I want to search for...

Permit #2021071573

Permit Details

Status: COED

Parcel Id: 05-11-31-5918-00000-0950
CONDITIONED SPACE: 2411 sqft
GARAGE: 602 sqft
OPENED PORCH (WITH ROOF) : 74 sqft
OPENED PORCH (WITH ROOF) : 277 sqft
Total Square Footage: 3364 sqft
Block: 00000
Subdivision: 2244 - VILLAGE AT PALM COAST PH 1
Job Phone: 386-447-4400
Location Address: 122 LONGVIEW WAY N
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 08/25/2021
NOC: RECORDED
Applicant name: DAVID PAUL CROCKETT
Owner: CHAMBERS JACK V & GEORGIA T H&W

Address

85 AVENUE DE LA MER #1005

PALM COAST, FL 32137

Lot: 0950
Contracted Stated Job Value: ¤440,500.00
Job Description: SINGLE FAMILY HOME
Type: CN

Contractor

SALTWATER HOMES INC
Status Location Address Mailing Address State License Number Phone Fax
DECEASED

138 PALM COAST PARKWAY

PALM COAST, FL 32137

SUITE 328

PALM COAST, FL 32137

RG0041345 (Exp: 08/31/2025) 386-447-4400 866-244-9639

Sub Contractors

WILLIAM FRANK DUDLEY JR.
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 978

Bunnell, FL 32110

EC0003177 (Exp: 08/31/2026) (386)437-3068
THOMAS A REGULA
Status Location Address State License Number Phone Fax
INACTIVE

11320 PHILLIPS PKWY DRIVE E

JACKSONVILLE, FL 32256

CMC1250075 (Exp: 08/31/2026) 904-278-0339 904-278-0366
KEN DEPRINZIO
Status Location Address State License Number Phone Fax
ACTIVE

325 WALKER STREET

HOLLY HILL, FL 32117

11351 (Exp: 08/31/2026) 386-672-8494 386-673-7856
SANTOS L HERNANDEZ
Status Location Address State License Number Phone Fax
ACTIVE

946 SHADDICK DRIVE

ORANGE CITY, FL 32763

CCC1328011 (Exp: 08/31/2026) 386-218-4942 386-218-4937
RUSSELL J CARTER
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 302

DELAND, FL 32721

CFC1425938 (Exp: 08/31/2026) 386-736-4220 386-736-4219

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 06/29/2023 FINAL APPROVED AGAETANO
ROW - STORMWATER FINAL 06/26/2023 FINAL APPROVED EMADISON
Note: 5/26/2023 - PREVIOUS INSPECTION NOTES **05/226/23 Flat work, i.e., slabs, walkways, hardscaping, patios, decking or AC pads are not allowed in any utility easements. Additionally, decorative objects, columns, light poles, mulch, stones, plantings or landscaping of any kind, is not allowed in the Right of Way (the swale area, between the edge of pavement and the property line). sec 300.03 C 1F per gbertola __________________________________________________________________________________________________________________________ 04/18/23=Flat work, i.e., slabs, walkways, hardscaping, patios, decking or AC pads are not allowed in any utility easements. Additionally, decorative objects, columns, light poles, mulch, stones, plantings or landscaping of any kind, is not allowed in the Right of Way (the swale area, between the edge of pavement and the property line). sec 300.03 C 1F per gbertola
U -UTILITY RESIDENTIAL FINAL 05/26/2023 FINAL APPROVED DHANEY
ROW - STORMWATER FINAL 05/26/2023 Disapproved -FEE REQUIRED EMADISON
Note: **05/226/23 Flat work, i.e., slabs, walkways, hardscaping, patios, decking or AC pads are not allowed in any utility easements. Additionally, decorative objects, columns, light poles, mulch, stones, plantings or landscaping of any kind, is not allowed in the Right of Way (the swale area, between the edge of pavement and the property line). sec 300.03 C 1F per gbertola __________________________________________________________________________________________________________________________ 04/18/23=Flat work, i.e., slabs, walkways, hardscaping, patios, decking or AC pads are not allowed in any utility easements. Additionally, decorative objects, columns, light poles, mulch, stones, plantings or landscaping of any kind, is not allowed in the Right of Way (the swale area, between the edge of pavement and the property line). sec 300.03 C 1F per gbertola
ROW - FINAL APRON (AFTER POUR) 05/25/2023 FINAL APPROVED EMADISON
ROW- FINAL SURVEY/GRADING CERTIFICATION 05/25/2023 APPROVED EMADISON
ROW FIELD SURVEY /GRADING CERTIFICATION 05/25/2023 APPROVED EMADISON
U-CROSS CONNECTION 05/15/2023 APPROVED DHANEY
ROW- PROJECT STATUS 05/05/2023 APPROVED GBERTOLA
Note: Inspector Notes from Inspection 9200 04/18/23=Flat work, i.e., slabs, walkways, hardscaping, patios, decking or AC pads are not allowed in any utility easements. Additionally, decorative objects, columns, light poles, mulch, stones, plantings or landscaping of any kind, is not allowed in the Right of Way (the swale area, between the edge of pavement and the property line). sec 300.03 C 1F
ROW- PROJECT STATUS 04/18/2023 APPROVED - AS NOTED GBERTOLA
Note: 04/18/23=Flat work, i.e., slabs, walkways, hardscaping, patios, decking or AC pads are not allowed in any utility easements. Additionally, decorative objects, columns, light poles, mulch, stones, plantings or landscaping of any kind, is not allowed in the Right of Way (the swale area, between the edge of pavement and the property line). sec 300.03 C 1F
ROW- PROJECT STATUS 04/17/2023 APPROVED GBERTOLA
ROW- PRE-APRON (PRE-POUR) 03/02/2023 APPROVED PFLANAGAN
Note: READY FOR PAVERS ----------------------------------------------------------------------------------------- 2/16/2023 - PREVIOUS INSPECTION NOTES READY TO POUR APRON, PAVER RESTRAINTS ONLY. BEFORE THE NEXT PRE POUR INSPECTION NEED TO HAVE ALL PAVER BASE DOWN AND SPREAD AND COMPACTED WITH NO PAVER LAID AT THE TIME OF THE INSPECTION.
U - SEWER TIE IN 02/21/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
GRAVITY SEWER TEST 02/21/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
ROW- PAVER RESTRAINTS 02/16/2023 APPROVED PFLANAGAN
Note: PAVER RESTRAINTS LOOKS GOOD AT THE TIME OF THIS INSPECTION
ROW- PRE-APRON (PRE-POUR) 02/16/2023 PARTIALLY APPROVED PFLANAGAN
Note: READY TO POUR APRON, PAVER RESTRAINTS ONLY. BEFORE THE NEXT PRE POUR INSPECTION NEED TO HAVE ALL PAVER BASE DOWN AND SPREAD AND COMPACTED WITH NO PAVER LAID AT THE TIME OF THE INSPECTION.
ELECTRIC - EARLY POWER 02/03/2023 APPROVED - AS NOTED AGAETANO
Note: 02-03-2023 Pool bath entry transom not covered. FPL notified 1:55pm
LATH/BRICK/ WATER BARRIER 11/21/2022 APPROVED AGAETANO
INSULATION 11/08/2022 APPROVED AGAETANO
Note: 11/7/2022 - PREVIOUS INSPECTION NOTES
INSULATION 11/07/2022 CANCELLED BY APPLICANT AGAETANO
ALL ROUGH 10/25/2022 APPROVED AGAETANO
ELECTRIC-TUG 10/25/2022 APPROVED AGAETANO
WALL SHEATHING 06/30/2022 APPROVED DCUSHING
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/30/2022 APPROVED DCUSHING
ROOF VALLEY & METAL 06/30/2022 APPROVED RMARTIN
TIE BEAM / LINTEL 05/05/2022 APPROVED AGAETANO
FOOTER 03/16/2022 APPROVED - AS NOTED AGAETANO
Note: Approved for the three footings/ piers ony.
MONOLITHIC SLAB 03/16/2022 APPROVED AGAETANO
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION
MONOLITHIC SLAB 03/15/2022 CANCELLED BY APPLICANT AGAETANO
Note: THIS IS A REINSPECTION
MONOLITHIC SLAB 03/14/2022 CANCELLED BY APPLICANT AGAETANO
PLUMBING 1ST ROUGH UNDERGROUND 03/03/2022 APPROVED MGIBSON
STEM WALL FOUNDATION 01/18/2022 Disapproved - NO FEE AGAETANO
Note: 1. Horizontal rebar as speciified on S1. S2, & S3. 2. Lanai footing and stem wall not installed. 3. Please submit reviosion if building layout has changed.
STEM WALL FOUNDATION 01/18/2022 APPROVED AGAETANO
Note: THIS IS A REINSPECTION 1. Horizontal rebar as speciified on S1. S2, & S3. 2. Lanai footing and stem wall not installed. 3. Please submit reviosion if building layout has changed.
FOOTER 12/10/2021 APPROVED DCUSHING
FOUND SURVEY APPROVED (OFFICE) 10/11/2021 APPROVED TBAKER
WATER METER INSTALLATION REQUEST 09/23/2021 APPROVED CSTONE
WILDLIFE CHECK - ENVIRONMENTAL 08/11/2021 APPROVED JMYERS

Review History

Department Status Date In Date Out
MECH COMPLETE 06/22/2023 06/22/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH COMPLETE 08/17/2022 08/18/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 06/27/2022 06/28/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
BADMIN INFORMATION 06/24/2022 06/24/2022
Note: Marked INFORMATION By: MARGA DEFREITAS - - MDEFREITAS@PALMCOASTGOV.COM THIS DOCUMENT NEEDS TO BE DIGITALLY SIGNED THIS IS NOT A DIGITAL DOCUMENTS
ENGIN1 COMPLETE 04/05/2022 04/06/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 04/05/2022 04/05/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ENGIN1 COMPLETE 10/11/2021 10/11/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 10/11/2021 10/14/2021
Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM
ZON COMPLETE 10/11/2021 10/11/2021
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ZON COMPLETE 08/17/2021 08/17/2021
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ENGIN1 COMPLETE 08/17/2021 08/17/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 08/17/2021 08/24/2021
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
BLD COMPLETE 08/10/2021 08/10/2021
Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM Upon reviewing the plans examiner's previous plan review comments, I was able to locate all information requested. Additionally, it appears the comments regarding the Product Approval worksheet are not valid as I was able to verify all information and the sheet was complete contrary to the plans examiner's comments. Plan review hold removed and now marked complete.
PLENV COMPLETE 08/04/2021 08/11/2021
Note: Released By: JORDAN MYERS, C.F.M - (904)562-0045 - JMYERS@PALMCOASTGOV.COM Staff conducted a site visit on 8/11/21 and found no Gopher Tortoise or their burrows. Staff suggests installing silt fence as soon as possible to prevent tortoise from moving into the site.
BLD HOLD 07/30/2021 08/02/2021
Note: Held By: JPI BUILDING: 1. Product Approval Specification Sheet: a. Mullions omitted; provide approved product, product description, manufacturer, and product approval number. b. Exterior Sliding Door, MI, 430 Florida product approval number (15532.5) listed is invalid; provide approved product, product description, manufacturer, and product approval number. c. Provide ALL Florida Product Approval numbers for ALL Wood Connectors, Wood Anchors and Truss Plates utilized on this project and specified throughout the drawings. 2. Identify ALL Wall/Partition Types on Floor Plan, Sht. 2 and provide index/legend- FBC 107.3.5. 3. Provide Architectural Wall Section identifying all materials and construction of exterior walls (gypsum wall board, insulation, furring, etc.)- FBC 107.3.5. 4. Provide Roof Pressure zone nailing schedule- FBC-R301.2(7). 5. Provide wall section of screen wall around A/C pad.
CUSVC COMPLETE 07/30/2021 08/04/2021
Note: Released By: HALEIGH HAND - -
ELEC COMPLETE 07/30/2021 08/02/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/30/2021 07/30/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 07/30/2021 08/03/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 07/30/2021 07/30/2021
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 07/30/2021 08/05/2021
Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM
ZON HOLD 07/30/2021 08/04/2021
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Front side setbacks are covered up on site plan/survey for review

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 06/29/2023
SW ENG REINSPECTION 20 ¤20.00 06/29/2023
SW ENG REINSPECTION 20 ¤20.00 06/29/2023
SW ENG REINSPECTION 20 ¤20.00 06/29/2023
SW ENG REINSPECTION 20 ¤20.00 06/29/2023
PLAN REVIEW - REVISION ¤32.50 06/29/2023
PLAN REVIEW - REVISION ¤32.50 06/29/2023
CONNECTION FEES ¤25.00 08/25/2021
METER - DEPOSIT ¤60.00 08/25/2021
WATER-METER ¤441.07 08/25/2021
ADMINISTRATIVE RESIDENTIAL ¤20.00 08/25/2021
INSPECTION- ELECTRICAL ¤324.60 08/25/2021
INSPECTION - MECHANICAL ¤324.60 08/25/2021
INSPECTION - PLUMBING ¤324.60 08/25/2021
PLAN REVIEW - RESIDENTIAL ¤176.40 08/25/2021
STORM WATER PERMIT FEES ¤80.00 08/25/2021
3% TRANS IMPACT FEE CREDIT (¤94.17) 08/25/2021
SEWER INSPECTION ¤25.00 08/25/2021
SEWER CAPITAL FACILITY ¤4,664.55 08/25/2021
WATER CAPITAL FACILITY FEE ¤3,424.45 08/25/2021
BUILDING DISCOUNT 100% (¤2,052.20) 08/25/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 08/25/2021
IMPACT FEE FIRE ¤367.00 08/25/2021
IMPACT FEE PARKS ¤1,199.12 08/25/2021
IMPACT FEE SCHOOL ¤3,600.00 08/25/2021
IMPACT FEE TRANSPORTATION ¤3,139.00 08/25/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 08/25/2021
NEW RESIDENTIAL INSPECTIONS ¤882.00 08/25/2021
SITE PLAN 20 ¤20.00 08/25/2021
SURCHARGE FS 533.721 ¤2.00 08/25/2021
SURCHARGE - FS 468.631 ¤2.00 08/25/2021
Fees Total Due: ¤0.00 Total Paid: ¤17,093.04