Permit #2021071580
Permit Details
Status: COED
| Parcel Id: 07-11-31-7022-00210-0020 |
| CONDITIONED SPACE: 2177 sqft |
| GARAGE: 657 sqft |
| OPENED PORCH (WITH ROOF) : 359 sqft |
| SCREEN PORCH (SOLID ROOF) : 88 sqft |
| Total Square Footage: 3281 sqft |
| Block: 00210 |
| Subdivision: 2217 - SECTION 22-WYNNFIELD |
| Job Phone: 386-437-4111 |
| Location Address: 176 WESTGRILL DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 11/12/2021 |
| NOC: RECORDED |
| Applicant name: MARK ANTHONY LANGELLO |
| Owner: M & M DEVELOPMENT & CONSTRUCTION LLC |
|
Address 2323 N STATE STREET #58 BUNNELL, FL 32110 |
| Lot: 0020 |
| Contracted Stated Job Value: ¤198,275.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
M & M DEVELOPMENT & CONSTRUCTION LLC
| Status | Location Address | State License Number | Phone |
| CANCEL |
2323 N. STATE ST BUNNELL, FL 32110 |
RG291103911 (Exp: 08/31/2023) | 386-313-6950 |
Sub Contractors
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
GLEN WILLIAM KEHLE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
P. O. Box 353511 BUNNELL, FL 32110 |
CFC057241 (Exp: 08/31/2026) | (386) 447-4249 | (386) 437-8488 |
WERNER SCHUMACHER
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 350791 PALM COAST, FL 32135 |
EC13007106 (Exp: 08/31/2026) | 386-852-8541 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - STORMWATER FINAL | 04/14/2023 | APPROVED | FSLADISH |
| Note: 04/14/23 CORRECTIONS MADE PER GABE'S PREVIOUS NOTES. LOOKED GOOD AT TIME OF INSPECTION. _______________________________________________________________________________________________________________________ 4/11/2023 - PREVIOUS INSPECTION NOTES Flat work, i.e., slabs, walkways, hardscaping, patios and AC pads are not allowed in the 5 foot utility easement. SEC 300.03 C | |||
| BLD - BUILDING FINAL | 04/13/2023 | FINAL APPROVED | MKRASKI |
| BLD - BUILDING FINAL | 04/12/2023 | Disapproved - NO FEE | MKRASKI |
| Note: Outlet require to be GFCI protected @ wet bar sink @ front entry | |||
| U-CROSS CONNECTION | 04/11/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: planning on well installatio , currently running under ground irrigation with hose bib from potable source with hose set up, hoze bib has backflow preventer attached | |||
| U -UTILITY RESIDENTIAL FINAL | 04/11/2023 | FINAL APPROVED | LFITZGERALD |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/11/2023 | APPROVED - AS NOTED | GBERTOLA |
| Note: 04/11/23=ON THE LEFT FRONT SIDE BY PALM TREE BUILDER NEED TO MOVE THE MULCH BACK 2 FT AND SODDED Flat work, i.e., slabs, walkways, hardscaping, patios and AC pads are not allowed in the 5 foot utility easement.SEC 300.03 C | |||
| ROW - STORMWATER FINAL | 04/11/2023 | Disapproved - NO FEE | GBERTOLA |
| Note: Flat work, i.e., slabs, walkways, hardscaping, patios and AC pads are not allowed in the 5 foot utility easement. SEC 300.03 C 04/11/23=ON THE LEFT FRONT SIDE BY PALM TREE BUILDER NEED TO MOVE THE MULCH BACK 2 FT AND SODDED | |||
| ROW - FINAL APRON (AFTER POUR) | 04/11/2023 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| FINAL SURVEY (OFFICE USE ONLY) | 04/10/2023 | APPROVED | FSLADISH |
| ROW- PRE-APRON (PRE-POUR) | 03/16/2023 | APPROVED | GBERTOLA |
| Note: 3/16/23=AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL city will be no responsabile for any broken tile above the row 3/15/2023 - PREVIOUS INSPECTION NOTES 1) THE CULVERT NEEDS TO BE 8' FROM EDGE OF PAVEMENT TO THE CENTER OF CULVERT 2) THE MIDDLE OF THE CULVERT AT BAND IS HIGH NOT ALLOWING THE WATER FLOW THROW PIPE | |||
| ROW- PRE-APRON (PRE-POUR) | 03/15/2023 | Disapproved - NO FEE | PFLANAGAN |
| Note: 1) THE CULVERT NEEDS TO BE 8' FROM EDGE OF PAVEMENT TO THE CENTER OF CULVERT 2) THE MIDDLE OF THE CULVERT AT BAND IS HIGH NOT ALLOWING THE WATER FLOW THROW PIPE | |||
| ROW- PRE-APRON (PRE-POUR) | 03/13/2023 | CANCELLED BY APPLICANT | WEB |
| U - SEWER TIE IN | 02/10/2023 | APPROVED | JSTEWART |
| ELECTRIC - EARLY POWER | 01/17/2023 | APPROVED - AS NOTED | MKRASKI |
| Note: Emailed FPL @ 2:15 PM | |||
| GRAVITY SEWER TEST | 12/29/2022 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 FIRST ROUGH APPROVED ANOTHER MONOLITHIC SLAB INSPECTION IS REQUIRED BEFORE CONCRETE IS POURED BACK IN PLACE | |||
| ELECTRIC-TUG | 11/04/2022 | APPROVED | JMUNSON |
| ELECTRIC - EARLY POWER | 11/04/2022 | CANCELLED BY APPLICANT | JMUNSON |
| Note: Inspector Notes from Inspection 2170 THIS IS A REINSPECTION Outlets need to be weather resistant. NEC 2017 406.3 Emailed FPL at 1:38 pm | |||
| INSULATION | 10/24/2022 | APPROVED | FWILLIS |
| Note: Inspector Notes from Inspection 2420 1. Electrical panel wiring needs to be phased properly 2. No meter main installed Check at insulation | |||
| ALL ROUGH | 10/10/2022 | APPROVED - AS NOTED | MKRASKI |
| Note: 1. Electrical panel wiring needs to be phased properly 2. No meter main installed Check at insulation | |||
| LATH/BRICK/ WATER BARRIER | 09/26/2022 | APPROVED - AS NOTED | MKRASKI |
| ROOF VALLEY & METAL | 09/13/2022 | APPROVED | MKRASKI |
| MONOLITHIC SLAB | 09/09/2022 | APPROVED | MKRASKI |
| PLUMBING 1ST ROUGH UNDERGROUND | 08/30/2022 | APPROVED - AS NOTED | MGIBSON |
| Note: FIRST ROUGH APPROVED ANOTHER MONOLITHIC SLAB INSPECTION IS REQUIRED BEFORE CONCRETE IS POURED BACK IN PLACE | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/25/2022 | APPROVED | DCUSHING |
| Note: THIS IS A REINSPECTION | |||
| TIE BEAM / LINTEL | 08/19/2022 | APPROVED | MKRASKI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/08/2022 | CANCELLED BY APPLICANT | MKRASKI |
| TIE BEAM / LINTEL | 06/14/2022 | APPROVED | MKRASKI |
| FOUND SURVEY APPROVED (OFFICE) | 06/07/2022 | APPROVED | TBAKER |
| ELECTRIC TEMP POLE | 03/18/2022 | Disapproved - NO FEE | JMUNSON |
| Note: Outlets need to be weather resistant. NEC 2017 406.3 | |||
| ELECTRIC TEMP POLE | 03/18/2022 | APPROVED - AS NOTED | JMUNSON |
| Note: THIS IS A REINSPECTION Outlets need to be weather resistant. NEC 2017 406.3 Emailed FPL at 1:38 pm | |||
| MONOLITHIC SLAB | 03/11/2022 | APPROVED | MKRASKI |
| MONOLITHIC SLAB | 03/10/2022 | Disapproved - NO FEE | MKRASKI |
| Note: Footing needs to be cleaned out from wash outs from rain, stumps in back right corner of slab looking from road | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 03/07/2022 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 12/15/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 03/19/2023 | 03/20/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/17/2022 | 08/18/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/07/2022 | 06/07/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/07/2022 | 06/07/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 06/06/2022 | 06/06/2022 |
| Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM SITE PLAN CUT OFF AND MISSING INFORMATION | |||
| ZON | COMPLETE | 08/20/2021 | 08/20/2021 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| ZON | HOLD | 08/17/2021 | 08/17/2021 |
| Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM the front of home needs eight shrubs four on each side. the shrub closest to the walk way is not counted as a foundation planting. Please add it to the left side corner of home | |||
| MECH | COMPLETE | 08/17/2021 | 08/17/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/30/2021 | 08/03/2021 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 07/30/2021 | 08/06/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 07/30/2021 | 08/02/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/30/2021 | 07/30/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 07/30/2021 | 08/03/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 07/30/2021 | 07/30/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/30/2021 | 08/05/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| ZON | HOLD | 07/30/2021 | 08/05/2021 |
| Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM the front of home needs eight shrubs four on each side and when rear of home faces a saltwater canal, lake or golf course and additional four shrubs shall be planted along the rear of the home. Landscape and site plan must match. Please include a/c pad to the proposed landscaping plan and the shrubs that will provide coverage for the mechanical equipment. | |||
| MECH | HOLD | 07/30/2021 | 07/30/2021 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM This is correct reveiw. Other was completed by mistake. 1. Energy Calcs need to be signed by the builder. 2. Address on energy calcs does not match house address | |||
| SWALE | COMPLETE | 07/30/2021 | 11/03/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 04/13/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 04/13/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 04/13/2023 |
| CONNECTION FEES | ¤1,017.83 | 11/12/2021 |
| METER - DEPOSIT | ¤60.00 | 11/12/2021 |
| WATER- TURN ON | ¤25.00 | 11/12/2021 |
| ADMINISTRATIVE RESIDENTIAL | ¤20.00 | 11/12/2021 |
| INSPECTION- ELECTRICAL | ¤232.20 | 11/12/2021 |
| INSPECTION - MECHANICAL | ¤232.20 | 11/12/2021 |
| INSPECTION - PLUMBING | ¤232.20 | 11/12/2021 |
| PLAN REVIEW - RESIDENTIAL | ¤114.80 | 11/12/2021 |
| BUILDING DISCOUNT 100% | (¤1,405.40) | 11/12/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 11/12/2021 |
| IMPACT FEE FIRE | ¤367.00 | 11/12/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 11/12/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 11/12/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 11/12/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 11/12/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 11/12/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤574.00 | 11/12/2021 |
| SITE PLAN 20 | ¤20.00 | 11/12/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 11/12/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 11/12/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 11/12/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 11/12/2021 |
| SEWER INSPECTION | ¤25.00 | 11/12/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 11/12/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 11/12/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤16,216.43 |