Permit #2021080463
Permit Details
Status: COED
| Parcel Id: 07-11-31-7034-01380-0130 |
| CONDITIONED SPACE: 2331 sqft |
| GARAGE: 610 sqft |
| OPENED PORCH (WITH ROOF) : 176 sqft |
| OPENED PORCH (WITH ROOF) : 96 sqft |
| Total Square Footage: 3213 sqft |
| Block: 01380 |
| Subdivision: 2165 - SECTION 34-EASTHAMPTON |
| Job Phone: (386) 672-8285 |
| Location Address: 110 EDWARD DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 09/07/2021 |
| NOC: RECORDED |
| Applicant name: JOSEPH TODD VANACORE |
| Owner: MARK ALAN BAKER AND KANDY LORRAINE |
|
Address 492 HAWRIDGE LANE SYKESVILLE, MD 21784 |
| Lot: 0130 |
| Contracted Stated Job Value: ¤269,999.00 |
| Job Description: Single family residence |
| Type: CN |
Contractor
VANACORE CONSTRUCTION INC.
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
1451 N US HIGHWAY 1 Ormond Beach, FL 32174 |
SUITE 13 Ormond Beach, FL 32174 |
CBC058991 (Exp: 08/31/2024) | (386) 672-8285 |
Sub Contractors
VERNON JACK SMITH III
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
224 KIRKLAND ROAD NEW SMYRNA BEACH, FL 32169 |
EC13004432 (Exp: 08/31/2026) | 386-409-3616 | 386-409-3616 |
ALFRED N FYOCK JR
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
387 SAULS ORMOND BEACH, FL 32174 |
ST ORMOND BEACH, FL 32174 |
CCC1329075 (Exp: 08/31/2026) | 386-566-6112 | 386-673-4299 |
SHAWN MICHAEL HISS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1315 LPGA BLVD HOLLY HILL, FL 32117 |
CAC1813585 (Exp: 08/31/2026) | (386)672-8688 |
JEFFREY DALE KNIGHT
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
923 ASHMEADE CT PORT ORANGE, FL 32127 |
CFC057351 (Exp: 08/31/2026) | 386-345-3857 | 386-345-4443 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 01/27/2023 | FINAL APPROVED | JHARDING |
| Note: 1/20/2023 - PREVIOUS INSPECTION NOTES 1/19/2023 - PREVIOUS INSPECTION NOTES need access to pep circuit breaker in garage Incorrect Fuse for pep tank , can not use ground fault type fuse. Also sewer ball valve box needs repaired . | |||
| U -UTILITY RESIDENTIAL FINAL | 01/20/2023 | Disapproved - NO FEE | DHANEY |
| Note: 1/19/2023 - PREVIOUS INSPECTION NOTES need access to pep circuit breaker in garage Incorrect Fuse for pep tank , can not use ground fault type fuse. Also sewer ball valve box needs repaired . | |||
| U -UTILITY RESIDENTIAL FINAL | 01/19/2023 | Disapproved -FEE REQUIRED | LFITZGERALD |
| Note: need access to pep circuit breaker in garage | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/17/2023 | APPROVED | GBERTOLA |
| Note: 01/17/23=CORRECTION WERE MADE 1/6/2023 - PREVIOUS INSPECTION NOTES NEED TO HAVE MORE ELEVATION BETWEEN THE POOL AND BACK PROPERTY LINE TO DETERMIND IF WATER IS FLOWING ON POOL DECK | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/17/2023 | APPROVED | GBERTOLA |
| ROW - STORMWATER FINAL | 01/17/2023 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| ROW - FINAL APRON (AFTER POUR) | 01/17/2023 | APPROVED | GBERTOLA |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/06/2023 | Disapproved - NO FEE | PFLANAGAN |
| Note: NEED TO HAVE MORE ELEVATION BETWEEN THE POOL AND BACK PROPERTY LINE TO DETERMIND IF WATER IS FLOWING ON POOL DECK | |||
| PLUMBING FINAL | 12/29/2022 | Approval - Private Provider | PPROVIDER |
| HVAC FINAL | 12/29/2022 | Approval - Private Provider | PPROVIDER |
| ELECTRIC FINAL | 12/29/2022 | Approval - Private Provider | PPROVIDER |
| BLD - BUILDING FINAL | 12/29/2022 | Approval - Private Provider | PPROVIDER |
| U-CROSS CONNECTION | 12/22/2022 | APPROVED - AS NOTED | JHARDING |
| Note: No cross connections. | |||
| U - SEWER TIE IN | 11/07/2022 | APPROVED | MGIBSON |
| Note: 11/3/2022 - PREVIOUS INSPECTION NOTES 11/3/2022: CANNOT VERIFY CONNECTION * connection is covered in dirt. | |||
| U - SEWER TIE IN | 11/03/2022 | Disapproved - NO FEE | RSIMS |
| Note: 11/3/2022: CANNOT VERIFY CONNECTION * connection is covered in dirt. | |||
| GRAVITY SEWER TEST | 11/03/2022 | Approval - Private Provider | PPROVIDER |
| ROW- PRE-APRON (PRE-POUR) | 10/24/2022 | APPROVED | PFLANAGAN |
| Note: IT'S THE CONTRACTORS RESPONSIBILITY TO CHECK CULVERT PIPE ELEVATIONS BEFORE POURING CONCRETE FOR DRIVEWAY ----------------------------------------------------------------------------------------------------------------- 10/21/2022 - PREVIOUS INSPECTION NOTES THIS PRE POUR IS NOT READY FOR INSPECTION NO FORMS AT THE TIME OF THE INSPECTION | |||
| ROW- PRE-APRON (PRE-POUR) | 10/21/2022 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: THIS PRE POUR IS NOT READY FOR INSPECTION NO FORMS AT THE TIME OF THE INSPECTION | |||
| ELECTRIC - EARLY POWER | 10/17/2022 | Approval - Private Provider | PPROVIDER |
| PEP TANK INSTALLATION REQUEST | 09/12/2022 | APPROVED | CSTONE |
| Note: THIS IS A REINSPECTION ADDED ON 7/14/2022 2:40:25 PM Exterior (stucco, stone, or siding must be applied) | |||
| INSULATION | 07/17/2022 | Approval - Private Provider | PPROVIDER |
| LATH/BRICK/ WATER BARRIER | 07/14/2022 | Approval - Private Provider | PPROVIDER |
| PEP TANK INSTALLATION REQUEST | 07/14/2022 | Disapproved - NO FEE | CSTONE |
| Note: Exterior (stucco, stone, or siding must be applied) | |||
| ALL ROUGH | 07/08/2022 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 02/09/2022 | Approval - Private Provider | PPROVIDER |
| WALL SHEATHING | 02/04/2022 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/04/2022 | Approval - Private Provider | PPROVIDER |
| FOUND SURVEY APPROVED (OFFICE) | 12/20/2021 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 12/14/2021 | Approval - Private Provider | PPROVIDER |
| Note: 12/14/2021 Lintel Inspection passed. | |||
| MONOLITHIC SLAB | 12/06/2021 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 12/01/2021 | Approval - Private Provider | PPROVIDER |
| WATER METER INSTALLATION REQUEST | 10/27/2021 | APPROVED | CSTONE |
| Note: THIS IS A REINSPECTION ADDED ON 10/18/2021 4:06:58 PM lot not cleared | |||
| WATER METER INSTALLATION REQUEST | 10/15/2021 | Disapproved - NO FEE | CSTONE |
| Note: lot not cleared |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 01/03/2023 | 01/03/2023 |
| Note: Marked INFORMATION By: MICHELLE RAMOS - - MRAMOS@PALMCOASTGOV.COM Unable to process final survey there is an inspection prior that is needed. | |||
| ENGIN1 | COMPLETE | 12/20/2021 | 12/20/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/20/2021 | 12/20/2021 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/19/2021 | 08/20/2021 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/19/2021 | 08/20/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 08/19/2021 | 08/26/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 08/17/2021 | 11/05/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 08/10/2021 | 08/10/2021 |
| Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Site plan and survey (Flood map number) is incorrect must read (12035C0226E) | |||
| CUSVC | COMPLETE | 08/09/2021 | 08/16/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ENGIN1 | COMPLETE | 08/09/2021 | 08/09/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 08/09/2021 | 08/10/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 08/09/2021 | 08/17/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 08/09/2021 | 08/17/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 30 | ¤30.00 | 01/30/2023 |
| REINSPECTION FEE | ¤40.00 | 01/30/2023 |
| SURCHARGE FS 533.721 | ¤2.62 | 09/07/2021 |
| SURCHARGE - FS 468.631 | ¤3.92 | 09/07/2021 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 09/07/2021 |
| SW ENG INSPECTION 60 | ¤60.00 | 09/07/2021 |
| SW ENG PRE APRON | ¤30.00 | 09/07/2021 |
| SW ENG - REVIEW 20 | ¤20.00 | 09/07/2021 |
| SW ENG RES REVIEW 200 | ¤200.00 | 09/07/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 09/07/2021 |
| SEWER CREDIT | (¤1,466.00) | 09/07/2021 |
| SEWER INSPECTION | ¤25.00 | 09/07/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 09/07/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 09/07/2021 |
| SITE PLAN 30 | ¤30.00 | 09/07/2021 |
| METER - DEPOSIT | ¤60.00 | 09/07/2021 |
| WATER- TURN ON | ¤25.00 | 09/07/2021 |
| ADMINISTRATIVE - RESID PP | ¤225.00 | 09/07/2021 |
| CONNECTION FEES | ¤1,017.83 | 09/07/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 09/07/2021 |
| IMPACT FEE FIRE | ¤367.00 | 09/07/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 09/07/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 09/07/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 09/07/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 09/07/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 09/07/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,222.97 |