I want to search for...

Permit #2021080874

Permit Details

Status: COED

Parcel Id: 07-11-31-7017-00040-0290
CONDITIONED SPACE: 2086 sqft
GARAGE: 867 sqft
OPENED PORCH (WITH ROOF) : 371 sqft
OPENED PORCH (WITH ROOF) : 60 sqft
Total Square Footage: 3384 sqft
Block: 00040
Subdivision: 2129 - SECTION 17-BELLE TERRE
Job Phone: 386-237-5837
Location Address: 51 BOLLING LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 09/12/2021
NOC: RECORDED
Applicant name: MARSEL GILMANSHIN
Owner: WROBEL BOGDAN

Address

161 MILTON AVE

NUTLEY, NJ 07110

Lot: 0290
Contracted Stated Job Value: ¤295,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

GILMANS DEVELOPMENT CORP
Status Location Address State License Number Phone
ACTIVE

4873 PALM COAST PARKWAY NW #4

PALM COAST, FL 32137

CBC1263180 (Exp: 08/31/2026) 386-237-5837

Sub Contractors

HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823
MAREK HENRYK SCHECHINGER
Status Location Address State License Number Phone Fax
ACTIVE

28 SEBASTIAN AVENUE

ST. AUGUSTINE, FL 32084

CAC058520 (Exp: 08/31/2026) (904)829-2345 (904)810-4926
BANY RAFAEL MELENDEZ
Status Location Address State License Number Phone
INACTIVE

2212 S CHICKASAW TRL #112

ORLANDO, FL 0

CCC1331793 (Exp: 08/31/2026) 407-694-9836
SCOTT H STILLWELL
Status Location Address State License Number Phone
ACTIVE

4500 US 1 UNIT 206

BUNNELL, FL 32110

CAC1819433 (Exp: 08/31/2026) 386-864-4404
MAREK DYBACKI
Status Location Address State License Number Phone
INACTIVE

4702 PERCEPTION CIRCLE

, 0

ER13016191 (Exp: 08/31/2024) 413-695-4060

Inspection History

Type Request Date Result Inspector
U -UTILITY RESIDENTIAL FINAL 11/21/2023 FINAL APPROVED DHANEY
Note: 10/25/2023 - PREVIOUS INSPECTION NOTES 10/23/2023 - PREVIOUS INSPECTION NOTES Could not find sewer clean out in yard . Still do not see sewer clean out in yard . 10/25 .
BLD - BUILDING FINAL 11/20/2023 FINAL APPROVED JSTEWART
Note: 10/26/2023 - PREVIOUS INSPECTION NOTES 10/26/23- Previous note # 5 not rectified.... Need to post Insulation cert..R303.1.1.2 INSTALLER SHALL SIGN DATE AND POST CERTIFICATE IN A CONSPICUOUS LOCATION Submitted energy calcs was Rejected by the building dept, please call the building dept to fix for aproval. 10/23/2023 - PREVIOUS INSPECTION NOTES 10/23/23- 1. Please obtain a revision on energy calcs for equipment installed. 2. Please install landscaping (mulch bed) at ODU liquid lines and condensation drain. 3. Please install permanent Hose bibb anti siphon vaccum breakers....P2902.4 Protection of potable water outlets 4. install face plates on both attic Lights switches. 5. Need to post Insulation cert..R303.1.1.2 INSTALLER SHALL SIGN DATE AND POST CERTIFICATE IN A CONSPICUOUS LOCATION 5. Please install Laundry water supply box cover or seal perimeter. 6. Please seal all ceiling penetrations in garage x 2.
BLD - BUILDING FINAL 10/26/2023 Disapproved -FEE REQUIRED JSTEWART
Note: 10/26/23- Previous note # 5 not rectified.... Need to post Insulation cert..R303.1.1.2 INSTALLER SHALL SIGN DATE AND POST CERTIFICATE IN A CONSPICUOUS LOCATION Submitted energy calcs was Rejected by the building dept, please call the building dept to fix for aproval. 10/23/2023 - PREVIOUS INSPECTION NOTES 10/23/23- 1. Please obtain a revision on energy calcs for equipment installed. 2. Please install landscaping (mulch bed) at ODU liquid lines and condensation drain. 3. Please install permanent Hose bibb anti siphon vaccum breakers....P2902.4 Protection of potable water outlets 4. install face plates on both attic Lights switches. 5. Need to post Insulation cert..R303.1.1.2 INSTALLER SHALL SIGN DATE AND POST CERTIFICATE IN A CONSPICUOUS LOCATION 5. Please install Laundry water supply box cover or seal perimeter. 6. Please seal all ceiling penetrations in garage x 2.
U -UTILITY RESIDENTIAL FINAL 10/25/2023 Disapproved -FEE REQUIRED DHANEY
Note: 10/23/2023 - PREVIOUS INSPECTION NOTES Could not find sewer clean out in yard . Still do not see sewer clean out in yard . 10/25 .
ROW - STORMWATER FINAL 10/25/2023 APPROVED RGROSS
Note: 10/23/2023 - PREVIOUS INSPECTION NOTES 10/23/23 SPOKE TO CM. STILL NEED TO CLEAN OUT CULVERT PIPE ENDS AND REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM VACANT LOT ON LEFT. _______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 ** 05/23/23 BUILDER NEEDS TO REPAIR RIGHT SIDE EDGE OF DRIVEWAY BROKEN CONCRETE ** CLEAN OUT CULVERT OF ALL SEDIMENT AND DEBRIS ** REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM VACANT ON LEFT SIDE ** SOD SWALE ON LEFT SIDE WHERE PORTA-JOHN WAS AT PROPERTY LINE
U -UTILITY RESIDENTIAL FINAL 10/23/2023 Disapproved - NO FEE DHANEY
Note: Could not find sewer clean out in yard .
BLD - BUILDING FINAL 10/23/2023 Disapproved - NO FEE JSTEWART
Note: 10/23/23- 1. Please obtain a revision on energy calcs for equipment installed. 2. Please install landscaping (mulch bed) at ODU liquid lines and condensation drain. 3. Please install permanent Hose bibb anti siphon vaccum breakers....P2902.4 Protection of potable water outlets 4. install face plates on both attic Lights switches. 5. Need to post Insulation cert..R303.1.1.2 INSTALLER SHALL SIGN DATE AND POST CERTIFICATE IN A CONSPICUOUS LOCATION 5. Please install Laundry water supply box cover or seal perimeter. 6. Please seal all ceiling penetrations in garage x 2.
ROW - FINAL APRON (AFTER POUR) 10/23/2023 APPROVED FSLADISH
Note: PIPE IS GOOD. CUTS MADE. CULVERTS CLEAR OF WATER. HOT PATCH COMPLETED. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 ** 05/23/23 BUILDER NEEDS TO REPAIR RIGHT SIDE EDGE OF DRIVEWAY BROKEN CONCRETE ** CLEAN OUT CULVERT OF ALL SEDIMENT AND DEBRIS ** REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM VACANT ON LEFT SIDE ** SOD SWALE ON LEFT SIDE WHERE PORTA-JOHN WAS AT PROPERTY LINE
ROW - STORMWATER FINAL 10/23/2023 Disapproved - NO FEE FSLADISH
Note: 10/23/23 SPOKE TO CM. STILL NEED TO CLEAN OUT CULVERT PIPE ENDS AND REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM VACANT LOT ON LEFT. _______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 ** 05/23/23 BUILDER NEEDS TO REPAIR RIGHT SIDE EDGE OF DRIVEWAY BROKEN CONCRETE ** CLEAN OUT CULVERT OF ALL SEDIMENT AND DEBRIS ** REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM VACANT ON LEFT SIDE ** SOD SWALE ON LEFT SIDE WHERE PORTA-JOHN WAS AT PROPERTY LINE
ROW- FINAL SURVEY/GRADING CERTIFICATION 05/23/2023 APPROVED EMADISON
ROW FIELD SURVEY /GRADING CERTIFICATION 05/23/2023 APPROVED - AS NOTED EMADISON
Note: ** 05/23/23 BUILDER NEEDS TO REPAIR RIGHT SIDE EDGE OF DRIVEWAY BROKEN CONCRETE ** CLEAN OUT CULVERT OF ALL SEDIMENT AND DEBRIS ** REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM VACANT ON LEFT SIDE ** SOD SWALE ON LEFT SIDE WHERE PORTA-JOHN WAS AT PROPERTY LINE
ELECTRIC - EARLY POWER 01/13/2023 APPROVED JMUNSON
Note: 12/19/2022 - PREVIOUS INSPECTION NOTES Everything needs to be safed off in a box Panel cover must be on All outlet and switch plates must be installed
ROW- PRE-APRON (PRE-POUR) 01/09/2023 APPROVED EMADISON
Note: ** 01/09/23 ALL CORRECTIONS HAVE BEEN MADE READY TO POUR ** MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** IN THE EVENT OF RAIN BUILDER NEEDS TO RECHECK CULVERT ELEVATION AND COMPACTION ___________________________________________________________________________________________________________________________ 1/5/2023 - PREVIOUS INSPECTION NOTES 01/5/23=The Culvert t is not 8 ft from the road edge. THE MITER END CENTER NEED TO BE A 8 FT FROM ROAD EDGE NEDD TO SECURE THE CULVERT PIPE 1/2 UP, IN THE ENTIRE AREA TO BE POURED. MATERIAL SHOULD BE COMPACTED AROUND PIPE ABOUT 1/2 WAY UP THE SIDE OF THE PIPE. NEED TO SHAVE THE DRIVEWAY NEED * 4” MINIMUM THICK CONCRETE REQUIRED ABOVE THE R.O.W. * 5" MINIMUM THICK CONCRETE REQUIRED IN THE APRON NEED AFORM BOARD BY THE EDGE OF THE ROAD
ROW- PRE-APRON (PRE-POUR) 01/05/2023 Disapproved - NO FEE GBERTOLA
Note: 01/5/23=The Culvert t is not 8 ft from the road edge. THE MITER END CENTER NEED TO BE A 8 FT FROM ROAD EDGE NEDD TO SECURE THE CULVERT PIPE 1/2 UP, IN THE ENTIRE AREA TO BE POURED. MATERIAL SHOULD BE COMPACTED AROUND PIPE ABOUT 1/2 WAY UP THE SIDE OF THE PIPE. NEED TO SHAVE THE DRIVEWAY NEED * 4” MINIMUM THICK CONCRETE REQUIRED ABOVE THE R.O.W. * 5" MINIMUM THICK CONCRETE REQUIRED IN THE APRON NEED AFORM BOARD BY THE EDGE OF THE ROAD
U-CROSS CONNECTION 12/19/2022 APPROVED - AS NOTED JHARDING
Note: No irrigation, no cross connections.
U - SEWER TIE IN 12/19/2022 APPROVED - AS NOTED MGIBSON
Note: THIS IS A REINSPECTION U-SEWER TIE IN TAP NOT MADE BOTH U-SEWER TIE IN AND GRAVITY SEWER APPROVED
ELECTRIC - EARLY POWER 12/19/2022 Disapproved -FEE REQUIRED JMUNSON
Note: Everything needs to be safed off in a box Panel cover must be on All outlet and switch plates must be installed
ROW - DRAINAGE 09/08/2022 APPROVED EMADISON
Note: THIS IS A REINSPECTION ** 09/08/22 CORRECTIONS MADE THIS IS A REINSPECTION ** SWALE APPEARS TO BE OPENED NEED TO REMOVE PORTA JOHN FROM SWALE AREA AND PUT ONTO JOB SITE. ** FOLLOW UP INSPECTION ON 09/08/22 BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED, MAINTAINED AT THE END OF EVERY DAY. INSPECTOR BE BACK 9/6/22
ROW - DRAINAGE 09/06/2022 PARTIALLY APPROVED EMADISON
Note: THIS IS A REINSPECTION ** SWALE APPEARS TO BE OPENED NEED TO REMOVE PORTA JOHN FROM SWALE AREA AND PUT ONTO JOB SITE. ** FOLLOW UP INSPECTION ON 09/08/22 BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED, MAINTAINED AT THE END OF EVERY DAY. INSPECTOR BE BACK 9/6/22
ROW - DRAINAGE 08/29/2022 Disapproved - NO FEE GBERTOLA
Note: BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED, MAINTAINED AT THE END OF EVERY DAY. INSPECTOR BE BACK 9/6/22
U - SEWER TIE IN 07/21/2022 Disapproved - NO FEE MGIBSON
Note: U-SEWER TIE IN TAP NOT MADE
GRAVITY SEWER TEST 07/21/2022 Disapproved -FEE REQUIRED MGIBSON
Note: GRAVITY SEWER NOT RAN YET, ALSO NOT INSPECTORS RESPONSIBILTY TO SCHEDUAL INSPECTIONS,BOTH GRAVITY SEWER AND USEWER TIE IN TO BE SCHEDULED AT SAME TIME
LATH/BRICK/ WATER BARRIER 05/20/2022 APPROVED FWILLIS
WALL SHEATHING 05/09/2022 APPROVED FWILLIS
WINDOW NAILING 04/29/2022 APPROVED FWILLIS
INSULATION 04/08/2022 APPROVED FWILLIS
ALL ROUGH 04/05/2022 APPROVED - AS NOTED KSANDOE
Note: THIS IS A REINSPECTION Window nailing inspection added. 5ft head test failed
ALL ROUGH 04/04/2022 CANCELLED BY APPLICANT MKRASKI
ROOF VALLEY & METAL 03/07/2022 APPROVED KSANDOE
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/22/2022 APPROVED - AS NOTED FWILLIS
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION COULD NOT FIND THE DETAILS FOR BUILT UP COLUMN, ANY FASTENERS, NAILING PATTERN AND RODS AT TRUSS T1, MASTERBEDROOM AREA. 2/9/22 - STILL NEED TO SEE THE DETAIL FOR THE WALL SEPARATING THE CRAFT ROOM AND LAUNDRY ROOM. CONNECTORS AND GO BOLTS BEING USED, IS THERE A DETAIL FOR THIS. 2/22/22 - PROVIDE STAMPED COPY OF APPROVED DRAWINGS AT NEXT INSPECTION.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/09/2022 Disapproved -FEE REQUIRED FWILLIS
Note: THIS IS A REINSPECTION COULD NOT FIND THE DETAILS FOR BUILT UP COLUMN, ANY FASTENERS, NAILING PATTERN AND RODS AT TRUSS T1, MASTERBEDROOM AREA. 2/9/22 - STILL NEED TO SEE THE DETAIL FOR THE WALL SEPARATING THE CRAFT ROOM AND LAUNDRY ROOM. CONNECTORS AND GO BOLTS BEING USED, IS THERE A DETAIL FOR THIS.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/08/2022 Disapproved - NO FEE FWILLIS
Note: COULD NOT FIND THE DETAILS FOR BUILT UP COLUMN, ANY FASTENERS, NAILING PATTERN AND RODS AT TRUSS T1, MASTERBEDROOM AREA.
FOUND SURVEY APPROVED (OFFICE) 02/07/2022 APPROVED TDOAK
TIE BEAM / LINTEL 01/06/2022 APPROVED FWILLIS
MONOLITHIC SLAB 11/19/2021 APPROVED FWILLIS
PLUMBING 1ST ROUGH UNDERGROUND 11/10/2021 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 11/04/2021 APPROVED CSTONE

Review History

Department Status Date In Date Out
MECH COMPLETE 11/13/2023 11/13/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH HOLD 10/25/2023 10/25/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2020 7Th edition
BLD COMPLETE 02/18/2022 02/22/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 02/07/2022 02/07/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 02/07/2022 02/07/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 08/31/2021 09/01/2021
Note: Released By: HAROLD ALLEN - - HALLEN@PALMCOASTGOV.COM
MECH COMPLETE 08/31/2021 09/01/2021
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 08/31/2021 09/10/2021
Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM
ENGIN1 COMPLETE 08/31/2021 09/01/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 08/31/2021 09/01/2021
Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM
SWALE COMPLETE 08/17/2021 11/10/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD HOLD 08/17/2021 08/17/2021
Note: Held By: HAROLD ALLEN - - HALLEN@PALMCOASTGOV.COM REVIEW COMMENTS: Openings from a private garage directly into a room used for sleeping purposes shall not be permitted. Other openings between the garage and residence shall be equipped with solid wood doors not less than 13/8 inches (35 mm) in thickness, solid or honeycombcore steel doors not less than 13/8 inches (35 mm) thick, or 20-minute fire-rated doors.
CUSVC COMPLETE 08/17/2021 08/20/2021
Note: Released By: HALEIGH HAND - -
ELEC COMPLETE 08/17/2021 08/17/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 08/17/2021 08/17/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 08/17/2021 08/19/2021
Note: Released By: TONI CHURCHILL - -
MECH HOLD 08/17/2021 08/17/2021
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Plans show R30 insulation with attic. Energy calcs say R20 with unvented attic. Revise to match
SW1 HOLD 08/17/2021 08/24/2021
Note: Held By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM 12 ft Driveway needs to be eliminated from the plan. Edge of Driveway must be a minimum of 75 ft from the center of the nearest intersection. Sec 300.01C1
ZON COMPLETE 08/17/2021 08/18/2021
Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 11/15/2023
REINSPECTION FEE ¤40.00 11/15/2023
PLAN REVIEW - REVISION ¤32.50 11/15/2023
REINSPECTION RESIDENTIAL ¤40.00 10/20/2023
PLAN REVIEW - REVISION ¤32.50 10/20/2023
REINSPECTION RESIDENTIAL ¤40.00 10/20/2023
REINSPECTION RESIDENTIAL ¤40.00 10/20/2023
SW ENG - INSPECTION 20 ¤20.00 10/20/2023
SW ENG - INSPECTION 20 ¤20.00 10/20/2023
SW ENG - INSPECTION 20 ¤20.00 10/20/2023
CONTRACTOR CHANGE ¤20.00 10/20/2023
CONTRACTOR CHANGE ¤40.00 10/20/2023
CONTRACTOR CHANGE ¤40.00 10/20/2023
3% FIRE IMPACT FEE CREDIT (¤11.01) 09/12/2021
IMPACT FEE FIRE ¤367.00 09/12/2021
IMPACT FEE PARKS ¤1,199.12 09/12/2021
IMPACT FEE SCHOOL ¤3,600.00 09/12/2021
IMPACT FEE TRANSPORTATION ¤1,718.00 09/12/2021
WATER -IRRIGATION INSPECTION ¤25.00 09/12/2021
WATER -IRRIGATION INSPECTION ¤25.00 09/12/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 09/12/2021
METER - DEPOSIT ¤60.00 09/12/2021
METER - DEPOSIT ¤60.00 09/12/2021
WATER-METER ¤441.07 09/12/2021
WATER- TURN ON ¤25.00 09/12/2021
WATER- TURN ON ¤25.00 09/12/2021
ADMINISTRATIVE RESIDENTIAL ¤30.00 09/12/2021
INSPECTION - RESIDENTIAL ¤811.25 09/12/2021
PLAN REVIEW - RESIDENTIAL ¤230.10 09/12/2021
SW ENG INSPECTION 60 ¤60.00 09/12/2021
SW ENG PRE APRON ¤30.00 09/12/2021
SW ENG - REVIEW 20 ¤20.00 09/12/2021
SW ENG RES REVIEW 200 ¤200.00 09/12/2021
3% TRANS IMPACT FEE CREDIT (¤51.54) 09/12/2021
SEWER CREDIT (¤2,465.75) 09/12/2021
SEWER INSPECTION ¤25.00 09/12/2021
SEWER CAPITAL FACILITY ¤4,664.55 09/12/2021
WATER CAPITAL FACILITY FEE ¤3,424.45 09/12/2021
SITE PLAN 30 ¤30.00 09/12/2021
CONNECTION FEES ¤1,017.83 09/12/2021
SURCHARGE FS 533.721 ¤11.30 09/12/2021
SURCHARGE - FS 468.631 ¤16.94 09/12/2021
SW ENG - FOUNDATION SURVEY ¤20.00 09/12/2021
Fees Total Due: ¤0.00 Total Paid: ¤15,997.34