I want to search for...

Permit #2021071524

Permit Details

Status: COED

Parcel Id: 42-10-30-3210-00000-1720
CONDITIONED SPACE: 2457 sqft
GARAGE: 480 sqft
OPENED PORCH (WITH ROOF) : 392 sqft
OPENED PORCH (WITH ROOF) : 53 sqft
Total Square Footage: 3382 sqft
Block: 00000
Subdivision: 2094 - CONSERVATORY AT HAMMOCK BEACH
Job Phone: 386-447-4400
Location Address: 401 BOURGANVILLE DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 09/28/2021
NOC: RECORDED
Applicant name: DAVID PAUL CROCKETT
Owner: JT820 LLC

Address

5 VISCAYA LANE

PALM COAST, FL 32137

Lot: 1720
Contracted Stated Job Value: ¤437,150.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

SALTWATER HOMES INC
Status Location Address Mailing Address State License Number Phone Fax
DECEASED

138 PALM COAST PARKWAY

PALM COAST, FL 32137

SUITE 328

PALM COAST, FL 32137

RG0041345 (Exp: 08/31/2025) 386-447-4400 866-244-9639

Sub Contractors

WILLIAM FRANK DUDLEY JR.
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 978

Bunnell, FL 32110

EC0003177 (Exp: 08/31/2026) (386)437-3068
THOMAS A REGULA
Status Location Address State License Number Phone Fax
INACTIVE

11320 PHILLIPS PKWY DRIVE E

JACKSONVILLE, FL 32256

CMC1250075 (Exp: 08/31/2026) 904-278-0339 904-278-0366
SANTOS L HERNANDEZ
Status Location Address State License Number Phone Fax
ACTIVE

946 SHADDICK DRIVE

ORANGE CITY, FL 32763

CCC1328011 (Exp: 08/31/2026) 386-218-4942 386-218-4937
KEN DEPRINZIO
Status Location Address State License Number Phone Fax
ACTIVE

325 WALKER STREET

HOLLY HILL, FL 32117

11351 (Exp: 08/31/2026) 386-672-8494 386-673-7856
RUSSELL J CARTER
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 302

DELAND, FL 32721

CFC1425938 (Exp: 08/31/2026) 386-736-4220 386-736-4219

Inspection History

Type Request Date Result Inspector
ROW FIELD SURVEY /GRADING CERTIFICATION 06/13/2023 APPROVED EMADISON
Note: ** 06/13/23 CORRECTIONS MADE __________________________________________________________________________________________________________________ 4/25/2023 - PREVIOUS INSPECTION NOTES ** RIGHT SIDE BUILDER NEEDS TO REMOVE ALL Flatwork, slabs, pads, landscaping plants, mulch, stones cannot be in the easements and ROW. (SEC. 300.03) OF THE CITY OF PALMCOAST TECHNICAL MANUAL ** RIGHT FRONT NEED TO REPAIR RUTS IN LAWN FROM MACHINE AS WELL AS SOD BARE EARTH ALONG PROPERTY LINE ** REAR YARD SEVERAL AREAS OF WASHOUT CREATING A TRIPPING HAZARD
BLD - BUILDING FINAL 06/12/2023 FINAL APPROVED AGAETANO
Note: Inspector Notes from Inspection 2450 03-21-2023 Wall sheathing was approved on 09-07-2022 at all rough.
ROW - STORMWATER FINAL 06/09/2023 FINAL APPROVED EMADISON
Note: ** 06/09/23 CORRECTIONS MADE ______________________________________________________________________________________________________________________ 6/6/2023 - PREVIOUS INSPECTION NOTES ** 06/06/23 POP-UP DRAINS IN EASEMENT AREA NEED TO BE MOVED TO THE TOP OF THE (ROW) AT PROPERTY LINE. WASHED OUT AREA NEEDS TO BE FILLED TAMPED AND SODDED TO PREVENT FUTURE WASHOUTS
U -UTILITY RESIDENTIAL FINAL 06/09/2023 FINAL APPROVED DHANEY
Note: 6/6/2023 - PREVIOUS INSPECTION NOTES Need brass lid installed on sewer clean out in Driveway .
U -UTILITY RESIDENTIAL FINAL 06/06/2023 Disapproved - NO FEE DHANEY
Note: Need brass lid installed on sewer clean out in Driveway .
ROW - STORMWATER FINAL 06/06/2023 Disapproved -FEE REQUIRED EMADISON
Note: ** 06/06/23 POP-UP DRAINS IN EASEMENT AREA NEED TO BE MOVED TO THE TOP OF THE (ROW) AT PROPERTY LINE. WASHED OUT AREA NEEDS TO BE FILLED TAMPED AND SODDED TO PREVENT FUTURE WASHOUTS
ROW - FINAL APRON (AFTER POUR) 06/06/2023 FINAL APPROVED EMADISON
ROW- FINAL SURVEY/GRADING CERTIFICATION 04/25/2023 APPROVED EMADISON
Note: ** 04/25/23 CORRECTIONS MADE ___________________________________________________________________________________________________________________ 3/22/2023 - PREVIOUS INSPECTION NOTES **03/22/23 NEED TO HAVE .10 OF FALL EVERY 20' ON RIGHT SIDE OF HOME.
ROW FIELD SURVEY /GRADING CERTIFICATION 04/25/2023 Disapproved - NO FEE EMADISON
Note: ** RIGHT SIDE BUILDER NEEDS TO REMOVE ALL Flatwork, slabs, pads, landscaping plants, mulch, stones cannot be in the easements and ROW. (SEC. 300.03) OF THE CITY OF PALMCOAST TECHNICAL MANUAL ** RIGHT FRONT NEED TO REPAIR RUTS IN LAWN FROM MACHINE AS WELL AS SOD BARE EARTH ALONG PROPERTY LINE ** REAR YARD SEVERAL AREAS OF WASHOUT CREATING A TRIPPING HAZARD
ROW- FINAL SURVEY/GRADING CERTIFICATION 03/22/2023 Disapproved - NO FEE FSLADISH
Note: **03/22/23 NEED TO HAVE .10 OF FALL EVERY 20' ON RIGHT SIDE OF HOME.
U-CROSS CONNECTION 03/21/2023 APPROVED DHANEY
WALL SHEATHING 03/21/2023 APPROVED - AS NOTED AGAETANO
Note: 03-21-2023 Wall sheathing was approved on 09-07-2022 at all rough.
ROW- PRE-APRON (PRE-POUR) 02/02/2023 APPROVED PFLANAGAN
Note: READY FOR PAVERS ----------------------------------------------------------------------- ** 01/20/23 APRON IS READY TO POUR ** MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR AFTER PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET ANY PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED
ROW- PAVER RESTRAINTS 01/23/2023 APPROVED EMADISON
Note: ** 01/23/23 CORRECTIONS MADE READY TO POUR ** MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ________________________________________________________________________________________________________________________ 1/20/2023 - PREVIOUS INSPECTION NOTES ** 01/20/23 PAVER RESTRAINTS ARE NOT READY NEED TO BEE RE-ESTABLISHED AS THERE ARE SEVERAL SPOTS WHERE THEY HAVE COLLAPSED AND CAVED IN.
ROW- PAVER RESTRAINTS 01/20/2023 Disapproved -FEE REQUIRED EMADISON
Note: ** 01/20/23 PAVER RESTRAINTS ARE NOT READY NEED TO BEE RE-ESTABLISHED AS THERE ARE SEVERAL SPOTS WHERE THEY HAVE COLLAPSED AND CAVED IN.
ROW- PRE-APRON (PRE-POUR) 01/20/2023 APPROVED EMADISON
Note: ** 01/20/23 APRON IS READY TO POUR ** MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR AFTER PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET ANY PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED
ELECTRIC - EARLY POWER 12/19/2022 APPROVED AGAETANO
Note: FPL notified 8:09 am
LATH/BRICK/ WATER BARRIER 10/26/2022 APPROVED RMARTIN
ELECTRIC-TUG 10/14/2022 APPROVED AGAETANO
INSULATION 09/19/2022 APPROVED FWILLIS
ALL ROUGH 09/07/2022 APPROVED AGAETANO
ROOF VALLEY & METAL 06/03/2022 APPROVED FWILLIS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/02/2022 APPROVED FWILLIS
TIE BEAM / LINTEL 04/12/2022 APPROVED AGAETANO
Note: THIS IS A REINSPECTION Please provide approved lintel schedule.
TIE BEAM / LINTEL 04/06/2022 Disapproved - NO FEE AGAETANO
Note: 1. Please provide detail for A2 of sheet 5. 2. Lintel schedule calls for precast. 3. Please provide revision for power box at lanai A2 sheet 5.
FOUND SURVEY APPROVED (OFFICE) 02/07/2022 APPROVED TBAKER
MONOLITHIC SLAB 01/25/2022 APPROVED AGAETANO
PLUMBING 1ST ROUGH UNDERGROUND 12/10/2021 APPROVED MGIBSON
GRAVITY SEWER TEST 12/10/2021 APPROVED MGIBSON
U - SEWER TIE IN 12/10/2021 APPROVED MGIBSON
ELECTRIC TEMP POLE 10/26/2021 APPROVED - AS NOTED JMUNSON
Note: Emailed FPL 10:14 am
WATER METER INSTALLATION REQUEST 10/19/2021 APPROVED CSTONE

Review History

Department Status Date In Date Out
MECH COMPLETE 06/12/2023 06/12/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 04/11/2022 04/11/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 02/07/2022 02/07/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 02/07/2022 02/07/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
SW1 COMPLETE 09/16/2021 09/16/2021
Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM If the concrete pad block the drainage we will make remove that concrete pad
ZON COMPLETE 08/30/2021 08/30/2021
Note: Released By: ESTELLE LENS - (386)986-3751 -
ENGIN1 COMPLETE 08/30/2021 08/30/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 HOLD 08/30/2021 09/03/2021
Note: Held By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM House need shifted to the right to allow for easement drainage on the left near A/C pad.
BLD COMPLETE 08/19/2021 08/19/2021
Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM
BLD HOLD 08/17/2021 08/18/2021
Note: Held By: JPI See comments
ENGIN1 COMPLETE 08/17/2021 08/17/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 08/17/2021 08/24/2021
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM Concrete Pad on the left side of house must not be over the property line.
MECH COMPLETE 08/17/2021 08/17/2021
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
ELEC COMPLETE 08/17/2021 08/17/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD HOLD 08/17/2021 08/18/2021
Note: Held By: JPI 1. Provide Roof Pressure zone nailing schedule- FBC-R301.2(7). REPEAT COMMENT 2. Provide wall section of screen wall around A/C pad. REPEAT COMMENT
ZON HOLD 08/17/2021 08/19/2021
Note: Held By: ESTELLE LENS - (386)986-3751 - Please provide the setback from the closest point of the residence to the front property line (cul de sac).
URB COMPLETE 08/04/2021 08/05/2021
Note: Released By: JOHN BEAUDET - (386)986-2456 -
BLD HOLD 07/30/2021 08/02/2021
Note: Held By: JPI BUILDING: 1. Product Approval Specification Sheet: a. Mullions omitted; provide approved product, product description, manufacturer, and product approval number. b. Exterior Sliding Door, MI, 430 Florida product approval number (15532.5) listed is invalid; provide approved product, product description, manufacturer, and product approval number. c. Provide ALL Florida Product Approval numbers for ALL Wood Connectors, Wood Anchors and Truss Plates utilized on this project and specified throughout the drawings. 2. Identify ALL Wall/Partition Types on Floor Plan, Sht. 2 and provide index/legend- FBC 107.3.5. 3. Provide Architectural Wall Section identifying all materials and construction of exterior walls (gypsum wall board, insulation, furring, etc.)- FBC 107.3.5. 4. Provide Roof Pressure zone nailing schedule- FBC-R301.2(7). 5. Provide wall section of screen wall around A/C pad.
CUSVC COMPLETE 07/30/2021 08/06/2021
Note: Released By: HALEIGH HAND - -
ELEC HOLD 07/30/2021 08/02/2021
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Need smoke alarm inside of guest bedroom. FRC 2020 314.3, 315.1
ENGIN1 COMPLETE 07/30/2021 07/30/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 07/30/2021 08/03/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH HOLD 07/30/2021 07/30/2021
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Provide Energy Calcs from 2020 7Th edition code cycle
SW1 COMPLETE 07/30/2021 08/05/2021
Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM
ZON HOLD 07/30/2021 08/04/2021
Note: Held By: ESTELLE LENS - (386)986-3751 - Please provide driveway width at the garage door. Please remove landscaping (around A/C) from adjacent property

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 06/12/2023
SW ENG REINSPECTION 20 ¤20.00 06/12/2023
SW ENG REINSPECTION 20 ¤20.00 06/12/2023
PLAN REVIEW - REVISION ¤32.50 06/12/2023
CONNECTION FEES ¤25.00 09/28/2021
STORM WATER PERMIT FEES ¤80.00 09/28/2021
3% TRANS IMPACT FEE CREDIT (¤94.17) 09/28/2021
SEWER INSPECTION ¤25.00 09/28/2021
METER - DEPOSIT ¤60.00 09/28/2021
WATER-METER ¤441.07 09/28/2021
ADMINISTRATIVE RESIDENTIAL ¤20.00 09/28/2021
INSPECTION- ELECTRICAL ¤322.80 09/28/2021
INSPECTION - MECHANICAL ¤322.80 09/28/2021
INSPECTION - PLUMBING ¤322.80 09/28/2021
PLAN REVIEW - RESIDENTIAL ¤175.20 09/28/2021
BUILDING DISCOUNT 100% (¤2,039.60) 09/28/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 09/28/2021
IMPACT FEE FIRE ¤367.00 09/28/2021
IMPACT FEE PARKS ¤1,199.12 09/28/2021
IMPACT FEE SCHOOL ¤3,600.00 09/28/2021
IMPACT FEE TRANSPORTATION ¤3,139.00 09/28/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 09/28/2021
NEW RESIDENTIAL INSPECTIONS ¤876.00 09/28/2021
SITE PLAN 20 ¤20.00 09/28/2021
SURCHARGE FS 533.721 ¤2.00 09/28/2021
SURCHARGE - FS 468.631 ¤2.00 09/28/2021
Fees Total Due: ¤0.00 Total Paid: ¤8,931.54