I want to search for...
Permit #2021080142
Permit Details
Status: COED
| Parcel Id: 07-11-31-7028-00710-0130 |
| CONDITIONED SPACE: 1705 sqft |
| GARAGE: 391 sqft |
| OPENED PORCH (WITH ROOF) : 240 sqft |
| OPENED PORCH (WITH ROOF) : 32 sqft |
| Total Square Footage: 2368 sqft |
| Block: 00710 |
| Subdivision: 2199 - SECTION 28-WYNNFIELD |
| Job Phone: 386-960-7720 |
| Location Address: 66 POINT OF WOODS DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/13/2021 |
| NOC: RECORDED |
| Applicant name: LAWRENCE FRED SIETSMA |
| Owner: AVTEC HOMES INC |
|
Address 620 MALABAR RD SE STE 5 PALM BAY, FL 32907 |
| Lot: 0130 |
| Contracted Stated Job Value: ¤273,150.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
AVTEC HOMES INC
| Status | Location Address | State License Number | Phone |
| CANCEL |
2405 E GRAVES AVE ORANGE CITY, FL 32763 |
CRC041905 (Exp: 08/31/2024) | 386-960-7720 |
Sub Contractors
DOUGLAS EDWARD RICHARDS
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
108 E INDIANA AVENUE DELAND, FL 32724 |
CCC1328824 (Exp: 08/31/2024) | 386-736-4226 | 386-740-0535 |
STEVEN JAY SMITH
| Status | Location Address | State License Number | Phone |
| INACTIVE |
104 West Cedar Avenue Orange City, FL 32763 |
EC0001542 (Exp: 08/31/2022) | (386)775-7776 |
RUSSELL J CARTER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 302 DELAND, FL 32721 |
CFC1425938 (Exp: 08/31/2026) | 386-736-4220 | 386-736-4219 |
BRUCE R BOLTON
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| CANCEL |
1982 SR 44 NEW SMYRNA BEACH, FL 32168 |
SUITE 357 NEW SMYRNA BEACH, FL 32168 |
CAC1817407 (Exp: 08/31/2022) | 386-216-5975 | 386-402-4191 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 06/30/2022 | FINAL APPROVED | KSANDOE |
| Note: THIS IS A REINSPECTION Energy calcs do not match installed equipment. Please submit revision or installed approved equipment. | |||
| ROW - STORMWATER FINAL | 06/30/2022 | APPROVED | PFLANAGAN |
| Note: NOTE TO INSPECTOR: See note on Field Survey about more Road Repair. | |||
| U -UTILITY RESIDENTIAL FINAL | 06/28/2022 | APPROVED - AS NOTED | LFITZGERALD |
| Note: as discussed with Brian, lower the sewer clean out cap so as to be flush with grades and place sod around water meter pit | |||
| ROW - FINAL APRON (AFTER POUR) | 06/28/2022 | APPROVED | PFLANAGAN |
| Note: Inspector Notes from Inspection 9465 More road repair needed before Final Stormwater can be approved. | |||
| BLD - BUILDING FINAL | 06/28/2022 | Disapproved - NO FEE | KSANDOE |
| Note: Energy calcs do not match installed equipment. Please submit revision or installed approved equipment. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 06/27/2022 | APPROVED - AS NOTED | RGROSS |
| Note: THIS IS A REINSPECTION THE FINAL SURVEY DOES NOT MATCH THE SITE PLANS DRAINAGE. THE SITE PLAN SHOWS WATER FROM BACK YARD FLOWING TO FRONT OF PROPERTY BUT THE FINAL SHOWS THAT IT FLOWING TO BACK PROPERTY LINE. ALSO THE CULVERT ELEVATION ARE OUT OF TOLERANCE. BOTH ELEVATION NEED TO BE WITH IN .10 FROM EACH OTHER AS OF NOW IT IS .18 FROM EACH OTHER. 6/27/22 - Culvert is slightly our of tolerance. However, it is tilted in the correct direction and will not negatively impact storm water flow. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/27/2022 | APPROVED - AS NOTED | RGROSS |
| Note: More road repair needed before Final Stormwater can be approved. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 06/17/2022 | Disapproved - NO FEE | PFLANAGAN |
| Note: THE FINAL SURVEY DOES NOT MATCH THE SITE PLANS DRAINAGE. THE SITE PLAN SHOWS WATER FROM BACK YARD FLOWING TO FRONT OF PROPERTY BUT THE FINAL SHOWS THAT IT FLOWING TO BACK PROPERTY LINE. ALSO THE CULVERT ELEVATION ARE OUT OF TOLERANCE. BOTH ELEVATION NEED TO BE WITH IN .10 FROM EACH OTHER AS OF NOW IT IS .18 FROM EACH OTHER. | |||
| GRAVITY SEWER TEST | 05/27/2022 | APPROVED | MGIBSON |
| U - SEWER TIE IN | 05/27/2022 | APPROVED | MGIBSON |
| U-CROSS CONNECTION | 05/27/2022 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irrigation-no cross connection NOTE:THERE IS A FIRE HYDRANT WITH A VALVE IN THE SWALE IN FRONT OF THIS PROPOSED RESIDENCE.PLEASE TAKE CARE NOT TO DAMAGE METAL VALVE TOP/CONCRETE COLLAR AND HAVE THIS BE MAINTAINED FLUSH WITH NEW GRADE SO THAT IT CAN BE UTILIZED FOR THE HYDRANT. | |||
| ROW- PRE-APRON (PRE-POUR) | 05/25/2022 | APPROVED - AS NOTED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. | |||
| ELECTRIC - EARLY POWER | 05/25/2022 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 9:11 am | |||
| PEP TANK INSTALLATION REQUEST | 05/06/2022 | APPROVED | CSTONE |
| INSULATION | 04/07/2022 | APPROVED | KSANDOE |
| ALL ROUGH | 04/06/2022 | APPROVED | KSANDOE |
| LATH/BRICK/ WATER BARRIER | 03/24/2022 | APPROVED | JWALKER |
| WALL SHEATHING | 03/22/2022 | APPROVED | KSANDOE |
| Note: THIS IS A REINSPECTION Wall sheathing needs to be removed from interior of entryway for roof sheathing/braces inspection | |||
| ROOF VALLEY & METAL | 03/21/2022 | APPROVED | KSANDOE |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/17/2022 | APPROVED | KSANDOE |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Need to see detail for roof sheathing due to different types used. Wall sheathing needs to be removed from inside front entryway to ensure header is framed correctly. 3/2/22 - Notes from previous inspection have not been addressed. 3/7/22- REMOVE ALL WALL SHEATHING FROM FRONT ENTRYWAY 3/8/22 - CMU Columns at front entry not constructed per detail. Submit revision to Building Department for review. Continue with dry in of roof | |||
| ROOF VALLEY & METAL | 03/14/2022 | CANCELLED BY APPLICANT | WEB |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/08/2022 | Disapproved - NO FEE | KSANDOE |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Need to see detail for roof sheathing due to different types used. Wall sheathing needs to be removed from inside front entryway to ensure header is framed correctly. 3/2/22 - Notes from previous inspection have not been addressed. 3/7/22- REMOVE ALL WALL SHEATHING FROM FRONT ENTRYWAY 3/8/22 - CMU Columns at front entry not constructed per detail. Submit revision to Building Department for review. Continue with dry in of roof | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/07/2022 | Disapproved -FEE REQUIRED | KSANDOE |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Need to see detail for roof sheathing due to different types used. Wall sheathing needs to be removed from inside front entryway to ensure header is framed correctly. 3/2/22 - Notes from previous inspection have not been addressed. 3/7/22- REMOVE ALL WALL SHEATHING FROM FRONT ENTRYWAY | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/02/2022 | Disapproved -FEE REQUIRED | KSANDOE |
| Note: THIS IS A REINSPECTION Need to see detail for roof sheathing due to different types used. Wall sheathing needs to be removed from inside front entryway to ensure header is framed correctly. 3/2/22 - Notes from previous inspection have not been addressed. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/28/2022 | Disapproved - NO FEE | KSANDOE |
| Note: Need to see detail for roof sheathing due to different types used. Wall sheathing needs to be removed from front entryway to ensure header is framed correctly. | |||
| WALL SHEATHING | 02/28/2022 | Disapproved - NO FEE | KSANDOE |
| Note: Wall sheathing needs to be removed from interior of entryway for roof sheathing/braces inspection | |||
| TIE BEAM / LINTEL | 02/07/2022 | APPROVED | KSANDOE |
| TIE BEAM / LINTEL | 02/04/2022 | CANCELLED BY APPLICANT | WEB |
| FOUND SURVEY APPROVED (OFFICE) | 01/24/2022 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 01/03/2022 | APPROVED | KSANDOE |
| Note: THIS IS A REINSPECTION HVAC drain line needs 2x larger sleeve than the line running through to pass through foundation. Need termite treatment papers in box. | |||
| MONOLITHIC SLAB | 12/28/2021 | Disapproved - NO FEE | KSANDOE |
| Note: HVAC drain line needs 2x larger sleeve than the line running through to pass through foundation. Need termite treatment papers in box. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 12/14/2021 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 12/07/2021 | APPROVED | CSTONE |
| Note: THIS IS A REINSPECTION ADDED ON 11/23/2021 12:18:30 PM lot not cleared | |||
| WATER METER INSTALLATION REQUEST | 11/16/2021 | Disapproved - NO FEE | CSTONE |
| Note: lot not cleared |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 03/16/2022 | 03/16/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | HOLD | 03/15/2022 | 03/15/2022 |
| Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM Repeat comment: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM Revision: Front porch repair with digital signature of engineer of record is not verifiable per F.S. 471.025 and F.A.C. 61G15 - 23.001. | |||
| BLD | HOLD | 03/10/2022 | 03/10/2022 |
| Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM Revision: Front porch repair with digital signature of engineer of record is not verifiable per F.S. 471.025 and F.A.C. 61G15 - 23.001. | |||
| BADMIN | HOLD | 02/03/2022 | 02/03/2022 |
| Note: Held By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM INCORRECT ADDRESS FOR FINAL SURVEY | |||
| BADMIN | COMPLETE | 02/03/2022 | 02/03/2022 |
| Note: Released By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 01/24/2022 | 01/24/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/24/2022 | 01/24/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/27/2021 | 08/27/2021 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 08/27/2021 | 08/30/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | HOLD | 08/26/2021 | 08/27/2021 |
| Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM the correction submitted is showing banding on the windows on the sides of the home. The right of way is facing Royal Palms please put banding on the windows in the Rear of the home and on door way | |||
| ELEC | COMPLETE | 08/26/2021 | 08/27/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | HOLD | 08/24/2021 | 08/25/2021 |
| Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Banding around doors and windows in rear of home required when rear of home is facing a right of way. please add bands to the windows facing Royal Palms Pkway | |||
| ELEC | COMPLETE | 08/24/2021 | 08/26/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | HOLD | 08/12/2021 | 08/12/2021 |
| Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Banding around doors and windows in rear of home required when rear of home is facing a right of way | |||
| ZON | HOLD | 08/11/2021 | 08/12/2021 |
| Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM repeat comment: Banding around doors and windows in rear of home required when rear of home is facing a right of way | |||
| MECH | COMPLETE | 08/11/2021 | 08/11/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/11/2021 | 08/16/2021 |
| Note: Released By: JPI | |||
| BLD | HOLD | 08/03/2021 | 08/10/2021 |
| Note: Held By: JPI 1. Product Approval Specification Sheet: a. Exterior Sectional/Roll Up garage door specified on the drawings appears to be 16’-0” wide and the one specified on the Product Approval Specification Sheet is for a 9’-2” wide garage door; provide approved product, product description, manufacturer, and product approval number. | |||
| CUSVC | COMPLETE | 08/03/2021 | 08/10/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 08/03/2021 | 08/04/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/03/2021 | 08/03/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 08/03/2021 | 08/05/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 08/03/2021 | 08/09/2021 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM 1. Energy Calcs and EPL card need to be signed by the builder 2. Orientation of Energy Calcs does not match the site plan. Revise to match the site plan | |||
| SW1 | COMPLETE | 08/03/2021 | 08/09/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| ZON | HOLD | 08/03/2021 | 08/05/2021 |
| Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Banding around doors and windows in rear of home required when rear of home is facing a right of way | |||
| SWALE | COMPLETE | 08/03/2021 | 11/05/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/30/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/30/2022 |
| CONNECTION FEES | ¤1,017.83 | 10/13/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 10/13/2021 |
| IMPACT FEE FIRE | ¤367.00 | 10/13/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 10/13/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 10/13/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 10/13/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 10/13/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 10/13/2021 |
| SURCHARGE FS 533.721 | ¤10.54 | 10/13/2021 |
| SURCHARGE - FS 468.631 | ¤15.80 | 10/13/2021 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 10/13/2021 |
| SW ENG INSPECTION 60 | ¤60.00 | 10/13/2021 |
| SW ENG PRE APRON | ¤30.00 | 10/13/2021 |
| SW ENG - REVIEW 20 | ¤20.00 | 10/13/2021 |
| SW ENG RES REVIEW 200 | ¤200.00 | 10/13/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 10/13/2021 |
| SEWER CREDIT | (¤650.00) | 10/13/2021 |
| SEWER INSPECTION | ¤25.00 | 10/13/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 10/13/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 10/13/2021 |
| SITE PLAN 30 | ¤30.00 | 10/13/2021 |
| METER - DEPOSIT | ¤60.00 | 10/13/2021 |
| WATER- TURN ON | ¤25.00 | 10/13/2021 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 10/13/2021 |
| INSPECTION - RESIDENTIAL | ¤753.50 | 10/13/2021 |
| PLAN REVIEW - RESIDENTIAL | ¤213.72 | 10/13/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤16,840.99 |