I want to search for...

Permit #2021070955

Permit Details

Status: COED

Parcel Id: 29-10-31-5540-00000-0270
CONDITIONED SPACE: 3424 sqft
GARAGE: 900 sqft
OPENED PORCH (WITH ROOF) : 990 sqft
OPENED PORCH (WITH ROOF) : 146 sqft
Total Square Footage: 5460 sqft
Block: 00000
Subdivision: 1005 - SANCTUARY SUBDIVISION
Job Phone: (386) 446-5850
Location Address: 48 OLD OAK DR S
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 12/17/2021
NOC: RECORDED
Applicant name: CHARLES DALLAS RINEK
Owner: ERDAHL BRIAN J & KAREN M H&W

Address

125 S RIVERWALK DRIVE

PALM COAST, FL 32137

Lot: 0270
Contracted Stated Job Value: ¤850,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

CHARLES RINEK CONSTRUCTION, INC.
Status Location Address State License Number Phone Fax
ACTIVE

P. O. Box 352502

Palm Coast, FL 32137

CGC046080 (Exp: 08/31/2026) (386) 446-5850 (386)445-9992

Sub Contractors

SHAWN MICHAEL HISS
Status Location Address State License Number Phone
ACTIVE

1315 LPGA BLVD

HOLLY HILL, FL 32117

CAC1813585 (Exp: 08/31/2026) (386)672-8688
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
PHILIP ALAN KENOVICH
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 1470

HOLLY HILL, FL 32117

LG270 (Exp: 08/31/2026) (386)672-2507
ERIC FRANCO
Status Location Address Mailing Address State License Number Phone
INACTIVE

840 DELTONA BLVD

DELTONA, FL 32725

STE F2

DELTONA, FL 32725

CCC1327280 (Exp: 08/31/2026) 386-575-4007
ROBERT J CATES
Status Location Address State License Number Phone
INACTIVE

400 NORTH US HIGHWAY 1

ORMOND BEACH, FL 32174

EC13003957 (Exp: 08/31/2026) 386-672-8494

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 11/16/2023 FINAL APPROVED AGAETANO
Note: 11/15/2023 - PREVIOUS INSPECTION NOTES 11/9/2023 - PREVIOUS INSPECTION NOTES 11-9-2023 1. D.W. cannot be connected to countertop kitchen circuit. 2. Generac panels and generator not listed on electrical diagram. 3. AHU #2 not listed on drawings. 4. Bonding wire not connected - see Gas Final notes. 11-15-2023 AHU #2 needs working space and access to unit. M1305.1.3 M1305.1 . Please confirm AHU model number and breaker size at next inspection.
BLD - BUILDING FINAL 11/15/2023 Disapproved - NO FEE AGAETANO
Note: 11/9/2023 - PREVIOUS INSPECTION NOTES 11-9-2023 1. D.W. cannot be connected to countertop kitchen circuit. 2. Generac panels and generator not listed on electrical diagram. 3. AHU #2 not listed on drawings. 4. Bonding wire not connected - see Gas Final notes. 11-15-2023 AHU #2 needs working space and access to unit. M1305.1.3 M1305.1 . Please confirm AHU model number and breaker size at next inspection.
GAS FINAL 11/15/2023 FINAL APPROVED AGAETANO
Note: 11/9/2023 - PREVIOUS INSPECTION NOTES 11-9-2023 Bonding wire not connected.
GAS FINAL 11/09/2023 Disapproved - NO FEE AGAETANO
Note: 11-9-2023 Bonding wire not connected.
BLD - BUILDING FINAL 11/09/2023 Disapproved - NO FEE AGAETANO
Note: 11-9-2023 1. D.W. cannot be connected to countertop kitchen circuit. 2. Generac panels and generator not listed on electrical diagram. 3. AHU #2 not listed on drawings. Need to confirm AHU #2 Calcs. 4. Bonding wire not connected - see Gas Final notes.
ROW - STORMWATER FINAL 11/09/2023 APPROVED - AS NOTED GBERTOLA
Note: 11/9/23= CORRECTION WERE MADE AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION FROM THE TIME OF THE INSPECTION APPROVAL TO THE CONCRETE POUR. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 11/6/2023 - PREVIOUS INSPECTION NOTES ** 11/06/23 CORRECTIONS STILL REQUIRED ** LEFT SIDE FRONT PROPERTY LINE NEED TO ADD SOD SEE WHITE PAINT HIGH LIGHTED AREA ** LEFT AND RIGHT REAR NEED TO REMOVE THE BARK MULCH AND PLANTS FROM THE DRAINAGE CONVEYANCE ** RIGHT REAR DRAINAGE DITCH NEED TO SOD BARE EARTH ALONG PROPERTY LINE AND REMOVE THE BARK MULCH FROM DRAINAGE CONVEYANCE RIGHT FRONT ______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 ** 10/30/23 BEFORE ROW STORMWATER FINAL IS APPROVED ** LEFT SIDE FRONT PROPERTY LINE NEED TO ADD SOD SEE WHITE PAINT HIGH LIGHTED AREA ** LEFT AND RIGHT REAR NEED TO REMOVE THE BARK MULCH AND PLANTS FROM THE DRAINAGE CONVEYANCE ** LEFT REAR IN DRAINAGE DITCH AT PROPERTY LINE NEED TO REMOVE THE HIGH SPOT ** RIGHT REAR DRAINAGE DITCH NEED TO SOD BARE EARTH ALONG PROPERTY LINE AND REMOVE THE BARK MULCH FROM DRAINAGE CONVEYANCE NOTE HIGH LIGHTED AREAS WITH WHITE PAINT ** RIGHT SIDE PROPERTY LINE AT A/C PAD AND GENERATOR NEED TO REMOVE HIGH SPOT HIGH LIGHTED WITH WHITE PAINT ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 ** READY TO SET PAVERS ____________________________________________________________________________________________________________________ 9/20/2023 - PREVIOUS INSPECTION NOTES ** 09/20/23 DRIVEWAY NOT READY PAVER BASE IS TOO LOOSE WHEN CHECKING COMPACTING WITH PROBE BAR BASE MATERIAL CAVES IN AROUND ITSELF, NEEDS MORE COMPACTION TO ENSURE STABILITY OF PAVERS _______________________________________________________________________________________________________________________ New inspection due to canceled inspection 6/9/2023 10:45:50 AM- PREVIOUS INSPECTION NOTES ** 06/09/23 READY TO POUR APRON AND PAVER RESTRAINTS **Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. ** SCHEDULE NEXT PRE-POUR INSPECTION ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET ANY PAVERS UNTIL THE NEXT PRE-POUR INSPECTION HAS BEEN APPROVED ___________________________________________________________________________________________________ ** 06/08/23 BUILDER NEEDS TO SUBMIT A RESIDENTIAL PAVER RESTRAINT DETAIL PLAN FOR DRIVEWAY
U -UTILITY RESIDENTIAL FINAL 11/06/2023 FINAL APPROVED DHANEY
ROW - STORMWATER FINAL 11/06/2023 Disapproved -FEE REQUIRED EMADISON
Note: ** 11/06/23 CORRECTIONS STILL REQUIRED ** LEFT SIDE FRONT PROPERTY LINE NEED TO ADD SOD SEE WHITE PAINT HIGH LIGHTED AREA ** LEFT AND RIGHT REAR NEED TO REMOVE THE BARK MULCH AND PLANTS FROM THE DRAINAGE CONVEYANCE ** RIGHT REAR DRAINAGE DITCH NEED TO SOD BARE EARTH ALONG PROPERTY LINE AND REMOVE THE BARK MULCH FROM DRAINAGE CONVEYANCE RIGHT FRONT ______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 ** 10/30/23 BEFORE ROW STORMWATER FINAL IS APPROVED ** LEFT SIDE FRONT PROPERTY LINE NEED TO ADD SOD SEE WHITE PAINT HIGH LIGHTED AREA ** LEFT AND RIGHT REAR NEED TO REMOVE THE BARK MULCH AND PLANTS FROM THE DRAINAGE CONVEYANCE ** LEFT REAR IN DRAINAGE DITCH AT PROPERTY LINE NEED TO REMOVE THE HIGH SPOT ** RIGHT REAR DRAINAGE DITCH NEED TO SOD BARE EARTH ALONG PROPERTY LINE AND REMOVE THE BARK MULCH FROM DRAINAGE CONVEYANCE NOTE HIGH LIGHTED AREAS WITH WHITE PAINT ** RIGHT SIDE PROPERTY LINE AT A/C PAD AND GENERATOR NEED TO REMOVE HIGH SPOT HIGH LIGHTED WITH WHITE PAINT ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 ** READY TO SET PAVERS ____________________________________________________________________________________________________________________ 9/20/2023 - PREVIOUS INSPECTION NOTES ** 09/20/23 DRIVEWAY NOT READY PAVER BASE IS TOO LOOSE WHEN CHECKING COMPACTING WITH PROBE BAR BASE MATERIAL CAVES IN AROUND ITSELF, NEEDS MORE COMPACTION TO ENSURE STABILITY OF PAVERS _______________________________________________________________________________________________________________________ New inspection due to canceled inspection 6/9/2023 10:45:50 AM- PREVIOUS INSPECTION NOTES ** 06/09/23 READY TO POUR APRON AND PAVER RESTRAINTS **Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. ** SCHEDULE NEXT PRE-POUR INSPECTION ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET ANY PAVERS UNTIL THE NEXT PRE-POUR INSPECTION HAS BEEN APPROVED ___________________________________________________________________________________________________ ** 06/08/23 BUILDER NEEDS TO SUBMIT A RESIDENTIAL PAVER RESTRAINT DETAIL PLAN FOR DRIVEWAY
ROW - FINAL APRON (AFTER POUR) 11/06/2023 APPROVED EMADISON
Note: ** 10/30/23 BEFORE ROW STORMWATER FINAL IS APPROVED ** LEFT SIDE FRONT PROPERTY LINE NEED TO ADD SOD SEE WHITE PAINT HIGH LIGHTED AREA ** LEFT AND RIGHT REAR NEED TO REMOVE THE BARK MULCH AND PLANTS FROM THE DRAINAGE CONVEYANCE ** LEFT REAR IN DRAINAGE DITCH AT PROPERTY LINE NEED TO REMOVE THE HIGH SPOT ** RIGHT REAR DRAINAGE DITCH NEED TO SOD BARE EARTH ALONG PROPERTY LINE AND REMOVE THE BARK MULCH FROM DRAINAGE CONVEYANCE RIGHT FRONT NOTE HIGH LIGHTED AREAS WITH WHITE PAINT ** RIGHT SIDE PROPERTY LINE AT A/C PAD AND GENERATOR NEED TO REMOVE HIGH SPOT HIGH LIGHTED WITH WHITE PAINT ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 ** READY TO SET PAVERS ____________________________________________________________________________________________________________________ 9/20/2023 - PREVIOUS INSPECTION NOTES ** 09/20/23 DRIVEWAY NOT READY PAVER BASE IS TOO LOOSE WHEN CHECKING COMPACTING WITH PROBE BAR BASE MATERIAL CAVES IN AROUND ITSELF, NEEDS MORE COMPACTION TO ENSURE STABILITY OF PAVERS _______________________________________________________________________________________________________________________ New inspection due to canceled inspection 6/9/2023 10:45:50 AM- PREVIOUS INSPECTION NOTES ** 06/09/23 READY TO POUR APRON AND PAVER RESTRAINTS **Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. ** SCHEDULE NEXT PRE-POUR INSPECTION ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET ANY PAVERS UNTIL THE NEXT PRE-POUR INSPECTION HAS BEEN APPROVED ___________________________________________________________________________________________________ ** 06/08/23 BUILDER NEEDS TO SUBMIT A RESIDENTIAL PAVER RESTRAINT DETAIL PLAN FOR DRIVEWAY
BLD - BUILDING FINAL 11/06/2023 CANCELLED BY APPLICANT WEB
U-CROSS CONNECTION 11/06/2023 APPROVED DHANEY
WALL SHEATHING 11/06/2023 APPROVED AGAETANO
FINAL SURVEY (OFFICE USE ONLY) 10/30/2023 APPROVED EMADISON
ROW FIELD SURVEY /GRADING CERTIFICATION 10/30/2023 APPROVED - AS NOTED EMADISON
Note: ** 10/30/23 BEFORE ROW STORMWATER FINAL IS APPROVED ** LEFT SIDE FRONT PROPERTY LINE NEED TO ADD SOD SEE WHITE PAINT HIGH LIGHTED AREA ** LEFT AND RIGHT REAR NEED TO REMOVE THE BARK MULCH AND PLANTS FROM THE DRAINAGE CONVEYANCE ** LEFT REAR IN DRAINAGE DITCH AT PROPERTY LINE NEED TO REMOVE THE HIGH SPOT ** RIGHT REAR DRAINAGE DITCH NEED TO SOD BARE EARTH ALONG PROPERTY LINE AND REMOVE THE BARK MULCH FROM DRAINAGE CONVEYANCE RIGHT FRONT NOTE HIGH LIGHTED AREAS WITH WHITE PAINT ** RIGHT SIDE PROPERTY LINE AT A/C PAD AND GENERATOR NEED TO REMOVE HIGH SPOT HIGH LIGHTED WITH WHITE PAINT ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 ** READY TO SET PAVERS ____________________________________________________________________________________________________________________ 9/20/2023 - PREVIOUS INSPECTION NOTES ** 09/20/23 DRIVEWAY NOT READY PAVER BASE IS TOO LOOSE WHEN CHECKING COMPACTING WITH PROBE BAR BASE MATERIAL CAVES IN AROUND ITSELF, NEEDS MORE COMPACTION TO ENSURE STABILITY OF PAVERS _______________________________________________________________________________________________________________________ New inspection due to canceled inspection 6/9/2023 10:45:50 AM- PREVIOUS INSPECTION NOTES ** 06/09/23 READY TO POUR APRON AND PAVER RESTRAINTS **Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. ** SCHEDULE NEXT PRE-POUR INSPECTION ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET ANY PAVERS UNTIL THE NEXT PRE-POUR INSPECTION HAS BEEN APPROVED ___________________________________________________________________________________________________ ** 06/08/23 BUILDER NEEDS TO SUBMIT A RESIDENTIAL PAVER RESTRAINT DETAIL PLAN FOR DRIVEWAY
ROW- PRE-APRON (PRE-POUR) 09/21/2023 APPROVED - AS NOTED EMADISON
Note: ** READY TO SET PAVERS ____________________________________________________________________________________________________________________ 9/20/2023 - PREVIOUS INSPECTION NOTES ** 09/20/23 DRIVEWAY NOT READY PAVER BASE IS TOO LOOSE WHEN CHECKING COMPACTING WITH PROBE BAR BASE MATERIAL CAVES IN AROUND ITSELF, NEEDS MORE COMPACTION TO ENSURE STABILITY OF PAVERS _______________________________________________________________________________________________________________________ New inspection due to canceled inspection 6/9/2023 10:45:50 AM- PREVIOUS INSPECTION NOTES ** 06/09/23 READY TO POUR APRON AND PAVER RESTRAINTS **Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. ** SCHEDULE NEXT PRE-POUR INSPECTION ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET ANY PAVERS UNTIL THE NEXT PRE-POUR INSPECTION HAS BEEN APPROVED ___________________________________________________________________________________________________ ** 06/08/23 BUILDER NEEDS TO SUBMIT A RESIDENTIAL PAVER RESTRAINT DETAIL PLAN FOR DRIVEWAY
ROW- PRE-APRON (PRE-POUR) 09/20/2023 Disapproved -FEE REQUIRED EMADISON
Note: ** 09/20/23 DRIVEWAY NOT READY PAVER BASE IS TOO LOOSE WHEN CHECKING COMPACTING WITH PROBE BAR BASE MATERIAL CAVES IN AROUND ITSELF, NEEDS MORE COMPACTION TO ENSURE STABILITY OF PAVERS ** SEE ATTACHED PHOTOS _______________________________________________________________________________________________________________________ New inspection due to canceled inspection 6/9/2023 10:45:50 AM- PREVIOUS INSPECTION NOTES ** 06/09/23 READY TO POUR APRON AND PAVER RESTRAINTS **Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. ** SCHEDULE NEXT PRE-POUR INSPECTION ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET ANY PAVERS UNTIL THE NEXT PRE-POUR INSPECTION HAS BEEN APPROVED ___________________________________________________________________________________________________ ** 06/08/23 BUILDER NEEDS TO SUBMIT A RESIDENTIAL PAVER RESTRAINT DETAIL PLAN FOR DRIVEWAY
ROW- PRE-APRON (PRE-POUR) 09/12/2023 CANCELLED BY APPLICANT WEB
Note: 6/9/2023 10:45:50 AM- PREVIOUS INSPECTION NOTES ** 06/09/23 READY TO POUR APRON AND PAVER RESTRAINTS **Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. ** SCHEDULE NEXT PRE-POUR INSPECTION ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET ANY PAVERS UNTIL THE NEXT PRE-POUR INSPECTION HAS BEEN APPROVED ___________________________________________________________________________________________________ ** 06/08/23 BUILDER NEEDS TO SUBMIT A RESIDENTIAL PAVER RESTRAINT DETAIL PLAN FOR DRIVEWAY
GRAVITY SEWER TEST 06/12/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS AVIRTUAL INSPECTION
U - SEWER TIE IN 06/12/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
ROW- PAVER RESTRAINTS 06/09/2023 APPROVED EMADISON
Note: ** 06/09/23 READY TO POUR APRON AND PAVER RESTRAINTS **Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh.
ROW- PRE-APRON (PRE-POUR) 06/09/2023 PARTIALLY APPROVED EMADISON
Note: ** 06/09/23 READY TO POUR APRON AND PAVER RESTRAINTS **Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. ** SCHEDULE NEXT PRE-POUR INSPECTION ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET ANY PAVERS UNTIL THE NEXT PRE-POUR INSPECTION HAS BEEN APPROVED ___________________________________________________________________________________________________ ** 06/08/23 BUILDER NEEDS TO SUBMIT A RESIDENTIAL PAVER RESTRAINT DETAIL PLAN FOR DRIVEWAY
ELECTRIC - EARLY POWER 05/22/2023 CANCELLED BY APPLICANT WEB
ELECTRIC - EARLY POWER 05/22/2023 APPROVED - AS NOTED AGAETANO
Note: 05-22-2023 FPL notified at 12:18pm
LATH/BRICK/ WATER BARRIER 03/23/2023 APPROVED TSTAUFFACHER
WINDOW NAILING 03/23/2023 APPROVED TSTAUFFACHER
INSULATION 03/07/2023 APPROVED AGAETANO
Note: Inspector Notes from Inspection 2420 1. A2 Floor plan and A3 note E states 6 x 6 PT. 6 X 6 Paralam installed. Please revise drawings to indicate changes made including the top connections. Please submit to the building department. Check at next inspection. 02-06-2023 1. Above revision has not been addressed. Please submit and have on site by final. 2. No service. Check at early power. 3. Window nailng will be added for two over entry door.
INSULATION 03/03/2023 Disapproved - NO FEE TSTAUFFACHER
Note: 03/03/2023 Missng fire foam at electric panel Missing fire foam at fire block on stairs Need fire foam at double wall at entry between top plates (left side of entry door)
ALL ROUGH 02/06/2023 APPROVED - AS NOTED AGAETANO
Note: 1. A2 Floor plan and A3 note E states 6 x 6 PT. 6 X 6 Paralam installed. Please revise drawings to indicate changes made including the top connections. Please submit to the building department. Check at next inspection. 02-06-2023 1. Above revision has not been addressed. Please submit and have on site by final. 2. No service. Check at early power. 3. Window nailng will be added for two over entry door.
GAS ROUGH 02/06/2023 APPROVED AGAETANO
ROOF VALLEY & METAL 10/19/2022 APPROVED AGAETANO
Note: Inspector Notes from Inspection 2460 Inspector Notes from Inspection 2460 08-29-2022 1. A2 Floor plan and A3 note E states 6 x 6 PT. 6 X 6 Paralam installed. Please revise drawings to indicate changes made. Please submit to the building department. 2. T47 engineering missed. 3. Piggy back Note C not installed as per plans ( not 24" oc in 1 area at center). Check at roof valley metal. 09-21-2022 1. A2 Floor plan and A3 note E states 6 x 6 PT. 6 X 6 Paralam installed. Please revise drawings to indicate changes made including the top connections. Please submit to the building department. Check at next inspection.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/21/2022 APPROVED - AS NOTED AGAETANO
Note: Inspector Notes from Inspection 2460 08-29-2022 1. A2 Floor plan and A3 note E states 6 x 6 PT. 6 X 6 Paralam installed. Please revise drawings to indicate changes made. Please submit to the building department. 2. T47 engineering missed. 3. Piggy back Note C not installed as per plans ( not 24" oc in 1 area at center). Check at roof valley metal. 09-21-2022 1. A2 Floor plan and A3 note E states 6 x 6 PT. 6 X 6 Paralam installed. Please revise drawings to indicate changes made including the top connections. Please submit to the building department. Check at next inspection.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/29/2022 APPROVED - AS NOTED AGAETANO
Note: 08-29-2022 1. A2 Floor plan and A3 note E states 6 x 6 PT. 6 X 6 Paralam installed. Please revise drawings to indicate changes made. Please submit to the building department. 2. T47 engineering missed. 3. Piggy back Note C not installed as per plans ( not 24" oc in 1 area at center). Check at roof valley metal.
TIE BEAM / LINTEL 07/07/2022 APPROVED AGAETANO
FOUND SURVEY APPROVED (OFFICE) 05/23/2022 APPROVED TBAKER
MONOLITHIC SLAB 03/31/2022 APPROVED AGAETANO
Note: THIS IS A REINSPECTION Please provide engineering details to the building department for the four concrete columns at the entry and the shaded footing area in the same location.
MONOLITHIC SLAB 03/29/2022 Disapproved - NO FEE AGAETANO
Note: Please provide engineering details to the building department for the four concrete columns at the entry and the shaded footing area in the same location.
WATER METER INSTALLATION REQUEST 03/29/2022 APPROVED CSTONE
WILDLIFE CHECK - ENVIRONMENTAL 02/28/2022 APPROVED JMYERS
PLUMBING 1ST ROUGH UNDERGROUND 02/25/2022 APPROVED AGAETANO

Review History

Department Status Date In Date Out
ELEC COMPLETE 11/13/2023 11/14/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ELEC HOLD 11/09/2023 11/13/2023
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need light and switch in attic with AHU NEC 2017 210.70
MECH COMPLETE 11/03/2023 11/03/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH CANCEL 11/01/2023 11/02/2023
BLD COMPLETE 10/29/2023 10/31/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD CANCEL 10/25/2023 10/27/2023
SW1 CANCEL 10/25/2023 10/27/2023
BLD HOLD 09/27/2023 10/03/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM All Comments per FBC Residential 2020 7Th edition 1. Provide guard construction details including guard construction materials, guard design loads for both the guard and guard in-fill components, guard height, guard top and bottom rails, guard in-fill components materials, maximum openings in guards, complete guard attachment details to landings. R301.5, Table R301.5, R312.1.2, R312.1.3 2. Provide fastening details for posts to deck, guard top and bottom rails to post and guard in-fill components to guard top and bottom rails and post height. R507 3. Provide lumber species and grade for deck joists, beams, and posts. R502.1.1, R301.5, Table R301.5, R507.5, R 507.6 4. Provide footing detail for posts including concrete strength and dimensions. R402, R403 5. Provide size of posts and attachment details to footing. R507.4.1 6. Provide details on landings and stairs/ ramps for both sides of walkway. 107.2.1 7. Provide construction details, material specs and fasteners on deck support beams and spacing. R507.5.1 9. Provide handrail detail and type (Type I or Type II) and mounting height and attachment detail. R311.7.8.1, R311.7.8.3. 10. Provide live and dead loads for deck. R301.4 R301.5 Table R301.5 11. Provide details on wood decking size and thickness 107.2.1 12. Provide details on walkway. Part of walkway in an AE flood zone. 107.2.1 13. Plans need to be digitally signed, sealed and verfiable per F.S. 471.025 14. Proposed walkway encroaches into 100 year floodplain Zone AE.  Engineer to provide statement the patios structural system has been designed, connected and anchored to resist flotation, collapse or permanent lateral movement due to structural loads and stresses from flooding equal to the design flood elevation.  R322.1.2, R322.1.3.   Exception is design according to ASCE 24.
ENGIN1 COMPLETE 09/27/2023 09/27/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 09/27/2023 09/28/2023
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON HOLD 09/27/2023 09/27/2023
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM 1. Please provide dimensions and material for proposed "walkover" on site plan. 2. If you are adding the proposed "path" from the owner's property through the Westerly Line of the ICW to the ICW, please add the width and material to the site plan and also the following is required: NO IMPROVEMENTS WITHIN THE ICWW RIGHT OF WAY WITHOUT WRITTEN PERMISSION FROM THE UNITED STATES ARMY CORPS OF ENGINEERS AND THE FLORIDA INLAND NAVIGATCAL DISTRICT.
BADMIN INFORMATION 09/22/2023 09/22/2023
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM 1. plans should be submitted under the 'plans' document type (not informational). 2. plans submitted online must be digitally signed and sealed and verifiable.
ENGIN1 COMPLETE 06/09/2023 06/09/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 06/09/2023 06/14/2023
Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM
BLD COMPLETE 02/06/2023 02/10/2023
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
BLD COMPLETE 12/15/2022 12/16/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
BADMIN INFORMATION 09/23/2022 09/23/2022
Note: Marked INFORMATION By: MARGA DEFREITAS - - MDEFREITAS@PALMCOASTGOV.COM Wrong File Name Uploaded file name was not correct - Example: Site plan=site plan (do not add anything to the file names like numbers.) also revision sheet needs to state what the chnges are PLANS NOT DIGITAL
ENGIN1 COMPLETE 05/20/2022 05/23/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 05/20/2022 05/20/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 03/30/2022 03/30/2022
Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM
PLENV CANCEL 02/10/2022 02/10/2022
Note: The After Action Report was already approved.
PLENV COMPLETE 12/06/2021 12/06/2021
Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The Approved After Action Report has been accepted.
PLFM COMPLETE 09/09/2021 09/10/2021
Note: Released By: JORDAN MYERS, C.F.M - (904)562-0045 - JMYERS@PALMCOASTGOV.COM According to the revised Site Plan submitted on 9/9/21, the structure will not fall within the Special Flood Hazard Area. No elevation certificates will be required.
ZON COMPLETE 09/09/2021 09/10/2021
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
PLENV HOLD 09/09/2021 09/10/2021
Note: Held By: JORDAN MYERS, C.F.M - (904)562-0045 - JMYERS@PALMCOASTGOV.COM The Gopher Tortoise letter confirms Potentially Occupied burrows on site and within 25ft of construction activities. Please provide an Approved After Action Report after relocation activities have been completed.
MECH COMPLETE 09/09/2021 09/10/2021
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
ELEC COMPLETE 09/09/2021 09/10/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 09/09/2021 09/11/2021
Note: Released By: JPI
PLENV HOLD 07/29/2021 08/03/2021
Note: Held By: JORDAN MYERS, C.F.M - (904)562-0045 - JMYERS@PALMCOASTGOV.COM Staff conducted a site visit on 8/3/21 and found multiple Potentially Occupied Gopher Tortoise burrows. Please provide a Gopher Tortoise survey by a QEP. If burrows exist within 25ft of construction activities they will have to be relocated and an approved After Action Report submitted.
PLFM HOLD 07/29/2021 07/29/2021
Note: Held By: JORDAN MYERS, C.F.M - (904)562-0045 - JMYERS@PALMCOASTGOV.COM Please revise the Site Plan to show Special Flood Hazard Area. Additional comments may apply when it is submitted and reviewed.
BLD HOLD 07/20/2021 07/27/2021
Note: Held By: JPI 1. Product Approval Specification Sheet: a. Exterior Sectional/Roll Up Doors (elevations) omitted; provide approved product, product description& type, manufacturer, and product approval number. b. Window Mullions (elevations) omitted; provide approved product, product description& type, manufacturer, and product approval number. c. Soffits omitted; provide approved product, product description& type, manufacturer, and product approval number. d. Precast Lintels omitted; provide approved product, product description& type, manufacturer, and product approval number. 2. Provide description to decipher Cast-Crete Lintel Type Designation (i.e. 8F16-IB/IT) on “Lintel Schedule”- FBC-R608.1. 3. Provide wall section of screen wall around A/C pad and Pool Equipment.
CUSVC COMPLETE 07/20/2021 07/27/2021
Note: Released By: HALEIGH HAND - -
ELEC HOLD 07/20/2021 07/22/2021
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need smoke alarms outside of all bedrooms. FRC 2020 315.1 2. Submit riser diagram and manufactured specs for generator
ENGIN1 COMPLETE 07/20/2021 07/20/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 07/20/2021 07/23/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH HOLD 07/20/2021 07/21/2021
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Provide Duct layout signed by the AC contractor
SW1 COMPLETE 07/20/2021 07/28/2021
Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM
ZON HOLD 07/20/2021 07/29/2021
Note: Held By: ESTELLE LENS - (386)986-3751 - The minimum driveway width for a three car garage is 24 feet. Please revise the site plan and demonstrate that the driveway will be a minimum of 24 feet for at least 20 feet from the garage door. (It can then taper to 10 feet towards the road.) Need to indicate the driveway material on the site plan. Need to add the walkway width and material to the site plan. Please correct the FEMA map panel number (...0127E) and add the second flood zone (X) to the site plan notes.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 11/16/2023
PLAN REVIEW - REVISION ¤32.50 11/16/2023
PLAN REVIEW - REVISION ¤32.50 11/16/2023
PLAN REVIEW - REVISION ¤32.50 11/16/2023
SW ENG REINSPECTION 20 ¤20.00 11/16/2023
SW ENG REINSPECTION 30 ¤30.00 11/16/2023
SW ENG REINSPECTION 30 ¤30.00 11/16/2023
STORM WATER PERMIT FEES ¤80.00 12/17/2021
SEWER INSPECTION ¤25.00 12/17/2021
SEWER CAPITAL FACILITY ¤4,664.55 12/17/2021
WATER CAPITAL FACILITY FEE ¤3,424.45 12/17/2021
CONNECTION FEES ¤25.00 12/17/2021
BUILDING DISCOUNT 100% (¤3,770.00) 12/17/2021
IMPACT FEE FIRE ¤367.00 12/17/2021
IMPACT FEE PARKS ¤1,199.12 12/17/2021
IMPACT FEE SCHOOL ¤3,600.00 12/17/2021
IMPACT FEE TRANSPORTATION ¤3,139.00 12/17/2021
WATER -IRRIGATION INSPECTION ¤25.00 12/17/2021
NEW RESIDENTIAL INSPECTIONS ¤1,700.00 12/17/2021
SITE PLAN 20 ¤20.00 12/17/2021
SURCHARGE FS 533.721 ¤2.00 12/17/2021
SURCHARGE - FS 468.631 ¤2.00 12/17/2021
METER - DEPOSIT ¤60.00 12/17/2021
METER - DEPOSIT ¤60.00 12/17/2021
WATER-METER ¤441.07 12/17/2021
WATER-METER ¤441.07 12/17/2021
WATER- TURN ON ¤25.00 12/17/2021
ADMINISTRATIVE RESIDENTIAL ¤20.00 12/17/2021
INSPECTION- ELECTRICAL ¤570.00 12/17/2021
INSPECTION - MECHANICAL ¤570.00 12/17/2021
INSPECTION - PLUMBING ¤570.00 12/17/2021
PLAN REVIEW - RESIDENTIAL ¤340.00 12/17/2021
Fees Total Due: ¤0.00 Total Paid: ¤17,817.76