Permit #2021070875
Permit Details
Status: COED
| Parcel Id: 07-11-31-7011-00060-0010 |
| CONDITIONED SPACE: 2471 sqft |
| GARAGE: 629 sqft |
| OPENED PORCH (WITH ROOF) : 191 sqft |
| OPENED PORCH (WITH ROOF) : 120 sqft |
| Total Square Footage: 3411 sqft |
| Block: 00060 |
| Subdivision: 2193 - SECTION 11-BELLE TERRE |
| Job Phone: 904-268-7730 |
| Location Address: 59 BELLEAIRE DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 08/10/2021 |
| NOC: RECORDED |
| Applicant name: DALE ALAN DUBBERLY |
| Owner: MARONDA HOMES LLC |
|
Address 5220 SHAD RD PALM COAST, FL 32257 |
|
Address STE 202 PALM COAST, FL 32257 |
| Lot: 0010 |
| Contracted Stated Job Value: ¤190,000.00 |
| Job Description: SINGLE FAMILY DWELLING |
| Type: CN |
Contractor
MARONDA HOMES INC
| Status | Location Address | State License Number | Phone |
| CANCEL |
5220 SHAD ROAD JACKSONVILLE , FL 32257 |
CGC1504922 (Exp: 08/31/2022) | 904-268-7730 |
Sub Contractors
ANDREW SCOTT DIGAETANO JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
44 FORT CAROLINE PALM COAST, FL 32137 |
CCC1331606 (Exp: 08/31/2026) | 386-302-9063 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
JAMES M GREENSLADE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
311 S BAY ST BUNNELL, FL 32110 |
EC13006083 (Exp: 08/31/2026) | 386-263-2960 | 386-263-2980 |
RANDALL SCOTT ROSENFELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
234 N WHITNEY ST PALM COAST, FL 32084 |
CAC1816641 (Exp: 08/31/2026) | 904-599-0082 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 08/25/2022 | FINAL APPROVED | DCUSHING |
| Note: THIS IS A REINSPECTION New inspection due to canceled inspection THIS IS A REINSPECTION 1. Energy cals still do not match A/C equipment installed 2. Wrong size breker installed for AHU 3. Disconnect in AHU closet is at 8' and can not be over 6'7'' Stopped inspection | |||
| BLD - BUILDING FINAL | 08/24/2022 | CANCELLED BY APPLICANT | MKRASKI |
| Note: New inspection due to canceled inspection THIS IS A REINSPECTION 1. Energy cals still do not match A/C equipment installed 2. Wrong size breker installed for AHU 3. Disconnect in AHU closet is at 8' and can not be over 6'7'' Stopped inspection | |||
| BLD - BUILDING FINAL | 08/23/2022 | CANCELLED BY APPLICANT | WEB |
| Note: THIS IS A REINSPECTION 1. Energy cals still do not match A/C equipment installed 2. Wrong size breker installed for AHU 3. Disconnect in AHU closet is at 8' and can not be over 6'7'' Stopped inspection | |||
| BLD - BUILDING FINAL | 08/15/2022 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 1. Energy cals still do not match A/C equipment installed 2. Wrong size breker installed for AHU 3. Disconnect in AHU closet is at 8' and can not be over 6'7'' Stopped inspection | |||
| BLD - BUILDING FINAL | 08/12/2022 | Disapproved - NO FEE | KSANDOE |
| Note: Energy calcs do not match installed equipment. Submit revised energy calcs to building department for review. | |||
| U -UTILITY RESIDENTIAL FINAL | 08/11/2022 | FINAL APPROVED | DHANEY |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/10/2022 | APPROVED | EMADISON |
| Note: Inspector Notes from Inspection 9270 ** AT THE TIME OF THE INSPECTION EVERYTHING LOOKS GOOD READY TO POUR, | |||
| ROW - STORMWATER FINAL | 08/10/2022 | APPROVED - AS NOTED | EMADISON |
| Note: ** 08/10/22 EVERYTHING LOOKS GOOD AYT THE TIME OF THE INSPECTION | |||
| ROW - FINAL APRON (AFTER POUR) | 08/10/2022 | APPROVED | EMADISON |
| FINAL SURVEY (OFFICE USE ONLY) | 08/10/2022 | APPROVED | EMADISON |
| ELECTRIC - EARLY POWER | 06/28/2022 | APPROVED - AS NOTED | MKRASKI |
| Note: Emailed FPL @ 12:30 PM | |||
| ROW- PRE-APRON (PRE-POUR) | 06/22/2022 | APPROVED - AS NOTED | EMADISON |
| Note: ** AT THE TIME OF THE INSPECTION EVERYTHING LOOKS GOOD READY TO POUR, | |||
| U-CROSS CONNECTION | 06/03/2022 | APPROVED - AS NOTED | DHANEY |
| Note: Yard/IRR. not installed yet no cross cn. | |||
| U - SEWER TIE IN | 06/03/2022 | APPROVED | MGIBSON |
| INSULATION | 05/23/2022 | APPROVED | FWILLIS |
| ALL ROUGH | 05/12/2022 | APPROVED - AS NOTED | RMARTIN |
| Note: NEED BATH FANS INSTALLED BY INSULATION | |||
| LATH/BRICK/ WATER BARRIER | 05/06/2022 | APPROVED | FWILLIS |
| ROOF VALLEY & METAL | 05/02/2022 | APPROVED | RMARTIN |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/28/2022 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION 1. Truss GRD15 missing bracing | |||
| WALL SHEATHING | 04/22/2022 | APPROVED | MKRASKI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/22/2022 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Truss GRD15 missing bracing | |||
| ELECTRIC-TUG | 04/22/2022 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 9:55 am | |||
| TIE BEAM / LINTEL | 04/11/2022 | APPROVED | FWILLIS |
| FOUND SURVEY APPROVED (OFFICE) | 01/19/2022 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 12/03/2021 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION ORGANIZE CONSTRUCTION BOX. PLANS ARE BUNDLED AND APPEARS TO HAVE BEEN STUFFED IN THE BOX IN TOTAL DISARRAY. | |||
| MONOLITHIC SLAB | 12/02/2021 | Disapproved - NO FEE | FWILLIS |
| Note: ORGANIZE CONSTRUCTION BOX. PLANS ARE BUNDLED AND APPEARS TO HAVE BEEN STUFFED IN THE BOX IN TOTAL DISARRAY. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 11/30/2021 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 11/30/2021 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 10/28/2021 | APPROVED | CSTONE |
| Note: THIS IS A REINSPECTION ADDED ON 10/18/2021 4:03:35 PM lot not cleared | |||
| WATER METER INSTALLATION REQUEST | 10/15/2021 | Disapproved - NO FEE | CSTONE |
| Note: lot not cleared |
Review History
| Department | Status | Date In | Date Out |
| MECH | HOLD | 08/19/2022 | 08/19/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM 1. Energy Calcs need to be signed by the builder 2. Duct layout needs to be signed by the AC contractor | |||
| MECH | HOLD | 08/19/2022 | 08/19/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM 1. Energy Calcs need to be signed by the builder 2. Duct layout needs to be signed by the AC contractor (Second Request) | |||
| MECH | COMPLETE | 08/19/2022 | 08/19/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 01/19/2022 | 01/19/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/19/2022 | 01/19/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/30/2021 | 07/30/2021 |
| Note: Released By: ESTELLE LENS - (386)986-3751 - | |||
| ENGIN1 | COMPLETE | 07/30/2021 | 07/30/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/30/2021 | 08/05/2021 |
| Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/19/2021 | 07/27/2021 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 07/19/2021 | 07/22/2021 |
| Note: Released By: ALYSSA ROSCOE - - | |||
| ELEC | COMPLETE | 07/19/2021 | 07/20/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/19/2021 | 07/19/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 07/19/2021 | 07/23/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 07/19/2021 | 07/20/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/19/2021 | 07/26/2021 |
| Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM | |||
| ZON | HOLD | 07/19/2021 | 07/28/2021 |
| Note: Held By: ESTELLE LENS - (386)986-3751 - Need to fix FEMA map number on the site plan and survey. (...0136E) Should bedroom number 4 be labeled bedroom 2 (or 3)? | |||
| SWALE | COMPLETE | 07/19/2021 | 10/13/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 08/24/2022 |
| CONTRACTOR CHANGE | ¤40.00 | 08/24/2022 |
| PLAN REVIEW - REVISION | ¤32.50 | 08/24/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 08/24/2022 |
| CONNECTION FEES | ¤1,017.83 | 08/10/2021 |
| METER - DEPOSIT | ¤60.00 | 08/10/2021 |
| WATER- TURN ON | ¤25.00 | 08/10/2021 |
| ADMINISTRATIVE RESIDENTIAL | ¤20.00 | 08/10/2021 |
| INSPECTION- ELECTRICAL | ¤247.80 | 08/10/2021 |
| INSPECTION - MECHANICAL | ¤247.80 | 08/10/2021 |
| INSPECTION - PLUMBING | ¤247.80 | 08/10/2021 |
| PLAN REVIEW - RESIDENTIAL | ¤125.20 | 08/10/2021 |
| BUILDING DISCOUNT 100% | (¤1,514.60) | 08/10/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 08/10/2021 |
| IMPACT FEE FIRE | ¤367.00 | 08/10/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 08/10/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 08/10/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 08/10/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 08/10/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 08/10/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤626.00 | 08/10/2021 |
| SITE PLAN 20 | ¤20.00 | 08/10/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 08/10/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 08/10/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 08/10/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 08/10/2021 |
| SEWER CREDIT | (¤1,147.00) | 08/10/2021 |
| SEWER INSPECTION | ¤25.00 | 08/10/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 08/10/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 08/10/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,136.93 |