I want to search for...
Permit #2021071428
Permit Details
Status: COED
| Parcel Id: 07-11-31-7058-00320-0050 |
| CONDITIONED SPACE: 1215 sqft |
| CONDITIONED SPACE: 1215 sqft |
| GARAGE: 280 sqft |
| GARAGE: 280 sqft |
| OPENED PORCH (WITH ROOF) : 22 sqft |
| OPENED PORCH (WITH ROOF) : 22 sqft |
| OPENED PORCH (WITH ROOF) : 118 sqft |
| OPENED PORCH (WITH ROOF) : 118 sqft |
| Total Square Footage: 3270 sqft |
| Block: 00320 |
| Subdivision: 2215 - SECTION 58-SEMINOLE PARK |
| Job Phone: 863-845-6967 |
| Location Address: 9 SERVICE TREE PL |
| Type: DU - DUPLEX |
| Issue Date: 02/01/2022 |
| NOC: RECORDED |
| Applicant name: LARRY SHERWIN THOMPSON |
| Owner: CARPENTER COMPANIES FLORIDA LLC |
|
Address 142 WEST PLATT STREET #116 TAMPA, FL 33606 |
| Lot: 0050 |
| Contracted Stated Job Value: ¤150,000.00 |
| Job Description: DUPLEX |
| Type: CN |
Contractor
THOMCO OF FLORIDA LLC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
6381 ROBERTS RD KATHLEEN, FL 33849 |
CGC1513647 (Exp: 08/31/2024) | 863-845-6967 |
Sub Contractors
JACK DOUGLAS LANIER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
485 COMMERCE WAY LONGWOOD , FL 32750 |
CCC058022 (Exp: 08/31/2026) | (321)441-2300 | (321)441-2313 |
ROBERT G DELLO RUSSO
| Status | Location Address | State License Number | Phone | Fax |
| DECEASED |
531 CODISCO WAY SANFORD, FL 32771 |
CAC032448 (Exp: 08/31/2022) | (407)831-2665 | (407)333-3853 |
RUSSELL J CARTER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 302 DELAND, FL 32721 |
CFC1425938 (Exp: 08/31/2026) | 386-736-4220 | 386-736-4219 |
JOSEPH HORATIO STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PARKWAY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2026) | 877-906-1113 |
ROBERT MICHAEL RENNER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
531 CODISCO WAY SANFORD, FL 32771 |
CAC051477 (Exp: 08/31/2026) | 407-333-2665 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 06/02/2023 | FINAL APPROVED | BTAYLOR |
| U -UTILITY RESIDENTIAL FINAL | 06/02/2023 | FINAL APPROVED | JHARDING |
| ROW - FINAL INSPECTION | 06/01/2023 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 5/31/2023 - PREVIOUS INSPECTION NOTES THIS INSPECTION IS DONE AFTER ALL FINAL SURVEY AND THE FIELD IS PASSED | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 06/01/2023 | APPROVED | GBERTOLA |
| Note: 6/1/23=AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 5/31/2023 - PREVIOUS INSPECTION NOTES THERE IS NO FINAL SURVEY IN THE SYSTEM | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/01/2023 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 5/31/2023 - PREVIOUS INSPECTION NOTES THIS IS DONE AFTER THE FINAL SURVEY IS PASSED | |||
| ROW - FINAL APRON (AFTER POUR) | 06/01/2023 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| U-CROSS CONNECTION | 05/31/2023 | APPROVED - AS NOTED | JHARDING |
| Note: No cross connections. | |||
| ROW - FINAL INSPECTION | 05/31/2023 | Disapproved - NO FEE | PFLANAGAN |
| Note: THIS INSPECTION IS DONE AFTER ALL FINAL SURVEY AND THE FIELD IS PASSED | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 05/31/2023 | Disapproved - NO FEE | PFLANAGAN |
| Note: THIS IS DONE AFTER THE FINAL SURVEY IS PASSED | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 05/31/2023 | Disapproved - NO FEE | PFLANAGAN |
| Note: THERE IS NO FINAL SURVEY IN THE SYSTEM | |||
| ROW- PRE-APRON (PRE-POUR) | 05/30/2023 | APPROVED | GBERTOLA |
| Note: 5/30/23= on 4/13/23= inspection was approved 4/13/2023 - PREVIOUS INSPECTION NOTES BUILDER NEED TO RE ESTABLISH BM TO MANNY NAIL ON HE ROAD | |||
| ROW- PROJECT STATUS | 05/22/2023 | APPROVED | GBERTOLA |
| Note: CHECK ON THE GRADE 4-1 SLOPE | |||
| ROW- PROJECT STATUS | 05/19/2023 | CANCELLED BY INSPECTOR | GBERTOLA |
| Note: Inspector Notes from Inspection 9200 All slopes must adjoin existing improved properties at no greater than a 4:1 slope. Slopes along developable vacant lots shall have a stabilized slope of no greater than 2:1, in expectation that eventually the vacant lot will be developed and graded to match the adjoining property elevation. | |||
| ROW- PROJECT STATUS | 05/12/2023 | APPROVED - AS NOTED | GBERTOLA |
| Note: All slopes must adjoin existing improved properties at no greater than a 4:1 slope. Slopes along developable vacant lots shall have a stabilized slope of no greater than 2:1, in expectation that eventually the vacant lot will be developed and graded to match the adjoining property elevation. | |||
| ELECTRIC - EARLY POWER | 04/19/2023 | APPROVED - AS NOTED | BTAYLOR |
| Note: 4-19-23 1. Emailed FPL at 1:33. | |||
| ROW- PRE-APRON (PRE-POUR) | 04/13/2023 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| U - SEWER TIE IN | 04/05/2023 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 04/05/2023 | APPROVED | MGIBSON |
| LATH/BRICK/ WATER BARRIER | 12/22/2022 | APPROVED | RMARTIN |
| INSULATION | 12/16/2022 | APPROVED | BTAYLOR |
| Note: 12/15/2022 - PREVIOUS INSPECTION NOTES | |||
| INSULATION | 12/15/2022 | CANCELLED BY APPLICANT | BTAYLOR |
| FIREWALL FINAL | 12/14/2022 | APPROVED | BTAYLOR |
| FIREWALL DRYWALL NAILING | 12/12/2022 | APPROVED | BTAYLOR |
| ALL ROUGH | 12/08/2022 | APPROVED | RMARTIN |
| ROOF VALLEY & METAL | 11/04/2022 | APPROVED | BTAYLOR |
| Note: Inspector Notes from Inspection 2460 10/27/2022 - PREVIOUS INSPECTION NOTES 9/16/2022 - PREVIOUS INSPECTION NOTES 10-27-22 1. Need flat strap to center bearing wall. 2. Over framing made of spruce. 3. Gables not strapped. 4. Over framing straping not correct. 11-1-22 1. Over framing made of spruce. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/01/2022 | APPROVED - AS NOTED | BTAYLOR |
| Note: 10/27/2022 - PREVIOUS INSPECTION NOTES 9/16/2022 - PREVIOUS INSPECTION NOTES 10-27-22 1. Need flat strap to center bearing wall. 2. Over framing made of spruce. 3. Gables not strapped. 4. Over framing straping not correct. 11-1-22 1. Over framing made of spruce. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/27/2022 | Disapproved - NO FEE | BTAYLOR |
| Note: 9/16/2022 - PREVIOUS INSPECTION NOTES 10-27-22 1. Need flat strap to center bearing wall. 2. Over framing made of spruce. 3. Gables not strapped. 4. Over framing straping not correct. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/16/2022 | CANCELLED BY APPLICANT | BTAYLOR |
| WALL SHEATHING | 09/16/2022 | APPROVED | BTAYLOR |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/26/2022 | CANCELLED BY APPLICANT | WEB |
| WALL SHEATHING | 07/26/2022 | CANCELLED BY APPLICANT | WEB |
| TIE BEAM / LINTEL | 07/12/2022 | APPROVED | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION multiple dowels missing dowel @ left side SGD not in wall at all 07/11/2022: Dowel still outside wall at slider | |||
| TIE BEAM / LINTEL | 07/11/2022 | Disapproved -FEE REQUIRED | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION multiple dowels missing dowel @ left side SGD not in wall at all 07/11/2022: Dowel still outside wall at slider | |||
| TIE BEAM / LINTEL | 07/07/2022 | Disapproved -FEE REQUIRED | DCUSHING |
| Note: multiple dowels missing dowel @ left side SGD not in wall at all | |||
| FOUND SURVEY APPROVED (OFFICE) | 06/22/2022 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 06/06/2022 | APPROVED | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION Compaction test not posted | |||
| MONOLITHIC SLAB | 06/02/2022 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: Compaction test not posted | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 05/27/2022 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 04/08/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 05/26/2023 | 05/26/2023 |
| Note: Marked INFORMATION By: MICHELLE RAMOS - - MRAMOS@PALMCOASTGOV.COM Unable to process final survey because there is an outstanding inspection needed prior. | |||
| MECH | COMPLETE | 03/29/2023 | 03/29/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 11/02/2022 | 11/02/2022 |
| Note: Marked INFORMATION By: MARGA DEFREITAS - - MDEFREITAS@PALMCOASTGOV.COM NO ROOFING AFFIDAVIT REQUIRED FOR DUPLEX | |||
| BLD | COMPLETE | 10/27/2022 | 10/27/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/25/2022 | 07/25/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/25/2022 | 07/25/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/22/2022 | 06/22/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/22/2022 | 06/22/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/13/2022 | 04/13/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/10/2021 | 11/10/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 11/10/2021 | 11/17/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KRUTH@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/10/2021 | 11/10/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 10/07/2021 | 10/07/2021 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Ac pad location does not match on landscape plan | |||
| SW1 | HOLD | 10/07/2021 | 10/13/2021 |
| Note: Held By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM Left side drainage plan needs to flow down the property line, not between the house and the property line. Note that whenever a house is next to a vacant lot the drainage is ALWAYS a "Common Swale" down the property line. | |||
| ENGIN1 | COMPLETE | 10/07/2021 | 10/08/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 09/24/2021 | 09/27/2021 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Ac pad location does not match on floor plan,landscape and site plan. All must match Driveway must be at least 16ft wide on each side so total it must be 32ft wide within the first 20ft closest to garage Driveway material must be concrete or pavers. | |||
| SW1 | HOLD | 09/24/2021 | 09/30/2021 |
| Note: Held By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM there are no changes made to the site plan from the first site plan the swale on the left side needs to flow down the property line and you need elevations on adjacent properties in a 20 foot grid 10 foot offset review the stormwater checklist and revise the site plan | |||
| MECH | COMPLETE | 09/08/2021 | 09/08/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | HOLD | 09/08/2021 | 09/08/2021 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please provide width of front entry walkway on site plan/survey | |||
| BLD | COMPLETE | 09/08/2021 | 09/11/2021 |
| Note: Released By: JPI | |||
| SW1 | HOLD | 09/08/2021 | 09/15/2021 |
| Note: Held By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM no changes to site plan drainage on the left side needs to flow down the property line see checklist | |||
| BLD | HOLD | 07/29/2021 | 08/03/2021 |
| Note: Held By: JPI 1. Please clarify whether the Product Approval in the plan set or the Product approval worksheet is the master for the project. | |||
| CUSVC | COMPLETE | 07/29/2021 | 08/05/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 07/29/2021 | 08/02/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/29/2021 | 07/29/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 07/29/2021 | 08/02/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 07/29/2021 | 07/30/2021 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Provide Energy calcs for both sides of duplex | |||
| SW1 | HOLD | 07/29/2021 | 08/03/2021 |
| Note: Held By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM See Checklist Highlighted comment in Attachments. Left side drainage must flow down the property line as a common swale. Drainage shown is flowing between the property line and the house. | |||
| ZON | HOLD | 07/29/2021 | 07/30/2021 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please provide width of front entry walkway on site plan/survey Landscape plan house layout must match layout on plans AC pad location does not match on plans and site plan/survey Banding/stone must wrap garage corners at least two foot on each side Banding required on windows and doors facing public right of way (rear backs to street) | |||
| SWALE | COMPLETE | 07/29/2021 | 10/29/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 05/31/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 05/31/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 05/31/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 05/31/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 05/31/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 05/31/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 05/31/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 05/31/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/31/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/31/2023 |
| CONNECTION FEES | ¤2,155.76 | 02/01/2022 |
| CONTRACTOR CHANGE | ¤40.00 | 02/01/2022 |
| STORM WATER PERMIT FEES | ¤80.00 | 02/01/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤79.98) | 02/01/2022 |
| SEWER CREDIT | (¤2,016.00) | 02/01/2022 |
| SEWER INSPECTION | ¤25.00 | 02/01/2022 |
| SEWER CAPITAL FACILITY | ¤9,879.52 | 02/01/2022 |
| WATER CAPITAL FACILITY FEE | ¤7,253.00 | 02/01/2022 |
| BUILDING DISCOUNT 100% | (¤20.00) | 02/01/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤22.02) | 02/01/2022 |
| IMPACT FEE FIRE | ¤734.00 | 02/01/2022 |
| IMPACT FEE PARKS | ¤2,398.24 | 02/01/2022 |
| IMPACT FEE SCHOOL | ¤7,200.00 | 02/01/2022 |
| IMPACT FEE TRANSPORTATION | ¤2,666.00 | 02/01/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 02/01/2022 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 02/01/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤71.95) | 02/01/2022 |
| NEW RESIDENTIAL INSPECTIONS | ¤300.00 | 02/01/2022 |
| SITE PLAN 20 | ¤20.00 | 02/01/2022 |
| SURCHARGE FS 533.721 | ¤7.70 | 02/01/2022 |
| SURCHARGE - FS 468.631 | ¤11.67 | 02/01/2022 |
| METER - DEPOSIT | ¤120.00 | 02/01/2022 |
| METER - DEPOSIT | ¤60.00 | 02/01/2022 |
| WATER-METER | ¤467.09 | 02/01/2022 |
| WATER- TURN ON | ¤25.00 | 02/01/2022 |
| WATER- TURN ON | ¤50.00 | 02/01/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤20.00 | 02/01/2022 |
| INSPECTION- ELECTRICAL | ¤150.00 | 02/01/2022 |
| INSPECTION - MECHANICAL | ¤150.00 | 02/01/2022 |
| INSPECTION - PLUMBING | ¤150.00 | 02/01/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤60.00 | 02/01/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤32,165.53 |