I want to search for...

Permit #2021071369

Permit Details

Status: COED

Parcel Id: 07-11-31-7011-00060-0210
CONDITIONED SPACE: 1867 sqft
GARAGE: 409 sqft
OPENED PORCH (WITH ROOF) : 28 sqft
Total Square Footage: 2304 sqft
Block: 00060
Subdivision: 2193 - SECTION 11-BELLE TERRE
Job Phone: 904-268-7730
Location Address: 28 BECKER LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 08/23/2021
NOC: RECORDED
Applicant name: DALE ALAN DUBBERLY
Owner: MARONDA HOMES LLC OF FLORIDA

Address

5220 SHAD ROAD SUTIE 202

JAX, FL 32257

Lot: 0210
Contracted Stated Job Value: ¤175,000.00
Job Description: SINGLE FAMILY DWELLING
Type: CN

Contractor

MARONDA HOMES INC
Status Location Address State License Number Phone
CANCEL

5220 SHAD ROAD

JACKSONVILLE , FL 32257

CGC1504922 (Exp: 08/31/2022) 904-268-7730

Sub Contractors

ANDREW SCOTT DIGAETANO JR
Status Location Address State License Number Phone
ACTIVE

44 FORT CAROLINE

PALM COAST, FL 32137

CCC1331606 (Exp: 08/31/2026) 386-302-9063
RONALD KEVIN HAUPT
Status Location Address State License Number Phone
ACTIVE

4005 MARONDA WAY

SANFORD, FL 32771

CAC058534 (Exp: 08/31/2026) 407-321-0064
JEFFREY TROY SABAKA
Status Location Address State License Number Phone Fax
ACTIVE

2191 DEERWOOD ACRES DR

ST AUGUSTINE, FL 32084

CFC1427439 (Exp: 08/31/2026) 904-838-2218 904-819-0965
JAMES M GREENSLADE
Status Location Address State License Number Phone Fax
ACTIVE

311 S BAY ST

BUNNELL, FL 32110

EC13006083 (Exp: 08/31/2026) 386-263-2960 386-263-2980

Inspection History

Type Request Date Result Inspector
ROW - FINAL INSPECTION 07/27/2022 Disapproved - NO FEE GBERTOLA
Note: 07/27/22= why you regrade half of the swale. WHAT WE TALK WAS, TO REMOVE THE SOD AT THE END OF YOUR SWALE WHERE MEET WITH THE NEIGHBORING SWALE. NEED TO REPLACE THE SOD IN THE NEIGHBORING SWALE ...................................................................................................................................................................................................................................... 07/26/22 CANCELLED BY INSPECTOR REASSIGNED TO INSPECTOR GABRIEL BERTOLA FOR 07/27/22 Inspector Notes from Inspection 9465 07/22/22= NOTE TO THE INSPECTOR =YOU SWALE WAS BUILD 5/10 LOWER THEN YOU NEIGHBORING SWALE ON THE RIGHT SIDE . NEED TO MATCH EXISTING GRADE AT EACH PROPERTY LINE
ROW - FINAL INSPECTION 07/27/2022 APPROVED - AS NOTED GBERTOLA
Note: 07/27/22= at 13:30 spoke to Doyle PM from Maronda and i will pass this and next week i will check the swale area where need to laid sod. 07/27/22= why you regrade half of the swale. WHAT WE TALK WAS, TO REMOVE THE SOD AT THE END OF YOUR SWALE WHERE MEET WITH THE NEIGHBORING SWALE. NEED TO REPLACE THE SOD IN THE NEIGHBORING SWALE ...................................................................................................................................................................................................................................... 07/26/22 CANCELLED BY INSPECTOR REASSIGNED TO INSPECTOR GABRIEL BERTOLA FOR 07/27/22 Inspector Notes from Inspection 9465 07/22/22= NOTE TO THE INSPECTOR =YOU SWALE WAS BUILD 5/10 LOWER THEN YOU NEIGHBORING SWALE ON THE RIGHT SIDE . NEED TO MATCH EXISTING GRADE AT EACH PROPERTY LINE
ROW - STORMWATER FINAL 07/26/2022 CANCELLED BY INSPECTOR EMADISON
Note: THIS IS A REINSPECTION ** 07/26/22 CANCELLED BY INSPECTOR REASSIGNED TO INSPECTOR GABRIEL BERTOLA FOR 07/27/22 Inspector Notes from Inspection 9465 07/22/22= NOTE TO THE INSPECTOR =YOU SWALE WAS BUILD 5/10 LOWER THEN YOU NEIGHBORING SWALE ON THE RIGHT SIDE . NEED TO MATCH EXISTING GRADE AT EACH PROPERTY LINE
BLD - BUILDING FINAL 07/26/2022 FINAL APPROVED MKRASKI
ROW - STORMWATER FINAL 07/25/2022 CANCELLED BY APPLICANT GBERTOLA
Note: Inspector Notes from Inspection 9465 07/22/22= NOTE TO THE INSPECTOR =YOU SWALE WAS BUILD 5/10 LOWER THEN YOU NEIGHBORING SWALE ON THE RIGHT SIDE . NEED TO MATCH EXISTING GRADE AT EACH PROPERTY LINE
U -UTILITY RESIDENTIAL FINAL 07/25/2022 FINAL APPROVED LFITZGERALD
ROW - FINAL APRON (AFTER POUR) 07/25/2022 APPROVED GBERTOLA
Note: 07/22/22= NOTE TO THE INSPECTOR =YOU SWALE WAS BUILD 5/10 LOWER THEN YOU NEIGHBORING SWALE ON THE RIGHT SIDE . NEED TO MATCH EXISTING GRADE AT EACH PROPERTY LINE
ROW FIELD SURVEY /GRADING CERTIFICATION 07/22/2022 APPROVED - AS NOTED GBERTOLA
Note: 07/22/22= NOTE TO THE INSPECTOR =YOU SWALE WAS BUILD 5/10 LOWER THEN YOU NEIGHBORING SWALE ON THE RIGHT SIDE . NEED TO MATCH EXISTING GRADE AT EACH PROPERTY LINE
FINAL SURVEY (OFFICE USE ONLY) 07/22/2022 APPROVED GBERTOLA
ELECTRIC - EARLY POWER 07/01/2022 APPROVED - AS NOTED JMUNSON
Note: Emailed FPL at 10:51 am
U - SEWER TIE IN 06/22/2022 APPROVED MGIBSON
U-CROSS CONNECTION 06/22/2022 APPROVED - AS NOTED JHARDING
Note: No irrigation, no cross connections.
ROW- PRE-APRON (PRE-POUR) 06/21/2022 APPROVED RGROSS
Note: READY TO POUR
INSULATION 05/10/2022 APPROVED JWALKER
ROW - DRAINAGE 05/05/2022 APPROVED RGROSS
Note: THIS IS A REINSPECTION NEED TO LOWER THE TEMPORARY CULVERT ON THE LEFT SIDE INSPECTOR BE BACK ON 5/5/22 Swale blocked by a major washout and the temporary culvert 75% blocked. Next inspection 4/22/22. 4/22/22-Swale still blocked. Culvert 75% clogged. Next Inspection 4/29/22.
LATH/BRICK/ WATER BARRIER 05/05/2022 FINAL APPROVED FWILLIS
ALL ROUGH 05/03/2022 APPROVED RMARTIN
ALL ROUGH 05/03/2022 APPROVED - AS NOTED RMARTIN
Note: ALL ROUGH WAS NOT FULLY APPROVED, NEED TO SEAL UNDER TUB AND AT SHOWER BY INSULATION
ROOF VALLEY & METAL 05/02/2022 APPROVED RMARTIN
ROW - DRAINAGE 04/29/2022 Disapproved - NO FEE GBERTOLA
Note: NEED TO LOWER THE TEMPORARY CULVERT ON THE LEFT SIDE INSPECTOR BE BACK ON 5/5/22 Swale blocked by a major washout and the temporary culvert 75% blocked. Next inspection 4/22/22. 4/22/22-Swale still blocked. Culvert 75% clogged. Next Inspection 4/29/22.
ROW - DRAINAGE 04/22/2022 Disapproved -FEE REQUIRED RGROSS
Note: THIS IS A REINSPECTION Swale blocked by a major washout and the temporary culvert 75% blocked. Next inspection 4/22/22. 4/22/22-Swale still blocked. Culvert 75% clogged. Next Inspection 4/29/22.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/21/2022 APPROVED FWILLIS
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL. NO APPROVED PLANS ON SITE. 4/20/22 Still no plans and only partial truss engineering packet on site.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/20/2022 Disapproved -FEE REQUIRED MKRASKI
Note: THIS IS A REINSPECTION DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL. NO APPROVED PLANS ON SITE. 4/20/22 Still no plans and only partial truss engineering packet on site.
WALL SHEATHING 04/20/2022 APPROVED MKRASKI
ELECTRIC-TUG 04/18/2022 APPROVED - AS NOTED JMUNSON
Note: Emailed FPL at 9:53 am
ROW - DRAINAGE 04/14/2022 Disapproved -FEE REQUIRED RGROSS
Note: Swale blocked by a major washout and the temporary culvert 75% blocked. Next inspection 4/22/22.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/13/2022 Disapproved -FEE REQUIRED FWILLIS
Note: DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL. NO APPROVED PLANS ON SITE.
TIE BEAM / LINTEL 04/06/2022 APPROVED FWILLIS
FOUND SURVEY APPROVED (OFFICE) 12/21/2021 APPROVED TBAKER
MONOLITHIC SLAB 12/17/2021 APPROVED FWILLIS
PLUMBING 1ST ROUGH UNDERGROUND 12/15/2021 APPROVED KSANDOE
GRAVITY SEWER TEST 12/15/2021 APPROVED KSANDOE
WATER METER INSTALLATION REQUEST 10/21/2021 APPROVED CSTONE

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 01/19/2022 01/20/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 01/19/2022 01/19/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ENGIN1 COMPLETE 12/21/2021 12/21/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 12/21/2021 12/21/2021
Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM
ZON COMPLETE 08/11/2021 08/12/2021
Note: Released By: ESTELLE LENS - (386)986-3751 -
ENGIN1 COMPLETE 08/11/2021 08/11/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 08/11/2021 08/19/2021
Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM
BLD COMPLETE 07/28/2021 07/29/2021
Note: Released By: JPI
CUSVC COMPLETE 07/28/2021 08/02/2021
Note: Released By: HALEIGH HAND - -
ELEC COMPLETE 07/28/2021 07/29/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/28/2021 07/28/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 07/28/2021 07/29/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 07/28/2021 07/29/2021
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 07/28/2021 08/03/2021
Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM
ZON HOLD 07/28/2021 07/30/2021
Note: Held By: ESTELLE LENS - (386)986-3751 - Need to fix map panel number on the site plan and survey (...0136E)
SWALE COMPLETE 07/28/2021 10/28/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 07/25/2022
CONTRACTOR CHANGE ¤40.00 07/25/2022
SW ENG - INSPECTION 20 ¤20.00 07/25/2022
SW ENG - INSPECTION 20 ¤20.00 07/25/2022
SW ENG - INSPECTION 20 ¤20.00 07/25/2022
SW ENG - INSPECTION 20 ¤20.00 07/25/2022
REINSPECTION RESIDENTIAL ¤40.00 07/25/2022
REINSPECTION RESIDENTIAL ¤40.00 07/25/2022
CONNECTION FEES ¤1,017.83 08/23/2021
METER - DEPOSIT ¤60.00 08/23/2021
WATER- TURN ON ¤25.00 08/23/2021
ADMINISTRATIVE RESIDENTIAL ¤20.00 08/23/2021
INSPECTION- ELECTRICAL ¤195.00 08/23/2021
INSPECTION - MECHANICAL ¤195.00 08/23/2021
INSPECTION - PLUMBING ¤195.00 08/23/2021
PLAN REVIEW - RESIDENTIAL ¤90.00 08/23/2021
STORM WATER PERMIT FEES ¤80.00 08/23/2021
3% TRANS IMPACT FEE CREDIT (¤51.54) 08/23/2021
SEWER CREDIT (¤1,342.00) 08/23/2021
SEWER INSPECTION ¤25.00 08/23/2021
SEWER CAPITAL FACILITY ¤4,664.55 08/23/2021
WATER CAPITAL FACILITY FEE ¤3,424.45 08/23/2021
BUILDING DISCOUNT 100% (¤1,145.00) 08/23/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 08/23/2021
IMPACT FEE FIRE ¤367.00 08/23/2021
IMPACT FEE PARKS ¤1,199.12 08/23/2021
IMPACT FEE SCHOOL ¤3,600.00 08/23/2021
IMPACT FEE TRANSPORTATION ¤1,718.00 08/23/2021
WATER -IRRIGATION INSPECTION ¤25.00 08/23/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 08/23/2021
NEW RESIDENTIAL INSPECTIONS ¤450.00 08/23/2021
SITE PLAN 20 ¤20.00 08/23/2021
SURCHARGE FS 533.721 ¤2.00 08/23/2021
SURCHARGE - FS 468.631 ¤2.00 08/23/2021
Fees Total Due: ¤0.00 Total Paid: ¤15,029.43