I want to search for...
Permit #2021071175
Permit Details
Status: COED
| Parcel Id: 07-11-31-7024-00240-0150 |
| CONDITIONED SPACE: 1817 sqft |
| GARAGE: 433 sqft |
| OPENED PORCH (WITH ROOF) : 186 sqft |
| OPENED PORCH (WITH ROOF) : 38 sqft |
| Total Square Footage: 2474 sqft |
| Block: 00240 |
| Subdivision: 2167 - SECTION 24-PINE GROVE |
| Job Phone: (386)437-1508 |
| Location Address: 44 PRINCETON LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/28/2021 |
| NOC: RECORDED |
| Applicant name: TAMMI SUE MARQUIS |
| Owner: JM PROPERTIES X LLC |
|
Address 29 COLUMBUS CT PALM COAST, FL 32137 |
| Lot: 0150 |
| Contracted Stated Job Value: ¤210,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
GULFSTREAM HOMES & CONSTRUCTION, LLC
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
PO BOX 1092 BUNNELL, FL 32110 |
CRC1326418 (Exp: 08/31/2026) | (386)437-1508 | 386-437-9769 |
Sub Contractors
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
ARTHUR J PASCOE
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 730007 ORMOND BEACH, FL 32174 |
EC13007168 (Exp: 08/31/2026) | 386-547-6439 |
JAMES CRAIG FISHER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 451 BUNNELL, FL 32110 |
CAC1819807 (Exp: 08/31/2026) | 386-222-9549 |
DANIEL DAVID RUTKOWSKI III
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1687 STATE AVENUE HOLLY HILL, FL 32117 |
CCC1328639 (Exp: 08/31/2026) | 386-290-7490 | 386-256-0001 |
MICHAEL MATTHEW SANKOSWSKI
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3 SEAMANSHIP TRAIL PALM COAST, FL 32164 |
CAC1818816 (Exp: 08/31/2026) | 386-316-4401 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 10/02/2023 | FINAL APPROVED | BTAYLOR |
| U -UTILITY RESIDENTIAL FINAL | 09/15/2023 | FINAL APPROVED | LFITZGERALD |
| Note: 9/8/2023 - PREVIOUS INSPECTION NOTES lower sewer clean out so flush with grafes | |||
| ROW - STORMWATER FINAL | 09/08/2023 | APPROVED - AS NOTED | FSLADISH |
| Note: 09/08/23 CORRECTIONS MADE. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ________________________________________________________________________________________________________________________ 8/24/2023 - PREVIOUS INSPECTION NOTES 08/24/23 READ MY PREVIOUS NOTES. NEED TO CLEAN OUT CULVERTS ENDS OF DIRT AND DEBRIS BEFORE ROW FINAL WILL BE PASSED. ________________________________________________________________________________________________________________________ 08/23/23 NEED TO CLEAN OUT CULVERTS OF DIRT AND DEBRIS BEFORE ROW FINAL WILL BE PASSED. | |||
| U -UTILITY RESIDENTIAL FINAL | 09/08/2023 | Disapproved -FEE REQUIRED | LFITZGERALD |
| Note: lower sewer clean out so flush with grafes | |||
| ROW - STORMWATER FINAL | 08/24/2023 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 08/24/23 READ MY PREVIOUS NOTES. NEED TO CLEAN OUT CULVERTS ENDS OF DIRT AND DEBRIS BEFORE ROW FINAL WILL BE PASSED. ________________________________________________________________________________________________________________________ 08/23/23 NEED TO CLEAN OUT CULVERTS OF DIRT AND DEBRIS BEFORE ROW FINAL WILL BE PASSED. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/23/2023 | APPROVED | FSLADISH |
| Note: 08/23/23 UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED. ___________________________________________________________________________________________________________________________ 8/16/2023 - PREVIOUS INSPECTION NOTES 08/16/23 PLEASE MOW GRASS SO THAT WE CAN DETERMINE THAT THE FIELD DRAINAGE MATCHES INDICATED DRAINAGE ON FINAL SURVEY. | |||
| ROW - FINAL APRON (AFTER POUR) | 08/23/2023 | APPROVED | FSLADISH |
| Note: 08/23/23 PIPE IS GOOD. CUTS MADE. HOT PATCH COMPLETED.. LOOKED GOOD AT TIME OF THIS INSPECTION. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/16/2023 | APPROVED | FSLADISH |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/16/2023 | Disapproved - NO FEE | FSLADISH |
| Note: 08/16/23 PLEASE MOW GRASS SO THAT WE CAN DETERMINE THAT THE FIELD DRAINAGE MATCHES INDICATED DRAINAGE ON FINAL SURVEY. 15-108 (d) is the code, This is how the code defines it…..Excessive growth of grass, weeds, or brush and other overgrowth means grass or weeds or brush, or bushes, or shrubs, or trees, or vines, or flowering plants and other living plant life that is allowed to grow in a wild and unkempt manner not in keeping with the neighborhood. | |||
| ROW- PRE-APRON (PRE-POUR) | 06/13/2023 | CANCELLED BY APPLICANT | WEB |
| Note: 6/9/2023 - PREVIOUS INSPECTION NOTES 06/09/23 ALL WATER MUST BE OUT OF CULVERT AND CULVERT FOOTER AREA TO POUR. PLEASE SEE PHOTO FOR REFERENCE. I HAVE TO FAIL YOU, BUT I AM NOT GOING TO FEE YOU TODAY. | |||
| ROW- PRE-APRON (PRE-POUR) | 06/13/2023 | APPROVED | GBERTOLA |
| Note: 6/13/23= AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 6/9/2023 - PREVIOUS INSPECTION NOTES 06/09/23 ALL WATER MUST BE OUT OF CULVERT AND CULVERT FOOTER AREA TO POUR. PLEASE SEE PHOTO FOR REFERENCE. I HAVE TO FAIL YOU, BUT I AM NOT GOING TO FEE YOU TODAY. | |||
| ROW- PRE-APRON (PRE-POUR) | 06/09/2023 | Disapproved - NO FEE | FSLADISH |
| Note: 06/09/23 ALL WATER MUST BE OUT OF CULVERT AND CULVERT FOOTER AREA TO POUR. PLEASE SEE PHOTO FOR REFERENCE. I HAVE TO FAIL YOU, BUT I AM NOT GOING TO FEE YOU TODAY. | |||
| RETAINING WALL | 06/08/2023 | CANCELLED BY INSPECTOR | MKRASKI |
| WALL SHEATHING | 02/14/2023 | APPROVED | KSANDOE |
| U-CROSS CONNECTION | 02/14/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irrigation-no cross connection | |||
| ELECTRIC - EARLY POWER | 01/27/2023 | APPROVED | JMUNSON |
| GRAVITY SEWER TEST | 10/26/2022 | APPROVED | MGIBSON |
| U - SEWER TIE IN | 10/26/2022 | APPROVED | MGIBSON |
| LATH/BRICK/ WATER BARRIER | 09/19/2022 | APPROVED | KSANDOE |
| Note: Inspector Notes from Inspection 2420 NEED TO GROUND COACH LIGHT METAL BOXES BY INSULATION | |||
| INSULATION | 09/19/2022 | APPROVED | KSANDOE |
| Note: Inspector Notes from Inspection 2420 NEED TO GROUND COACH LIGHT METAL BOXES BY INSULATION | |||
| ALL ROUGH | 08/18/2022 | APPROVED - AS NOTED | RMARTIN |
| Note: NEED TO GROUND COACH LIGHT METAL BOXES BY INSULATION | |||
| ROOF VALLEY & METAL | 06/21/2022 | APPROVED | MKRASKI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/06/2022 | APPROVED | KSANDOE |
| TIE BEAM / LINTEL | 04/18/2022 | APPROVED | KSANDOE |
| FOUND SURVEY APPROVED (OFFICE) | 04/13/2022 | APPROVED | TBAKER |
| WATER METER INSTALLATION REQUEST | 04/05/2022 | APPROVED | CSTONE |
| MONOLITHIC SLAB | 03/29/2022 | APPROVED | KSANDOE |
| Note: THIS IS A REINSPECTION Clear dirt and debris from proposed footer areas | |||
| MONOLITHIC SLAB | 03/23/2022 | Disapproved - NO FEE | KSANDOE |
| Note: Clear dirt and debris from proposed footer areas | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 03/11/2022 | APPROVED | MGIBSON |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 10/05/2023 | 10/09/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 08/10/2023 | 08/10/2023 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Remove the address from the beginning of the file name. | |||
| BADMIN | INFORMATION | 01/24/2023 | 01/24/2023 |
| Note: Marked INFORMATION By: MICHELLE RAMOS - - MRAMOS@PALMCOASTGOV.COM NOC needs to be recorded. | |||
| MECH | COMPLETE | 06/14/2022 | 06/14/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 04/14/2022 | 04/18/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/13/2022 | 04/13/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/13/2022 | 04/13/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/02/2021 | 09/02/2021 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/02/2021 | 09/02/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 09/02/2021 | 09/14/2021 |
| Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/23/2021 | 07/27/2021 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 07/23/2021 | 07/29/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 07/23/2021 | 07/26/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/23/2021 | 07/23/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 07/23/2021 | 07/26/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 07/23/2021 | 07/26/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/23/2021 | 08/02/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| ZON | HOLD | 07/23/2021 | 07/30/2021 |
| Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Survey States Section 25 Our records indicate Section 24 please have that corrected on survey. Please indicate which type of sod will be used at this property. | |||
| SWALE | COMPLETE | 07/23/2021 | 10/26/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 10/16/2023 |
| REINSPECTION FEE | ¤40.00 | 09/12/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 09/12/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 01/03/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 01/03/2023 |
| CONTRACTOR CHANGE | ¤40.00 | 01/03/2023 |
| BUILDING DISCOUNT 100% | (¤1,161.80) | 10/28/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 10/28/2021 |
| IMPACT FEE FIRE | ¤367.00 | 10/28/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 10/28/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 10/28/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 10/28/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 10/28/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 10/28/2021 |
| CONNECTION FEES | ¤1,017.83 | 10/28/2021 |
| METER - DEPOSIT | ¤60.00 | 10/28/2021 |
| WATER- TURN ON | ¤25.00 | 10/28/2021 |
| ADMINISTRATIVE RESIDENTIAL | ¤20.00 | 10/28/2021 |
| INSPECTION- ELECTRICAL | ¤197.40 | 10/28/2021 |
| INSPECTION - MECHANICAL | ¤197.40 | 10/28/2021 |
| INSPECTION - PLUMBING | ¤197.40 | 10/28/2021 |
| PLAN REVIEW - RESIDENTIAL | ¤91.60 | 10/28/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 10/28/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 10/28/2021 |
| SEWER CREDIT | (¤1,342.00) | 10/28/2021 |
| SEWER INSPECTION | ¤25.00 | 10/28/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 10/28/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 10/28/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤458.00 | 10/28/2021 |
| SITE PLAN 20 | ¤20.00 | 10/28/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 10/28/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 10/28/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤14,986.93 |