I want to search for...
Permit #2021071118
Permit Details
Status: COED
| Parcel Id: 07-11-31-7035-00360-0060 |
| CONDITIONED SPACE: 2052 sqft |
| GARAGE: 407 sqft |
| OPENED PORCH (WITH ROOF) : 16 sqft |
| Total Square Footage: 2475 sqft |
| Block: 00360 |
| Subdivision: 2172 - SECTION 35-BELLE TERRE |
| Job Phone: 904-268-7730 |
| Location Address: 29 BUTTERMILK DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 08/04/2021 |
| NOC: RECORDED |
| Applicant name: DALE ALAN DUBBERLY |
| Owner: MARONDA HOMES, LLC |
|
Address 5220 SHAD RD JACKSONVILLE, FL 32257 |
|
Address STE 202 JACKSONVILLE, FL 32257 |
| Lot: 0060 |
| Contracted Stated Job Value: ¤175,000.00 |
| Job Description: SINGLE FAMILY DWELLING |
| Type: CN |
Contractor
MARONDA HOMES INC
| Status | Location Address | State License Number | Phone |
| CANCEL |
5220 SHAD ROAD JACKSONVILLE , FL 32257 |
CGC1504922 (Exp: 08/31/2022) | 904-268-7730 |
Sub Contractors
RONALD KEVIN HAUPT
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4005 MARONDA WAY SANFORD, FL 32771 |
CAC058534 (Exp: 08/31/2026) | 407-321-0064 |
JEFFREY R OESCHGER
| Status | Location Address | State License Number |
| INACTIVE |
4237 HOLDEN ROAD LAKELAND, FL 33811 |
CFC1429768 (Exp: 08/31/2024) |
JAMES M GREENSLADE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
311 S BAY ST BUNNELL, FL 32110 |
EC13006083 (Exp: 08/31/2026) | 386-263-2960 | 386-263-2980 |
DEBORAH MAXINE JACKSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1165 SOUTH 5TH MACCLENNY, FL 32063 |
CCC1330709 (Exp: 08/31/2026) | 904-322-9409 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 07/25/2022 | FINAL APPROVED | MKRASKI |
| ROW - STORMWATER FINAL | 07/25/2022 | Disapproved - NO FEE | EMADISON |
| Note: ** NEED SOD ON BARE AREAS ACROSS REAR OF PROPERTY AS NOTED IN THE APPROVED FIELD SURVEY CONDUCTED ON 07/22/22 TO ASSIST IN EROSION CONTROL I inspected the property on 7/14/22 the right side property line does not have a 4:1 slope from the property line and is not maintainable. Second part of the rear and side yard is draining onto the adjacent lot. 1) Builder needs to tamper the grade from the property line to the top of the berm needed to keep the water on there property. 2) Redifine the drainage conveyance from the back to the front on the right side | |||
| ROW - STORMWATER FINAL | 07/25/2022 | APPROVED - AS NOTED | EMADISON |
| Note: THIS IS A REINSPECTION ** corrections made everything looks good at the time of the inspection ** NEED SOD ON BARE AREAS ACROSS REAR OF PROPERTY AS NOTED IN THE APPROVED FIELD SURVEY CONDUCTED ON 07/22/22 TO ASSIST IN EROSION CONTROL I inspected the property on 7/14/22 the right side property line does not have a 4:1 slope from the property line and is not maintainable. Second part of the rear and side yard is draining onto the adjacent lot. 1) Builder needs to tamper the grade from the property line to the top of the berm needed to keep the water on there property. 2) Redifine the drainage conveyance from the back to the front on the right side | |||
| U -UTILITY RESIDENTIAL FINAL | 07/25/2022 | APPROVED - AS NOTED | LFITZGERALD |
| Note: change out square nut type sewer clean out cap to a flush mount type | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/22/2022 | APPROVED - AS NOTED | EMADISON |
| Note: ** NEED SOD ON BARE AREAS ACROSS REAR OF PROPERTY | |||
| ROW - FINAL APRON (AFTER POUR) | 07/22/2022 | APPROVED | EMADISON |
| FINAL SURVEY (OFFICE USE ONLY) | 07/22/2022 | APPROVED - AS NOTED | EMADISON |
| Note: ** CORRECTIONS WERE MADE 07/18/22= IS MISSING SOD IN THE BACK RIGHT SIDE OF THE HOUSE , FINAL SURVEY NEED TO BE DONE AFTER THE SOD IS DONE ** FINAL SURVEY NEEDS TO SHOW ALL ELEVATIONS INCLUDING THOSE OF THE ADJACENT PROPERTY LINES I inspected the property on 7/14/22 the right side property line does not have a 4:1 slope from the property line and is not maintainable. Second part of the rear and side yard is draining onto the adjacent lot. 1) Builder needs to tamper the grade from the property line to the top of the berm needed to keep the water on there property. 2) Redifine the drainage conveyance from the back to the front on the right side | |||
| FINAL SURVEY (OFFICE USE ONLY) | 07/18/2022 | Disapproved - NO FEE | GBERTOLA |
| Note: IS MISSING SOD IN THE BACK RIGHT SIDE OF THE HOUSE , FINAL SURVEY NEED TO BE DONE AFTER THE SOD IS DONE ** FINAL SURVEY NEEDS TO SHOW ALL ELEVATIONS INCLUDING THOSE OF THE ADJACENT PROPERTY LINES | |||
| ROW- PROJECT STATUS | 07/14/2022 | Disapproved - NO FEE | CTROHA |
| Note: I inspected the property on 7/14/22 the right side property line does not have a 4:1 slope from the property line and is not maintainable. Secondly: part of the rear and side yard is draining onto the adjacent lot. 1) Builder needs to tamper the grade from the property line to the top of the berm needed to keep the water on there property. 2) Redifine the drainage conveyance from the back to the front on the right side | |||
| FINAL SURVEY (OFFICE USE ONLY) | 07/08/2022 | Disapproved - NO FEE | EMADISON |
| Note: ** FINAL SURVEY NEEDS TO SHOW ALL ELEVATIONS INCLUDING THOSE OF THE ADJACENT PROPERTY LINES | |||
| ELECTRIC - EARLY POWER | 06/15/2022 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 10:25 | |||
| U - SEWER TIE IN | 06/09/2022 | APPROVED | MGIBSON |
| U-CROSS CONNECTION | 06/09/2022 | APPROVED | DHANEY |
| ROW- PRE-APRON (PRE-POUR) | 06/08/2022 | APPROVED - AS NOTED | EMADISON |
| Note: ** ARE AROUND PIPE HAS BEEN COMPACTED WATER HAS BEEN PUMPED FROM THE SITE READY TO POUR IN THE EVENT OF RAIN PRIOR TO POUR BUILDER NEEDS TO RECHECK ELEVATIONS BEFORE POUR TOO MUCH WATER IN THE POUR AREA. WATER INSIDE THE CULVERT FROM LAST NIGHTS RAIN. i didn't check the culvert pipe | |||
| ROW- PRE-APRON (PRE-POUR) | 06/07/2022 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: TOO MUCH WATER IN THE POUR AREA. WATER INSIDE THE CULVERT FROM LAST NIGHTS RAIN. i didn't check the culvert pipe | |||
| ELECTRIC-TUG | 06/01/2022 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 10:37 am | |||
| PEP TANK INSTALLATION REQUEST | 05/25/2022 | APPROVED | CSTONE |
| LATH/BRICK/ WATER BARRIER | 05/10/2022 | APPROVED | FWILLIS |
| INSULATION | 05/02/2022 | APPROVED | DCUSHING |
| ALL ROUGH | 04/27/2022 | APPROVED - AS NOTED | MKRASKI |
| Note: 1. No water to home 2. Plumbing fo tub needs to be sealed at slab Check on insulation | |||
| ROOF VALLEY & METAL | 04/18/2022 | APPROVED | FWILLIS |
| WALL SHEATHING | 04/14/2022 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/13/2022 | APPROVED | FWILLIS |
| TIE BEAM / LINTEL | 04/01/2022 | APPROVED | FWILLIS |
| FOUND SURVEY APPROVED (OFFICE) | 02/07/2022 | APPROVED | AMOBLEY |
| MONOLITHIC SLAB | 01/07/2022 | APPROVED | FWILLIS |
| GRAVITY SEWER TEST | 12/29/2021 | APPROVED | MGIBSON |
| Note: THIS IS A REINSPECTION SEE FIRST ROUGH NOTE | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 12/29/2021 | APPROVED | MGIBSON |
| Note: THIS IS A REINSPECTION NOT HOLDING 5' HEAD TEST | |||
| GRAVITY SEWER TEST | 12/28/2021 | Disapproved - NO FEE | MGIBSON |
| Note: SEE FIRST ROUGH NOTE | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 12/28/2021 | Disapproved -FEE REQUIRED | MGIBSON |
| Note: NOT HOLDING 5' HEAD TEST | |||
| WATER METER INSTALLATION REQUEST | 10/28/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 07/13/2022 | 07/13/2022 |
| Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM SUBMIT BLOWER DOOR/ENVELOPE LEAKAGE TEST | |||
| ENGIN1 | COMPLETE | 02/07/2022 | 02/07/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/07/2022 | 02/07/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/22/2021 | 07/27/2021 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 07/22/2021 | 07/28/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 07/22/2021 | 07/23/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/22/2021 | 07/22/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 07/22/2021 | 07/27/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 07/22/2021 | 07/23/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/22/2021 | 07/29/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/22/2021 | 07/29/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 07/22/2021 | 10/25/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 07/22/2022 |
| CONTRACTOR CHANGE | ¤40.00 | 07/22/2022 |
| CONTRACTOR CHANGE | ¤40.00 | 07/22/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/22/2022 |
| SW ENG REINSPECTION 30 | ¤30.00 | 07/22/2022 |
| STORM WATER PERMIT FEES | ¤80.00 | 08/04/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 08/04/2021 |
| SEWER CREDIT | (¤850.00) | 08/04/2021 |
| SEWER INSPECTION | ¤25.00 | 08/04/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 08/04/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 08/04/2021 |
| CONNECTION FEES | ¤1,017.83 | 08/04/2021 |
| METER - DEPOSIT | ¤60.00 | 08/04/2021 |
| WATER- TURN ON | ¤25.00 | 08/04/2021 |
| ADMIN FEE | ¤20.00 | 08/04/2021 |
| BUILDING DISCOUNT 100% | (¤1,229.00) | 08/04/2021 |
| ELECTRIC FEE | ¤207.00 | 08/04/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 08/04/2021 |
| IMPACT FEE FIRE | ¤367.00 | 08/04/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 08/04/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 08/04/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 08/04/2021 |
| MECHANICAL FEE | ¤207.00 | 08/04/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 08/04/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 08/04/2021 |
| PLAN CHECK FEE | ¤98.00 | 08/04/2021 |
| PLUMBING FEE | ¤207.00 | 08/04/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤490.00 | 08/04/2021 |
| SITE PLAN 20 | ¤20.00 | 08/04/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 08/04/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 08/04/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,471.43 |