I want to search for...
Permit #2021071542
Permit Details
Status: COED
| Parcel Id: 07-11-31-7063-00660-0070 |
| CONDITIONED SPACE: 2026 sqft |
| GARAGE: 685 sqft |
| OPENED PORCH (WITH ROOF) : 212 sqft |
| OPENED PORCH (WITH ROOF) : 60 sqft |
| Total Square Footage: 2983 sqft |
| Block: 00660 |
| Subdivision: - |
| Job Phone: 386-960-7720 |
| Location Address: 43 ZEBULAHS TRL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 09/21/2021 |
| NOC: RECORDED |
| Applicant name: LAWRENCE FRED SIETSMA |
| Owner: AVTEC HOMES, INC. |
|
Address 620 MALABAR RD SE PALM BAY, FL 32907 |
|
Address STE 5 PALM BAY, FL 32907 |
| Lot: 0070 |
| Contracted Stated Job Value: ¤335,490.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
AVTEC HOMES INC
| Status | Location Address | State License Number | Phone |
| CANCEL |
2405 E GRAVES AVE ORANGE CITY, FL 32763 |
CRC041905 (Exp: 08/31/2024) | 386-960-7720 |
Sub Contractors
BRUCE R BOLTON
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| CANCEL |
1982 SR 44 NEW SMYRNA BEACH, FL 32168 |
SUITE 357 NEW SMYRNA BEACH, FL 32168 |
CAC1817407 (Exp: 08/31/2022) | 386-216-5975 | 386-402-4191 |
DOUGLAS EDWARD RICHARDS
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
108 E INDIANA AVENUE DELAND, FL 32724 |
CCC1328824 (Exp: 08/31/2024) | 386-736-4226 | 386-740-0535 |
RUSSELL J CARTER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 302 DELAND, FL 32721 |
CFC1425938 (Exp: 08/31/2026) | 386-736-4220 | 386-736-4219 |
STEVEN JAY SMITH
| Status | Location Address | State License Number | Phone |
| INACTIVE |
104 West Cedar Avenue Orange City, FL 32763 |
EC0001542 (Exp: 08/31/2022) | (386)775-7776 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 07/28/2022 | FINAL APPROVED | TSTAUFFACHER |
| ROW - STORMWATER FINAL | 07/26/2022 | APPROVED - AS NOTED | PFLANAGAN |
| Note: PASSING CONTRACTOR WANTS ROAD DAMAGE TO BE DONE BY THE CITY THE AREA IS 120' LONG AT $10.00 SQFT MAKES THE FEE $1,200.00. SEE PHOTOS OF AREAS NEEDED TO BE PATCHED | |||
| U -UTILITY RESIDENTIAL FINAL | 07/21/2022 | FINAL APPROVED | JHARDING |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/15/2022 | APPROVED | PFLANAGAN |
| ROW - FINAL APRON (AFTER POUR) | 07/15/2022 | APPROVED | PFLANAGAN |
| FINAL SURVEY (OFFICE USE ONLY) | 07/15/2022 | APPROVED | PFLANAGAN |
| Note: THIS IS A REINSPECTION 7/8/22 ONTHE LEFT SIDE OF HOUSE THE DRAINAGE IS IMPACTING THE AJACENT LOT TO THE LEFT NEED TO KEEP ALL STORMWATER ON YOUR LOT. THE SWALE IN THE FRONT NEEDS TO HAVE POSITIVE FLOW FROM RIGHT TO LEFT IT IS FLAT. THE SWALE TO RIGHT OF HOUSE GOES UP AND DOWN THAT MEANS THAT WATER IS NOT FLOWING DOWN ZEPHYR LILY TRAIL NEED TO REGRADE ALL AREAS TO FIX ALL PROBLEMS | |||
| FINAL SURVEY (OFFICE USE ONLY) | 07/08/2022 | Disapproved - NO FEE | PFLANAGAN |
| Note: 7/8/22 ONTHE LEFT SIDE OF HOUSE THE DRAINAGE IS IMPACTING THE AJACENT LOT TO THE LEFT NEED TO KEEP ALL STORMWATER ON YOUR LOT. THE SWALE IN THE FRONT NEEDS TO HAVE POSITIVE FLOW FROM RIGHT TO LEFT IT IS FLAT. THE SWALE TO RIGHT OF HOUSE GOES UP AND DOWN THAT MEANS THAT WATER IS NOT FLOWING DOWN ZEPHYR LILY TRAIL NEED TO REGRADE ALL AREAS TO FIX ALL PROBLEMS | |||
| GRAVITY SEWER TEST | 05/27/2022 | APPROVED | MGIBSON |
| U - SEWER TIE IN | 05/27/2022 | APPROVED | MGIBSON |
| ELECTRIC - EARLY POWER | 05/26/2022 | APPROVED - AS NOTED | JMUNSON |
| Note: THIS IS A REINSPECTION Emailed FPL at 11;17 AM 5/26/22 Emailed FPL at 7:33 am | |||
| ROW- PRE-APRON (PRE-POUR) | 05/25/2022 | APPROVED - AS NOTED | EMADISON |
| Note: * AT THE TIME OF INSPECTION EVERYTHING LOOKS GOOD * RECHECK ELEVATIONS IN THE EVENT OF RAIN PRIOR TO POUR AS WELL AS COMPACTION/AND FOOTERS NEED TO COMPACT APRON MORE THE SAND AND DIRT IS WAY TO SOFT | |||
| ROW- PRE-APRON (PRE-POUR) | 05/19/2022 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: NEED TO COMPACT APRON MORE THE SAND AND DIRT IS WAY TO SOFT | |||
| ELECTRIC - EARLY POWER | 05/17/2022 | PARTIALLY APPROVED | TSTAUFFACHER |
| Note: Emailed FPL at 11;17 AM | |||
| PEP TANK INSTALLATION REQUEST | 04/19/2022 | APPROVED | CSTONE |
| U-CROSS CONNECTION | 04/14/2022 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation, no cross connections. | |||
| U - SEWER TIE IN | 04/14/2022 | CANCELLED BY APPLICANT | WEB |
| INSULATION | 04/06/2022 | APPROVED | DCUSHING |
| Note: THIS IS A REINSPECTION Install scuttle access in guest hallway//from all rough 04/04/2022: Drywall has started prior to insulation inspection Remove drywall in guest hall and expose scuttle opening for inspection | |||
| INSULATION | 04/04/2022 | Disapproved -FEE REQUIRED | TSTAUFFACHER |
| Note: Install scuttle access in guest hallway//from all rough 04/04/2022: Drywall has started prior to insulation inspection Remove drywall in guest hall and expose scuttle opening for inspection | |||
| ALL ROUGH | 03/30/2022 | APPROVED | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION AC not complete Electric not complete | |||
| LATH/BRICK/ WATER BARRIER | 03/22/2022 | APPROVED | TSTAUFFACHER |
| ALL ROUGH | 03/22/2022 | Disapproved -FEE REQUIRED | TSTAUFFACHER |
| Note: AC not complete Electric not complete | |||
| ROOF VALLEY & METAL | 03/01/2022 | APPROVED | TSTAUFFACHER |
| ROOF VALLEY & METAL | 02/28/2022 | CANCELLED BY APPLICANT | WEB |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/23/2022 | APPROVED | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION Truss A24 missing engineering. Circled on truss plans in box Please provide dumpster | |||
| WALL SHEATHING | 02/22/2022 | APPROVED | TSTAUFFACHER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/22/2022 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: Truss A24 missing engineering. Circled on truss plans in box Please provide dumpster | |||
| FOUND SURVEY APPROVED (OFFICE) | 02/21/2022 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 02/04/2022 | APPROVED | TSTAUFFACHER |
| MONOLITHIC SLAB | 01/03/2022 | APPROVED | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION Plans in box are incomplete and not approved by City No compaction test certificate posted | |||
| MONOLITHIC SLAB | 12/28/2021 | Disapproved -FEE REQUIRED | TSTAUFFACHER |
| Note: Plans in box are incomplete and not approved by City No compaction test certificate posted | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 12/08/2021 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 11/10/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 02/18/2022 | 02/18/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/18/2022 | 02/18/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 08/10/2021 | 08/10/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 08/02/2021 | 11/02/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/30/2021 | 08/03/2021 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 07/30/2021 | 08/06/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 07/30/2021 | 08/02/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/30/2021 | 08/02/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 07/30/2021 | 08/03/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 07/30/2021 | 07/30/2021 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM 1. Energy calcs need to be signed by the builder 2, Design location on Energy calcs needs to be closer to Palm Coast. I. E., Daytona Beach or St. Augustine | |||
| SW1 | COMPLETE | 07/30/2021 | 08/05/2021 |
| Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/30/2021 | 08/04/2021 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 08/05/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 08/05/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 08/05/2022 |
| ENGINEERING ROAD DAMAGE | ¤1,200.00 | 08/05/2022 |
| SW ENG REINSPECTION 30 | ¤30.00 | 08/05/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 09/21/2021 |
| SEWER CREDIT | (¤850.00) | 09/21/2021 |
| SEWER INSPECTION | ¤25.00 | 09/21/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 09/21/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 09/21/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 09/21/2021 |
| IMPACT FEE FIRE | ¤367.00 | 09/21/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 09/21/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 09/21/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 09/21/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 09/21/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤672.00 | 09/21/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 09/21/2021 |
| SITE PLAN 20 | ¤20.00 | 09/21/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 09/21/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 09/21/2021 |
| INSPECTION - PLUMBING | ¤261.60 | 09/21/2021 |
| CONNECTION FEES | ¤1,017.83 | 09/21/2021 |
| PLAN REVIEW - RESIDENTIAL | ¤134.40 | 09/21/2021 |
| BUILDING DISCOUNT 100% | (¤1,611.20) | 09/21/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 09/21/2021 |
| METER - DEPOSIT | ¤60.00 | 09/21/2021 |
| WATER- TURN ON | ¤25.00 | 09/21/2021 |
| INSPECTION- ELECTRICAL | ¤261.60 | 09/21/2021 |
| ADMINISTRATIVE RESIDENTIAL | ¤20.00 | 09/21/2021 |
| INSPECTION - MECHANICAL | ¤261.60 | 09/21/2021 |
| INSPECTION - PLUMBING | (¤261.60) | 08/26/2021 |
| INSPECTION- ELECTRICAL | (¤261.60) | 08/26/2021 |
| INSPECTION- ELECTRICAL | ¤261.60 | 08/26/2021 |
| INSPECTION - MECHANICAL | ¤261.60 | 08/26/2021 |
| INSPECTION - MECHANICAL | (¤261.60) | 08/26/2021 |
| WATER- TURN ON | ¤25.00 | 08/26/2021 |
| ADMINISTRATIVE RESIDENTIAL | ¤20.00 | 08/26/2021 |
| ADMINISTRATIVE RESIDENTIAL | (¤20.00) | 08/26/2021 |
| WATER- TURN ON | (¤25.00) | 08/26/2021 |
| METER - DEPOSIT | ¤60.00 | 08/26/2021 |
| METER - DEPOSIT | (¤60.00) | 08/26/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 08/26/2021 |
| IMPACT FEE FIRE | ¤367.00 | 08/26/2021 |
| IMPACT FEE FIRE | (¤367.00) | 08/26/2021 |
| BUILDING DISCOUNT 100% | (¤1,611.20) | 08/26/2021 |
| BUILDING DISCOUNT 100% | ¤1,611.20 | 08/26/2021 |
| INSPECTION - PLUMBING | ¤261.60 | 08/26/2021 |
| PLAN REVIEW - RESIDENTIAL | ¤134.40 | 08/26/2021 |
| PLAN REVIEW - RESIDENTIAL | (¤134.40) | 08/26/2021 |
| CONNECTION FEES | ¤1,017.83 | 08/26/2021 |
| CONNECTION FEES | (¤1,017.83) | 08/26/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 08/26/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 08/26/2021 |
| 3% TRANS IMPACT FEE CREDIT | ¤51.54 | 08/26/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 08/26/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 08/26/2021 |
| SURCHARGE - FS 468.631 | (¤2.00) | 08/26/2021 |
| SURCHARGE FS 533.721 | (¤2.00) | 08/26/2021 |
| NEW RESIDENTIAL INSPECTIONS | (¤672.00) | 08/26/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤672.00 | 08/26/2021 |
| SITE PLAN 20 | ¤20.00 | 08/26/2021 |
| SITE PLAN 20 | (¤20.00) | 08/26/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 08/26/2021 |
| 3% PARKS IMPACT FEE CREDIT | ¤35.97 | 08/26/2021 |
| IMPACT FEE TRANSPORTATION | (¤1,718.00) | 08/26/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 08/26/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 08/26/2021 |
| WATER -IRRIGATION INSPECTION | (¤25.00) | 08/26/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 08/26/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 08/26/2021 |
| IMPACT FEE SCHOOL | (¤3,600.00) | 08/26/2021 |
| IMPACT FEE PARKS | (¤1,199.12) | 08/26/2021 |
| 3% FIRE IMPACT FEE CREDIT | ¤11.01 | 08/26/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 08/26/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 08/26/2021 |
| WATER CAPITAL FACILITY FEE | (¤3,424.45) | 08/26/2021 |
| SEWER CAPITAL FACILITY | (¤4,664.55) | 08/26/2021 |
| SEWER INSPECTION | ¤25.00 | 08/26/2021 |
| SEWER INSPECTION | (¤25.00) | 08/26/2021 |
| SEWER CREDIT | (¤850.00) | 08/26/2021 |
| SEWER CREDIT | ¤850.00 | 08/26/2021 |
| STORM WATER PERMIT FEES | (¤80.00) | 08/26/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤16,631.43 |