I want to search for...

Permit #2021071446

Permit Details

Status: COED

Parcel Id: 07-11-31-7004-00130-0100
CONDITIONED SPACE: 2417 sqft
GARAGE: 590 sqft
OPENED PORCH (WITH ROOF) : 144 sqft
OPENED PORCH (WITH ROOF) : 87 sqft
Total Square Footage: 3238 sqft
Block: 00130
Subdivision: 2203 - SECTION 4-COUNTRY CLUB COVE
Job Phone: (386) 672-8285
Location Address: 22 CRESCENT CT S
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 09/07/2021
NOC: RECORDED
Applicant name: JOSEPH TODD VANACORE
Owner: RUSSELL H & MARY E HARPER

Address

7 PALMER AVE

CROTON ON HUDSON, NY 10520

Lot: 0100
Contracted Stated Job Value: ¤249,999.00
Job Description: Single family residence
Type: CN

Contractor

VANACORE CONSTRUCTION INC.
Status Location Address Mailing Address State License Number Phone
INACTIVE

1451 N US HIGHWAY 1

Ormond Beach, FL 32174

SUITE 13

Ormond Beach, FL 32174

CBC058991 (Exp: 08/31/2024) (386) 672-8285

Sub Contractors

VERNON JACK SMITH III
Status Location Address State License Number Phone Fax
ACTIVE

224 KIRKLAND ROAD

NEW SMYRNA BEACH, FL 32169

EC13004432 (Exp: 08/31/2026) 386-409-3616 386-409-3616
SHAWN MICHAEL HISS
Status Location Address State License Number Phone
ACTIVE

1315 LPGA BLVD

HOLLY HILL, FL 32117

CAC1813585 (Exp: 08/31/2026) (386)672-8688
ALFRED N FYOCK JR
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

387 SAULS

ORMOND BEACH, FL 32174

ST

ORMOND BEACH, FL 32174

CCC1329075 (Exp: 08/31/2026) 386-566-6112 386-673-4299
JEFFREY DALE KNIGHT
Status Location Address State License Number Phone Fax
INACTIVE

923 ASHMEADE CT

PORT ORANGE, FL 32127

CFC057351 (Exp: 08/31/2026) 386-345-3857 386-345-4443

Inspection History

Type Request Date Result Inspector
ROW - STORMWATER FINAL 10/28/2022 FINAL APPROVED EMADISON
Note: ** 10/28/22 CORRECTIONS MADE SEDIMENT ISSUE AFTER FURTHER INSPECTION APPEARS TO BE A NON-ISSUE OR NEGATIVE IMPACT FROM THE CONSTRUCTION SITE. *** BEFORE FINAL ROW IS APPROVED *** ** 10/27/22 RIGHT SIDE SWALE NEEDS TO BE SODDED ALL BARE AREAS OF EARTH TO MATCH EXISTING GRADE ** RIGHT SIDE PROPERTY LINE WITH VACANT NEEDS SEED AND STRAW (SEED) IS NEEDED ** RIGHT REAR CORNER SEDIMENT NEEDS TO BE REMOVED FROM THE CANAL THAT HAS ERODED FROM THIS PROPERTY INTO THE CANAL.
U -UTILITY RESIDENTIAL FINAL 10/28/2022 FINAL APPROVED DHANEY
U-CROSS CONNECTION 10/27/2022 APPROVED DHANEY
ROW - FINAL APRON (AFTER POUR) 10/27/2022 APPROVED EMADISON
ROW- FINAL SURVEY/GRADING CERTIFICATION 10/27/2022 APPROVED EMADISON
ROW FIELD SURVEY /GRADING CERTIFICATION 10/27/2022 APPROVED EMADISON
Note: *** BEFORE FINAL ROW IS APPROVED *** ** 10/27/22 RIGHT SIDE SWALE NEEDS TO BE SODDED ALL BARE AREAS OF EARTH TO MATCH EXISTING GRADE ** RIGHT SIDE PROPERTY LINE WITH VACANT NEEDS SEED AND STRAW (SEED) IS NEEDED ** RIGHT REAR CORNER SEDIMENT NEEDS TO BE REMOVED FROM THE CANAL THAT HAS ERODED FROM THIS PROPERTY INTO THE CANAL.
PLUMBING FINAL 10/27/2022 Approval - Private Provider PPROVIDER
HVAC FINAL 10/27/2022 Approval - Private Provider PPROVIDER
ELECTRIC FINAL 10/27/2022 Approval - Private Provider PPROVIDER
BLD - BUILDING FINAL 10/27/2022 Approval - Private Provider PPROVIDER
U - SEWER TIE IN 10/19/2022 APPROVED - AS NOTED MGIBSON
Note: SEWER WAS TAPPED BY UTILITIES
ROW- PRE-APRON (PRE-POUR) 10/19/2022 APPROVED RGROSS
Note: ** NOTE TO INSPECTOR PAVERS HAVE BEEN SET PRIOR TO PAVER BASE / COMPACTION INSPECTION
ROW- PAVER RESTRAINTS 09/01/2022 APPROVED RGROSS
ROW- PRE-APRON (PRE-POUR) 09/01/2022 APPROVED RGROSS
Note: READY TO POUR the concrete over the pipe and paver restraints. 2nd part of a pre pour needed. Paver Driveway
ELECTRIC - EARLY POWER 07/17/2022 Approval - Private Provider PPROVIDER
GRAVITY SEWER TEST 07/14/2022 Approval - Private Provider PPROVIDER
INSULATION 04/04/2022 Approval - Private Provider PPROVIDER
ALL ROUGH 03/30/2022 Approval - Private Provider PPROVIDER
LATH/BRICK/ WATER BARRIER 03/30/2022 Approval - Private Provider PPROVIDER
ROOF VALLEY & METAL 03/03/2022 Approval - Private Provider PPROVIDER
WALL SHEATHING 02/02/2022 Approval - Private Provider PPROVIDER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/02/2022 Approval - Private Provider PPROVIDER
TIE BEAM / LINTEL 01/19/2022 Approval - Private Provider PPROVIDER
FOUND SURVEY APPROVED (OFFICE) 01/18/2022 APPROVED TBAKER
MONOLITHIC SLAB 01/03/2022 Approval - Private Provider PPROVIDER
PLUMBING 1ST ROUGH UNDERGROUND 12/20/2021 Approval - Private Provider PPROVIDER
STEM WALL FOUNDATION 12/06/2021 Approval - Private Provider PPROVIDER
Note: Stem Wall Lintel Inspection 12/06/21. originally input under 'lintel' inspection.
TIE BEAM / LINTEL 12/06/2021 Approval - Private Provider PPROVIDER
Note: Stem Wall Lintel ONLY
WATER METER INSTALLATION REQUEST 10/21/2021 APPROVED CSTONE

Review History

Department Status Date In Date Out
PLFM COMPLETE 10/27/2022 10/28/2022
Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM
PLFM COMPLETE 10/26/2022 10/27/2022
Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM
PLFM HOLD 10/25/2022 10/26/2022
Note: Held By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM Provide a Final Survey with the Final Elevation Certificate.
ENGIN1 COMPLETE 01/13/2022 01/14/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 01/13/2022 01/13/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 10/13/2021 10/14/2021
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
BADMIN HOLD 09/30/2021 09/30/2021
Note: Held By: MARGA DEFREITAS - - MDEFREITAS@PALMCOASTGOV.COM PLEASE RESEND HTE UTILITY FORM AGAIN SOMEHOW I JUSTSEE THE PREVIOUS ONE.
BADMIN COMPLETE 09/30/2021 09/30/2021
Note: Released By: MARGA DEFREITAS - - MDEFREITAS@PALMCOASTGOV.COM
CUSVC COMPLETE 09/30/2021 10/04/2021
Note: Released By: HALEIGH HAND - -
ENGIN1 COMPLETE 09/08/2021 09/08/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 09/08/2021 09/15/2021
Note: Released By: CONRAD TROHA - (386)986-4767 - CTROHA@PALMCOASTGOV.COM
ZON COMPLETE 09/08/2021 09/08/2021
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
SW1 COMPLETE 08/27/2021 09/02/2021
Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM
ENGIN1 COMPLETE 08/27/2021 08/27/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 08/27/2021 08/27/2021
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ZON COMPLETE 08/19/2021 08/20/2021
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
SW1 HOLD 08/19/2021 08/26/2021
Note: Held By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM Culvert material and size to be depicted. Typical is 17X13 CMP (L) L.Land Development Code Technical Manual, Section 300, Drawing 300.E, Note 5
ENGIN1 COMPLETE 08/19/2021 08/20/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON HOLD 08/17/2021 08/17/2021
Note: Held By: ESTELLE LENS - (386)986-3751 - Original Right of Way agreement has been received. Waiting on site plan approval so that it may be recorded. Repeat Comments: Please provide the width and material of the proposed walkways, (ON A REVISED SITE PLAN). Please provide the setback from the walkway on the right side of the house to the property line to demonstrate that it is not encroaching in the easement. (ON A REVISED SITE PLAN.)
ZON HOLD 08/13/2021 08/16/2021
Note: Held By: ESTELLE LENS - (386)986-3751 - Repeat Comments: Please provide the ORIGINALLY SIGNED right of way utilization agreement. (The ORIGINAL - HARD COPY is required for recording Please provide the width and material of the proposed walkways, (ON A REVISED SITE PLAN). Please provide the setback from the walkway on the right side of the house to the property line to demonstrate that it is not encroaching in the easement. (ON A REVISED SITE PLAN.)
ZON HOLD 08/10/2021 08/11/2021
Note: Held By: ESTELLE LENS - (386)986-3751 - Please provide the ORIGINALLY SIGNED right of way utilization agreement. (The original is required for recording.) Repeat comments: Please provide the width and material of the proposed walkways, (on the site plan). Please provide the setback from the walkway on the right side of the house to the property line to demonstrate that it is not encroaching in the easement.
SW1 HOLD 08/10/2021 08/17/2021
Note: Held By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM Please see the stormwater checklist in attachments you dont have a driveway culvert on the site plan and there needs to be one
CUSVC COMPLETE 07/29/2021 08/05/2021
Note: Released By: HALEIGH HAND - -
ENGIN1 COMPLETE 07/29/2021 07/29/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 07/29/2021 08/02/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
SW1 HOLD 07/29/2021 08/04/2021
Note: Held By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM please see the stormwater checklist in attachments you dont have a driveway culvert on the site plan and there needs to be one
ZON HOLD 07/29/2021 07/30/2021
Note: Held By: ESTELLE LENS - (386)986-3751 - Please provide an original right of way utilization agreement signed (and notarized) by all property owners on the deed. Please provide the width and material of the proposed walkways. Please provide the setback from the walkway on the right side of the house to the walkway to demonstrate that it is not encroaching in the easement. The landscape plan did not scan/upload well. Please upload a legible landscape plan for review/approval.
SWALE COMPLETE 07/29/2021 10/29/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
METER - DEPOSIT ¤60.00 02/01/2022
WATER-METER ¤441.07 02/01/2022
WATER- TURN ON ¤25.00 02/01/2022
WATER -IRRIGATION INSPECTION ¤25.00 02/01/2022
3% PARKS IMPACT FEE CREDIT (¤35.97) 09/07/2021
SITE PLAN 20 ¤20.00 09/07/2021
SURCHARGE FS 533.721 ¤2.00 09/07/2021
SURCHARGE - FS 468.631 ¤2.00 09/07/2021
STORM WATER PERMIT FEES ¤80.00 09/07/2021
3% TRANS IMPACT FEE CREDIT (¤51.54) 09/07/2021
SEWER INSPECTION ¤25.00 09/07/2021
SEWER CAPITAL FACILITY ¤4,664.55 09/07/2021
WATER CAPITAL FACILITY FEE ¤3,424.45 09/07/2021
WATER- TURN ON ¤25.00 09/07/2021
ADMINISTRATIVE RESIDENTIAL ¤20.00 09/07/2021
CONNECTION FEES ¤1,017.83 09/07/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 09/07/2021
IMPACT FEE FIRE ¤367.00 09/07/2021
IMPACT FEE PARKS ¤1,199.12 09/07/2021
IMPACT FEE SCHOOL ¤3,600.00 09/07/2021
RECORDING FEE REIMBURSE DOC ¤44.00 09/07/2021
IMPACT FEE TRANSPORTATION ¤1,718.00 09/07/2021
WATER -IRRIGATION INSPECTION ¤25.00 09/07/2021
METER - DEPOSIT ¤60.00 09/07/2021
Fees Total Due: ¤0.00 Total Paid: ¤16,746.50