I want to search for...
Permit #2021071550
Permit Details
Status: COED
| Parcel Id: 07-11-31-7009-00410-0160 |
| CONDITIONED SPACE: 1804 sqft |
| GARAGE: 389 sqft |
| OPENED PORCH (WITH ROOF) : 28 sqft |
| OPENED PORCH (WITH ROOF) : 80 sqft |
| Total Square Footage: 2301 sqft |
| Block: 00410 |
| Subdivision: 2208 - SECTION 9-FLORIDA PARK |
| Job Phone: 321-610-3924 |
| Location Address: 37 FENWICK LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 09/17/2021 |
| NOC: RECORDED |
| Applicant name: KENNETH WAYNE CAMBELL JR |
| Owner: VINTAGE ESTATE HOMES LLC |
|
Address 4885 N WICKHAM ROAD MELBOURNE, FL 32940 |
| Lot: 0160 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
MERCEDES PREMIER HOMES LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| CANCEL |
4885 N WICKHAM RD MELBOURNE, FL 32940 |
SUITE 101 MELBOURNE, FL 32940 |
CBC058803 (Exp: 08/31/2022) | 321-610-3924 |
Sub Contractors
ZACHARY PETER BOERA
| Status | Location Address | State License Number | Phone |
| CANCEL |
7225 SANDSCOVE COURT, SUITE 1 WINTER PARK, FL 32792 |
CAC1817652 (Exp: 08/31/2022) | 407-629-6920 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
JOSEPH C WRIGHT
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST, FL 32137 |
UNIT 3 D PALM COAST, FL 32137 |
EC13003278 (Exp: 08/31/2026) | 386-447-9644 | 386-447-9633 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 06/09/2022 | FINAL APPROVED | AGAETANO |
| Note: THIS IS A REINSPECTION | |||
| BLD - BUILDING FINAL | 06/07/2022 | CANCELLED BY APPLICANT | LMILLER |
| ROW - FINAL APRON (AFTER POUR) | 06/06/2022 | APPROVED | EMADISON |
| ROW - STORMWATER FINAL | 06/06/2022 | APPROVED - AS NOTED | EMADISON |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOKS GOOD | |||
| U -UTILITY RESIDENTIAL FINAL | 06/06/2022 | FINAL APPROVED | DHANEY |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/03/2022 | APPROVED - AS NOTED | EMADISON |
| Note: * ENSURE THAT ALL BARE AREAS ARE SODDED PRIOR TO ROW FINAL | |||
| FINAL SURVEY (OFFICE USE ONLY) | 06/03/2022 | APPROVED | EMADISON |
| U-CROSS CONNECTION | 05/27/2022 | APPROVED | DHANEY |
| ELECTRIC - EARLY POWER | 04/28/2022 | APPROVED - AS NOTED | JMUNSON |
| Note: THIS IS A REINSPECTION Left outside enclosure cover not installed. 4/28/22 Emailed FPL at 10:05 am | |||
| ELECTRIC - EARLY POWER | 04/27/2022 | Disapproved - NO FEE | AGAETANO |
| Note: Left outside enclosure cover not installed. | |||
| ROW- PRE-APRON (PRE-POUR) | 04/25/2022 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Culvert full of water. Material way too soft to pour. 4/20/22 - Culvert full of water. Material in the Apron too soft and needs better compaction. 4/21/22 - Still too much water in the pour area and too soft to pour. Builder may want to spread and compact a load of road base to obsorb the moisture. 4/25/22 -Heavy rain in the forecast. Be sure to double check pipe elevation again before pouring. | |||
| ROW- PRE-APRON (PRE-POUR) | 04/21/2022 | Disapproved - NO FEE | RGROSS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Culvert full of water. Material way too soft to pour. 4/20/22 - Culvert full of water. Material in the Apron too soft and needs better compaction. 4/21/22 - Still too much water in the pour area and too soft to pour. Builder may want to spread and compact a load of road base to obsorb the moisture. | |||
| ROW- PRE-APRON (PRE-POUR) | 04/20/2022 | Disapproved -FEE REQUIRED | RGROSS |
| Note: THIS IS A REINSPECTION Culvert full of water. Material way too soft to pour. 4/20/22 - Culvert full of water. Material in the Apron too soft and needs better compaction. | |||
| ROW- PRE-APRON (PRE-POUR) | 04/18/2022 | Disapproved -FEE REQUIRED | RGROSS |
| Note: Culvert full of water. Material way too soft to pour. | |||
| U - SEWER TIE IN | 04/04/2022 | APPROVED | MGIBSON |
| Note: THIS IS A REINSPECTION Water has filled the hole, cannot see the connection at the street. | |||
| U - SEWER TIE IN | 03/23/2022 | Disapproved - NO FEE | AGAETANO |
| Note: Water has filled the hole, cannot see the connection at the street. | |||
| INSULATION | 02/22/2022 | APPROVED | AGAETANO |
| LATH/BRICK/ WATER BARRIER | 02/11/2022 | APPROVED | AGAETANO |
| ALL ROUGH | 02/08/2022 | CANCELLED BY APPLICANT | WEB |
| ALL ROUGH | 02/08/2022 | APPROVED | AGAETANO |
| WALL SHEATHING | 01/26/2022 | APPROVED | KSANDOE |
| ROOF VALLEY & METAL | 01/24/2022 | APPROVED | AGAETANO |
| Note: THIS IS A REINSPECTION Missing 5 x 5 metal at entry. | |||
| ROOF VALLEY & METAL | 01/21/2022 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: Missing 5 x 5 metal at entry. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/19/2022 | APPROVED - AS NOTED | AGAETANO |
| Note: 1. EJ7 at lanai and left of SGD strap is not nailed properly 2. A5 truss engineered upright is missing. Check at all rough | |||
| FOUND SURVEY APPROVED (OFFICE) | 11/16/2021 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 11/05/2021 | APPROVED | DCUSHING |
| Note: THIS IS A REINSPECTION DOWN ROD RIGHT OF GARAGE, LEFT OF FRONT ENTRY NOT TIED FIXED-DC | |||
| TIE BEAM / LINTEL | 11/04/2021 | Disapproved - NO FEE | DCUSHING |
| Note: DOWN ROD RIGHT OF GARAGE, LEFT OF FRONT ENTRY NOT TIED | |||
| MONOLITHIC SLAB | 10/13/2021 | APPROVED | DCUSHING |
| PLUMBING 1ST ROUGH UNDERGROUND | 10/08/2021 | APPROVED | DCUSHING |
| GRAVITY SEWER TEST | 10/08/2021 | APPROVED | DCUSHING |
| WATER METER INSTALLATION REQUEST | 09/28/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 03/04/2022 | 03/07/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/16/2021 | 11/16/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/16/2021 | 11/16/2021 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 08/09/2021 | 08/16/2021 |
| Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/09/2021 | 08/09/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/09/2021 | 08/10/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/30/2021 | 08/03/2021 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 07/30/2021 | 08/06/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 07/30/2021 | 08/02/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/30/2021 | 07/30/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 07/30/2021 | 08/03/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 07/30/2021 | 07/30/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 07/30/2021 | 08/05/2021 |
| Note: Held By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM Left side of the house drainage pattern on the property line is not consistent Refer to stormwater checklist to make the corrections needed to meet the city minimums stormwater requirements | |||
| ZON | COMPLETE | 07/30/2021 | 08/04/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 07/30/2021 | 11/03/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 06/14/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/14/2022 |
| SW ENG REINSPECTION 30 | ¤30.00 | 06/14/2022 |
| SW ENG REINSPECTION 30 | ¤30.00 | 06/14/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 09/17/2021 |
| SW ENG RES REVIEW 200 | ¤200.00 | 09/17/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 09/17/2021 |
| SEWER CREDIT | (¤1,147.00) | 09/17/2021 |
| SEWER INSPECTION | ¤25.00 | 09/17/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 09/17/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 09/17/2021 |
| SITE PLAN 30 | ¤30.00 | 09/17/2021 |
| CONNECTION FEES | ¤1,017.83 | 09/17/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 09/17/2021 |
| IMPACT FEE FIRE | ¤367.00 | 09/17/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 09/17/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 09/17/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 09/17/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 09/17/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 09/17/2021 |
| SURCHARGE FS 533.721 | ¤9.67 | 09/17/2021 |
| SURCHARGE - FS 468.631 | ¤14.50 | 09/17/2021 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 09/17/2021 |
| SW ENG INSPECTION 60 | ¤60.00 | 09/17/2021 |
| SW ENG PRE APRON | ¤30.00 | 09/17/2021 |
| METER - DEPOSIT | ¤60.00 | 09/17/2021 |
| WATER- TURN ON | ¤25.00 | 09/17/2021 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 09/17/2021 |
| INSPECTION - RESIDENTIAL | ¤687.50 | 09/17/2021 |
| PLAN REVIEW - RESIDENTIAL | ¤195.00 | 09/17/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤16,309.60 |