I want to search for...
Permit #2021080744
Permit Details
Status: COED
| Parcel Id: 07-11-31-7030-00080-0160 |
| CONDITIONED SPACE: 1595 sqft |
| GARAGE: 499 sqft |
| OPENED PORCH (WITH ROOF) : 233 sqft |
| OPENED PORCH (WITH ROOF) : 63 sqft |
| Total Square Footage: 2390 sqft |
| Block: 00080 |
| Subdivision: 2154 - SECTION 30-ROYAL PALMS |
| Job Phone: 386-447-4151 |
| Location Address: 26 RAEMOND LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/18/2021 |
| NOC: RECORDED |
| Applicant name: GENE WARREN SLONE |
| Owner: FLORIDA GREEN CONSTRUCTION, INC. |
|
Address 50 LEANNI WAY PALM COAST, FL 32164 |
|
Address STE C-1 PALM COAST, FL 32164 |
| Lot: 0160 |
| Contracted Stated Job Value: ¤200,000.00 |
| Job Description: SINGLE FAMILY HOME |
| Type: CN |
Contractor
FLORIDA GREEN CONSTRUCTION INC.
| Status | Location Address | State License Number | Phone |
| INACTIVE |
870 E RETTA STREET DELEON SPRINGS, FL 32130 |
CBC1260957 (Exp: 08/31/2026) | 407-580-2657 |
Sub Contractors
GREGG A MCANALLY
| Status | Location Address | State License Number | Phone |
| INACTIVE |
3370 AGRICULTURAL CENTER DRIVE PALM COAST, FL 32092 |
CAC1815760 (Exp: 08/31/2022) | 904-829-8898 |
JOHN EDWARD GAMBONE
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
15 HARGROVE LN PALM COAST, FL 32137 |
1G PALM COAST, FL 32137 |
EC13006037 (Exp: 08/31/2026) | 386-586-9144 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
ERIC FRANCO
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
840 DELTONA BLVD DELTONA, FL 32725 |
STE F2 DELTONA, FL 32725 |
CCC1327280 (Exp: 08/31/2026) | 386-575-4007 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 02/07/2023 | FINAL APPROVED | JWALKER |
| Note: 2/3/2023 - PREVIOUS INSPECTION NOTES 2/3/23 1. Install a water hammer at the dishwasher supply. 2. Window front of the house is broken. 3. Window revision listed below waiting for approval Please submitt a revision for the change of windows. Listed on the product approval sheet calls for MI windows Windows installed are VIWINCO FL # 17557.8 Rear door fastener are to be installed on the 1 1/4" thick part of the jamb. Check for corrections at Final | |||
| ROW - FINAL APRON (AFTER POUR) | 02/07/2023 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| ROW - STORMWATER FINAL | 02/07/2023 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| BLD - BUILDING FINAL | 02/03/2023 | Disapproved - NO FEE | JWALKER |
| Note: 2/3/23 1. Install a water hammer at the dishwasher supply. 2. Window front of the house is broken. 3. Window revision listed below waiting for approval Please submitt a revision for the change of windows. Listed on the product approval sheet calls for MI windows Windows installed are VIWINCO FL # 17557.8 Rear door fastener are to be installed on the 1 1/4" thick part of the jamb. Check for corrections at Final | |||
| U-CROSS CONNECTION | 01/31/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: has potable irrigation with PVB installed-no cross connection | |||
| U -UTILITY RESIDENTIAL FINAL | 01/31/2023 | FINAL APPROVED | LFITZGERALD |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/27/2023 | APPROVED | PFLANAGAN |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/27/2023 | APPROVED | PFLANAGAN |
| ROW- PRE-APRON (PRE-POUR) | 01/03/2023 | APPROVED | PFLANAGAN |
| Note: IT'S THE CONTRACTORS RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING THE CONCRETE FOR THE DRIVEWAY ------------------------------------------------------------------------------------------------ 12/27/2022 - PREVIOUS INSPECTION NOTES 12/27/22= CULVERT PIPE IS GOOD. NEED TO RE-ESTABLISH THE FORM BOARD BY THE ROAD AND LEFT SIDE WING ON THE APRON NEED AT LEAST 24 INCHES OF #4 REBAR IS PLACED UNDER EACH END OF THE PIPE. PIPE SHOULD BE DUG OUT 6 INCHES DEEP BY 6 INCHES LONG UNDER EACH END OF THE PIPE | |||
| ROW- PRE-APRON (PRE-POUR) | 12/27/2022 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: 12/27/22= CULVERT PIPE IS GOOD. NEED TO RE-ESTABLISH THE FORM BOARD BY THE ROAD AND LEFT SIDE WING ON THE APRON NEED AT LEAST 24 INCHES OF #4 REBAR IS PLACED UNDER EACH END OF THE PIPE. PIPE SHOULD BE DUG OUT 6 INCHES DEEP BY 6 INCHES LONG UNDER EACH END OF THE PIPE | |||
| ELECTRIC - EARLY POWER | 11/18/2022 | APPROVED | RMARTIN |
| Note: Inspector Notes from Inspection 2170 THIS IS A REINSPECTION Neutral lug laying on the bottom of the meter can, needs to be installed in the proper spot. 1/18/22 Emailed FPL at 10:26 am | |||
| GRAVITY SEWER TEST | 10/26/2022 | APPROVED | MGIBSON |
| U - SEWER TIE IN | 10/26/2022 | APPROVED | MGIBSON |
| PEP TANK INSTALLATION REQUEST | 10/06/2022 | APPROVED | CSTONE |
| LATH/BRICK/ WATER BARRIER | 09/08/2022 | APPROVED | JWALKER |
| Note: Inspector Notes from Inspection 2490 Please submitt a revision for the change of windows. Listed on the product approval sheet calls for MI windows Windows installed are VIWINCO FL # 17557.8 Rear door fastener are to be installed on the 1 1/4" thick part of the jamb. Check for corrections at Final | |||
| INSULATION | 08/31/2022 | APPROVED - AS NOTED | JWALKER |
| Note: Please submitt a revision for the change of windows. Listed on the product approval sheet calls for MI windows Windows installed are VIWINCO FL # 17557.8 Rear door fastener are to be installed on the 1 1/4" thick part of the jamb. Check for corrections at Final | |||
| ALL ROUGH | 08/17/2022 | APPROVED - AS NOTED | JWALKER |
| Note: Electrical panel. The wire clamps installed are missing the push in clamping mechanism. The black protective bushing that have also been used are not an approved wire clamp remove and install approved clamps. Phase out the 2 wire in the electrical panel. The rear door is to be fastened into the 1 1/4" thick part of the jamb. Or supply the manufacture instruction for the fasteners as installed. Note to the contractor there is a broken window in the front of the building. | |||
| WALL SHEATHING | 06/02/2022 | APPROVED | JWALKER |
| ROOF VALLEY & METAL | 05/10/2022 | APPROVED | DCUSHING |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/25/2022 | APPROVED - AS NOTED | JWALKER |
| Note: Install missing fasteners at the ABU base anchor at the front entry post. Install missing fasteners at the J7 Jack trusses 1 on the left side of building 3 on the right side. The knee wall at the front entry is missing the hold down all thread at 48" o.c. detail page 6 of the drawings. | |||
| TIE BEAM / LINTEL | 02/25/2022 | APPROVED | JWALKER |
| Note: THIS IS A REINSPECTION Missing two dowels rear porch area marked the locations on the prints. | |||
| TIE BEAM / LINTEL | 02/24/2022 | Disapproved - NO FEE | JWALKER |
| Note: Missing two dowels rear porch area marked the locations on the prints. | |||
| FOUND SURVEY APPROVED (OFFICE) | 02/15/2022 | APPROVED | TBAKER |
| ELECTRIC TEMP POLE | 01/18/2022 | APPROVED - AS NOTED | JMUNSON |
| Note: THIS IS A REINSPECTION Neutral lug laying on the bottom of the meter can, needs to be installed in the proper spot. 1/18/22 Emailed FPL at 10:26 am | |||
| ELECTRIC TEMP POLE | 01/10/2022 | Disapproved - NO FEE | JMUNSON |
| Note: Neutral lug laying on the bottom of the meter can, needs to be installed in the proper spot. | |||
| MONOLITHIC SLAB | 12/29/2021 | APPROVED | JWALKER |
| PLUMBING 1ST ROUGH UNDERGROUND | 12/13/2021 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 10/22/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 02/06/2023 | 02/06/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | HOLD | 02/03/2023 | 02/06/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM wrong product approval for mullion | |||
| MECH | COMPLETE | 01/12/2023 | 01/12/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/14/2022 | 02/15/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/14/2022 | 02/14/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 09/21/2021 | 09/22/2021 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BADMIN | HOLD | 09/21/2021 | 09/21/2021 |
| Note: Held By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM REMOVE '26 Raemond Ln-DANIELLA-CD3 ' FROM ALL FILE NAMES | |||
| BADMIN | COMPLETE | 09/21/2021 | 09/21/2021 |
| Note: Released By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 09/14/2021 | 09/15/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | HOLD | 09/14/2021 | 09/15/2021 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM REVIEW COMMENTS: Second Request 1. Simpson Heta and MSTA are called out with (2) on each of the truss. Drawing makes no mention there is a reduction in each tie per the manufactures specifications. A revision is required to provide the correct hold down per the uplift requirements. 2. Uplift Table is noted as using the Simpson 2016-2017 specifications. A revision is required to reflect the up to date requirements. They can be found at Simpsonstrongtie.com | |||
| SWALE | COMPLETE | 09/01/2021 | 11/09/2021 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 08/31/2021 | 09/01/2021 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Need outlets next to bathroom sink in master bathroom NEC 2017 210.52 (D) 2nd Request | |||
| ENGIN1 | COMPLETE | 08/31/2021 | 09/01/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/31/2021 | 09/02/2021 |
| Note: Released By: HAROLD ALLEN - - HALLEN@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 08/31/2021 | 09/01/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 08/31/2021 | 09/10/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/31/2021 | 09/01/2021 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | HOLD | 08/13/2021 | 08/16/2021 |
| Note: Held By: HAROLD ALLEN - - HALLEN@PALMCOASTGOV.COM REVIEW COMMENTS: 1. Simpson Heta and MSTA are called out with (2) on each of the truss. Drawing makes no mention there is a reduction in each tie per the manufactures specifications. A revision is required to provide the correct hold down per the uplift requirements. 2. Uplift Table is noted as using the Simpson 2016-2017 specifications. A revision is required to reflect the up to date requirements. They can be found at Simpsonstrongtie.com | |||
| CUSVC | COMPLETE | 08/13/2021 | 08/20/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | HOLD | 08/13/2021 | 08/13/2021 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Need outlets next to bathroom sink in master bathroom NEC 2017 210.52 (D) | |||
| ENGIN1 | HOLD | 08/13/2021 | 08/13/2021 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM No benchmark on survey | |||
| LOCATE | COMPLETE | 08/13/2021 | 08/17/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 08/13/2021 | 08/16/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 08/13/2021 | 08/20/2021 |
| Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/13/2021 | 08/16/2021 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 02/06/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 02/06/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 10/18/2021 |
| SW ENG RES REVIEW 200 | ¤200.00 | 10/18/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 10/18/2021 |
| SEWER CREDIT | (¤1,147.00) | 10/18/2021 |
| SEWER INSPECTION | ¤25.00 | 10/18/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 10/18/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 10/18/2021 |
| SITE PLAN 30 | ¤30.00 | 10/18/2021 |
| CONNECTION FEES | ¤1,017.83 | 10/18/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 10/18/2021 |
| IMPACT FEE FIRE | ¤367.00 | 10/18/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 10/18/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 10/18/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 10/18/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 10/18/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 10/18/2021 |
| SURCHARGE FS 533.721 | ¤8.22 | 10/18/2021 |
| SURCHARGE - FS 468.631 | ¤12.33 | 10/18/2021 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 10/18/2021 |
| SW ENG INSPECTION 60 | ¤60.00 | 10/18/2021 |
| SW ENG PRE APRON | ¤30.00 | 10/18/2021 |
| METER - DEPOSIT | ¤60.00 | 10/18/2021 |
| WATER- TURN ON | ¤25.00 | 10/18/2021 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 10/18/2021 |
| INSPECTION - RESIDENTIAL | ¤577.50 | 10/18/2021 |
| PLAN REVIEW - RESIDENTIAL | ¤163.80 | 10/18/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤16,094.78 |