Permit #2021070988
Permit Details
Status: COED
| Parcel Id: 07-11-31-7019-00160-0080 |
| CONDITIONED SPACE: 2298 sqft |
| GARAGE: 797 sqft |
| OPENED PORCH (WITH ROOF) : 365 sqft |
| OPENED PORCH (WITH ROOF) : 88 sqft |
| Total Square Footage: 3548 sqft |
| Block: 00160 |
| Subdivision: 2214 - SECTION 19-WYNNFIELD |
| Job Phone: 386-931-5395 |
| Location Address: 6 WATERMILL PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 08/11/2021 |
| NOC: RECORDED |
| Applicant name: RYAN JAMES PERRY |
| Owner: ANJANETTE STEVENS AND JEFFREY STUART |
|
Address 6 WATERMILL PLACE PALM COAST, FL 32164 |
| Lot: 0080 |
| Contracted Stated Job Value: ¤375,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
WATERSIDE HOMES RENOVATIONS AND DESIGNS INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
10 BISCAYNE DRIVE PALM COAST, FL 32137 |
CBC1263021 (Exp: 08/31/2026) | 386-931-5395 |
Sub Contractors
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 912 PALM COAST, FL 32164 |
CAC1820539 (Exp: 08/31/2026) | 386-264-0550 |
PETER JOSEPH LYDEN
| Status | Location Address | State License Number | Phone |
| CANCEL |
17 UNIMAY CT BUNNELL, FL 32110 |
EC0002436 (Exp: 08/31/2022) | 386-931-2568 |
RYAN JAMES PERRY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
10 BISCAYNE DRIVE PALM COAST, FL 32137 |
CBC1263021 (Exp: 08/31/2026) | 386-931-5395 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 07/13/2022 | FINAL APPROVED | MKRASKI |
| Note: Generator plug removed, no interlock needed at final | |||
| ROW - STORMWATER FINAL | 07/13/2022 | APPROVED | GBERTOLA |
| Note: 07/13/22=CORRECTION WERE MADE Road repair with hot patch not done yet. | |||
| BLD - BUILDING FINAL | 07/11/2022 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 7/11/22 1. No generator interlock installed 2. Microwave needs a breaker lock 3. Range hood cover still missing | |||
| BLD - BUILDING FINAL | 07/08/2022 | Disapproved -FEE REQUIRED | DCUSHING |
| Note: THIS IS A REINSPECTION 1. No interlock kit for generator plug 2. ODU disconnect cannot be behind unit 3. Low voltage in soffit must have covers 4. Cable for outside TV must be sealed or have a cable jack cover Stopped inspection 7.8.22 - Locking caps on A/C Condenser not locked Fireplace face not installed, connections exposed Range hood cover not installed | |||
| BLD - BUILDING FINAL | 07/06/2022 | Disapproved - NO FEE | MKRASKI |
| Note: 1. No interlock kit for generator plug 2. ODU disconnect cannot be behind unit 3. Low voltage in soffit must have covers 4. Cable for outside TV must be sealed or have a cable jack cover Stopped inspection | |||
| U -UTILITY RESIDENTIAL FINAL | 06/30/2022 | FINAL APPROVED | LFITZGERALD |
| ROW - STORMWATER FINAL | 06/30/2022 | Disapproved -FEE REQUIRED | RGROSS |
| Note: Road repair with hot patch not done yet. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/29/2022 | APPROVED | PFLANAGAN |
| Note: Inspector Notes from Inspection 9270 New inspection due to canceled inspection THIS IS A REINSPECTION 05/4/22AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. need to turn down the bolts ON THE ALUMINUM BAND need 5 inch on top of the culvert pipe 6/28/22 - Per Gabe, the original Inspector, this culvert second pre-pour was approved. Therefore being approved as-approved. CULVERT PIPE IS GOOD | |||
| ROW - FINAL APRON (AFTER POUR) | 06/29/2022 | APPROVED | PFLANAGAN |
| FINAL SURVEY (OFFICE USE ONLY) | 06/29/2022 | APPROVED | PFLANAGAN |
| ROW- PRE-APRON (PRE-POUR) | 06/28/2022 | CANCELLED BY APPLICANT | WEB |
| Note: THIS IS A REINSPECTION 05/4/22AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. need to turn down the bolts ON THE ALUMINUM BAND need 5 inch on top of the culvert pipe CULVERT PIPE IS GOOD | |||
| ROW- PRE-APRON (PRE-POUR) | 06/28/2022 | APPROVED - AS NOTED | RGROSS |
| Note: New inspection due to canceled inspection THIS IS A REINSPECTION 05/4/22AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. need to turn down the bolts ON THE ALUMINUM BAND need 5 inch on top of the culvert pipe 6/28/22 - Per Gabe, the original Inspector, this culvert second pre-pour was approved. Therefore being approved as-approved. CULVERT PIPE IS GOOD | |||
| ELECTRIC - EARLY POWER | 06/22/2022 | APPROVED - AS NOTED | MKRASKI |
| Note: 1. Need to install Generator interlock kit before final Emailed FPL @ 1:30 PM | |||
| ELECTRIC - EARLY POWER | 06/21/2022 | Disapproved - NO FEE | JMUNSON |
| Note: 1. Need to install Generator interlock kit 2. Hood wire needs to be safed off in a box | |||
| ROW- PRE-APRON (PRE-POUR) | 05/04/2022 | PARTIALLY APPROVED | GBERTOLA |
| Note: 05/4/22AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. need to turn down the bolts ON THE ALUMINUM BAND need 5 inch on top of the culvert pipe CULVERT PIPE IS GOOD | |||
| ROW- PAVER RESTRAINTS | 05/03/2022 | APPROVED | GBERTOLA |
| ROW- PRE-APRON (PRE-POUR) | 05/03/2022 | Disapproved - NO FEE | GBERTOLA |
| Note: need to turn down the bolts ON THE ALUMINUM BAND need 5 inch on top of the culvert pipe CULVERT PIPE IS GOOD | |||
| U - SEWER TIE IN | 03/10/2022 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 03/10/2022 | APPROVED | MGIBSON |
| INSULATION | 01/25/2022 | APPROVED | FWILLIS |
| LATH/BRICK/ WATER BARRIER | 01/14/2022 | APPROVED | FWILLIS |
| ALL ROUGH | 01/14/2022 | APPROVED | KSANDOE |
| Note: THIS IS A REINSPECTION Zip tape cannot be used on exhaust vents. HVAC ducting needs to be sealed with and approved tape or mastic. | |||
| ALL ROUGH | 01/12/2022 | Disapproved - NO FEE | KSANDOE |
| Note: Zip tape cannot be used on exhaust vents. HVAC ducting needs to be sealed with and approved tape or mastic. | |||
| ROOF VALLEY & METAL | 01/04/2022 | APPROVED | RMARTIN |
| ROOF VALLEY & METAL | 12/29/2021 | CANCELLED BY APPLICANT | WEB |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/01/2021 | APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION Can Not Inspect when framers are actively working inside. Multiple trip Hazards on the floor. | |||
| WALL SHEATHING | 12/01/2021 | APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION Can Not Inspect when Framers are actively working inside. Multiple trip Hazards on floor. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/29/2021 | Disapproved - NO FEE | FWILLIS |
| Note: Can Not Inspect when framers are actively working inside. Multiple trip Hazards on the floor. | |||
| WALL SHEATHING | 11/29/2021 | Disapproved - NO FEE | FWILLIS |
| Note: Can Not Inspect when Framers are actively working inside. Multiple trip Hazards on floor. | |||
| ELECTRIC-TUG | 11/15/2021 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 10:00 am | |||
| TIE BEAM / LINTEL | 10/27/2021 | APPROVED | FWILLIS |
| FOUND SURVEY APPROVED (OFFICE) | 10/20/2021 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 10/12/2021 | APPROVED | KSANDOE |
| PLUMBING 1ST ROUGH UNDERGROUND | 10/04/2021 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 09/09/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 07/05/2022 | 07/05/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 06/23/2022 | 06/23/2022 |
| Note: Marked INFORMATION By: MARGA DEFREITAS - - MDEFREITAS@PALMCOASTGOV.COM YOU HAVE TO CALL YOUR ROW-PRE APRON INSPECTION FIRST BEFORE THE FIANL SURVEY | |||
| ZON | COMPLETE | 04/12/2022 | 04/12/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/11/2022 | 04/11/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 04/11/2022 | 04/18/2022 |
| Note: Released By: PARREN FLANAGAN - - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 04/11/2022 | 04/11/2022 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Please submit original Right Of Way Agreement. | |||
| ENGIN1 | COMPLETE | 10/18/2021 | 10/20/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/18/2021 | 10/18/2021 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/30/2021 | 08/02/2021 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 07/30/2021 | 08/06/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ZON | COMPLETE | 07/30/2021 | 07/30/2021 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | HOLD | 07/21/2021 | 07/27/2021 |
| Note: Held By: JPI 1. Product Approval Specification Sheet: a. Exterior Doors, Sectional/Roll Up FL product approval number (FL8248.6) specifies “single-car (up to 9’-0” wide) garage door, however the product indicates it is 16’ x 7’; there are two (2) garage doors indicated on this project with one being 10’-0” wide and the other 16’-0” wide. Provide approved products, product descriptions, manufacturers, and product approval number for both sizes of garage doors. b. Window Mullions (elevations) omitted; provide approved product, product description& type, manufacturer, and product approval number. c. Harding Siding (elevations) omitted; provide approved product, product description, manufacturer, and product approval number. d. Florida Product Approval number for Roofing Product, “Rhino Dry in Material” (19567.1R1) is for Ridge Vent; drawings indicate there are NOT any vents in the roof. 2. Provide description to decipher Cast-Crete Lintel Type Designation (i.e. 8F16-IB/IT) on “Lintel Schedule”- FBC-R608.1. | |||
| CUSVC | HOLD | 07/21/2021 | 07/28/2021 |
| Note: Held By: HALEIGH HAND - - Please correct the utility application to reflect the correct parcel number. | |||
| ELEC | COMPLETE | 07/21/2021 | 07/22/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/21/2021 | 07/21/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 07/21/2021 | 07/23/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 07/21/2021 | 07/22/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/21/2021 | 07/28/2021 |
| Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM | |||
| ZON | HOLD | 07/21/2021 | 07/29/2021 |
| Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Rear setback must be shown from the closest point of the rear covered porch to rear property lin. Due to angle of rear property, it must be shown from right corner of rear covered porch. | |||
| SWALE | COMPLETE | 07/21/2021 | 10/21/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 07/13/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/13/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/13/2022 |
| RECORDING FEE REIMBURSE DOC | ¤44.00 | 07/13/2022 |
| SW ENG REINSPECTION 20 | ¤20.00 | 07/13/2022 |
| STORM WATER PERMIT FEES | ¤80.00 | 08/11/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 08/11/2021 |
| SEWER CREDIT | (¤1,147.00) | 08/11/2021 |
| SEWER INSPECTION | ¤25.00 | 08/11/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 08/11/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 08/11/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 08/11/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 08/11/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 08/11/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 08/11/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤750.00 | 08/11/2021 |
| SITE PLAN 20 | ¤20.00 | 08/11/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 08/11/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 08/11/2021 |
| CONNECTION FEES | ¤1,017.83 | 08/11/2021 |
| BUILDING DISCOUNT 100% | (¤1,775.00) | 08/11/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 08/11/2021 |
| IMPACT FEE FIRE | ¤367.00 | 08/11/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 08/11/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 08/11/2021 |
| METER - DEPOSIT | ¤60.00 | 08/11/2021 |
| METER - DEPOSIT | ¤60.00 | 08/11/2021 |
| WATER-METER | ¤441.07 | 08/11/2021 |
| WATER- TURN ON | ¤25.00 | 08/11/2021 |
| WATER- TURN ON | ¤25.00 | 08/11/2021 |
| ADMINISTRATIVE RESIDENTIAL | ¤20.00 | 08/11/2021 |
| INSPECTION- ELECTRICAL | ¤285.00 | 08/11/2021 |
| INSPECTION - MECHANICAL | ¤285.00 | 08/11/2021 |
| INSPECTION - PLUMBING | ¤285.00 | 08/11/2021 |
| PLAN REVIEW - RESIDENTIAL | ¤150.00 | 08/11/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,712.00 |