I want to search for...

Permit #2021071386

Permit Details

Status: COED

Parcel Id: 07-11-31-7035-00540-0020
CONDITIONED SPACE: 1876 sqft
GARAGE: 414 sqft
OPENED PORCH (WITH ROOF) : 68 sqft
Total Square Footage: 2358 sqft
Block: 00540
Subdivision: 2172 - SECTION 35-BELLE TERRE
Job Phone: 904-268-7730
Location Address: 31 BUNKER LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 08/23/2021
NOC: RECORDED
Applicant name: DALE ALAN DUBBERLY
Owner: MARONDA HOMES LLC OF FLORIDA

Address

5220 SHAD ROAD SUITE 202

JAX, FL 32257

Lot: 0020
Contracted Stated Job Value: ¤175,000.00
Job Description: SINGLE FAMILY DWELLING
Type: CN

Contractor

MARONDA HOMES INC
Status Location Address State License Number Phone
CANCEL

5220 SHAD ROAD

JACKSONVILLE , FL 32257

CGC1504922 (Exp: 08/31/2022) 904-268-7730

Sub Contractors

JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113
ANDREW SCOTT DIGAETANO JR
Status Location Address State License Number Phone
ACTIVE

44 FORT CAROLINE

PALM COAST, FL 32137

CCC1331606 (Exp: 08/31/2026) 386-302-9063
RONALD KEVIN HAUPT
Status Location Address State License Number Phone
ACTIVE

4005 MARONDA WAY

SANFORD, FL 32771

CAC058534 (Exp: 08/31/2026) 407-321-0064
JEFFREY TROY SABAKA
Status Location Address State License Number Phone Fax
ACTIVE

2191 DEERWOOD ACRES DR

ST AUGUSTINE, FL 32084

CFC1427439 (Exp: 08/31/2026) 904-838-2218 904-819-0965

Inspection History

Type Request Date Result Inspector
ROW - FINAL APRON (AFTER POUR) 04/21/2022 APPROVED RGROSS
Note: THIS IS A REINSPECTION Need more fill around the Apron concrete miteres. Washing out and bottom of concrete edge is already visiable and allowing storm water to undermine the driveway. On site with CM
ROW - STORMWATER FINAL 04/21/2022 APPROVED RGROSS
Note: THIS IS A REINSPECTION Needs burmed on the right side to prevent neighbor from ponding. Burm brom fence to fence on the right side. On site with CM
U -UTILITY RESIDENTIAL FINAL 04/19/2022 FINAL APPROVED DHANEY
ROW FIELD SURVEY /GRADING CERTIFICATION 04/19/2022 APPROVED RGROSS
Note: THIS IS A REINSPECTION Not graded correctly from rear to front down the right side property line. Allowing water to flow and stand on the adjacent property. Either regrade to consistantly flow forward to the front swale and/or burm sod down the property line to prevent storm water from flowing onto the adjacent lot.
ROW - STORMWATER FINAL 04/19/2022 Disapproved - NO FEE RGROSS
Note: Needs burmed on the right side to prevent neighbor from ponding. Burm brom fence to fence on the right side. On site with CM
ROW - FINAL APRON (AFTER POUR) 04/19/2022 Disapproved - NO FEE RGROSS
Note: Need more fill around the Apron concrete miteres. Washing out and bottom of concrete edge is already visiable and allowing storm water to undermine the driveway. On site with CM
BLD - BUILDING FINAL 04/19/2022 FINAL APPROVED MKRASKI
FINAL SURVEY (OFFICE USE ONLY) 04/18/2022 APPROVED - AS NOTED RGROSS
Note: See Field survey results
ROW FIELD SURVEY /GRADING CERTIFICATION 04/18/2022 Disapproved - NO FEE RGROSS
Note: Not graded correctly from rear to front down the right side property line. Allowing water to flow and stand on the adjacent property. Either regrade to consistantly flow forward to the front swale and/or burm sod down the property line to prevent storm water from flowing onto the adjacent lot.
WALL SHEATHING 04/14/2022 APPROVED FWILLIS
Note: THIS IS A REINSPECTION WALLS ARE COVERED CANNOT VIEW/INSPECT
WALL SHEATHING 04/13/2022 Disapproved - NO FEE FWILLIS
Note: WALLS ARE COVERED CANNOT VIEW/INSPECT
ROW- PRE-APRON (PRE-POUR) 03/23/2022 APPROVED - AS NOTED KRUTH
Note: pipe is good at the time of the inspection It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete.
ELECTRIC - EARLY POWER 03/21/2022 APPROVED - AS NOTED JMUNSON
Note: Emailed FPL at 9:27 am
U-CROSS CONNECTION 03/17/2022 APPROVED DHANEY
U - SEWER TIE IN 03/17/2022 APPROVED MGIBSON
WINDOW FASTENING 02/22/2022 APPROVED FWILLIS
PEP TANK INSTALLATION REQUEST 02/15/2022 APPROVED CSTONE
INSULATION 02/14/2022 APPROVED FWILLIS
Note: Small leak in drain on guest tub. Check at insulation
ALL ROUGH 02/09/2022 APPROVED - AS NOTED KSANDOE
Note: Window nailing inspection added. Small leak in drain on guest tub. Check at insulation
LATH/BRICK/ WATER BARRIER 02/04/2022 APPROVED FWILLIS
ELECTRIC-TUG 01/26/2022 APPROVED - AS NOTED JMUNSON
Note: Emailed FPL at 10:04 am
ROOF VALLEY & METAL 01/26/2022 APPROVED FWILLIS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/20/2022 APPROVED FWILLIS
FOUND SURVEY APPROVED (OFFICE) 01/18/2022 APPROVED TBAKER
TIE BEAM / LINTEL 01/03/2022 APPROVED FWILLIS
TIE BEAM / LINTEL 12/30/2021 CANCELLED BY APPLICANT WEB
MONOLITHIC SLAB 12/03/2021 APPROVED FWILLIS
PLUMBING 1ST ROUGH UNDERGROUND 11/30/2021 APPROVED MGIBSON
GRAVITY SEWER TEST 11/30/2021 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 10/28/2021 APPROVED CSTONE

Review History

Department Status Date In Date Out
BADMIN INFORMATION 04/13/2022 04/13/2022
Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM SUBMIT REVISION SHEET WITH BLOWER DOOR TEST
ENGIN1 COMPLETE 01/18/2022 01/18/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 01/18/2022 01/18/2022
Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM
ZON COMPLETE 08/11/2021 08/12/2021
Note: Released By: ESTELLE LENS - (386)986-3751 -
BLD COMPLETE 07/28/2021 07/29/2021
Note: Released By: JPI
CUSVC COMPLETE 07/28/2021 08/04/2021
Note: Released By: HALEIGH HAND - -
ELEC COMPLETE 07/28/2021 07/29/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/28/2021 07/28/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 07/28/2021 07/29/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 07/28/2021 07/29/2021
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 07/28/2021 08/03/2021
Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM
ZON HOLD 07/28/2021 07/30/2021
Note: Held By: ESTELLE LENS - (386)986-3751 - Need to fix legal description on the survey and site plan.
SWALE COMPLETE 07/28/2021 10/28/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 04/22/2022
BUILDING DISCOUNT 100% (¤1,157.60) 08/23/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 08/23/2021
IMPACT FEE FIRE ¤367.00 08/23/2021
IMPACT FEE PARKS ¤1,199.12 08/23/2021
IMPACT FEE SCHOOL ¤3,600.00 08/23/2021
IMPACT FEE TRANSPORTATION ¤1,718.00 08/23/2021
WATER -IRRIGATION INSPECTION ¤25.00 08/23/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 08/23/2021
NEW RESIDENTIAL INSPECTIONS ¤456.00 08/23/2021
SITE PLAN 20 ¤20.00 08/23/2021
SURCHARGE FS 533.721 ¤2.00 08/23/2021
SURCHARGE - FS 468.631 ¤2.00 08/23/2021
STORM WATER PERMIT FEES ¤80.00 08/23/2021
3% TRANS IMPACT FEE CREDIT (¤51.54) 08/23/2021
SEWER CREDIT (¤2,465.75) 08/23/2021
SEWER INSPECTION ¤25.00 08/23/2021
SEWER CAPITAL FACILITY ¤4,664.55 08/23/2021
WATER CAPITAL FACILITY FEE ¤3,424.45 08/23/2021
METER - DEPOSIT ¤60.00 08/23/2021
WATER- TURN ON ¤25.00 08/23/2021
ADMINISTRATIVE RESIDENTIAL ¤20.00 08/23/2021
INSPECTION- ELECTRICAL ¤196.80 08/23/2021
INSPECTION - MECHANICAL ¤196.80 08/23/2021
INSPECTION - PLUMBING ¤196.80 08/23/2021
PLAN REVIEW - RESIDENTIAL ¤91.20 08/23/2021
CONNECTION FEES ¤1,017.83 08/23/2021
Fees Total Due: ¤0.00 Total Paid: ¤13,705.68