Permit #2021071540
Permit Details
Status: COED
| Parcel Id: 07-11-31-7009-00450-0220 |
| CONDITIONED SPACE: 2514 sqft |
| GARAGE: 602 sqft |
| OPENED PORCH (WITH ROOF) : 314 sqft |
| OPENED PORCH (WITH ROOF) : 62 sqft |
| Total Square Footage: 3492 sqft |
| Block: 00450 |
| Subdivision: 2208 - SECTION 9-FLORIDA PARK |
| Job Phone: 386-447-4400 |
| Location Address: 54 FENIMORE LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 08/24/2021 |
| NOC: RECORDED |
| Applicant name: DAVID PAUL CROCKETT |
| Owner: QUIRK JOHN & AIDA H&W |
|
Address 1 FELING LN PALM COAST, FL 32164 |
| Lot: 0220 |
| Contracted Stated Job Value: ¤420,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SALTWATER HOMES INC
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| DECEASED |
138 PALM COAST PARKWAY PALM COAST, FL 32137 |
SUITE 328 PALM COAST, FL 32137 |
RG0041345 (Exp: 08/31/2025) | 386-447-4400 | 866-244-9639 |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
KEN DEPRINZIO
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
325 WALKER STREET HOLLY HILL, FL 32117 |
11351 (Exp: 08/31/2026) | 386-672-8494 | 386-673-7856 |
RUSSELL J CARTER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 302 DELAND, FL 32721 |
CFC1425938 (Exp: 08/31/2026) | 386-736-4220 | 386-736-4219 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 04/11/2023 | FINAL APPROVED | TSTAUFFACHER |
| BLD - BUILDING FINAL | 04/06/2023 | CANCELLED BY APPLICANT | WEB |
| ROW - STORMWATER FINAL | 03/20/2023 | APPROVED | FSLADISH |
| U -UTILITY RESIDENTIAL FINAL | 03/07/2023 | FINAL APPROVED | DHANEY |
| ROW - FINAL APRON (AFTER POUR) | 03/06/2023 | APPROVED | PFLANAGAN |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 03/06/2023 | APPROVED | PFLANAGAN |
| Note: 2/28/2023 - PREVIOUS INSPECTION NOTES THE DRAINAGE IS BEING HELD IN THE BACK AND NOT ALLOWING WATER TO FLOW TO ROAD SIDE SWALE | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 02/28/2023 | Disapproved - NO FEE | PFLANAGAN |
| Note: THE DRAINAGE IS BEING HELD IN THE BACK AND NOT ALLOWING WATER TO FLOW TO ROAD SIDE SWALE | |||
| U-CROSS CONNECTION | 02/28/2023 | APPROVED | DHANEY |
| FINAL SURVEY (OFFICE USE ONLY) | 02/27/2023 | Disapproved - NO FEE | PFLANAGAN |
| Note: NEED TO RE-SUBMIT A NEW FINAL SURVEY MOST ELEVATIONS ARE BLURRY CANT READ THE NUMERS CORRECTLY | |||
| GRAVITY SEWER TEST | 01/10/2023 | APPROVED | MGIBSON |
| U - SEWER TIE IN | 01/10/2023 | APPROVED | MGIBSON |
| ROW- PAVER RESTRAINTS | 12/28/2022 | APPROVED | GBERTOLA |
| Note: ALREADY APPROVED | |||
| ROW- PRE-APRON (PRE-POUR) | 12/28/2022 | APPROVED | GBERTOLA |
| Note: 12/28/22= READY FOR PAVERS 11/17/2022 - PREVIOUS INSPECTION NOTES ** 11/17/22 READY TO POUR APRON AND PAVER RESTRAINTS ** MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET ANY PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED | |||
| ROW- PAVER RESTRAINTS | 11/17/2022 | APPROVED | EMADISON |
| Note: ** 11/17/22 PAVER RESTRAINTS READY TO POUR WITH APRON | |||
| ROW- PRE-APRON (PRE-POUR) | 11/17/2022 | PARTIALLY APPROVED | EMADISON |
| Note: ** 11/17/22 READY TO POUR APRON AND PAVER RESTRAINTS ** MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET ANY PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED | |||
| ELECTRIC - EARLY POWER | 10/25/2022 | APPROVED | AGAETANO |
| Note: FPL Notified at 9:17am | |||
| LATH/BRICK/ WATER BARRIER | 08/17/2022 | APPROVED | AGAETANO |
| INSULATION | 08/09/2022 | Disapproved - NO FEE | LMILLER |
| Note: need INSULATION CERTIFICATE per ENERGY CONSERVATION R303.1.1. | |||
| INSULATION | 08/09/2022 | APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION need INSULATION CERTIFICATE per ENERGY CONSERVATION R303.1.1. Second entry today Rockry showed me the address specific cert, resuilt is approved | |||
| GAS ROUGH | 08/02/2022 | APPROVED | MGIBSON |
| ALL ROUGH | 08/01/2022 | APPROVED | AGAETANO |
| Note: THIS IS A REINSPECTION | |||
| ALL ROUGH | 07/28/2022 | CANCELLED BY APPLICANT | AGAETANO |
| WALL SHEATHING | 04/12/2022 | APPROVED | AGAETANO |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/12/2022 | APPROVED | AGAETANO |
| ROOF VALLEY & METAL | 04/12/2022 | APPROVED | AGAETANO |
| TIE BEAM / LINTEL | 02/22/2022 | Disapproved - NO FEE | AGAETANO |
| Note: Blocks at the bottom of foundation not knocked out at two dowel locations (right side of foundaton). | |||
| TIE BEAM / LINTEL | 02/22/2022 | APPROVED | AGAETANO |
| Note: THIS IS A REINSPECTION Blocks at the bottom of foundation not knocked out at two dowel locations (right side of foundaton). | |||
| FOUND SURVEY APPROVED (OFFICE) | 01/28/2022 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 01/07/2022 | APPROVED | DCUSHING |
| PLUMBING 1ST ROUGH UNDERGROUND | 12/21/2021 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 09/30/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 11/13/2022 | 11/14/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 11/13/2022 | 11/21/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/13/2022 | 11/14/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/22/2022 | 03/23/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/11/2022 | 03/11/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 01/27/2022 | 01/28/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/27/2022 | 01/27/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/19/2021 | 08/19/2021 |
| Note: Released By: JPI | |||
| ZON | COMPLETE | 08/19/2021 | 08/19/2021 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Note: Marisella explained that the drive way will have a concrete apron so no right of way utilization will be needed. | |||
| BLD | HOLD | 07/30/2021 | 08/02/2021 |
| Note: Held By: JPI BUILDING: 1. Product Approval Specification Sheet: a. Mullions omitted; provide approved product, product description, manufacturer, and product approval number. b. Exterior Sliding Door, MI, 430 Florida product approval number (15532.5) listed is invalid; provide approved product, product description, manufacturer, and product approval number. c. Provide ALL Florida Product Approval numbers for ALL Wood Connectors, Wood Anchors and Truss Plates utilized on this project and specified throughout the drawings. 2. Identify ALL Wall/Partition Types on Floor Plan, Sht. 2 and provide index/legend- FBC 107.3.5. 3. Provide Architectural Wall Section identifying all materials and construction of exterior walls (gypsum wall board, insulation, furring, etc.)- FBC 107.3.5. 4. Provide Roof Pressure zone nailing schedule- FBC-R301.2(7). 5. Provide wall section of screen wall around A/C pad. | |||
| CUSVC | COMPLETE | 07/30/2021 | 08/05/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 07/30/2021 | 08/02/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/30/2021 | 07/30/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 07/30/2021 | 08/03/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 07/30/2021 | 07/30/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/30/2021 | 08/05/2021 |
| Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM | |||
| ZON | HOLD | 07/30/2021 | 08/04/2021 |
| Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Residential homes shall provide a foundation plantings consisting of 16 shrubs on interior lots. Eight shrubs shall be planted in front of home and four shrubs planted on each side of the home. The corners of the home shall be wrapped with shrubbery or have an understory tree planted there. Please provide a Right of way utilization agreement for the paved drive way. | |||
| SWALE | COMPLETE | 07/30/2021 | 11/02/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 04/03/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 04/03/2023 |
| CONNECTION FEES | ¤1,017.83 | 08/24/2021 |
| METER - DEPOSIT | ¤60.00 | 08/24/2021 |
| WATER- TURN ON | ¤25.00 | 08/24/2021 |
| ADMINISTRATIVE RESIDENTIAL | ¤20.00 | 08/24/2021 |
| INSPECTION- ELECTRICAL | ¤312.00 | 08/24/2021 |
| INSPECTION - MECHANICAL | ¤312.00 | 08/24/2021 |
| INSPECTION - PLUMBING | ¤312.00 | 08/24/2021 |
| PLAN REVIEW - RESIDENTIAL | ¤168.00 | 08/24/2021 |
| BUILDING DISCOUNT 100% | (¤1,964.00) | 08/24/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 08/24/2021 |
| IMPACT FEE FIRE | ¤367.00 | 08/24/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 08/24/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 08/24/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 08/24/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 08/24/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 08/24/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤840.00 | 08/24/2021 |
| SITE PLAN 20 | ¤20.00 | 08/24/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 08/24/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 08/24/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 08/24/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 08/24/2021 |
| SEWER INSPECTION | ¤25.00 | 08/24/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 08/24/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 08/24/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤16,203.93 |