I want to search for...

Permit #2021071382

Permit Details

Status: COED

Parcel Id: 07-11-31-7064-00390-0030
CONDITIONED SPACE: 2435 sqft
GARAGE: 588 sqft
OPENED PORCH (WITH ROOF) : 187 sqft
OPENED PORCH (WITH ROOF) : 131 sqft
Total Square Footage: 3341 sqft
Block: 00390
Subdivision: -
Job Phone: 904-268-7730
Location Address: 38 LLEWELLYN TR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 08/10/2021
NOC: RECORDED
Applicant name: DALE ALAN DUBBERLY
Owner: MARONDA HOMES LLC OF FLORIDA

Address

5220 SHAD ROAD SUITE 202

JAX , FL 32257

Lot: 0030
Contracted Stated Job Value: ¤190,000.00
Job Description: SINGLE FAMILY DWELLING
Type: CN

Contractor

MARONDA HOMES INC
Status Location Address State License Number Phone
CANCEL

5220 SHAD ROAD

JACKSONVILLE , FL 32257

CGC1504922 (Exp: 08/31/2022) 904-268-7730

Sub Contractors

JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113
ANDREW SCOTT DIGAETANO JR
Status Location Address State License Number Phone
ACTIVE

44 FORT CAROLINE

PALM COAST, FL 32137

CCC1331606 (Exp: 08/31/2026) 386-302-9063
MICHAEL LEE RAFFENSBERGER
Status Location Address State License Number Phone Fax
CANCEL

7725 SANDSCOVE CT

WINTER PARK, FL 32792

CAC1819723 (Exp: 08/31/2024) 407-629-6920 407-629-9307
JEFFREY TROY SABAKA
Status Location Address State License Number Phone Fax
ACTIVE

2191 DEERWOOD ACRES DR

ST AUGUSTINE, FL 32084

CFC1427439 (Exp: 08/31/2026) 904-838-2218 904-819-0965

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 05/27/2022 Disapproved - NO FEE TSTAUFFACHER
Note: THIS IS A REINSPECTION Door locked Due to volume of inspections, unable to return today 05/26/2022 05.26,2022// Drywall still in progress Missing return air vent
BLD - BUILDING FINAL 05/27/2022 FINAL APPROVED RMARTIN
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Door locked Due to volume of inspections, unable to return today 05/26/2022 05.26,2022// Drywall still in progress Missing return air vent
BLD - BUILDING FINAL 05/26/2022 Disapproved - NO FEE TSTAUFFACHER
Note: Door locked Due to volume of inspections, unable to return today 05/26/2022
ROW FIELD SURVEY /GRADING CERTIFICATION 05/26/2022 APPROVED - AS NOTED EMADISON
Note: * CORRECTIONS MADE, EVERYTHING LOOKS GOOD AT THE TIME OF THE INSPETION * CONSTRUCTION DEBRIS AND TRASH NEEDS TO BE REMOVED FROM VACANT ADJACENT PROPERTIES BOTH SIDES AND IN THE REAR OF HOUSE. AREA ON RIGHT SIDE OF HOME IS ALL RUTTED UP AND BARE GROUND NEED TO FIX AREA BEFORE THIS INSPECTION IS PASSED
U -UTILITY RESIDENTIAL FINAL 05/26/2022 FINAL APPROVED JHARDING
ROW FIELD SURVEY /GRADING CERTIFICATION 05/25/2022 Disapproved -FEE REQUIRED EMADISON
Note: * CONSTRUCTION DEBRIS AND TRASH NEEDS TO BE REMOVED FROM VACANT ADJACENT PROPERTIES BOTH SIDES AND IN THE REAR OF HOUSE. AREA ON RIGHT SIDE OF HOME IS ALL RUTTED UP AND BARE GROUND NEED TO FIX AREA BEFORE THIS INSPECTION IS PASSED
ROW - STORMWATER FINAL 05/25/2022 APPROVED - AS NOTED EMADISON
Note: * CORRECTION MADE * EVERYTHING LOOKS GOOD AT THE TIME OF THE INSPECTION AREA ON RIGHT SIDE OF HOME IS ALL RUTTED UP AND BARE GROUND NEED TO FIX AREA BEFORE THIS INSPECTION IS PASSED NEED TO READ INSPECTOR NOTES
U -UTILITY RESIDENTIAL FINAL 05/23/2022 CANCELLED BY APPLICANT WEB
ROW - STORMWATER FINAL 05/23/2022 Disapproved -FEE REQUIRED GBERTOLA
Note: AREA ON RIGHT SIDE OF HOME IS ALL RUTTED UP AND BARE GROUND NEED TO FIX AREA BEFORE THIS INSPECTION IS PASSED NEED TO READ INSPECTOR NOTES
ROW - FINAL APRON (AFTER POUR) 05/23/2022 APPROVED GBERTOLA
ROW FIELD SURVEY /GRADING CERTIFICATION 05/20/2022 Disapproved - NO FEE PFLANAGAN
Note: AREA ON RIGHT SIDE OF HOME IS ALL RUTTED UP AND BARE GROUND NEED TO FIX AREA BEFORE THIS INSPECTION IS PASSED
FINAL SURVEY (OFFICE USE ONLY) 05/20/2022 APPROVED PFLANAGAN
ELECTRIC - EARLY POWER 05/16/2022 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 10:50
ROW- PRE-APRON (PRE-POUR) 05/02/2022 APPROVED - AS NOTED EMADISON
Note: 05/02/22 CONTRACTORS RESPONSIBILITY TO CHECK CULVERT ELEVATIONS BEFORE POURING CONCRETE. NEED TO CHIP OVER POURED CONCRETE AT GARAGE DOORS TO GET MINIMUM AMOUNT OF CONCRETE
U-CROSS CONNECTION 04/29/2022 APPROVED - AS NOTED JHARDING
Note: No irrigation, no cross connections.
ROW- PRE-APRON (PRE-POUR) 04/29/2022 Disapproved -FEE REQUIRED PFLANAGAN
Note: NEED TO CHIP OVER POURED CONCRETE AT GARAGE DOORS TO GET MINIMUM AMOUNT OF CONCRETE
U - SEWER TIE IN 04/27/2022 APPROVED MGIBSON
PEP TANK INSTALLATION REQUEST 04/04/2022 APPROVED CSTONE
WALL SHEATHING 04/04/2022 APPROVED TSTAUFFACHER
LATH/BRICK/ WATER BARRIER 03/30/2022 APPROVED TSTAUFFACHER
INSULATION 03/29/2022 APPROVED - AS NOTED DCUSHING
Note: INSPECTOR NOTE FROM ALL ROUGH: DO NOT PASS THIS INSPECTION UNTIL--REMOVE PLASTIC FILLER AT FLOOR OUTLET AND FILL WITH CONCRETE
ALL ROUGH 03/24/2022 APPROVED - AS NOTED TSTAUFFACHER
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 1. foil backed insulation was placed prior to all-rough (need to expose all MEP's for inspection) 2. Missing nail plates for electric 3. plumbing out of wall at bathroom 4. need to seal floor at floor outlet 03/22/2022: Floor outlet not sealed Replace missing studs where removed for tub install. Plans call for studs to be 24" OC 03/24/2022: REMOVE PLASTIC FILLER AT FLOOR OUTLET AND FILL WITH CONCRETE
ALL ROUGH 03/22/2022 Disapproved - NO FEE TSTAUFFACHER
Note: THIS IS A REINSPECTION 1. foil backed insulation was placed prior to all-rough (need to expose all MEP's for inspection) 2. Missing nail plates for electric 3. plumbing out of wall at bathroom 4. need to seal floor at floor outlet 03/22/2022: Floor outlet not sealed Replace missing studs where removed for tub install. Plans call for studs to be 24" OC
ALL ROUGH 03/15/2022 Disapproved -FEE REQUIRED LMILLER
Note: 1. foil backed insulation was placed prior to all-rough (need to expose all MEP's for inspection) 2. Missing nail plates for electric 3. plumbing out of wall at bathroom 4. need to seal floor at floor outlet
ELECTRIC-TUG 03/07/2022 APPROVED - AS NOTED JMUNSON
Note: Emailed FPL at 8:39 am
ROOF VALLEY & METAL 02/28/2022 APPROVED TSTAUFFACHER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/31/2022 APPROVED TSTAUFFACHER
Note: THIS IS A REINSPECTION Job box not set up Truss prints not on site Prints are crumpled and torn
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/20/2022 Disapproved -FEE REQUIRED TSTAUFFACHER
Note: Job box not set up Truss prints not on site Prints are crumpled and torn
TIE BEAM / LINTEL 01/03/2022 APPROVED JWALKER
FOUND SURVEY APPROVED (OFFICE) 12/15/2021 APPROVED TBAKER
MONOLITHIC SLAB 11/03/2021 APPROVED TSTAUFFACHER
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION No compaction certificate posted on site Please set up doc box 10/29/21 Job box is still laying on the ground. Missing compaction test results. The heavy rains have caused soil collapse into the footings The protection sleave at the building drain needs to be adjusted to cover the pipe completely through the footing. Slab depth and rebar good. Please make corrections listed and have compaction test on site for reinspection. 11/02/2021:: Multiple locations around perimeter still do not meet steel clearance of 3". Remove dirt from collapsed footings and call in when ready
MONOLITHIC SLAB 11/02/2021 Disapproved -FEE REQUIRED TSTAUFFACHER
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION No compaction certificate posted on site Please set up doc box 10/29/21 Job box is still laying on the ground. Missing compaction test results. The heavy rains have caused soil collapse into the footings The protection sleave at the building drain needs to be adjusted to cover the pipe completely through the footing. Slab depth and rebar good. Please make corrections listed and have compaction test on site for reinspection. 11/02/2021:: Multiple locations around perimeter still do not meet steel clearance of 3". Remove dirt from collapsed footings and call in when ready
MONOLITHIC SLAB 10/29/2021 Disapproved -FEE REQUIRED JWALKER
Note: THIS IS A REINSPECTION No compaction certificate posted on site Please set up doc box 10/29/21 Job box is still laying on the ground. Missing compaction test results. The heavy rains have caused soil collapse into the footings The protection sleave at the building drain needs to be adjusted to cover the pipe completely through the footing. Slab depth and rebar good. Please make corrections listed and have compaction test on site for reinspection.
MONOLITHIC SLAB 10/28/2021 Disapproved -FEE REQUIRED TSTAUFFACHER
Note: No compaction certificate posted on site Please set up doc box
PLUMBING 1ST ROUGH UNDERGROUND 10/26/2021 APPROVED MGIBSON
GRAVITY SEWER TEST 10/26/2021 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 09/14/2021 APPROVED CSTONE

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 12/14/2021 12/15/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 12/14/2021 12/14/2021
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 07/28/2021 07/29/2021
Note: Released By: JPI
CUSVC COMPLETE 07/28/2021 08/04/2021
Note: Released By: HALEIGH HAND - -
ELEC COMPLETE 07/28/2021 07/29/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/28/2021 07/28/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 07/28/2021 07/29/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 07/28/2021 07/29/2021
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 07/28/2021 08/03/2021
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
ZON COMPLETE 07/28/2021 07/30/2021
Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM
SWALE COMPLETE 07/28/2021 10/28/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG REINSPECTION 20 ¤20.00 05/27/2022
SW ENG REINSPECTION 30 ¤30.00 05/23/2022
SW ENG REINSPECTION 20 ¤20.00 05/23/2022
REINSPECTION RESIDENTIAL ¤40.00 05/23/2022
REINSPECTION RESIDENTIAL ¤40.00 05/23/2022
REINSPECTION RESIDENTIAL ¤40.00 05/23/2022
REINSPECTION RESIDENTIAL ¤40.00 05/23/2022
REINSPECTION RESIDENTIAL ¤40.00 05/23/2022
CONTRACTOR CHANGE ¤40.00 05/23/2022
BUILDING DISCOUNT 100% (¤1,489.40) 08/10/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 08/10/2021
IMPACT FEE FIRE ¤367.00 08/10/2021
IMPACT FEE PARKS ¤1,199.12 08/10/2021
IMPACT FEE SCHOOL ¤3,600.00 08/10/2021
IMPACT FEE TRANSPORTATION ¤1,718.00 08/10/2021
WATER -IRRIGATION INSPECTION ¤25.00 08/10/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 08/10/2021
NEW RESIDENTIAL INSPECTIONS ¤614.00 08/10/2021
SITE PLAN 20 ¤20.00 08/10/2021
SURCHARGE FS 533.721 ¤2.00 08/10/2021
SURCHARGE - FS 468.631 ¤2.00 08/10/2021
CONNECTION FEES ¤1,017.83 08/10/2021
METER - DEPOSIT ¤60.00 08/10/2021
WATER- TURN ON ¤25.00 08/10/2021
ADMINISTRATIVE RESIDENTIAL ¤20.00 08/10/2021
INSPECTION- ELECTRICAL ¤244.20 08/10/2021
INSPECTION - MECHANICAL ¤244.20 08/10/2021
INSPECTION - PLUMBING ¤244.20 08/10/2021
PLAN REVIEW - RESIDENTIAL ¤122.80 08/10/2021
STORM WATER PERMIT FEES ¤80.00 08/10/2021
3% TRANS IMPACT FEE CREDIT (¤51.54) 08/10/2021
SEWER CREDIT (¤2,291.75) 08/10/2021
SEWER INSPECTION ¤25.00 08/10/2021
SEWER CAPITAL FACILITY ¤4,664.55 08/10/2021
WATER CAPITAL FACILITY FEE ¤3,424.45 08/10/2021
Fees Total Due: ¤0.00 Total Paid: ¤14,149.68