I want to search for...
Permit #2021071562
Permit Details
Status: COED
| Parcel Id: 07-11-31-7010-00050-0040 |
| CONDITIONED SPACE: 2170 sqft |
| GARAGE: 473 sqft |
| OPENED PORCH (WITH ROOF) : 497 sqft |
| OPENED PORCH (WITH ROOF) : 114 sqft |
| Total Square Footage: 3254 sqft |
| Block: 00050 |
| Subdivision: 2137 - SECTION 10-FLORIDA PARK |
| Job Phone: 386-447-7007 |
| Location Address: 10 FERNMILL LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/12/2021 |
| NOC: RECORDED |
| Applicant name: MAXIM TARANNIK |
| Owner: STEPUL GENNADIY |
|
Address 4187 COVE LANE UNIT A GLEANVIEW, IL 60025 |
| Lot: 0040 |
| Contracted Stated Job Value: ¤315,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
GOLDEN MAGNOLIA, INC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
1 ROCKEFELLER DRIVE PALM COAST, FL 32164 |
RR282811984 (Exp: 08/31/2025) | 386-447-7007 |
Sub Contractors
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
FERNANDO MEZA SR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
457 CHELSEA PLACE AVE ORMOND BEACH, FL 32174 |
EC13003906 (Exp: 08/31/2026) | 386-241-5211 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - STORMWATER FINAL | 01/20/2023 | APPROVED | EMADISON |
| Note: ** 01/20/23 ALL CORRECTIONS MADE EVERYTHING LOOKS GOOD AT THE TIME OF THE INSPECTION _________________________________________________________________________________________________________________________ 1/18/2023 - PREVIOUS INSPECTION NOTES ** 01/18/23 BUILDER HAS SOMEONE WORKING ON SITE TRYING TO CLEAN CULVERT OUT. ** STILL TOO MUCH DIRT AND MUD INSIDE I AM DISAPPROVING INSPECTION WITHOUT FEE DUE TO WORK BEING DONE AT TIME OF INSPECTION. 1/17/2023 - PREVIOUS INSPECTION NOTES ** 01/17/23 AS INDICATED ON THE PREVIOUS INSPECTION THE ENTIRE CULVERT PIPE IS 90% FULL OF DIRT BUILDER NEEDS TO HAVE THE CULVERT CLEANED OF THE DIRT AND SEDIMENT TO ALLOW FOR THE STORMWATER TO FLOW. ** SEE ATTACHED PHOTOS SHOWING INSIDE OF CULVERT 12/7/2022 - PREVIOUS INSPECTION NOTES 12/07/22=CULVERT PIPES ARE 90% FULL OFF DIRT NEED TO REMOVE THE SILT FROM INSIDETHE CULVERT PIPES,WASH OUT NEED TO BE RAKE IT | |||
| ROW - STORMWATER FINAL | 01/18/2023 | Disapproved - NO FEE | EMADISON |
| Note: ** 01/18/23 BUILDER HAS SOMEONE WORKING ON SITE TRYING TO CLEAN CULVERT OUT. ** STILL TOO MUCH DIRT AND MUD INSIDE I AM DISAPPROVING INSPECTION WITHOUT FEE DUE TO WORK BEING DONE AT TIME OF INSPECTION. 1/17/2023 - PREVIOUS INSPECTION NOTES ** 01/17/23 AS INDICATED ON THE PREVIOUS INSPECTION THE ENTIRE CULVERT PIPE IS 90% FULL OF DIRT BUILDER NEEDS TO HAVE THE CULVERT CLEANED OF THE DIRT AND SEDIMENT TO ALLOW FOR THE STORMWATER TO FLOW. ** SEE ATTACHED PHOTOS SHOWING INSIDE OF CULVERT 12/7/2022 - PREVIOUS INSPECTION NOTES 12/07/22=CULVERT PIPES ARE 90% FULL OFF DIRT NEED TO REMOVE THE SILT FROM INSIDETHE CULVERT PIPES,WASH OUT NEED TO BE RAKE IT | |||
| BLD - BUILDING FINAL | 01/18/2023 | FINAL APPROVED | AGAETANO |
| Note: 1/17/2023 - PREVIOUS INSPECTION NOTES 1/13/2023 - PREVIOUS INSPECTION NOTES 1/9/2023 - PREVIOUS INSPECTION NOTES 1/9/23 ENERGY CALCS DO NOT MATCH EQUIPMENT, MASTER SHOWER WATER NOT WORKING, UNDER CABINET ROMEX CAN NOT BE EXPOSED AND BOXES ARE CUT VOIDING UL LISTING, GARAGE NEEDS TO BE CLEANED FOR FINAL 1/9/2023 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 12/7/2022 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2425 Glazing not installed on entry doors. 12-07-2022 House is locked. Need access to home for inspection. 01-09-2023 No inspection, doors locked, need access for inspection. FBC R110.1 Wall sheathing was also requested. Please provide engineering that the wall sheathing was installed properly. 01-13-2023 No inspection, doors locked, need access for inspection. FBC R110.1 01-17-2023 AHU in garage at ceiling not sealed completely. HOLES IN CEILING MUST BE SEALED: FBC ENERGY CONSERVATION RESIDENTIAL PROVISIONS CHAPTER 4- R402.4.1 BUILDING THERMAL ENVELOPE, R402.4 1.1 AIR LEAKAGE (MANDATORY). INSTALLATION, R402.4, OPENINGS AND PENETRATIONS THROUGH WALLS OR CEILINGS SEPARATING THE DWELLING UNIT FROM THE GARAGE SHALL NOT BE PERMITTED fbc. R302.5 | |||
| BLD - BUILDING FINAL | 01/17/2023 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: 1/13/2023 - PREVIOUS INSPECTION NOTES 1/9/2023 - PREVIOUS INSPECTION NOTES 1/9/23 ENERGY CALCS DO NOT MATCH EQUIPMENT, MASTER SHOWER WATER NOT WORKING, UNDER CABINET ROMEX CAN NOT BE EXPOSED AND BOXES ARE CUT VOIDING UL LISTING, GARAGE NEEDS TO BE CLEANED FOR FINAL 1/9/2023 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 12/7/2022 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2425 Glazing not installed on entry doors. 12-07-2022 House is locked. Need access to home for inspection. 01-09-2023 No inspection, doors locked, need access for inspection. FBC R110.1 Wall sheathing was also requested. Please provide engineering that the wall sheathing was installed properly. 01-13-2023 No inspection, doors locked, need access for inspection. FBC R110.1 01-17-2023 AHU in garage at ceiling not sealed completely. HOLES IN CEILING MUST BE SEALED: FBC ENERGY CONSERVATION RESIDENTIAL PROVISIONS CHAPTER 4- R402.4.1 BUILDING THERMAL ENVELOPE, R402.4 1.1 AIR LEAKAGE (MANDATORY). INSTALLATION, R402.4, OPENINGS AND PENETRATIONS THROUGH WALLS OR CEILINGS SEPARATING THE DWELLING UNIT FROM THE GARAGE SHALL NOT BE PERMITTED fbc. R302.5 | |||
| ROW - STORMWATER FINAL | 01/17/2023 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 01/17/23 AS INDICATED ON THE PREVIOUS INSPECTION THE ENTIRE CULVERT PIPE IS 90% FULL OF DIRT BUILDER NEEDS TO HAVE THE CULVERT CLEANED OF THE DIRT AND SEDIMENT TO ALLOW FOR THE STORMWATER TO FLOW. ** SEE ATTACHED PHOTOS SHOWING INSIDE OF CULVERT 12/7/2022 - PREVIOUS INSPECTION NOTES 12/07/22=CULVERT PIPES ARE 90% FULL OFF DIRT NEED TO REMOVE THE SILT FROM INSIDETHE CULVERT PIPES,WASH OUT NEED TO BE RAKE IT | |||
| BLD - BUILDING FINAL | 01/13/2023 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: 1/9/2023 - PREVIOUS INSPECTION NOTES 1/9/23 ENERGY CALCS DO NOT MATCH EQUIPMENT, MASTER SHOWER WATER NOT WORKING, UNDER CABINET ROMEX CAN NOT BE EXPOSED AND BOXES ARE CUT VOIDING UL LISTING, GARAGE NEEDS TO BE CLEANED FOR FINAL 1/9/2023 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 12/7/2022 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2425 Glazing not installed on entry doors. 12-07-2022 House is locked. Need access to home for inspection. 01-09-2023 No inspection, doors locked, need access for inspection. FBC R110.1 Wall sheathing was also requested. Please provide engineering that the wall sheathing was installed properly. 01-13-2023 No inspection, doors locked, need access for inspection. FBC R110.1 | |||
| BLD - BUILDING FINAL | 01/09/2023 | CANCELLED BY APPLICANT | WEB |
| Note: 12/7/2022 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2425 Glazing not installed on entry doors. 12-07-2022 House is locked. Need acces to home for inspection. | |||
| BLD - BUILDING FINAL | 01/09/2023 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: New inspection due to canceled inspection 12/7/2022 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2425 Glazing not installed on entry doors. 12-07-2022 House is locked. Need access to home for inspection. 01-09-2023 No inspection, doors locked, need access for inspection. FBC R110.1 Wall sheathing was also requested. Please provide engineering that the wall sheathing was installed properly. | |||
| BLD - BUILDING FINAL | 01/09/2023 | Disapproved - NO FEE | RMARTIN |
| Note: 1/9/23 ENERGY CALCS DO NOT MATCH EQUIPMENT, MASTER SHOWER WATER NOT WORKING, UNDER CABINET ROMEX CAN NOT BE EXPOSED AND BOXES ARE CUT VOIDING UL LISTING, GARAGE NEEDS TO BE CLEANED FOR FINAL 1/9/2023 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 12/7/2022 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2425 Glazing not installed on entry doors. 12-07-2022 House is locked. Need access to home for inspection. 01-09-2023 No inspection, doors locked, need access for inspection. FBC R110.1 Wall sheathing was also requested. Please provide engineering that the wall sheathing was installed properly. | |||
| WALL SHEATHING | 01/09/2023 | CANCELLED BY APPLICANT | WEB |
| Note: 12/7/2022 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2425 Glazing not installed on entry doors. 12-07-2022 House is locked. Need to inspect plans to see if wall sheathing was installed. | |||
| WALL SHEATHING | 01/09/2023 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: New inspection due to canceled inspection 12/7/2022 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2425 Glazing not installed on entry doors. 12-07-2022 House is locked. Need to inspect plans to see if wall sheathing was installed. 01 -09-2023 No inspection, doors locked, need access for inspection. FBC R110.1 Wall sheathing was also requested. Please provide engineering that the wall sheathing was installed properly. | |||
| WALL SHEATHING | 01/09/2023 | APPROVED | RMARTIN |
| Note: 1/9/2023 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 12/7/2022 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2425 Glazing not installed on entry doors. 12-07-2022 House is locked. Need to inspect plans to see if wall sheathing was installed. 01 -09-2023 No inspection, doors locked, need access for inspection. FBC R110.1 Wall sheathing was also requested. Please provide engineering that the wall sheathing was installed properly. | |||
| WALL SHEATHING | 12/07/2022 | Disapproved - NO FEE | AGAETANO |
| Note: Inspector Notes from Inspection 2425 Glazing not installed on entry doors. 12-07-2022 House is locked. Need to inspect plans to see if wall sheathing was installed. | |||
| BLD - BUILDING FINAL | 12/07/2022 | Disapproved - NO FEE | AGAETANO |
| Note: Inspector Notes from Inspection 2425 Glazing not installed on entry doors. 12-07-2022 House is locked. Need acces to home for inspection. | |||
| U-CROSS CONNECTION | 12/07/2022 | APPROVED | DHANEY |
| ROW - STORMWATER FINAL | 12/07/2022 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: 12/07/22=CULVERT PIPES ARE 90% FULL OFF DIRT NEED TO REMOVE THE SILT FROM INSIDETHE CULVERT PIPES,WASH OUT NEED TO BE RAKE IT | |||
| U -UTILITY RESIDENTIAL FINAL | 12/06/2022 | CANCELLED BY APPLICANT | WEB |
| U -UTILITY RESIDENTIAL FINAL | 12/06/2022 | FINAL APPROVED | DHANEY |
| U -UTILITY RESIDENTIAL FINAL | 11/08/2022 | CANCELLED BY APPLICANT | WEB |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/02/2022 | APPROVED | EMADISON |
| Note: ** 11/02/22 CORRECTIONS MADE 10/20/2022 - PREVIOUS INSPECTION NOTES Final survey must have the grade elevation shots outside the four corners of the structure next to the foundation to verify that the FFE is 4 inches above the outside grade. Florida Building Code, Residential, Chapter 4, R404.1.6E Final Survey must also show the Center line of Road Elevation to ensure that the FFE meets the city code. Land Development Code Technical Manual, Section 300, Drawing 300.D | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/02/2022 | APPROVED | EMADISON |
| Note: **** BEFORE FINAL ROW **** ** 11/02/22 RIGHT FRONT LAWN ON SLOPE NEEP TO REPAIR WASHOUTIN YARD ** THE ENTIRE CULVERT NEEDS TO BE CLEANED OUT AS IT IS FULL OF SEDIMENT ** ROAD REPAIR HOT PATCH STILL NEEDED ALONG ENTIRE LENGTH OF DRIVEWAY 12' WIDE TO RUN ENTIRE EDGE OF DRIVEWAY | |||
| ROW - FINAL APRON (AFTER POUR) | 11/02/2022 | APPROVED | EMADISON |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 10/20/2022 | Disapproved - NO FEE | RGROSS |
| Note: Final survey must have the grade elevation shots outside the four corners of the structure next to the foundation to verify that the FFE is 4 inches above the outside grade. Florida Building Code, Residential, Chapter 4, R404.1.6E Final Survey must also show the Center line of Road Elevation to ensure that the FFE meets the city code. Land Development Code Technical Manual, Section 300, Drawing 300.D | |||
| ROW- PRE-APRON (PRE-POUR) | 09/09/2022 | APPROVED | EMADISON |
| Note: THIS IS A REINSPECTION ** 09/09/22 ALL CORRECTIONS MADE AT THE TIME OF THE INSPECTION EVERYTHING LOOKS GOOD READY POUR THIS IS A REINSPECTION ** 09/07/22 ROW APRON AREA HAS TOO MUCH MATERIAL WASHED INTO POUR AREA PIPE IS ALMOST COVERED WITH MATERIAL / NOT ENOUGH MATERIAL ON APRON SIDE OF CULVERT SHOULD BE BURIED 1/2 WAY UP PIPE AND COMPACTED. ** TOO MUCH MATERIAL I8N FRONT OF GARAGE OPENING ** FOOTERS ARE FILLED IN WITH MATERIAL NEED TO BE DUG OUT / SITE NOT READY TO POUR ** ELEVATIONS CHECKED GOOD AT TIME OF INSPECTION ** 08/31/22 ROW APRON AREA IS TO SOFT TO POUR, MATERIAL HAS ERODED MATERIAL HAS ERODED FROM AROUND THE CULVERT. ** CULVERT HAS ALSO BEEN COVERED WITH MATERIAL FROM ABOVE ROW AREA NEEDS TO BE REMOVED TO MUCH MATERIAL IN FRONT OF GARAGE OPENING. ** FOOTERS ARE FILLED IN NEED TO BE DUG OUT. ** MATERIAL NEEDS TO BE COMPACTED IN ROW. ** PHOTOS ATTACHED | |||
| ROW- PRE-APRON (PRE-POUR) | 09/07/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: THIS IS A REINSPECTION ** 09/07/22 ROW APRON AREA HAS TOO MUCH MATERIAL WASHED INTO POUR AREA PIPE IS ALMOST COVERED WITH MATERIAL / NOT ENOUGH MATERIAL ON APRON SIDE OF CULVERT SHOULD BE BURIED 1/2 WAY UP PIPE AND COMPACTED. ** TOO MUCH MATERIAL I8N FRONT OF GARAGE OPENING ** FOOTERS ARE FILLED IN WITH MATERIAL NEED TO BE DUG OUT / SITE NOT READY TO POUR ** ELEVATIONS CHECKED GOOD AT TIME OF INSPECTION ** 08/31/22 ROW APRON AREA IS TO SOFT TO POUR, MATERIAL HAS ERODED MATERIAL HAS ERODED FROM AROUND THE CULVERT. ** CULVERT HAS ALSO BEEN COVERED WITH MATERIAL FROM ABOVE ROW AREA NEEDS TO BE REMOVED TO MUCH MATERIAL IN FRONT OF GARAGE OPENING. ** FOOTERS ARE FILLED IN NEED TO BE DUG OUT. ** MATERIAL NEEDS TO BE COMPACTED IN ROW. ** PHOTOS ATTACHED | |||
| ROW- PRE-APRON (PRE-POUR) | 08/31/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 08/31/22 ROW APRON AREA IS TO SOFT TO POUR, MATERIAL HAS ERODED MATERIAL HAS ERODED FROM AROUND THE CULVERT. ** CULVERT HAS ALSO BEEN COVERED WITH MATERIAL FROM ABOVE ROW AREA NEEDS TO BE REMOVED TO MUCH MATERIAL IN FRONT OF GARAGE OPENING. ** FOOTERS ARE FILLED IN NEED TO BE DUG OUT. ** MATERIAL NEEDS TO BE COMPACTED IN ROW. ** PHOTOS ATTACHED | |||
| U - SEWER TIE IN | 08/26/2022 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 08/26/2022 | APPROVED | MGIBSON |
| ELECTRIC - EARLY POWER | 07/22/2022 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 10:20 am | |||
| WINDOW NAILING | 06/10/2022 | APPROVED - AS NOTED | AGAETANO |
| Note: Glazing not installed on entry doors. | |||
| INSULATION | 06/08/2022 | APPROVED - AS NOTED | LMILLER |
| Note: New inspection due to canceled inspection 05-27-2022 - 1. AP foil insulation not complete over entry. 2. Entry doors glass not installed. Glazing back ordered. CHECK AT NEXT INSPECTION. 6-8-22 AP foil at front door corrected. Entry doors glass still not installed. Glazing back ordered. window nailing inspectoion added (call in prior to final. | |||
| INSULATION | 06/07/2022 | CANCELLED BY APPLICANT | WEB |
| Note: 05-27-2022 - 1. AP foil insulation not complete over entry. 2. Entry doors glass not installed. Glazing back ordered. CHECK AT NEXT INSPECTION. | |||
| LATH/BRICK/ WATER BARRIER | 06/02/2022 | APPROVED | LMILLER |
| ALL ROUGH | 05/27/2022 | APPROVED - AS NOTED | AGAETANO |
| Note: THIS IS A REINSPECTION 1. Wires not phased out in electrical panel 2. Back bathroom fan not installed. 3. AP foil insulation not complete over entry. 4. Entry doors glass not installed. 05-27-2022 - 1. AP foil insulation not complete over entry. 2. Entry doors glass not installed. Glazing back ordered. CHECK AT NEXT INSPECTION. | |||
| ALL ROUGH | 05/25/2022 | Disapproved - NO FEE | AGAETANO |
| Note: 1. Wires not phased out in electrical panel 2. Back bathroom fan not installed. 3. AP foil insulation not complete over entry. 4. Entry doors glass not installed. | |||
| ROOF VALLEY & METAL | 03/29/2022 | APPROVED | AGAETANO |
| Note: THIS IS A REINSPECTION not ready, no metal applied yet, still nailing off underlayment | |||
| ROOF VALLEY & METAL | 03/25/2022 | Disapproved -FEE REQUIRED | LMILLER |
| Note: not ready, no metal applied yet, still nailing off underlayment | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/24/2022 | APPROVED | AGAETANO |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS INSPECTION IS FOR ROOF SHEATHING ONLY. Sheathing has gaps between sheets well over 1/4", multiple H Clips not engaged, improperly installed. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/22/2022 | Disapproved -FEE REQUIRED | DCUSHING |
| Note: THIS IS A REINSPECTION THIS INSPECTION IS FOR ROOF SHEATHING ONLY. Sheathing has gaps between sheets well over 1/4", multiple H Clips not engaged, improperly installed. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/21/2022 | PARTIALLY APPROVED | AGAETANO |
| Note: THIS INSPECTION IS FOR ROOF SHEATHING ONLY. | |||
| TIE BEAM / LINTEL | 02/25/2022 | APPROVED | AGAETANO |
| FOUND SURVEY APPROVED (OFFICE) | 12/01/2021 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 11/22/2021 | APPROVED | DCUSHING |
| PLUMBING 1ST ROUGH UNDERGROUND | 11/16/2021 | APPROVED | MGIBSON |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 01/11/2023 | 01/11/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 10/18/2022 | 10/18/2022 |
| Note: Marked INFORMATION By: MARGA DEFREITAS - - MDEFREITAS@PALMCOASTGOV.COM rename the documents what they are Termite | |||
| BADMIN | INFORMATION | 10/17/2022 | 10/17/2022 |
| Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM RENAME TO FINAL SURVEY.PDF | |||
| ENGIN1 | COMPLETE | 12/01/2021 | 12/01/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/01/2021 | 12/01/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 10/06/2021 | 10/06/2021 |
| Note: Released By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM | |||
| BADMIN | HOLD | 10/05/2021 | 10/05/2021 |
| Note: Held By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM NOC IS NOT RECORDED | |||
| ZON | COMPLETE | 09/27/2021 | 09/27/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/27/2021 | 09/27/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 09/27/2021 | 10/04/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| ZON | HOLD | 09/22/2021 | 09/22/2021 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM REPEAT COMMENT: AC pad location on floor plan does not match location on site and landscape plans House setback on rear left side covered up by another number. That is the closest point to property line so must be legible | |||
| PLENV | COMPLETE | 09/10/2021 | 09/21/2021 |
| Note: Released By: JORDAN MYERS, C.F.M - (904)562-0045 - JMYERS@PALMCOASTGOV.COM Staff conducted a site visit on 9/21/2021 and found no Gopher Tortoise or their burrows. | |||
| ENGIN1 | COMPLETE | 09/02/2021 | 09/02/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 09/02/2021 | 11/03/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 09/01/2021 | 09/01/2021 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Please carry spot grades and road elevations to the nearest hundredth of a foot. | |||
| ZON | HOLD | 09/01/2021 | 09/01/2021 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Must have at least four shrubs along each side of house AC pad location on floor plan does not match location on site and landscape plans House setback on left side covered up by another number | |||
| SW1 | COMPLETE | 09/01/2021 | 09/10/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/30/2021 | 08/03/2021 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 07/30/2021 | 08/05/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 07/30/2021 | 08/02/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 07/30/2021 | 07/30/2021 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Please carry all spot grades and elevations to the nearest hundredth of a foot. | |||
| LOCATE | COMPLETE | 07/30/2021 | 08/02/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 07/30/2021 | 07/30/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/30/2021 | 08/04/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| ZON | HOLD | 07/30/2021 | 08/04/2021 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Must have at least four shrubs along each front side of house AC pad location on floor plan does not match location on site and landscape plans House setback on left side should be shown from the furthest point. It should be shown from the back corner of the patio on left side. Walkways can not exceed the maximum 6ft in width Survey shows a total of the drainage easement being 20ft. The plat shows it is a 40ft easement with 20ft being on this lot. Please have surveyor correct that and show the 20ft easement on this lot. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 01/20/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/20/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/20/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/20/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/20/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/20/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/20/2023 |
| CONTRACTOR CHANGE | ¤40.00 | 01/20/2023 |
| CONTRACTOR CHANGE | ¤40.00 | 01/20/2023 |
| CONTRACTOR CHANGE | ¤40.00 | 01/20/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 01/20/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 01/20/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 01/20/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 01/20/2023 |
| CONTRACTOR CHANGE | ¤40.00 | 02/07/2022 |
| CONNECTION FEES | ¤1,017.83 | 10/12/2021 |
| INSPECTION - PLUMBING | ¤249.00 | 10/12/2021 |
| METER - DEPOSIT | ¤60.00 | 10/12/2021 |
| WATER- TURN ON | ¤25.00 | 10/12/2021 |
| INSPECTION- ELECTRICAL | ¤249.00 | 10/12/2021 |
| ADMINISTRATIVE RESIDENTIAL | ¤20.00 | 10/12/2021 |
| INSPECTION - MECHANICAL | ¤249.00 | 10/12/2021 |
| BUILDING DISCOUNT 100% | (¤1,523.00) | 10/12/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 10/12/2021 |
| IMPACT FEE FIRE | ¤367.00 | 10/12/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 10/12/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 10/12/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 10/12/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 10/12/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 10/12/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤630.00 | 10/12/2021 |
| SITE PLAN 20 | ¤20.00 | 10/12/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 10/12/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 10/12/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 10/12/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 10/12/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 10/12/2021 |
| SEWER INSPECTION | ¤25.00 | 10/12/2021 |
| PLAN REVIEW - RESIDENTIAL | ¤126.00 | 10/12/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 10/12/2021 |
| SEWER INSPECTION | ¤25.00 | 10/04/2021 |
| SEWER CAPITAL FACILITY | (¤4,664.55) | 10/04/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 10/04/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 10/04/2021 |
| WATER CAPITAL FACILITY FEE | (¤3,424.45) | 10/04/2021 |
| SEWER INSPECTION | (¤25.00) | 10/04/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 10/04/2021 |
| 3% TRANS IMPACT FEE CREDIT | ¤51.54 | 10/04/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 10/04/2021 |
| SURCHARGE - FS 468.631 | (¤2.00) | 10/04/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 10/04/2021 |
| STORM WATER PERMIT FEES | (¤80.00) | 10/04/2021 |
| SITE PLAN 20 | ¤20.00 | 10/04/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 10/04/2021 |
| SURCHARGE FS 533.721 | (¤2.00) | 10/04/2021 |
| SITE PLAN 20 | (¤20.00) | 10/04/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 10/04/2021 |
| 3% PARKS IMPACT FEE CREDIT | ¤35.97 | 10/04/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 10/04/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤630.00 | 10/04/2021 |
| NEW RESIDENTIAL INSPECTIONS | (¤630.00) | 10/04/2021 |
| WATER -IRRIGATION INSPECTION | (¤25.00) | 10/04/2021 |
| IMPACT FEE SCHOOL | (¤3,600.00) | 10/04/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 10/04/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 10/04/2021 |
| IMPACT FEE TRANSPORTATION | (¤1,718.00) | 10/04/2021 |
| IMPACT FEE FIRE | ¤367.00 | 10/04/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 10/04/2021 |
| IMPACT FEE PARKS | (¤1,199.12) | 10/04/2021 |
| IMPACT FEE FIRE | (¤367.00) | 10/04/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 10/04/2021 |
| 3% FIRE IMPACT FEE CREDIT | ¤11.01 | 10/04/2021 |
| BUILDING DISCOUNT 100% | (¤1,523.00) | 10/04/2021 |
| BUILDING DISCOUNT 100% | ¤1,523.00 | 10/04/2021 |
| INSPECTION - PLUMBING | (¤249.00) | 10/04/2021 |
| INSPECTION- ELECTRICAL | (¤249.00) | 10/04/2021 |
| INSPECTION- ELECTRICAL | ¤249.00 | 10/04/2021 |
| INSPECTION - MECHANICAL | ¤249.00 | 10/04/2021 |
| INSPECTION - MECHANICAL | (¤249.00) | 10/04/2021 |
| WATER- TURN ON | ¤25.00 | 10/04/2021 |
| ADMINISTRATIVE RESIDENTIAL | ¤20.00 | 10/04/2021 |
| ADMINISTRATIVE RESIDENTIAL | (¤20.00) | 10/04/2021 |
| WATER- TURN ON | (¤25.00) | 10/04/2021 |
| METER - DEPOSIT | ¤60.00 | 10/04/2021 |
| METER - DEPOSIT | (¤60.00) | 10/04/2021 |
| INSPECTION - PLUMBING | ¤249.00 | 10/04/2021 |
| PLAN REVIEW - RESIDENTIAL | ¤126.00 | 10/04/2021 |
| PLAN REVIEW - RESIDENTIAL | (¤126.00) | 10/04/2021 |
| CONNECTION FEES | ¤1,017.83 | 10/04/2021 |
| CONNECTION FEES | (¤1,017.83) | 10/04/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤16,663.93 |