I want to search for...

Permit #2021070873

Permit Details

Status: COED

Parcel Id: 42-10-30-3210-00000-0580
CONDITIONED SPACE: 2253 sqft
GARAGE: 561 sqft
OPENED PORCH (WITH ROOF) : 417 sqft
OPENED PORCH (WITH ROOF) : 60 sqft
Total Square Footage: 3291 sqft
Block: 01010
Subdivision: 2094 - CONSERVATORY AT HAMMOCK BEACH
Job Phone: 386-447-4400
Location Address: 689 MAHOGANY RUN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 08/24/2021
NOC: RECORDED
Applicant name: DAVID PAUL CROCKETT
Owner: FARRELL, BRETT & JANE

Address

400 SYBELIA PKWY

MAITLAND, FL 32751

Address

#290

MAITLAND, FL 32751

Lot: 58
Contracted Stated Job Value: ¤440,275.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

SALTWATER HOMES INC
Status Location Address Mailing Address State License Number Phone Fax
DECEASED

138 PALM COAST PARKWAY

PALM COAST, FL 32137

SUITE 328

PALM COAST, FL 32137

RG0041345 (Exp: 08/31/2025) 386-447-4400 866-244-9639

Sub Contractors

WILLIAM FRANK DUDLEY JR.
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 978

Bunnell, FL 32110

EC0003177 (Exp: 08/31/2026) (386)437-3068
THOMAS A REGULA
Status Location Address State License Number Phone Fax
INACTIVE

11320 PHILLIPS PKWY DRIVE E

JACKSONVILLE, FL 32256

CMC1250075 (Exp: 08/31/2026) 904-278-0339 904-278-0366
SANTOS L HERNANDEZ
Status Location Address State License Number Phone Fax
ACTIVE

946 SHADDICK DRIVE

ORANGE CITY, FL 32763

CCC1328011 (Exp: 08/31/2026) 386-218-4942 386-218-4937
FRANK E SEVERINO
Status Location Address State License Number Phone Fax
ACTIVE

1360 N NOVA RD

DAYTONA BEACH, FL 32117

CBC060543 (Exp: 08/31/2026) 386-253-1943 386-238-0139
KEN DEPRINZIO
Status Location Address State License Number Phone Fax
ACTIVE

325 WALKER STREET

HOLLY HILL, FL 32117

11351 (Exp: 08/31/2026) 386-672-8494 386-673-7856
JEFFREY DALE KNIGHT
Status Location Address State License Number Phone Fax
INACTIVE

923 ASHMEADE CT

PORT ORANGE, FL 32127

CFC057351 (Exp: 08/31/2026) 386-345-3857 386-345-4443

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 05/05/2023 FINAL APPROVED AGAETANO
ROW - STORMWATER FINAL 05/02/2023 APPROVED - AS NOTED RGROSS
Note: Builder place the row of sod along the property line where mulch beds were. 4/25/2023 - PREVIOUS INSPECTION NOTES ** 04/25/23 BUILDER NEEDS TO REMOVE ALL SHRUBBERY FROM THE DRAINAGE CONVEYANCE ON THE RIGHT SIDE OF THE HOUSE Flatwork, slabs, pads, landscaping plants, mulch, stones cannot be in the easements and ROW. LEFT SIDE ALONG A/C NEED TO REMOVE SCHRUBS FROM THE DRAINAGE CONVEYANCE
U -UTILITY RESIDENTIAL FINAL 04/25/2023 FINAL APPROVED DHANEY
ROW - STORMWATER FINAL 04/25/2023 Disapproved -FEE REQUIRED EMADISON
Note: ** 04/25/23 BUILDER NEEDS TO REMOVE ALL SHRUBBERY FROM THE DRAINAGE CONVEYANCE ON THE RIGHT SIDE OF THE HOUSE Flatwork, slabs, pads, landscaping plants, mulch, stones cannot be in the easements and ROW. LEFT SIDE ALONG A/C NEED TO REMOVE SCHRUBS FROM THE DRAINAGE CONVEYANCE
ROW - FINAL APRON (AFTER POUR) 04/25/2023 FINAL APPROVED EMADISON
U-CROSS CONNECTION 04/25/2023 APPROVED DHANEY
ROW- FINAL SURVEY/GRADING CERTIFICATION 02/28/2023 APPROVED PFLANAGAN
Note: 2/8/2023 - PREVIOUS INSPECTION NOTES 1) ALL SOD ELEVATIONS UP AGAINST THE HOUSE NEED TO BE 4" BELOW FFE 2) ON LEFT SIDE PROPERTY LINE THERE IS NO FALL FOR 60' NEED TO HAVE POSITIVE FALL .10 EVERY 20'
ROW FIELD SURVEY /GRADING CERTIFICATION 02/28/2023 APPROVED PFLANAGAN
WALL SHEATHING 02/15/2023 APPROVED AGAETANO
Note: Inspected on 5/26/2022
ROW- FINAL SURVEY/GRADING CERTIFICATION 02/08/2023 Disapproved - NO FEE PFLANAGAN
Note: 1) ALL SOD ELEVATIONS UP AGAINST THE HOUSE NEED TO BE 4" BELOW FFE 2) ON LEFT SIDE PROPERTY LINE THERE IS NO FALL FOR 60' NEED TO HAVE POSITIVE FALL .10 EVERY 20'
ELECTRIC - EARLY POWER 12/15/2022 APPROVED AGAETANO
Note: 12-15-2022 FPL Notified at 9:23 am
ROW- PRE-APRON (PRE-POUR) 12/07/2022 APPROVED GBERTOLA
Note: 12/07/22= READY FOR PAVERS __________________________________________________________________________________________________________________________ 11/15/2022 - PREVIOUS INSPECTION NOTES ** APRON AND PAVER RESTRAINTS ARE READY TO POUR ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET ANY PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED
ROW- PAVER RESTRAINTS 11/15/2022 APPROVED EMADISON
Note: ** 11/15/22 READY TO POUR PAVER RESTRAINTS WITH APRON
ROW- PRE-APRON (PRE-POUR) 11/15/2022 PARTIALLY APPROVED EMADISON
Note: ** APRON AND PAVER RESTRAINTS ARE READY TO POUR ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET ANY PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED
U - SEWER TIE IN 10/25/2022 APPROVED MGIBSON
GRAVITY SEWER TEST 10/24/2022 APPROVED - AS NOTED MGIBSON
Note: Inspector Notes from Inspection 2060 NEED TO CHANGE PLUMBING SUB CONTRACTOR FROM ADVANCED TO JEFF KNIGHT NEED TO SHEDULE U-SEWER TIE IN
LATH/BRICK/ WATER BARRIER 09/09/2022 APPROVED AGAETANO
INSULATION 08/25/2022 APPROVED AGAETANO
Note: THIS IS A REINSPECTION Inspector Notes from Inspection 2420 Gas line not strapped. PIPING SUPPORT TABLE: G2424.1 (415) Check at insulation.
INSULATION 08/24/2022 CANCELLED BY APPLICANT AGAETANO
Note: Inspector Notes from Inspection 2420 Gas line not strapped. PIPING SUPPORT TABLE: G2424.1 (415) Check at insulation.
ALL ROUGH 08/15/2022 APPROVED - AS NOTED AGAETANO
Note: Gas line not strapped. PIPING SUPPORT TABLE: G2424.1 (415) Check at insulation.
ROOF VALLEY & METAL 08/12/2022 APPROVED LMILLER
ELECTRIC-TUG 07/20/2022 APPROVED AGAETANO
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/26/2022 APPROVED AGAETANO
TIE BEAM / LINTEL 02/24/2022 APPROVED AGAETANO
FOUND SURVEY APPROVED (OFFICE) 12/07/2021 APPROVED AMOBLEY
MONOLITHIC SLAB 11/22/2021 APPROVED DCUSHING
PLUMBING 1ST ROUGH UNDERGROUND 10/25/2021 APPROVED - AS NOTED MGIBSON
Note: NEED TO CHANGE PLUMBING SUB CONTRACTOR FROM ADVANCED TO JEFF KNIGHT
WATER METER INSTALLATION REQUEST 09/29/2021 APPROVED CSTONE

Review History

Department Status Date In Date Out
SW1 COMPLETE 05/01/2023 05/04/2023
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
BLD COMPLETE 07/27/2022 07/28/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 12/07/2021 12/07/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 12/07/2021 12/07/2021
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 08/27/2021 08/30/2021
Note: Released By: HAROLD ALLEN - - HALLEN@PALMCOASTGOV.COM
BLD COMPLETE 08/09/2021 08/10/2021
Note: Released By: JPI
ZON COMPLETE 08/09/2021 08/10/2021
Note: Released By: ESTELLE LENS - (386)986-3751 -
URB COMPLETE 07/29/2021 08/03/2021
Note: Released By: JOHN BEAUDET - (386)986-2456 -
ZON HOLD 07/29/2021 07/29/2021
Note: Held By: ESTELLE LENS - (386)986-3751 - Please provide the driveway width at the garage door. Please provide the setback from the house (in addition to the garage) to right side property line.
BLD HOLD 07/19/2021 07/27/2021
Note: Held By: JPI 1. Provide Roof Pressure zone nailing schedule- FBC-R301.2(7). 2. Provide wall section of screen wall around A/C pad.
CUSVC COMPLETE 07/19/2021 07/23/2021
Note: Released By: HALEIGH HAND - -
ELEC COMPLETE 07/19/2021 07/20/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/19/2021 07/19/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 07/19/2021 07/23/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 07/19/2021 07/20/2021
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 07/19/2021 07/23/2021
Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 05/08/2023
SW ENG REINSPECTION 20 ¤20.00 05/08/2023
PLAN REVIEW - REVISION ¤32.50 05/08/2023
CONNECTION FEES ¤25.00 08/24/2021
STORM WATER PERMIT FEES ¤80.00 08/24/2021
3% TRANS IMPACT FEE CREDIT (¤94.17) 08/24/2021
SEWER INSPECTION ¤25.00 08/24/2021
METER - DEPOSIT ¤60.00 08/24/2021
WATER-METER ¤441.07 08/24/2021
ADMIN FEE ¤20.00 08/24/2021
ADMINISTRATIVE RESIDENTIAL ¤20.00 08/24/2021
INSPECTION- ELECTRICAL ¤324.60 08/24/2021
INSPECTION - MECHANICAL ¤324.60 08/24/2021
INSPECTION - PLUMBING ¤324.60 08/24/2021
PLAN REVIEW - RESIDENTIAL ¤176.40 08/24/2021
BUILDING DISCOUNT 100% (¤2,052.20) 08/24/2021
ELECTRIC FEE ¤324.17 08/24/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 08/24/2021
IMPACT FEE FIRE ¤367.00 08/24/2021
IMPACT FEE PARKS ¤1,199.12 08/24/2021
IMPACT FEE SCHOOL ¤3,600.00 08/24/2021
IMPACT FEE TRANSPORTATION ¤3,139.00 08/24/2021
MECHANICAL FEE ¤324.16 08/24/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 08/24/2021
PLAN CHECK FEE ¤176.11 08/24/2021
PLUMBING FEE ¤324.16 08/24/2021
NEW RESIDENTIAL INSPECTIONS ¤882.00 08/24/2021
SITE PLAN 20 ¤20.00 08/24/2021
SURCHARGE FS 533.721 ¤2.00 08/24/2021
SURCHARGE - FS 468.631 ¤2.00 08/24/2021
Fees Total Due: ¤0.00 Total Paid: ¤10,080.14