOTH ALL THREADS TOGETHER. **SDW SCREWS , ON THE RIGHT SIDE SECOND FLOOR, NOT SCREWED DOWN TO BOTTOM PLATE. 3/16/22 - SAME AS BEFORE, ALL THREAD UPSTAIRS LEFT SIDE NOT CONNECTED. 3/17/22 - SAME AS YESTERDAY, ALL THREAD UPSTAIRS LEFT SIDE NOT CONNECTED. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/16/2022 | Disapproved -FEE REQUIRED | FWILLIS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 1. All thread not connected up stairs for continuious load path 2. Continuious load path screws on exterior wall not screwed down on second story 3/4/22 - *PLANS ON SECOND FLOOR ARE RIPPED, BALLED UP, OUT OF ORDER AND MISSING PAGES. 107.3.1 **LEFT SIDE OF DOOR SECOND FLOOR (inside facing the door) ALL THREAD IS MISSING A COUPLING SECURING BOTH ALL THREADS TOGETHER. **SDW SCREWS , ON THE RIGHT SIDE SECOND FLOOR, NOT SCREWED DOWN TO BOTTOM PLATE. 3/16/22 - SAME AS BEFORE, ALL THREAD UPSTAIRS LEFT SIDE NOT CONNECTED. | |||
| WALL SHEATHING | 03/15/2022 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Nails missing above garage on Seams in several places. 3/4/22 - left panel above garage at the seam has no nails. | |||
| WALL SHEATHING | 03/04/2022 | Disapproved -FEE REQUIRED | FWILLIS |
| Note: THIS IS A REINSPECTION Nails missing above garage on Seams in several places. 3/4/22 - left panel above garage at the seam has no nails. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/04/2022 | Disapproved -FEE REQUIRED | FWILLIS |
| Note: THIS IS A REINSPECTION 1. All thread not connected up stairs for continuious load path 2. Continuious load path screws on exterior wall not screwed down on second story 3/4/22 - *PLANS ON SECOND FLOOR ARE RIPPED, BALLED UP, OUT OF ORDER AND MISSING PAGES. 107.3.1 **LEFT SIDE OF DOOR SECOND FLOOR (inside facing the door) ALL THREAD IS MISSING A COUPLING SECURING BOTH ALL THREADS TOGETHER. **SDW SCREWS , ON THE RIGHT SIDE SECOND FLOOR, NOT SCREWED DOWN TO BOTTOM PLATE. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/01/2022 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 1. All thread not connected up stairs for continuious load path 2. Continuious load path screws on exterior wall not screwed down on second story | |||
| ROOF VALLEY & METAL | 02/28/2022 | APPROVED | FWILLIS |
| FOUND SURVEY APPROVED (OFFICE) | 02/25/2022 | APPROVED | TBAKER |
| WALL SHEATHING | 02/24/2022 | Disapproved - NO FEE | FWILLIS |
| Note: Nails missing above garage on Seams in several places. | |||
| ROW - DRAINAGE | 01/24/2022 | CANCELLED BY INSPECTOR | KRUTH |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION the swale is blocked and dirt needs to be removed so the swale can flow or a pipe needs to be installed next inspection tues 1/18/22 | |||
| ROW - DRAINAGE | 01/20/2022 | Disapproved -FEE REQUIRED | KRUTH |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION the swale is blocked and dirt needs to be removed so the swale can flow or a pipe needs to be installed next inspection tues 1/18/22 | |||
| ROW - DRAINAGE | 01/18/2022 | Disapproved -FEE REQUIRED | KRUTH |
| Note: THIS IS A REINSPECTION the swale is blocked and dirt needs to be removed so the swale can flow or a pipe needs to be installed next inspection tues 1/18/22 | |||
| ROW - DRAINAGE | 01/13/2022 | Disapproved -FEE REQUIRED | KRUTH |
| Note: the swale is blocked and dirt needs to be removed so the swale can flow or a pipe needs to be installed next inspection tues 1/18/22 | |||
| ELECTRIC-TUG | 01/10/2022 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 10:13 am | |||
| TIE BEAM / LINTEL | 12/15/2021 | APPROVED | DCUSHING |
| MONOLITHIC SLAB | 11/15/2021 | APPROVED | FWILLIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 11/03/2021 | APPROVED - AS NOTED | MGIBSON |
| Note: PROVIDE PORTA POTTY BY MONOLITHIC SLAB INSPECTIO | |||
| GRAVITY SEWER TEST | 11/03/2021 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 09/30/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 02/25/2022 | 02/25/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/25/2022 | 02/25/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/28/2021 | 07/29/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/28/2021 | 07/28/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/28/2021 | 08/03/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/15/2021 | 07/18/2021 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 07/15/2021 | 07/23/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 07/15/2021 | 07/16/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/15/2021 | 07/15/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 07/15/2021 | 07/21/2021 |
| Note: Released By: TONI CHURCHILL - - | |||
| MECH | COMPLETE | 07/15/2021 | 07/16/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/15/2021 | 07/22/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| ZON | HOLD | 07/15/2021 | 07/26/2021 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Plans are for a two story but site plan/survey only state one story. Plans are for a three car garage. Site plan/survey and landscape plans show a two car garage. Please correct whichever is wrong. | |||
| SWALE | COMPLETE | 07/15/2021 | 10/06/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/14/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/14/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/14/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/14/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/14/2022 |
| CONTRACTOR CHANGE | ¤40.00 | 06/14/2022 |
| SW ENG - INSPECTION 20 | ¤20.00 | 06/14/2022 |
| SW ENG - INSPECTION 20 | ¤20.00 | 06/14/2022 |
| SW ENG - INSPECTION 20 | ¤20.00 | 06/14/2022 |
| SW ENG - INSPECTION 20 | ¤20.00 | 06/14/2022 |
| STORM WATER PERMIT FEES | ¤80.00 | 08/10/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 08/10/2021 |
| SEWER INSPECTION | ¤25.00 | 08/10/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 08/10/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 08/10/2021 |
| BUILDING DISCOUNT 100% | (¤2,304.20) | 08/10/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 08/10/2021 |
| IMPACT FEE FIRE | ¤367.00 | 08/10/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 08/10/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 08/10/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 08/10/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 08/10/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 08/10/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤1,002.00 | 08/10/2021 |
| SITE PLAN 20 | ¤20.00 | 08/10/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 08/10/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 08/10/2021 |
| CONNECTION FEES | ¤1,017.83 | 08/10/2021 |
| METER - DEPOSIT | ¤60.00 | 08/10/2021 |
| WATER- TURN ON | ¤25.00 | 08/10/2021 |
| ADMINISTRATIVE RESIDENTIAL | ¤20.00 | 08/10/2021 |
| INSPECTION- ELECTRICAL | ¤360.60 | 08/10/2021 |
| INSPECTION - MECHANICAL | ¤360.60 | 08/10/2021 |
| INSPECTION - PLUMBING | ¤360.60 | 08/10/2021 |
| PLAN REVIEW - RESIDENTIAL | ¤200.40 | 08/10/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤16,451.43 |