I want to search for...
Permit #2021080911
Permit Details
Status: FINAL
| Block: 00000 |
| Subdivision: - |
| Job Phone: 407-916-7235 |
| Location Address: 100 ADVENTHEALTH WAY |
| Type: CSD - COMMERCIAL SITE DEVELOPMENT |
| Issue Date: 09/14/2021 |
| NOC: RECORDED |
| Applicant name: BRUCE ROBERT ADAMS |
| Owner: MEMORIAL HOSPITAL-FLAGLER INC |
|
Address 60 MEMORIAL MEDICAL PKWY PALM COAST, FL 32164 |
| Lot: 0100 |
| Job Description: SITE WORK- ADVENTHEALTH HOSPITAL |
| Type: CN |
Contractor
THE ROBINS & MORTON GROUP
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
423 S KELLER RD ORLANDO, FL 32810 |
#200 ORLANDO, FL 32810 |
CGC1523017 (Exp: 08/31/2026) | 407-916-7235 |
Inspection History
| Type | Request Date | Result | Inspector |
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | 06/08/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: Eastbound pad now correct- other outstanding items to be installed by end of day per Chelsea 6/6/2023 - PREVIOUS INSPECTION NOTES Eastbound pad now demo'd-pouring slab tomorrow-will reinspect/missing pipe stands for both backflow preventors 5/31/2023 - PREVIOUS INSPECTION NOTES NOTE-MIN CLEARANCE FOR AIR RELEASE VALVE -EASTBOUND BACKFLOW -NOT CORRECT(9IN VERSUS 12IN)/PIPE STANDS NOT YET INSTALLED ON BOTH BACKFLOW-POTABLE DEVICE 5/4/2023 - PREVIOUS INSPECTION NOTES water line tone -satisfactory(Gemstone) 2/2/2023 - PREVIOUS INSPECTION NOTES 10 inch bore mandrel pulled -ok and pressure test ok 1/20/2023 - PREVIOUS INSPECTION NOTES 10 inch bore installed -westbound/10x8 wet tap done/tie into bore done/pig flush -bore-done 11/30/2022 - PREVIOUS INSPECTION NOTES THIS IS A REINSPECTION WM now connected to westbound BF/pig flushed to BF/pressure tested from BF to BF THIS IS A REINSPECTION -8in x 8in wet tap-Eastbound plus 8in pipe tied into RPZ start install of 6in fire/8in potable RPZ-Eastbound side | |||
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | 06/06/2023 | PARTIALLY APPROVED | LFITZGERALD |
| Note: Eastbound pad now demo'd-pouring slab tomorrow-will reinspect/missing pipe stands for both backflow preventors 5/31/2023 - PREVIOUS INSPECTION NOTES NOTE-MIN CLEARANCE FOR AIR RELEASE VALVE -EASTBOUND BACKFLOW -NOT CORRECT(9IN VERSUS 12IN)/PIPE STANDS NOT YET INSTALLED ON BOTH BACKFLOW-POTABLE DEVICE 5/4/2023 - PREVIOUS INSPECTION NOTES water line tone -satisfactory(Gemstone) 2/2/2023 - PREVIOUS INSPECTION NOTES 10 inch bore mandrel pulled -ok and pressure test ok 1/20/2023 - PREVIOUS INSPECTION NOTES 10 inch bore installed -westbound/10x8 wet tap done/tie into bore done/pig flush -bore-done 11/30/2022 - PREVIOUS INSPECTION NOTES THIS IS A REINSPECTION WM now connected to westbound BF/pig flushed to BF/pressure tested from BF to BF THIS IS A REINSPECTION -8in x 8in wet tap-Eastbound plus 8in pipe tied into RPZ start install of 6in fire/8in potable RPZ-Eastbound side | |||
| MAINT BOND ACCEPTANCE (OFFICE) | 06/06/2023 | APPROVED | DRAMIREZ |
| CLOSE OUT DOCUMENTS | 06/06/2023 | APPROVED | DRAMIREZ |
| LDSC- LANDSCAPE FINAL | 06/05/2023 | FINAL APPROVED | RPICATAGI |
| Note: Approval is conditioned on the following plant replacementd 62 Loropatelam chinensis 'Ruby" @ 3 gal size on south side of of east parking area 2 Podocarpus macrophylla # 30" ht in healing garden 1 Sabal Palmetto at northeast entry | |||
| UC-FINAL SITE INSPECTION | 06/05/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: 1)items to be comopleted by Halifax and 4C'S -NOTED IN E-MAIL TO THEM. ALSO,NOTE TO EOR-ALLIANT-drainage issue at Bridgehaven to be monitored and corrections to be made if neccessary | |||
| ROW - FINAL INSPECTION | 06/05/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: Westbound ROW-north side where water tap was made-seed/straw all bare areas and install 2 signs along Eastbound and remove 2MOT signs at westbound | |||
| LDSC-IRRIGATION FINAL | 06/02/2023 | CANCELLED BY INSPECTOR | RPICATAGI |
| Note: Landscape AsBuilts have been submitted and reviewed | |||
| PLANNING - OFFICE USE - FINAL AS-BUILT SURVEY | 06/01/2023 | APPROVED | DRAMIREZ |
| Note: Approved under 5427 | |||
| LDSC- LANDSCAPE / IRRIGATION AS-BUILT | 05/31/2023 | APPROVED | DRAMIREZ |
| Note: As-builts approved under application #5450 | |||
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | 05/31/2023 | PARTIALLY APPROVED | LFITZGERALD |
| Note: NOTE-MIN CLEARANCE FOR AIR RELEASE VALVE -EASTBOUND BACKFLOW -NOT CORRECT(9IN VERSUS 12IN)/PIPE STANDS NOT YET INSTALLED ON BOTH BACKFLOW-POTABLE DEVICE 5/4/2023 - PREVIOUS INSPECTION NOTES water line tone -satisfactory(Gemstone) 2/2/2023 - PREVIOUS INSPECTION NOTES 10 inch bore mandrel pulled -ok and pressure test ok 1/20/2023 - PREVIOUS INSPECTION NOTES 10 inch bore installed -westbound/10x8 wet tap done/tie into bore done/pig flush -bore-done 11/30/2022 - PREVIOUS INSPECTION NOTES THIS IS A REINSPECTION WM now connected to westbound BF/pig flushed to BF/pressure tested from BF to BF THIS IS A REINSPECTION -8in x 8in wet tap-Eastbound plus 8in pipe tied into RPZ start install of 6in fire/8in potable RPZ-Eastbound side | |||
| U-GREASE INTERCEPTOR FLOW/DYE TESTED | 05/23/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: assisted by Don who was in kitchen on 2nd floor placing dye in all proposed grease compartments | |||
| BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS | 05/22/2023 | APPROVED | FWILLIS |
| BLD- ADA PARKING | 05/22/2023 | APPROVED | FWILLIS |
| BLD - ADA COMPLIANT | 05/22/2023 | APPROVED | FWILLIS |
| BLD- ADA SIGNAGECONTROL | 05/22/2023 | APPROVED | FWILLIS |
| BLD- ADA VEHICULAR WAY | 05/22/2023 | APPROVED | FWILLIS |
| BLD - ADA SIGNAGE- INFOR/DIRECT | 05/22/2023 | APPROVED | FWILLIS |
| UC-TRAF - FINAL (SIGN/PAVEMENT MARKING) | 05/22/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: THIS IS A REINSPECTION-edge line along westbound turn lane was supposed to be white not yellow according to the approved plans-discussed with city traffic engineer-Michael G.-will be allowed/missing(2)signs in eastbound ROW-that were there prior to turning into a turn lane:(1) stating DO NOT ENTER and OTHER facing Goodwill stating Right turn only(was installed when Goodwill was constructed-will be noted on Final punch list and TBD-ADA mat for concrete landing next to existing westbound tree and possible STOP sign just west of ambulance parking where there is a stop bar/STOP written on asphalt/possible stop sign at stop bar across from Emergency entrance/possible stop sign on concrete parking oposite loading dock where thwer is a stop bar only.ALL POSSIBLE AND REQUIRED ITEMS TO BE ADRESED IN FINAL PUNCH OUT. started paving now at North east parking bay over storm retention | |||
| UROW- CURBING & GUTTER | 05/11/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: last area at Market now completed 3/29/2023 - PREVIOUS INSPECTION NOTES curbing at SW/SE Entrances 2/7/2023 - PREVIOUS INSPECTION NOTES THIS IS A REINSPECTION continue with curbing at west areas start placing modified F curb at North East parking rea | |||
| ROW - EROSION CONTROL / INLET PROTE/SILT FENCE | 05/11/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: THIS IS A REINSPECTION -All areas now paved/sodded a couple of areas need repair-Francisco informed | |||
| UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) | 05/11/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: last area between MOB/Hospital completed 4/11/2023 - PREVIOUS INSPECTION NOTES sidewalks at:Bridgehaven/westbound entrance area/east tie in to existing at SEentrance 3/28/2023 - PREVIOUS INSPECTION NOTES Not ready 2/7/2023 - PREVIOUS INSPECTION NOTES heliport pad now with concrete 2/7/2023 - PREVIOUS INSPECTION NOTES sidewalks along west side and misc areas 12/7/2022 - PREVIOUS INSPECTION NOTES sidewalk along eastbound side/other misc. along buildinf-eastside | |||
| UROW -FINAL GRADE PRIOR SOD | 05/04/2023 | FINAL APPROVED | LFITZGERALD |
| Note: 3/28/2023 - PREVIOUS INSPECTION NOTES Not ready for this inspection. | |||
| U-WATER METER INSTALLATION/VERIFICATION | 05/04/2023 | APPROVED | LFITZGERALD |
| Note: 4/21/2023 - PREVIOUS INSPECTION NOTES THIS IS A REINSPECTION FDEP clearence now approved THIS IS A REINSPECTION main now installed from BFP-eastbound to MOB-North side/Pig flushed from BFP-Eastbound side to NECorner of hospital Estbound side-2in potable RPZ installed/waiting on 8in meter(s) for the 8in RPZ(they were not in the RPZ assembly(were not ordered | |||
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | 05/04/2023 | PARTIALLY APPROVED | LFITZGERALD |
| Note: water line tone -satisfactory(Gemstone) 2/2/2023 - PREVIOUS INSPECTION NOTES 10 inch bore mandrel pulled -ok and pressure test ok 1/20/2023 - PREVIOUS INSPECTION NOTES 10 inch bore installed -westbound/10x8 wet tap done/tie into bore done/pig flush -bore-done 11/30/2022 - PREVIOUS INSPECTION NOTES THIS IS A REINSPECTION WM now connected to westbound BF/pig flushed to BF/pressure tested from BF to BF THIS IS A REINSPECTION -8in x 8in wet tap-Eastbound plus 8in pipe tied into RPZ start install of 6in fire/8in potable RPZ-Eastbound side | |||
| UC-MOT MAINTENANCE OF TRAFFIC | 05/03/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: all ROW/Turn lanes along roadways adjacent to site now completed 4/4/2023 - PREVIOUS INSPECTION NOTES 4-3=westbound inside lane closure for Market ALF entrance/2nd lift turn lane;4-4 eastbound inside lane closure for grade shoulder with Gradall 3/31/2023 - PREVIOUS INSPECTION NOTES Eastbound-left thru lane closed in order pave 2nd lift -hospital turn lane into SE entrance;Westbound-left thru lane closed in order to reconstrucut Market ALF Entrance-base only 12/13/2022 - PREVIOUS INSPECTION NOTES lane closure-left lane-now in progress for eastbound PCPKWY for new turn lane | |||
| UC-SUBSTANTIAL WALK-THRU | 05/03/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: walk thru with-4C's,Alliant, Halifax and Robbins-punch list generated for appropriate parties | |||
| UC- PRELIMINARY AS-BUILTS | 05/03/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: all but water as-builts submitted electronically for inspector review-Robbins to submit;paper copy for all as-builts submitted for walk thru | |||
| LDSC-PRE-PLANTING TREE QUALITY | 04/26/2023 | APPROVED - AS NOTED | RPICATAGI |
| Note: 4/18/2023 - PREVIOUS INSPECTION NOTES Sabal Palms | |||
| LDSC- LANDSCAPE / IRRIGATION AS-BUILT | 04/21/2023 | CANCELLED BY APPLICANT | LFITZGERALD |
| Note: not ready yet | |||
| U-GRAVITY SEWER INSTALL/TESTING | 04/21/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: FDEP clearance now approved 3/9/2023 - PREVIOUS INSPECTION NOTES THIS IS A REINSPECTION finish TV/Mandrel/Air Test for MH 10-11,7-8,8-9 THIS IS A REINSPECTION -started relaying from mh 10 to mh11 THIS IS A REINSPECTION air test for mh 2,3,4,5 stub out,6,7 THIS IS A REINSPECTION mh10 installed/tied into existing 10in line THIS IS A REINSPECTION 8in now installed from mh3 to installed mh6 and mh 7 THIS IS A REINSPECTION 8in now installed from mh4 to installed mh5 THIS IS A REINSPECTION 8in now installed from mh3 to installed mh4 THIS IS A REINSPECTION 8in now installed from mh2 to installed mh3 THIS IS A REINSPECTION 8in now installed from mh1 to installed mh2 sewer mh1 now installed/tied into existing10in sewer main | |||
| PROJECT CLOSE OUT MEETING (386-986-3750) | 04/21/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: 2nd meeting-Chris -Alliant now attended with same folks as 1st time-all feel confident will be able to achieve successful close out now that all issues have been discussed 3/9/2023 - PREVIOUS INSPECTION NOTES city staff present along with Chelsea-utility contractor.Jack with Halifax and Jon with Robbins-Morton. EOR =Chris accepted meeting invite but did not attend. All parameters for MOB-TCO and over all site/hospital CO were iscussed. Anothe rmeeting to be scheduled April 17th to facilitate smooth completion of site/building close out. | |||
| UC-ASPHALT PRE PLACEMENT | 04/21/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: All asphalt now placed 4/18/2023 - PREVIOUS INSPECTION NOTES now paving center parking areas -east of MOB and Hospital 4/11/2023 - PREVIOUS INSPECTION NOTES no asphalt placement to note?? 4/5/2023 - PREVIOUS INSPECTION NOTES 4-4 pave both lifts at SWentrance 4/4/2023 - PREVIOUS INSPECTION NOTES 4-3=pave Market ALF/westbound turn lanes/2nd lift SEentrance/1st lift of east drive thru road;4-4 paving south/east 1st lift/2nd lifts misc. 3/31/2023 - PREVIOUS INSPECTION NOTES eastbound turn lane-2nd lift/SEentranceto both lifts to part of SWentrance-1st lift 3/30/2023 - PREVIOUS INSPECTION NOTES now paving 2nd lift-SWentr and SEentr.-1st lift-Cal tech on site 3/29/2023 - PREVIOUS INSPECTION NOTES continuing on 2nd lift west parking areas/Orielly entrance | |||
| U-WATER METER INSTALLATION/VERIFICATION | 04/21/2023 | PARTIALLY APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION FDEP clearence now approved THIS IS A REINSPECTION main now installed from BFP-eastbound to MOB-North side/Pig flushed from BFP-Eastbound side to NECorner of hospital Estbound side-2in potable RPZ installed/waiting on 8in meter(s) for the 8in RPZ(they were not in the RPZ assembly(were not ordered | |||
| UC-ASPHALT PRE PLACEMENT | 04/18/2023 | PARTIALLY APPROVED | LFITZGERALD |
| Note: now paving center parking areas -east of MOB and Hospital 4/11/2023 - PREVIOUS INSPECTION NOTES no asphalt placement to note?? 4/5/2023 - PREVIOUS INSPECTION NOTES 4-4 pave both lifts at SWentrance 4/4/2023 - PREVIOUS INSPECTION NOTES 4-3=pave Market ALF/westbound turn lanes/2nd lift SEentrance/1st lift of east drive thru road;4-4 paving south/east 1st lift/2nd lifts misc. 3/31/2023 - PREVIOUS INSPECTION NOTES eastbound turn lane-2nd lift/SEentranceto both lifts to part of SWentrance-1st lift 3/30/2023 - PREVIOUS INSPECTION NOTES now paving 2nd lift-SWentr and SEentr.-1st lift-Cal tech on site 3/29/2023 - PREVIOUS INSPECTION NOTES continuing on 2nd lift west parking areas/Orielly entrance | |||
| LDSC-PRE-PLANTING TREE QUALITY | 04/18/2023 | PARTIALLY APPROVED | LFITZGERALD |
| Note: Sabal Palms | |||
| UC-ASPHALT PRE PLACEMENT | 04/11/2023 | PARTIALLY APPROVED | LFITZGERALD |
| Note: no asphalt placement to note?? 4/5/2023 - PREVIOUS INSPECTION NOTES 4-4 pave both lifts at SWentrance 4/4/2023 - PREVIOUS INSPECTION NOTES 4-3=pave Market ALF/westbound turn lanes/2nd lift SEentrance/1st lift of east drive thru road;4-4 paving south/east 1st lift/2nd lifts misc. 3/31/2023 - PREVIOUS INSPECTION NOTES eastbound turn lane-2nd lift/SEentranceto both lifts to part of SWentrance-1st lift 3/30/2023 - PREVIOUS INSPECTION NOTES now paving 2nd lift-SWentr and SEentr.-1st lift-Cal tech on site 3/29/2023 - PREVIOUS INSPECTION NOTES continuing on 2nd lift west parking areas/Orielly entrance | |||
| UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) | 04/11/2023 | PARTIALLY APPROVED | LFITZGERALD |
| Note: sidewalks at:Bridgehaven/westbound entrance area/east tie in to existing at SEentrance 3/28/2023 - PREVIOUS INSPECTION NOTES Not ready 2/7/2023 - PREVIOUS INSPECTION NOTES heliport pad now with concrete 2/7/2023 - PREVIOUS INSPECTION NOTES sidewalks along west side and misc areas 12/7/2022 - PREVIOUS INSPECTION NOTES sidewalk along eastbound side/other misc. along buildinf-eastside | |||
| UC-ASPHALT PRE PLACEMENT | 04/05/2023 | PARTIALLY APPROVED | LFITZGERALD |
| Note: 4-4 pave both lifts at SWentrance 4/4/2023 - PREVIOUS INSPECTION NOTES 4-3=pave Market ALF/westbound turn lanes/2nd lift SEentrance/1st lift of east drive thru road;4-4 paving south/east 1st lift/2nd lifts misc. 3/31/2023 - PREVIOUS INSPECTION NOTES eastbound turn lane-2nd lift/SEentranceto both lifts to part of SWentrance-1st lift 3/30/2023 - PREVIOUS INSPECTION NOTES now paving 2nd lift-SWentr and SEentr.-1st lift-Cal tech on site 3/29/2023 - PREVIOUS INSPECTION NOTES continuing on 2nd lift west parking areas/Orielly entrance | |||
| LDSC-PRE-PLANTING TREE QUALITY | 04/05/2023 | APPROVED | RPICATAGI |
| Note: 3/30/2023 1:46:54 PM- PREVIOUS INSPECTION NOTES 2/14/2023 - PREVIOUS INSPECTION NOTES Rick-myself oaks/magnolia's/crepe's/japanese privot's 3/30/23 - No truck loaded with trees was present on the site. | |||
| UC-ASPHALT PRE PLACEMENT | 04/04/2023 | PARTIALLY APPROVED | LFITZGERALD |
| Note: 4-3=pave Market ALF/westbound turn lanes/2nd lift SEentrance/1st lift of east drive thru road;4-4 paving south/east 1st lift/2nd lifts misc. 3/31/2023 - PREVIOUS INSPECTION NOTES eastbound turn lane-2nd lift/SEentranceto both lifts to part of SWentrance-1st lift 3/30/2023 - PREVIOUS INSPECTION NOTES now paving 2nd lift-SWentr and SEentr.-1st lift-Cal tech on site 3/29/2023 - PREVIOUS INSPECTION NOTES continuing on 2nd lift west parking areas/Orielly entrance | |||
| UC-MOT MAINTENANCE OF TRAFFIC | 04/04/2023 | PARTIALLY APPROVED | LFITZGERALD |
| Note: 4-3=westbound inside lane closure for Market ALF entrance/2nd lift turn lane;4-4 eastbound inside lane closure for grade shoulder with Gradall 3/31/2023 - PREVIOUS INSPECTION NOTES Eastbound-left thru lane closed in order pave 2nd lift -hospital turn lane into SE entrance;Westbound-left thru lane closed in order to reconstrucut Market ALF Entrance-base only 12/13/2022 - PREVIOUS INSPECTION NOTES lane closure-left lane-now in progress for eastbound PCPKWY for new turn lane | |||
| UC-ASPHALT PRE PLACEMENT | 03/31/2023 | PARTIALLY APPROVED | LFITZGERALD |
| Note: eastbound turn lane-2nd lift/SEentranceto both lifts to part of SWentrance-1st lift 3/30/2023 - PREVIOUS INSPECTION NOTES now paving 2nd lift-SWentr and SEentr.-1st lift-Cal tech on site 3/29/2023 - PREVIOUS INSPECTION NOTES continuing on 2nd lift west parking areas/Orielly entrance | |||
| BLD - UNDERGROUND SITE LIGHTING CONDUITS | 03/31/2023 | APPROVED | RMARTIN |
| BLD - SITE STRUCTURE - TRASH DUMPSTER | 03/31/2023 | APPROVED | FWILLIS |
| UC-MOT MAINTENANCE OF TRAFFIC | 03/31/2023 | PARTIALLY APPROVED | LFITZGERALD |
| Note: Eastbound-left thru lane closed in order pave 2nd lift -hospital turn lane into SE entrance;Westbound-left thru lane closed in order to reconstrucut Market ALF Entrance-base only 12/13/2022 - PREVIOUS INSPECTION NOTES lane closure-left lane-now in progress for eastbound PCPKWY for new turn lane | |||
| BLD - SITE LIGHTING-PLACEMENT/FOUNDATION | 03/30/2023 | APPROVED | RMARTIN |
| Note: 3/29/2023 - PREVIOUS INSPECTION NOTES | |||
| LDSC-PRE-PLANTING TREE QUALITY | 03/30/2023 | PARTIALLY APPROVED | RPICATAGI |
| Note: 2/14/2023 - PREVIOUS INSPECTION NOTES Rick-myself oaks/magnolia's/crepe's/japanese privot's 3/30/23 - No truck loaded with trees was present on the site. | |||
| UC-ASPHALT PRE PLACEMENT | 03/30/2023 | PARTIALLY APPROVED | LFITZGERALD |
| Note: now paving 2nd lift-SWentr and misc areas in west parking-Cal tech on site 3/29/2023 - PREVIOUS INSPECTION NOTES continuing on 2nd lift west parking areas/Orielly entrance | |||
| UC-ASPHALT PRE PLACEMENT | 03/29/2023 | PARTIALLY APPROVED | LFITZGERALD |
| Note: continuing on 2nd lift west parking areas/Orielly entrance | |||
| UROW- CURBING & GUTTER | 03/29/2023 | PARTIALLY APPROVED | LFITZGERALD |
| Note: curbing at SW/SE Entrances 2/7/2023 - PREVIOUS INSPECTION NOTES THIS IS A REINSPECTION continue with curbing at west areas start placing modified F curb at North East parking rea | |||
| BLD - SITE LIGHTING-POLE SET/FIXTURE | 03/29/2023 | APPROVED | RMARTIN |
| BLD - SITE LIGHTING-PLACEMENT/FOUNDATION | 03/29/2023 | CANCELLED BY APPLICANT | RMARTIN |
| UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) | 03/28/2023 | CANCELLED BY APPLICANT | JHARDING |
| Note: Not ready 2/7/2023 - PREVIOUS INSPECTION NOTES heliport pad now with concrete 2/7/2023 - PREVIOUS INSPECTION NOTES sidewalks along west side and misc areas 12/7/2022 - PREVIOUS INSPECTION NOTES sidewalk along eastbound side/other misc. along buildinf-eastside | |||
| UROW -FINAL GRADE PRIOR SOD | 03/28/2023 | CANCELLED BY APPLICANT | JHARDING |
| Note: Not ready for this inspection. | |||
| UC-ASPHALT PRE PLACEMENT | 03/28/2023 | APPROVED | JHARDING |
| Note: 3/24/2023 - PREVIOUS INSPECTION NOTES now paving new O'Rielly entrance-in part-misc. areas in west parking areas 3/1/2023 - PREVIOUS INSPECTION NOTES now paving NW entrance/thru road east side/SEparking area/NW parking area-informed Jack-HPI- of required asphalt placement monotoring/obtaining samples for analysis | |||
| UC-ASPHALT PRE PLACEMENT | 03/24/2023 | PARTIALLY APPROVED | LFITZGERALD |
| Note: now paving new O'Rielly entrance-in part-misc. areas in west parking areas 3/1/2023 - PREVIOUS INSPECTION NOTES now paving NW entrance/thru road east side/SEparking area/NW parking area-informed Jack-HPI- of required asphalt placement monotoring/obtaining samples for analysis | |||
| PROJECT CLOSE OUT MEETING (386-986-3750) | 03/09/2023 | PARTIALLY APPROVED | LFITZGERALD |
| Note: city staff present along with Chelsea-utility contractor.Jack with Halifax and Jon with Robbins-Morton. EOR =Chris accepted meeting invite but did not attend. All parameters for MOB-TCO and over all site/hospital CO were iscussed. Anothe rmeeting to be scheduled April 17th to facilitate smooth completion of site/building close out. | |||
| U-GRAVITY SEWER INSTALL/TESTING | 03/09/2023 | PARTIALLY APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION finish TV/Mandrel/Air Test for MH 10-11,7-8,8-9 THIS IS A REINSPECTION -started relaying from mh 10 to mh11 THIS IS A REINSPECTION air test for mh 2,3,4,5 stub out,6,7 THIS IS A REINSPECTION mh10 installed/tied into existing 10in line THIS IS A REINSPECTION 8in now installed from mh3 to installed mh6 and mh 7 THIS IS A REINSPECTION 8in now installed from mh4 to installed mh5 THIS IS A REINSPECTION 8in now installed from mh3 to installed mh4 THIS IS A REINSPECTION 8in now installed from mh2 to installed mh3 THIS IS A REINSPECTION 8in now installed from mh1 to installed mh2 sewer mh1 now installed/tied into existing10in sewer main | |||
| UC-ASPHALT PRE PLACEMENT | 03/01/2023 | PARTIALLY APPROVED | LFITZGERALD |
| Note: now paving NW entrance/thru road east side/SEparking area/NW parking area-informed Jack-HPI- of required asphalt placement monotoring/obtaining samples for analysis | |||
| U-WATER MAIN DISINFECTION | 02/21/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: Bore pipe plus now disinfected on Thursday-FEB.9TH by Phil Story-photos recieved | |||
| U-WATER MAIN DISINFECTION SAMPLING | 02/21/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: BORE PIPE PLUS-Sampled day 1 on Monday-city holiday-photos recieved-Herb/Day 2 now sampled | |||
| U-WATER MAIN DISINFECTION | 02/16/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: Now bore pipe /fittings/pvc pieces chlorinated by Phil up to westbound BF 12/5/2022 - PREVIOUS INSPECTION NOTES WM now chlorinated from eastbound tap to westbound backflow | |||
| UC-DRAINAGE PIPE PLACEMENT/LAMPING | 02/15/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: THIS IS A REINSPECTION all remaining now installed THIS IS A REINSPECTION-continuing to CB-15 and CB-16 until they cant place due to stuff in the way THIS IS A REINSPECTION -start under ground retention system-NEast area THIS IS A REINSPECTION 60in installed from JMH6 to JMH7/also 15in to JMH 7 from existing THIS IS A REINSPECTION 60 in installed from JMH 5 to JMH 6 THIS IS A REINSPECTION- 15in from CB1 and CB2 to JMH1 THIS IS A REINSPECTION- 24in from CB27 to CB26 continuing up to existing MES/8in drain pipe out of CB26 THIS IS A REINSPECTION-36in from MES to JMH4 to CB27 MES to DCS-1 installed | |||
| UC-DRAINAGE STRUCT PLACMNT | 02/15/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: THIS IS A REINSPECTION all remaining now installed THIS IS A REINSPECTION-now continuing with CB-15 and onward until run out of accessible areas THIS IS A REINSPECTION-start under ground retention with CB-12 THIS IS A REINSPECTION- JMH 7 now installed THIS IS A REINSPECTION JMH5 and JMH6 now installed THIS IS A REINSPECTION- CB1 and CB2 now installed THIS IS A REINSPECTION- CB26 and JMH1 installed THIS IS A REINSPECTION-JMH4 and CB27installed DCS-1installed | |||
| LDSC-PRE-PLANTING TREE QUALITY | 02/14/2023 | PARTIALLY APPROVED | LFITZGERALD |
| Note: inspected by Rick-myself oaks/magnolia's/crepe's/japanese privot's | |||
| LANDSCAPE PRE-CONSTRUCTION MEETING | 02/14/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: Rick and i met with Ryan-Verde Go and discussed install/close out parameters 12/7/2022 - PREVIOUS INSPECTION NOTES | |||
| UC-CONSTRUCTION ENTRANCE | 02/13/2023 | APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION 2 are now in , 1 at SW along Bridgehaven and 1 at SE along PalmCoast pkwy eastbound | |||
| UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) | 02/07/2023 | PARTIALLY APPROVED | LFITZGERALD |
| Note: sidewalks along west side MOB-and misc areas-also along south side streetside/also north side street side 12/7/2022 - PREVIOUS INSPECTION NOTES sidewalk along eastbound side/other misc. along buildinf-eastside | |||
| UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) | 02/07/2023 | PARTIALLY APPROVED | LFITZGERALD |
| Note: heliport pad now with concrete 2/7/2023 - PREVIOUS INSPECTION NOTES sidewalks along west side and misc areas 12/7/2022 - PREVIOUS INSPECTION NOTES sidewalk along eastbound side/other misc. along buildinf-eastside | |||
| UROW- CURBING & GUTTER | 02/07/2023 | PARTIALLY APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION continue with curbing at west areas start placing modified F curb at North East parking rea | |||
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | 02/02/2023 | PARTIALLY APPROVED | LFITZGERALD |
| Note: 10 inch bore mandrel pulled -ok and pressure test ok 1/20/2023 - PREVIOUS INSPECTION NOTES 10 inch bore installed -westbound/10x8 wet tap done/tie into bore done/pig flush -bore-done 11/30/2022 - PREVIOUS INSPECTION NOTES THIS IS A REINSPECTION WM now connected to westbound BF/pig flushed to BF/pressure tested from BF to BF THIS IS A REINSPECTION -8in x 8in wet tap-Eastbound plus 8in pipe tied into RPZ start install of 6in fire/8in potable RPZ-Eastbound side | |||
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | 01/20/2023 | PARTIALLY APPROVED | LFITZGERALD |
| Note: 10 inch bore installed -westbound/10x8 wet tap done/tie into bore done/pig flush -bore-done 11/30/2022 - PREVIOUS INSPECTION NOTES THIS IS A REINSPECTION WM now connected to westbound BF/pig flushed to BF/pressure tested from BF to BF THIS IS A REINSPECTION -8in x 8in wet tap-Eastbound plus 8in pipe tied into RPZ start install of 6in fire/8in potable RPZ-Eastbound side | |||
| UC-MOT MAINTENANCE OF TRAFFIC | 12/13/2022 | PARTIALLY APPROVED | LFITZGERALD |
| Note: lane closure-left lane-now in progress for eastbound PCPKWY for new turn lane | |||
| U-WATER MAIN DISINFECTION SAMPLING | 12/08/2022 | APPROVED - AS NOTED | LFITZGERALD |
| Note: day 2 sampling -sample 4 location(MOB service-FAILED-sample again 12-10-22) 12/7/2022 - PREVIOUS INSPECTION NOTES Day 1 sampling-eastbound BF to westbound BF(5 sample points) | |||
| U-WATER MAIN DISINFECTION SAMPLING | 12/07/2022 | PARTIALLY APPROVED | LFITZGERALD |
| Note: Day 1 sampling-eastbound BF to westbound BF(5 sample points) | |||
| LANDSCAPE PRE-CONSTRUCTION MEETING | 12/07/2022 | CANCELLED BY APPLICANT | LFITZGERALD |
| UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) | 12/07/2022 | PARTIALLY APPROVED | LFITZGERALD |
| Note: sidewalk along eastbound side/other misc. along buildinf-eastside | |||
| U-WATER MAIN DISINFECTION | 12/05/2022 | PARTIALLY APPROVED | LFITZGERALD |
| Note: WM now chlorinated from eastbound tap to westbound backflow | |||
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | 11/30/2022 | PARTIALLY APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION WM now connected to westbound BF/pig flushed to BF/pressure tested from BF to BF THIS IS A REINSPECTION -8in x 8in wet tap-Eastbound plus 8in pipe tied into RPZ start install of 6in fire/8in potable RPZ-Eastbound side | |||
| U-GREASE INTERCEPTOR INSTALLED/PLUMBED | 11/03/2022 | APPROVED | LFITZGERALD |
| Note: 11/2/2022 - PREVIOUS INSPECTION NOTES hard /pressureT fittings used in the 4inch pvc infflueny/efflunt piping inside the grease traps-sanitary(sweeping) T'S required per spec. line item 6h-SS 29A literture of utility standards | |||
| U-GREASE INTERCEPTOR INSTALLED/PLUMBED | 11/02/2022 | Disapproved - NO FEE | LFITZGERALD |
| Note: hard /pressureT fittings used in the 4inch pvc infflueny/efflunt piping inside the grease traps-sanitary(sweeping) T'S required per spec. line item 6h | |||
| BLD - GREASE INTERCEPTOR PLUMBING & VENTING | 11/02/2022 | APPROVED | MGIBSON |
| BLD - GREASE INTERCEPTOR VENTING | 11/02/2022 | APPROVED | MGIBSON |
| U-GREASE INTERCEPTOR PRE-INSTALLATION | 10/10/2022 | APPROVED - AS NOTED | LFITZGERALD |
| Note: 1-2500 gal grease tank installed with rock on bottom/baffle hole 2ft from btm(1ft required) and 13in from left side wall(required to be in center)-will inspect during plum inspection 10/6/2022 - PREVIOUS INSPECTION NOTES 1 -1500 gal tank installed with rock on bottom | |||
| U-GREASE INTERCEPTOR PRE-INSTALLATION | 10/06/2022 | PARTIALLY APPROVED | LFITZGERALD |
| Note: 1 -1500 gal tank installed with rock on bottom | |||
| UC-TRAF - FINAL (SIGN/PAVEMENT MARKING) | 08/10/2022 | PARTIALLY APPROVED | LFITZGERALD |
| Note: started paving now at North east parking bay over storm retention | |||
| UROW- CURBING & GUTTER | 07/21/2022 | PARTIALLY APPROVED | LFITZGERALD |
| Note: start placing modified F curb at North East parking rea | |||
| U-WATER METER INSTALLATION/VERIFICATION | 07/11/2022 | PARTIALLY APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION main now installed from BFP-eastbound to MOB-North side/Pig flushed from BFP-Eastbound side to NECorner of hospital Estbound side-2in potable RPZ installed/waiting on 8in meter(s) for the 8in RPZ(they were not in the RPZ assembly(were not ordered | |||
| U-WATER METER INSTALLATION/VERIFICATION | 06/16/2022 | PARTIALLY APPROVED | LFITZGERALD |
| Note: Estbound side-2in potable RPZ installed/waiting on 8in meter(s) for the 8in RPZ(they were not in the RPZ assembly(were not ordered | |||
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | 06/16/2022 | PARTIALLY APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION -8in x 8in wet tap-Eastbound plus 8in pipe tied into RPZ start install of 6in fire/8in potable RPZ-Eastbound side | |||
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | 06/14/2022 | PARTIALLY APPROVED | LFITZGERALD |
| Note: start install of 6in fire/8in potable RPZ-Eastbound side | |||
| UC-DRAINAGE PIPE PLACEMENT/LAMPING | 06/08/2022 | PARTIALLY APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION-continuing to CB-15 and CB-16 until they cant place due to stuff in the way THIS IS A REINSPECTION -start under ground retention system-NEast area THIS IS A REINSPECTION 60in installed from JMH6 to JMH7/also 15in to JMH 7 from existing THIS IS A REINSPECTION 60 in installed from JMH 5 to JMH 6 THIS IS A REINSPECTION- 15in from CB1 and CB2 to JMH1 THIS IS A REINSPECTION- 24in from CB27 to CB26 continuing up to existing MES/8in drain pipe out of CB26 THIS IS A REINSPECTION-36in from MES to JMH4 to CB27 MES to DCS-1 installed | |||
| UC-DRAINAGE STRUCT PLACMNT | 06/08/2022 | PARTIALLY APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION-now continuing with CB-15 and onward until run out of accessible areas THIS IS A REINSPECTION-start under ground retention with CB-12 THIS IS A REINSPECTION- JMH 7 now installed THIS IS A REINSPECTION JMH5 and JMH6 now installed THIS IS A REINSPECTION- CB1 and CB2 now installed THIS IS A REINSPECTION- CB26 and JMH1 installed THIS IS A REINSPECTION-JMH4 and CB27installed DCS-1installed | |||
| U-GRAVITY SEWER INSTALL/TESTING | 06/02/2022 | PARTIALLY APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION -started relaying from mh 10 to mh11 THIS IS A REINSPECTION air test for mh 2,3,4,5 stub out,6,7 THIS IS A REINSPECTION mh10 installed/tied into existing 10in line THIS IS A REINSPECTION 8in now installed from mh3 to installed mh6 and mh 7 THIS IS A REINSPECTION 8in now installed from mh4 to installed mh5 THIS IS A REINSPECTION 8in now installed from mh3 to installed mh4 THIS IS A REINSPECTION 8in now installed from mh2 to installed mh3 THIS IS A REINSPECTION 8in now installed from mh1 to installed mh2 sewer mh1 now installed/tied into existing10in sewer main | |||
| UC-DRAINAGE STRUCT PLACMNT | 05/04/2022 | PARTIALLY APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION-start under ground retention with CB-12 THIS IS A REINSPECTION- JMH 7 now installed THIS IS A REINSPECTION JMH5 and JMH6 now installed THIS IS A REINSPECTION- CB1 and CB2 now installed THIS IS A REINSPECTION- CB26 and JMH1 installed THIS IS A REINSPECTION-JMH4 and CB27installed DCS-1installed | |||
| UC-DRAINAGE PIPE PLACEMENT/LAMPING | 05/04/2022 | PARTIALLY APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION -start under ground retention system-NEast area-DCS-1Stucture THIS IS A REINSPECTION 60in installed from JMH6 to JMH7/also 15in to JMH 7 from existing THIS IS A REINSPECTION 60 in installed from JMH 5 to JMH 6 THIS IS A REINSPECTION- 15in from CB1 and CB2 to JMH1 THIS IS A REINSPECTION- 24in from CB27 to CB26 continuing up to existing MES/8in drain pipe out of CB26 THIS IS A REINSPECTION-36in from MES to JMH4 to CB27 MES to DCS-1 installed | |||
| U-GRAVITY SEWER INSTALL/TESTING | 12/22/2021 | PARTIALLY APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION air test for mh 2,3,4,5 stub out,6,7 THIS IS A REINSPECTION mh10 installed/tied into existing 10in line THIS IS A REINSPECTION 8in now installed from mh3 to installed mh6 and mh 7 THIS IS A REINSPECTION 8in now installed from mh4 to installed mh5 THIS IS A REINSPECTION 8in now installed from mh3 to installed mh4 THIS IS A REINSPECTION 8in now installed from mh2 to installed mh3 THIS IS A REINSPECTION 8in now installed from mh1 to installed mh2 sewer mh1 now installed/tied into existing10in sewer main | |||
| U-GRAVITY SEWER INSTALL/TESTING | 12/16/2021 | PARTIALLY APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION mh10 installed/tied into existing 10in line THIS IS A REINSPECTION 8in now installed from mh3 to installed mh6 and mh 7 THIS IS A REINSPECTION 8in now installed from mh4 to installed mh5 THIS IS A REINSPECTION 8in now installed from mh3 to installed mh4 THIS IS A REINSPECTION 8in now installed from mh2 to installed mh3 THIS IS A REINSPECTION 8in now installed from mh1 to installed mh2 sewer mh1 now installed/tied into existing10in sewer main | |||
| UC-DRAINAGE PIPE PLACEMENT/LAMPING | 11/17/2021 | PARTIALLY APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION 60in installed from JMH6 to JMH7/also 15in to JMH 7 from existing THIS IS A REINSPECTION 60 in installed from JMH 5 to JMH 6 THIS IS A REINSPECTION- 15in from CB1 and CB2 to JMH1 THIS IS A REINSPECTION- 24in from CB27 to CB26 continuing up to existing MES/8in drain pipe out of CB26 THIS IS A REINSPECTION-36in from MES to JMH4 to CB27 MES to DCS-1 installed | |||
| UC-DRAINAGE STRUCT PLACMNT | 11/16/2021 | PARTIALLY APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION- JMH 7 now installed THIS IS A REINSPECTION JMH5 and JMH6 now installed THIS IS A REINSPECTION- CB1 and CB2 now installed THIS IS A REINSPECTION- CB26 and JMH1 installed THIS IS A REINSPECTION-JMH4 and CB27installed DCS-1installed | |||
| UC-DRAINAGE PIPE PLACEMENT/LAMPING | 11/09/2021 | PARTIALLY APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION 60 in installed from JMH 5 to JMH 6 THIS IS A REINSPECTION- 15in from CB1 and CB2 to JMH1 THIS IS A REINSPECTION- 24in from CB27 to CB26 continuing up to existing MES/8in drain pipe out of CB26 THIS IS A REINSPECTION-36in from MES to JMH4 to CB27 MES to DCS-1 installed | |||
| UC-DRAINAGE STRUCT PLACMNT | 11/09/2021 | PARTIALLY APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION JMH5 and JMH6 now installed THIS IS A REINSPECTION- CB1 and CB2 now installed THIS IS A REINSPECTION- CB26 and JMH1 installed THIS IS A REINSPECTION-JMH4 and CB27installed DCS-1installed | |||
| UC-DRAINAGE STRUCT PLACMNT | 10/29/2021 | PARTIALLY APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION- CB1 and CB2 now installed THIS IS A REINSPECTION- CB26 and JMH1 installed THIS IS A REINSPECTION-JMH4 and CB27installed DCS-1installed | |||
| UC-DRAINAGE PIPE PLACEMENT/LAMPING | 10/29/2021 | PARTIALLY APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION- 15in from CB1 and CB2 to JMH1 THIS IS A REINSPECTION- 24in from CB27 to CB26 continuing up to existing MES/8in drain pipe out of CB26 THIS IS A REINSPECTION-36in from MES to JMH4 to CB27 MES to DCS-1 installed | |||
| UC-DRAINAGE PIPE PLACEMENT/LAMPING | 10/26/2021 | PARTIALLY APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION- 24in from CB27 to CB26 continuing up to existing MES/8in drain pipe out of CB26 THIS IS A REINSPECTION-36in from MES to JMH4 to CB27 MES to DCS-1 installed | |||
| UC-DRAINAGE STRUCT PLACMNT | 10/26/2021 | PARTIALLY APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION- CB26 and JMH1 installed THIS IS A REINSPECTION-JMH4 and CB27installed DCS-1installed | |||
| UC-DRAINAGE STRUCT PLACMNT | 10/19/2021 | PARTIALLY APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION-JMH4 and CB27installed DCS-1installed | |||
| UC-DRAINAGE PIPE PLACEMENT/LAMPING | 10/19/2021 | PARTIALLY APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION-36in from MES to JMH4 to CB27 MES to DCS-1 installed | |||
| UC-DRAINAGE PIPE PLACEMENT/LAMPING | 10/14/2021 | PARTIALLY APPROVED | LFITZGERALD |
| Note: MES to DCS-1 installed | |||
| UC-DRAINAGE STRUCT PLACMNT | 10/14/2021 | PARTIALLY APPROVED | LFITZGERALD |
| Note: DCS-1installed | |||
| U-GRAVITY SEWER INSTALL/TESTING | 10/04/2021 | PARTIALLY APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION 8in now installed from mh5 to installed mh6 and mh 7 THIS IS A REINSPECTION 8in now installed from mh4 to installed mh5 THIS IS A REINSPECTION 8in now installed from mh3 to installed mh4 THIS IS A REINSPECTION 8in now installed from mh2 to installed mh3 THIS IS A REINSPECTION 8in now installed from mh1 to installed mh2 sewer mh1 now installed/tied into existing10in sewer main | |||
| U-GRAVITY SEWER INSTALL/TESTING | 09/30/2021 | PARTIALLY APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION 8in now installed from mh4 to installed mh5 THIS IS A REINSPECTION 8in now installed from mh3 to installed mh4 THIS IS A REINSPECTION 8in now installed from mh2 to installed mh3 THIS IS A REINSPECTION 8in now installed from mh1 to installed mh2 sewer mh1 now installed/tied into existing10in sewer main | |||
| U-GRAVITY SEWER INSTALL/TESTING | 09/29/2021 | PARTIALLY APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION 8in now installed from mh3 to installed mh4 THIS IS A REINSPECTION 8in now installed from mh2 to installed mh3 THIS IS A REINSPECTION 8in now installed from mh1 to installed mh2 sewer mh1 now installed/tied into existing10in sewer main | |||
| U-GRAVITY SEWER INSTALL/TESTING | 09/27/2021 | PARTIALLY APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION 8in now installed from mh2 to installed mh3 THIS IS A REINSPECTION 8in now installed from mh1 to installed mh2 sewer mh1 now installed/tied into existing10in sewer main | |||
| U-GRAVITY SEWER INSTALL/TESTING | 09/22/2021 | PARTIALLY APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION 8in now installed from mh1 to installed mh2 sewer mh1 now installed/tied into existing10in sewer main | |||
| U-GRAVITY SEWER INSTALL/TESTING | 09/21/2021 | PARTIALLY APPROVED | LFITZGERALD |
| Note: sewer mh1 now installed/tied into existing10in sewer main | |||
| UC-CONSTRUCTION ENTRANCE | 09/17/2021 | PARTIALLY APPROVED | LFITZGERALD |
| Note: 2 are now in , 1 at SW along Bridgehaven and 1 at SE along PalmCoast pkwy eastbound | |||
| LDSC-TREE BARRICADE | 09/17/2021 | APPROVED | LFITZGERALD |
| ROW - EROSION CONTROL / INLET PROTE/SILT FENCE | 09/17/2021 | PARTIALLY APPROVED | LFITZGERALD |
| Note: a couple of areas need repair-Francisco informed | |||
| PLAN - PRE-CON 386-986-3750 | 09/13/2021 | APPROVED | LFITZGERALD |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 08/17/2021 | 08/18/2021 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 08/17/2021 | 08/17/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| PLENG | COMPLETE | 08/17/2021 | 08/17/2021 |
| Note: Released By: DENNIS R. LEAP, P.E. - - DLEAP@PALMCOASTGOV.COM | |||
| PLLA | COMPLETE | 08/17/2021 | 08/18/2021 |
| Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM | |||
| UD1 | COMPLETE | 08/17/2021 | 08/18/2021 |
| Note: Released By: CHRIS JOHNSON - - CJOHNSON@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADMINISTRATIVE- SITE DEVELOP | ¤125.00 | 09/14/2021 |
| INSPECTION - GENERAL | ¤520.00 | 09/14/2021 |
| SITE INSPECTION | ¤840.00 | 09/14/2021 |
| SITE PLAN 30 | ¤30.00 | 09/14/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤1,515.00 |