Permit #2021081012

Permit Details

Status: COED

Parcel Id: 07-11-31-7010-00280-0160
CONDITIONED SPACE: 1346 sqft
CONDITIONED SPACE: 1346 sqft
GARAGE: 524 sqft
GARAGE: 524 sqft
OPENED PORCH (WITH ROOF) : 307 sqft
OPENED PORCH (WITH ROOF) : 116 sqft
Total Square Footage: 4163 sqft
Block: 00280
Subdivision: 2137 - SECTION 10-FLORIDA PARK
Job Phone: 386-447-7007
Location Address: 31 FRENEAU LN
Type: DU - DUPLEX
Issue Date: 11/09/2021
NOC: RECORDED
Applicant name: MAXIM TARANNIK
Owner: CARLOS F AND NANETTE MARQUES-FREITAS

Address

52 FRANKFORD LANE

PALM COAST, FL 32137

Lot: 0160
Contracted Stated Job Value: ¤349,800.00
Job Description: Duplex
Type: CN

Contractor

GOLDEN MAGNOLIA, INC
Status Location Address State License Number Phone
INACTIVE

1 ROCKEFELLER DRIVE

PALM COAST, FL 32164

RR282811984 (Exp: 08/31/2025) 386-447-7007

Sub Contractors

GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone
ACTIVE

48 EAGLE LAKES DRIVE

FLAGLER BEACH, FL 32136

CAC048127 (Exp: 08/31/2026) 386-597-3280
DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629
THOMAS JOSEPH WALL
Status Location Address State License Number Phone
ACTIVE

PO BOX 314

PALAKTKA, FL 32177

CFC037193 (Exp: 08/31/2026) 386-336-9050

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 07/24/2023 FINAL APPROVED TSTAUFFACHER
Note: 7/13/2023 - PREVIOUS INSPECTION NOTES 7/5/2023 - PREVIOUS INSPECTION NOTES 07/05/2023 energy calcs do not match installed units please provide new energy calcs to city for revision units not labeled A and B Broken window left unit Doorknobs not installed Not a complete list/ inspection stopped 6/29/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2450 5/11/2023 - PREVIOUS INSPECTION NOTES 4/27/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2490 9/20/2022 - PREVIOUS INSPECTION NOTES 9/16/2022 - PREVIOUS INSPECTION NOTES THIS IS A REINSPECTION Inspector Notes from Inspection 2445 Inspector Notes from Inspection 2420 THIS IS A REINSPECTION Inspector Notes from Inspection 2467 Trash on site. Site needs to be cleaned. No further inspections will be passed until trash is cleaned. 07-29-2022 1. Service wire not installed. 2. Wires in both electrical panels not installed. 3. UFER grounds not visible 4. Floor outlet added in right unit and filled with concrete. Please submit a revision to the building department. Uncover concrete for inspection. 5. Grounds not connected in both units. 6. Light not installed in left unit masterbedroom closet. 7. Back doors and right unit window will need a window nailing added. (Contractor noted that window is on backorder). 08-22-2022. 1. Service not installed - check at early power. 2. UFER ground not visible - check at early power. 3. Electrical panels conductors not phased out. Check at next inspection (insulation). 08-29-2022 - Three items above have not been addressed. Check at next inspection. 09-08-2022 - 1. FIREBLOCKING . Fireblocking needed at garage walls. R302.11.1 2. Service not installed - check at early power. 3. UFER ground not visible - check at early power. 09-14-2022 - Fireblocking will be addressed at insulation. Fire foam is needed at garage wall fireblocking penetrations. 09-16-2022 - Fire foam needed at garage walls penetrations. FIREBLOCKING INTEGRITY MUST BE MAINTAINED R302.11.2. When drilled through the fire blocking. 09-20-2022 1. Fire foam missed at left unit, right side of wall at ceiling near entry door. Insulation not installed at same area. FIREBLOCKING INTEGRITY MUST BE MAINTAINED R302.11.2. 2. Service not installed - check at early power. 3. UFER ground not visible - check at early power. 09-21-2022 1.Service not installed - check at early power. 2. UFER ground not visible - check at early power. 04-27-2023 Exterior of home is complete. Please submit an engineering letter to the building department and have on site along with the approved drawings, that the work has been installed as per plans. 05-11-2023. Above issue has not been resolved. Exterior of home is complete. Please submit an engineering letter to the building department and have on site along with the approved drawings, that the work has been installed as per plans. 5/24/23 Inspection administratively approved by CBO on submission of PE inspection letter. 06-29-2023 1. Kitchen outlets not installed. 2. Kitchen hood duct not correct M505. 3. Approved documents not on site. Not ready for inspection. 07-13-2023 1. Unit A: Broken front window. 2. Disposal switch not installed. 3. AHU drain pipe not insulated completely. 4. AC not proper clearance form grade. 5. Garage door will not close. Inspection stopped. Not ready for inspection.
BLD - BUILDING FINAL 07/24/2023 FINAL APPROVED TSTAUFFACHER
BLD - BUILDING FINAL 07/13/2023 Disapproved -FEE REQUIRED AGAETANO
Note: 7/5/2023 - PREVIOUS INSPECTION NOTES 07/05/2023 energy calcs do not match installed units please provide new energy calcs to city for revision units not labeled A and B Broken window left unit Doorknobs not installed Not a complete list/ inspection stopped 6/29/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2450 5/11/2023 - PREVIOUS INSPECTION NOTES 4/27/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2490 9/20/2022 - PREVIOUS INSPECTION NOTES 9/16/2022 - PREVIOUS INSPECTION NOTES THIS IS A REINSPECTION Inspector Notes from Inspection 2445 Inspector Notes from Inspection 2420 THIS IS A REINSPECTION Inspector Notes from Inspection 2467 Trash on site. Site needs to be cleaned. No further inspections will be passed until trash is cleaned. 07-29-2022 1. Service wire not installed. 2. Wires in both electrical panels not installed. 3. UFER grounds not visible 4. Floor outlet added in right unit and filled with concrete. Please submit a revision to the building department. Uncover concrete for inspection. 5. Grounds not connected in both units. 6. Light not installed in left unit masterbedroom closet. 7. Back doors and right unit window will need a window nailing added. (Contractor noted that window is on backorder). 08-22-2022. 1. Service not installed - check at early power. 2. UFER ground not visible - check at early power. 3. Electrical panels conductors not phased out. Check at next inspection (insulation). 08-29-2022 - Three items above have not been addressed. Check at next inspection. 09-08-2022 - 1. FIREBLOCKING . Fireblocking needed at garage walls. R302.11.1 2. Service not installed - check at early power. 3. UFER ground not visible - check at early power. 09-14-2022 - Fireblocking will be addressed at insulation. Fire foam is needed at garage wall fireblocking penetrations. 09-16-2022 - Fire foam needed at garage walls penetrations. FIREBLOCKING INTEGRITY MUST BE MAINTAINED R302.11.2. When drilled through the fire blocking. 09-20-2022 1. Fire foam missed at left unit, right side of wall at ceiling near entry door. Insulation not installed at same area. FIREBLOCKING INTEGRITY MUST BE MAINTAINED R302.11.2. 2. Service not installed - check at early power. 3. UFER ground not visible - check at early power. 09-21-2022 1.Service not installed - check at early power. 2. UFER ground not visible - check at early power. 04-27-2023 Exterior of home is complete. Please submit an engineering letter to the building department and have on site along with the approved drawings, that the work has been installed as per plans. 05-11-2023. Above issue has not been resolved. Exterior of home is complete. Please submit an engineering letter to the building department and have on site along with the approved drawings, that the work has been installed as per plans. 5/24/23 Inspection administratively approved by CBO on submission of PE inspection letter. 06-29-2023 1. Kitchen outlets not installed. 2. Kitchen hood duct not correct M505. 3. Approved documents not on site. Not ready for inspection. 07-13-2023 1. Unit A: Broken front window. 2. Disposal switch not installed. 3. AHU drain pipe not insulated completely. 4. AC not proper clearance form grade. 5. Garage door will not close. Inspection stopped. Not ready for inspection.
BLD - BUILDING FINAL 07/05/2023 Disapproved - NO FEE TSTAUFFACHER
Note: 07/05/2023 energy calcs do not match installed units please provide new energy calcs to city for revision units not labeled A and B Broken window left unit Doorknobs not installed Not a complete list/ inspection stopped 6/29/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2450 5/11/2023 - PREVIOUS INSPECTION NOTES 4/27/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2490 9/20/2022 - PREVIOUS INSPECTION NOTES 9/16/2022 - PREVIOUS INSPECTION NOTES THIS IS A REINSPECTION Inspector Notes from Inspection 2445 Inspector Notes from Inspection 2420 THIS IS A REINSPECTION Inspector Notes from Inspection 2467 Trash on site. Site needs to be cleaned. No further inspections will be passed until trash is cleaned. 07-29-2022 1. Service wire not installed. 2. Wires in both electrical panels not installed. 3. UFER grounds not visible 4. Floor outlet added in right unit and filled with concrete. Please submit a revision to the building department. Uncover concrete for inspection. 5. Grounds not connected in both units. 6. Light not installed in left unit masterbedroom closet. 7. Back doors and right unit window will need a window nailing added. (Contractor noted that window is on backorder). 08-22-2022. 1. Service not installed - check at early power. 2. UFER ground not visible - check at early power. 3. Electrical panels conductors not phased out. Check at next inspection (insulation). 08-29-2022 - Three items above have not been addressed. Check at next inspection. 09-08-2022 - 1. FIREBLOCKING . Fireblocking needed at garage walls. R302.11.1 2. Service not installed - check at early power. 3. UFER ground not visible - check at early power. 09-14-2022 - Fireblocking will be addressed at insulation. Fire foam is needed at garage wall fireblocking penetrations. 09-16-2022 - Fire foam needed at garage walls penetrations. FIREBLOCKING INTEGRITY MUST BE MAINTAINED R302.11.2. When drilled through the fire blocking. 09-20-2022 1. Fire foam missed at left unit, right side of wall at ceiling near entry door. Insulation not installed at same area. FIREBLOCKING INTEGRITY MUST BE MAINTAINED R302.11.2. 2. Service not installed - check at early power. 3. UFER ground not visible - check at early power. 09-21-2022 1.Service not installed - check at early power. 2. UFER ground not visible - check at early power. 04-27-2023 Exterior of home is complete. Please submit an engineering letter to the building department and have on site along with the approved drawings, that the work has been installed as per plans. 05-11-2023. Above issue has not been resolved. Exterior of home is complete. Please submit an engineering letter to the building department and have on site along with the approved drawings, that the work has been installed as per plans. 5/24/23 Inspection administratively approved by CBO on submission of PE inspection letter. 06-29-2023 1. Kitchen outlets not installed. 2. Kitchen hood duct not correct M505. 3. Approved documents not on site. Not ready for inspection.
BLD - BUILDING FINAL 06/29/2023 Disapproved -FEE REQUIRED AGAETANO
Note: Inspector Notes from Inspection 2450 5/11/2023 - PREVIOUS INSPECTION NOTES 4/27/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2490 9/20/2022 - PREVIOUS INSPECTION NOTES 9/16/2022 - PREVIOUS INSPECTION NOTES THIS IS A REINSPECTION Inspector Notes from Inspection 2445 Inspector Notes from Inspection 2420 THIS IS A REINSPECTION Inspector Notes from Inspection 2467 Trash on site. Site needs to be cleaned. No further inspections will be passed until trash is cleaned. 07-29-2022 1. Service wire not installed. 2. Wires in both electrical panels not installed. 3. UFER grounds not visible 4. Floor outlet added in right unit and filled with concrete. Please submit a revision to the building department. Uncover concrete for inspection. 5. Grounds not connected in both units. 6. Light not installed in left unit masterbedroom closet. 7. Back doors and right unit window will need a window nailing added. (Contractor noted that window is on backorder). 08-22-2022. 1. Service not installed - check at early power. 2. UFER ground not visible - check at early power. 3. Electrical panels conductors not phased out. Check at next inspection (insulation). 08-29-2022 - Three items above have not been addressed. Check at next inspection. 09-08-2022 - 1. FIREBLOCKING . Fireblocking needed at garage walls. R302.11.1 2. Service not installed - check at early power. 3. UFER ground not visible - check at early power. 09-14-2022 - Fireblocking will be addressed at insulation. Fire foam is needed at garage wall fireblocking penetrations. 09-16-2022 - Fire foam needed at garage walls penetrations. FIREBLOCKING INTEGRITY MUST BE MAINTAINED R302.11.2. When drilled through the fire blocking. 09-20-2022 1. Fire foam missed at left unit, right side of wall at ceiling near entry door. Insulation not installed at same area. FIREBLOCKING INTEGRITY MUST BE MAINTAINED R302.11.2. 2. Service not installed - check at early power. 3. UFER ground not visible - check at early power. 09-21-2022 1.Service not installed - check at early power. 2. UFER ground not visible - check at early power. 04-27-2023 Exterior of home is complete. Please submit an engineering letter to the building department and have on site along with the approved drawings, that the work has been installed as per plans. 05-11-2023. Above issue has not been resolved. Exterior of home is complete. Please submit an engineering letter to the building department and have on site along with the approved drawings, that the work has been installed as per plans. 5/24/23 Inspection administratively approved by CBO on submission of PE inspection letter. 06-29-2023 1. Kitchen outlets not installed. 2. Kitchen hood duct not correct M1503 & M505. 3. Approved documents not on site. Not ready for inspection. Inspection stopped.
U -UTILITY RESIDENTIAL FINAL 06/29/2023 FINAL APPROVED DHANEY
ROW - FINAL INSPECTION 06/28/2023 FINAL APPROVED EMADISON
Note: 6/20/2023 - PREVIOUS INSPECTION NOTES ** 06/20/23 BUILDER IS STILL REQUIRED TO REMOVE "ALL" THE TRASH AND CONSTRUCTION DEBRIS FROM THE VACANT ON LEFT SIDE AND REAR AS NOTED IN PREVIOUS INSPECTIONS ______________________________________________________________________________________________________________________ 5/30/2023 12:26:15 PM- PREVIOUS INSPECTION NOTES 5/30/2023 12:24:10 PM- PREVIOUS INSPECTION NOTES 5/30/2023 - PREVIOUS INSPECTION NOTES ** 05/30/23 BUILDER NEEDS TO REPAIR SWALE ON LEFT SIDE OF LEFT SIDE DRIVEWAY AND SOD OUTLINED WITH WHITE PAINT NEED TO FILL AND SOD LOW SPOTS AND REMOVE HIGH SPOT AND SOD ** BUILDER NEEDS TO REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM PROPERTY AND VACANT THIS INCLUDES REMOVING ALL DEBRIS FROM DRIVEWAYS (SIGNS, POSTS, TUBS WITH DEBRIS, CONCRETE) ** ** SEED** NEEDS TO BE USED WITH THE STRAW TO AID IN EROSION CONTROL ** RIGHT & LEFT SIDE SIDEWALK SEWER CLEAN-OUTS ARE TO LOW IT IS A TRIPPING HAZARD AND NEEDS TO BE RAISED FLUSH WITH THE TOP OF SIDEWALK ELEVATION ________________________________________________________________________________________________________________________ 4/27/2023 - PREVIOUS INSPECTION NOTES ** 04/27/23 ** 04/26/23 BUILDER NEEDS TO REPAIR SWALE ON LEFT SIDE OF LEFT SIDE DRIVEWAY AND SOD OUTLINED WITH PINK PAINT ** BUILDER NEEDS TO REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM PROPERTY AND VACANT ** ** SEED** NEEDS TO BE USED WITH THE STRAW ______________________________________________________________________________________________________________________ ** BEFORE FINAL ROW INSPECTION IS APPROVED CORRECTIONS NEEDED** ** 04/26/23 BUILDER NEEDS TO REPAIR SWALE ON LEFT SIDE OF LEFT SIDE DRIVEWAY AND SOD OUTLINED WITH PINK PAINT ** BUILDER NEEDS TO REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM PROPERTY AND VACANT ** ** SEED** NEEDS TO BE USED WITH THE STRAW
ROW - FINAL INSPECTION 06/20/2023 Disapproved -FEE REQUIRED EMADISON
Note: ** 06/20/23 BUILDER IS STILL REQUIRED TO REMOVE "ALL" THE TRASH AND CONSTRUCTION DEBRIS FROM THE VACANT ON LEFT SIDE AND REAR AS NOTED IN PREVIOUS INSPECTIONS ______________________________________________________________________________________________________________________ 5/30/2023 12:26:15 PM- PREVIOUS INSPECTION NOTES 5/30/2023 12:24:10 PM- PREVIOUS INSPECTION NOTES 5/30/2023 - PREVIOUS INSPECTION NOTES ** 05/30/23 BUILDER NEEDS TO REPAIR SWALE ON LEFT SIDE OF LEFT SIDE DRIVEWAY AND SOD OUTLINED WITH WHITE PAINT NEED TO FILL AND SOD LOW SPOTS AND REMOVE HIGH SPOT AND SOD ** BUILDER NEEDS TO REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM PROPERTY AND VACANT THIS INCLUDES REMOVING ALL DEBRIS FROM DRIVEWAYS (SIGNS, POSTS, TUBS WITH DEBRIS, CONCRETE) ** ** SEED** NEEDS TO BE USED WITH THE STRAW TO AID IN EROSION CONTROL ** RIGHT & LEFT SIDE SIDEWALK SEWER CLEAN-OUTS ARE TO LOW IT IS A TRIPPING HAZARD AND NEEDS TO BE RAISED FLUSH WITH THE TOP OF SIDEWALK ELEVATION ________________________________________________________________________________________________________________________ 4/27/2023 - PREVIOUS INSPECTION NOTES ** 04/27/23 ** 04/26/23 BUILDER NEEDS TO REPAIR SWALE ON LEFT SIDE OF LEFT SIDE DRIVEWAY AND SOD OUTLINED WITH PINK PAINT ** BUILDER NEEDS TO REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM PROPERTY AND VACANT ** ** SEED** NEEDS TO BE USED WITH THE STRAW ______________________________________________________________________________________________________________________ ** BEFORE FINAL ROW INSPECTION IS APPROVED CORRECTIONS NEEDED** ** 04/26/23 BUILDER NEEDS TO REPAIR SWALE ON LEFT SIDE OF LEFT SIDE DRIVEWAY AND SOD OUTLINED WITH PINK PAINT ** BUILDER NEEDS TO REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM PROPERTY AND VACANT ** ** SEED** NEEDS TO BE USED WITH THE STRAW
ROW - FINAL INSPECTION 05/31/2023 CANCELLED BY APPLICANT STHOMAS
Note: 5/30/2023 - PREVIOUS INSPECTION NOTES ** 05/30/23 BUILDER NEEDS TO REPAIR SWALE ON LEFT SIDE OF LEFT SIDE DRIVEWAY AND SOD OUTLINED WITH WHITE PAINT NEED TO FILL AND SOD LOW SPOTS AND REMOVE HIGH SPOT AND SOD ** BUILDER NEEDS TO REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM PROPERTY AND VACANT THIS INCLUDES REMOVING ALL DEBRIS FROM DRIVEWAYS (SIGNS, POSTS, TUBS WITH DEBRIS, CONCRETE) ** ** SEED** NEEDS TO BE USED WITH THE STRAW TO AID IN EROSION CONTROL ** RIGHT & LEFT SIDE SIDEWALK SEWER CLEAN-OUTS ARE TO LOW IT IS A TRIPPING HAZARD AND NEEDS TO BE RAISED FLUSH WITH THE TOP OF SIDEWALK ELEVATION ________________________________________________________________________________________________________________________ 4/27/2023 - PREVIOUS INSPECTION NOTES ** 04/27/23 ** 04/26/23 BUILDER NEEDS TO REPAIR SWALE ON LEFT SIDE OF LEFT SIDE DRIVEWAY AND SOD OUTLINED WITH PINK PAINT ** BUILDER NEEDS TO REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM PROPERTY AND VACANT ** ** SEED** NEEDS TO BE USED WITH THE STRAW ______________________________________________________________________________________________________________________ ** BEFORE FINAL ROW INSPECTION IS APPROVED CORRECTIONS NEEDED** ** 04/26/23 BUILDER NEEDS TO REPAIR SWALE ON LEFT SIDE OF LEFT SIDE DRIVEWAY AND SOD OUTLINED WITH PINK PAINT ** BUILDER NEEDS TO REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM PROPERTY AND VACANT ** ** SEED** NEEDS TO BE USED WITH THE STRAW
ROW - FINAL INSPECTION 05/31/2023 CANCELLED BY APPLICANT STHOMAS
Note: 5/30/2023 12:24:10 PM- PREVIOUS INSPECTION NOTES 5/30/2023 - PREVIOUS INSPECTION NOTES ** 05/30/23 BUILDER NEEDS TO REPAIR SWALE ON LEFT SIDE OF LEFT SIDE DRIVEWAY AND SOD OUTLINED WITH WHITE PAINT NEED TO FILL AND SOD LOW SPOTS AND REMOVE HIGH SPOT AND SOD ** BUILDER NEEDS TO REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM PROPERTY AND VACANT THIS INCLUDES REMOVING ALL DEBRIS FROM DRIVEWAYS (SIGNS, POSTS, TUBS WITH DEBRIS, CONCRETE) ** ** SEED** NEEDS TO BE USED WITH THE STRAW TO AID IN EROSION CONTROL ** RIGHT & LEFT SIDE SIDEWALK SEWER CLEAN-OUTS ARE TO LOW IT IS A TRIPPING HAZARD AND NEEDS TO BE RAISED FLUSH WITH THE TOP OF SIDEWALK ELEVATION ________________________________________________________________________________________________________________________ 4/27/2023 - PREVIOUS INSPECTION NOTES ** 04/27/23 ** 04/26/23 BUILDER NEEDS TO REPAIR SWALE ON LEFT SIDE OF LEFT SIDE DRIVEWAY AND SOD OUTLINED WITH PINK PAINT ** BUILDER NEEDS TO REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM PROPERTY AND VACANT ** ** SEED** NEEDS TO BE USED WITH THE STRAW ______________________________________________________________________________________________________________________ ** BEFORE FINAL ROW INSPECTION IS APPROVED CORRECTIONS NEEDED** ** 04/26/23 BUILDER NEEDS TO REPAIR SWALE ON LEFT SIDE OF LEFT SIDE DRIVEWAY AND SOD OUTLINED WITH PINK PAINT ** BUILDER NEEDS TO REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM PROPERTY AND VACANT ** ** SEED** NEEDS TO BE USED WITH THE STRAW
ROW - FINAL INSPECTION 05/30/2023 Disapproved -FEE REQUIRED EMADISON
Note: ** 05/30/23 BUILDER NEEDS TO REPAIR SWALE ON LEFT SIDE OF LEFT SIDE DRIVEWAY AND SOD OUTLINED WITH WHITE PAINT NEED TO FILL AND SOD LOW SPOTS AND REMOVE HIGH SPOT AND SOD ** BUILDER NEEDS TO REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM PROPERTY AND VACANT THIS INCLUDES REMOVING ALL DEBRIS FROM DRIVEWAYS (SIGNS, POSTS, TUBS WITH DEBRIS, CONCRETE) ** ** SEED** NEEDS TO BE USED WITH THE STRAW TO AID IN EROSION CONTROL ** RIGHT & LEFT SIDE SIDEWALK SEWER CLEAN-OUTS ARE TO LOW IT IS A TRIPPING HAZARD AND NEEDS TO BE RAISED FLUSH WITH THE TOP OF SIDEWALK ELEVATION ________________________________________________________________________________________________________________________ 4/27/2023 - PREVIOUS INSPECTION NOTES ** 04/27/23 ** 04/26/23 BUILDER NEEDS TO REPAIR SWALE ON LEFT SIDE OF LEFT SIDE DRIVEWAY AND SOD OUTLINED WITH PINK PAINT ** BUILDER NEEDS TO REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM PROPERTY AND VACANT ** ** SEED** NEEDS TO BE USED WITH THE STRAW ______________________________________________________________________________________________________________________ ** BEFORE FINAL ROW INSPECTION IS APPROVED CORRECTIONS NEEDED** ** 04/26/23 BUILDER NEEDS TO REPAIR SWALE ON LEFT SIDE OF LEFT SIDE DRIVEWAY AND SOD OUTLINED WITH PINK PAINT ** BUILDER NEEDS TO REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM PROPERTY AND VACANT ** ** SEED** NEEDS TO BE USED WITH THE STRAW
WALL SHEATHING 05/24/2023 APPROVED - AS NOTED PBUCKLEY
Note: 5/11/2023 - PREVIOUS INSPECTION NOTES 4/27/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2490 9/20/2022 - PREVIOUS INSPECTION NOTES 9/16/2022 - PREVIOUS INSPECTION NOTES THIS IS A REINSPECTION Inspector Notes from Inspection 2445 Inspector Notes from Inspection 2420 THIS IS A REINSPECTION Inspector Notes from Inspection 2467 Trash on site. Site needs to be cleaned. No further inspections will be passed until trash is cleaned. 07-29-2022 1. Service wire not installed. 2. Wires in both electrical panels not installed. 3. UFER grounds not visible 4. Floor outlet added in right unit and filled with concrete. Please submit a revision to the building department. Uncover concrete for inspection. 5. Grounds not connected in both units. 6. Light not installed in left unit masterbedroom closet. 7. Back doors and right unit window will need a window nailing added. (Contractor noted that window is on backorder). 08-22-2022. 1. Service not installed - check at early power. 2. UFER ground not visible - check at early power. 3. Electrical panels conductors not phased out. Check at next inspection (insulation). 08-29-2022 - Three items above have not been addressed. Check at next inspection. 09-08-2022 - 1. FIREBLOCKING . Fireblocking needed at garage walls. R302.11.1 2. Service not installed - check at early power. 3. UFER ground not visible - check at early power. 09-14-2022 - Fireblocking will be addressed at insulation. Fire foam is needed at garage wall fireblocking penetrations. 09-16-2022 - Fire foam needed at garage walls penetrations. FIREBLOCKING INTEGRITY MUST BE MAINTAINED R302.11.2. When drilled through the fire blocking. 09-20-2022 1. Fire foam missed at left unit, right side of wall at ceiling near entry door. Insulation not installed at same area. FIREBLOCKING INTEGRITY MUST BE MAINTAINED R302.11.2. 2. Service not installed - check at early power. 3. UFER ground not visible - check at early power. 09-21-2022 1.Service not installed - check at early power. 2. UFER ground not visible - check at early power. 04-27-2023 Exterior of home is complete. Please submit an engineering letter to the building department and have on site along with the approved drawings, that the work has been installed as per plans. 05-11-2023. Above issue has not been resolved. Exterior of home is complete. Please submit an engineering letter to the building department and have on site along with the approved drawings, that the work has been installed as per plans. 5/24/23 Inspection administratively approved by CBO on submission of PE inspection letter.
WALL SHEATHING 05/11/2023 Disapproved -FEE REQUIRED AGAETANO
Note: 4/27/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2490 9/20/2022 - PREVIOUS INSPECTION NOTES 9/16/2022 - PREVIOUS INSPECTION NOTES THIS IS A REINSPECTION Inspector Notes from Inspection 2445 Inspector Notes from Inspection 2420 THIS IS A REINSPECTION Inspector Notes from Inspection 2467 Trash on site. Site needs to be cleaned. No further inspections will be passed until trash is cleaned. 07-29-2022 1. Service wire not installed. 2. Wires in both electrical panels not installed. 3. UFER grounds not visible 4. Floor outlet added in right unit and filled with concrete. Please submit a revision to the building department. Uncover concrete for inspection. 5. Grounds not connected in both units. 6. Light not installed in left unit masterbedroom closet. 7. Back doors and right unit window will need a window nailing added. (Contractor noted that window is on backorder). 08-22-2022. 1. Service not installed - check at early power. 2. UFER ground not visible - check at early power. 3. Electrical panels conductors not phased out. Check at next inspection (insulation). 08-29-2022 - Three items above have not been addressed. Check at next inspection. 09-08-2022 - 1. FIREBLOCKING . Fireblocking needed at garage walls. R302.11.1 2. Service not installed - check at early power. 3. UFER ground not visible - check at early power. 09-14-2022 - Fireblocking will be addressed at insulation. Fire foam is needed at garage wall fireblocking penetrations. 09-16-2022 - Fire foam needed at garage walls penetrations. FIREBLOCKING INTEGRITY MUST BE MAINTAINED R302.11.2. When drilled through the fire blocking. 09-20-2022 1. Fire foam missed at left unit, right side of wall at ceiling near entry door. Insulation not installed at same area. FIREBLOCKING INTEGRITY MUST BE MAINTAINED R302.11.2. 2. Service not installed - check at early power. 3. UFER ground not visible - check at early power. 09-21-2022 1.Service not installed - check at early power. 2. UFER ground not visible - check at early power. 04-27-2023 Exterior of home is complete. Please submit an engineering letter to the building department and have on site along with the approved drawings, that the work has been installed as per plans. 05-11-2023. Above issue has not been resolved. Exterior of home is complete. Please submit an engineering letter to the building department and have on site along with the approved drawings, that the work has been installed as per plans. Approved drawings not on site.
WALL SHEATHING 04/27/2023 Disapproved - NO FEE AGAETANO
Note: Inspector Notes from Inspection 2490 9/20/2022 - PREVIOUS INSPECTION NOTES 9/16/2022 - PREVIOUS INSPECTION NOTES THIS IS A REINSPECTION Inspector Notes from Inspection 2445 Inspector Notes from Inspection 2420 THIS IS A REINSPECTION Inspector Notes from Inspection 2467 Trash on site. Site needs to be cleaned. No further inspections will be passed until trash is cleaned. 07-29-2022 1. Service wire not installed. 2. Wires in both electrical panels not installed. 3. UFER grounds not visible 4. Floor outlet added in right unit and filled with concrete. Please submit a revision to the building department. Uncover concrete for inspection. 5. Grounds not connected in both units. 6. Light not installed in left unit masterbedroom closet. 7. Back doors and right unit window will need a window nailing added. (Contractor noted that window is on backorder). 08-22-2022. 1. Service not installed - check at early power. 2. UFER ground not visible - check at early power. 3. Electrical panels conductors not phased out. Check at next inspection (insulation). 08-29-2022 - Three items above have not been addressed. Check at next inspection. 09-08-2022 - 1. FIREBLOCKING . Fireblocking needed at garage walls. R302.11.1 2. Service not installed - check at early power. 3. UFER ground not visible - check at early power. 09-14-2022 - Fireblocking will be addressed at insulation. Fire foam is needed at garage wall fireblocking penetrations. 09-16-2022 - Fire foam needed at garage walls penetrations. FIREBLOCKING INTEGRITY MUST BE MAINTAINED R302.11.2. When drilled through the fire blocking. 09-20-2022 1. Fire foam missed at left unit, right side of wall at ceiling near entry door. Insulation not installed at same area. FIREBLOCKING INTEGRITY MUST BE MAINTAINED R302.11.2. 2. Service not installed - check at early power. 3. UFER ground not visible - check at early power. 09-21-2022 1.Service not installed - check at early power. 2. UFER ground not visible - check at early power. 04-27-2023 Exterior of home is complete. Please submit an engineering letter to the building department and have on site along with the approved drawings, that the work has been installed as per plans.
ROW - FINAL INSPECTION 04/27/2023 Disapproved -FEE REQUIRED EMADISON
Note: ** 04/27/23 ** 04/26/23 BUILDER NEEDS TO REPAIR SWALE ON LEFT SIDE OF LEFT SIDE DRIVEWAY AND SOD OUTLINED WITH PINK PAINT ** BUILDER NEEDS TO REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM PROPERTY AND VACANT ** ** SEED** NEEDS TO BE USED WITH THE STRAW ______________________________________________________________________________________________________________________ ** BEFORE FINAL ROW INSPECTION IS APPROVED CORRECTIONS NEEDED** ** 04/26/23 BUILDER NEEDS TO REPAIR SWALE ON LEFT SIDE OF LEFT SIDE DRIVEWAY AND SOD OUTLINED WITH PINK PAINT ** BUILDER NEEDS TO REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM PROPERTY AND VACANT ** ** SEED** NEEDS TO BE USED WITH THE STRAW
ROW- FINAL SURVEY/GRADING CERTIFICATION 04/26/2023 APPROVED EMADISON
ROW FIELD SURVEY /GRADING CERTIFICATION 04/26/2023 APPROVED EMADISON
Note: ** 04/26/23 BUILDER NEEDS TO REPAIR SWALE ON LEFT SIDE OF LEFT SIDE DRIVEWAY AND SOD OUTLINED WITH PINK PAINT ** BUILDER NEEDS TO REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM PROPERTY AND VACANT ** ** SEED** NEEDS TO BE USED WITH THE STRAW
ROW - FINAL APRON (AFTER POUR) 04/26/2023 FINAL APPROVED EMADISON
ELECTRIC - EARLY POWER 03/13/2023 APPROVED AGAETANO
Note: 08-22-2022. 1. Service not installed - check at early power. 2. UFER ground not visible - check at early power. 3. Electrical panels conductors not phased out. Check at next inspection (insulation).
ROW- PRE-APRON (PRE-POUR) 01/18/2023 APPROVED EMADISON
Note: ** 01/18/23 CORRECTIONS HAVE BEEN MADE READY TO POUR IN THE EVENT OF RAIN RECHECK THE CULVERT ELEVATIONS AND COMPACTION AROUND CULVERT. ** MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL _________________________________________________________________________________________________________________________ 1/17/2023 - PREVIOUS INSPECTION NOTES ** 01/17/23 NO CORRECTION WERE MADE DID SPEAK TO CONTRACTOR WHO IS ON HIS WAY OUT TO CORRECT THE ISSUES OF THE MITERED ENDS BEING FORMED TO MEET THE MINIMUM STANDARD AS DESCRIBED IN THE RESIDENTIAL CULVERT DETAIL, INSPECTION IS DISAPPROVED WITHOUT FEE New inspection due to canceled inspection 1/13/2023 - PREVIOUS INSPECTION NOTES ** 01/13/23 THE BUILDER NEEDS TO REVIEW THE CITY OF PALM COASTS RESIDENTIAL CULVERT DETAIL. ** THE MITERED SHOULD BE 18 INCHES AT THE TOP OF THE MITERED ENDS BOTH SETS OF DRIVEWAY CULVERTS ** THERE ARE NO EQUALS AS TO HOW THIS IS FORMED BUILDER NEEDS TO REVIEW PREVIOUS INSPECTOR NOTES AND MAKE THE APPROPRIATE CORRECTIONS TO HIS FORMS ON BOTH DRIVEWAYS.. 1/11/2023 - PREVIOUS INSPECTION NOTES ** 01/11/23 LEFT SIDE DRIVEWAY STILL NEEDS COMPACTION IN THE APRON ** LEFT SIDE CULVERT MITERED END THERE ARE NO EQUALS NEED TO BE 18 INCHES FROM CULVERT TO FORM 27 INCHES AND 21 INCHES ON RIGHT 21 INCHES AND 25 INCHES ** LEFT SIDE FOOTERS NEED TO BE DUG AND ALSO NEED REBAR. ** SEE ATTACHED PHOTOS FOR MITERED END FORM 1/9/2023 - PREVIOUS INSPECTION NOTES ** 01/09/23 LEFT SIDE DRIVEWAY NEEDS COMPACTION IN APRON AND AROUND THE CULVERT MATERIAL IS TOO SOFT ** LEFT SIDE DRIVEWAY ABOVE ROW NEEDS TO BE A MINIMUM OF 4 INCHES OF CONCRETE SEE AREA OUTLINED WITH RED PAINT NEEDS TO MATERIAL REMOVED. ** RIGHT SIDE DRIVEWAY APRON NEEDS TO BE A MINIMUM OF 5 INCHES OF CONCRETE AND MATERIAL COMPACTED IN APRON AND AROUND CULVERT WHICH NEEDS TO HAVE MATERIAL COVERING HALF WAY UP CULVERT. ___________________________________________________________________________________________________________________________ 1/6/2023 - PREVIOUS INSPECTION NOTES 01/06/23=CULVERT PIPES ARE OUT OF TOLERANCE BOTH END. PLEASE RESET THE PIPES ACCORDING SWALE PLAN ______________________________________________________________________________________________________________________ 1/5/2023 - PREVIOUS INSPECTION NOTES 01/05/23=Not ready for inspection. Not formed. PICTURE ATTACHED POSTING OF PERMIT SITE ADDRESS, PERMIT, APPROVED PLANS AND DOCUMENTS December 19, 2022 SITE ADDRESS: This is a reminder; the permit project site address must be posted on the job site upon issuance of the building permit and maintained for the duration of construction and until the final address numbers are posted on the completed building. Address identification numbers shall be on a contrasting background, plainly visible from the street and 4 inches tall, and 1/2-inch minimum stroke width. The primary purposes of posting the site address is to ensure first responders are able to locate the property in the event of an emergency and to assist building inspectors in locating properties for inspection. Numbers shall be posted on near the street fronting the property and maintained for the duration of the permit. Numbers can also be placed on the exterior wall of the home facing the street. Posting the legal description or lot and block is not an acceptable substitute. ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2 PERMIT DOCUMENTS: This is a reminder, the permit documents issued with the building permit, including, but not limited to; the issued building permit, City approved plans, Inspection Record Card, Product Approval and Roofing Worksheets and all other City issued documents are the property of the City of Palm Coast. Documents shall be kept clean and dry and, on the site, and made available to Building Inspectors for all inspections. CITY APPROVED PERMIT DOCUMENTS SHALL NOT BE USED FOR ANY PURPOSES BY CONTRACTORS OR SUB-CONTRACTORS. PERMIT DOCUMENTS THAT ARE FADED, ILLEGIBLE, WRINKLED, WATER DAMAGED OR STAINED OR FOR WHATEVER REASON ARE OTHERWISE UNUSABLE MUST BE RELACED BY THE CONTRACTOR BEFORE INSPECTION. INSPECTIONS WILL NOT BE PERFORMED WHERE CITY APPROVED PERMIT DOCUMENTS ARE NOT PRESENT OR IN AN UNUSABLE CONDITION. Florida Building Code-Building Section 105.7 and Florida Statute 468.604(1)
ROW- PRE-APRON (PRE-POUR) 01/17/2023 CANCELLED BY APPLICANT WEB
Note: 1/13/2023 - PREVIOUS INSPECTION NOTES ** 01/13/23 THE BUILDER NEEDS TO REVIEW THE CITY OF PALM COASTS RESIDENTIAL CULVERT DETAIL. ** THE MITERED SHOULD BE 18 INCHES AT THE TOP OF THE MITERED ENDS BOTH SETS OF DRIVEWAY CULVERTS ** THERE ARE NO EQUALS AS TO HOW THIS IS FORMED BUILDER NEEDS TO REVIEW PREVIOUS INSPECTOR NOTES AND MAKE THE APPROPRIATE CORRECTIONS TO HIS FORMS ON BOTH DRIVEWAYS.. 1/11/2023 - PREVIOUS INSPECTION NOTES ** 01/11/23 LEFT SIDE DRIVEWAY STILL NEEDS COMPACTION IN THE APRON ** LEFT SIDE CULVERT MITERED END THERE ARE NO EQUALS NEED TO BE 18 INCHES FROM CULVERT TO FORM 27 INCHES AND 21 INCHES ON RIGHT 21 INCHES AND 25 INCHES ** LEFT SIDE FOOTERS NEED TO BE DUG AND ALSO NEED REBAR. ** SEE ATTACHED PHOTOS FOR MITERED END FORM 1/9/2023 - PREVIOUS INSPECTION NOTES ** 01/09/23 LEFT SIDE DRIVEWAY NEEDS COMPACTION IN APRON AND AROUND THE CULVERT MATERIAL IS TOO SOFT ** LEFT SIDE DRIVEWAY ABOVE ROW NEEDS TO BE A MINIMUM OF 4 INCHES OF CONCRETE SEE AREA OUTLINED WITH RED PAINT NEEDS TO MATERIAL REMOVED. ** RIGHT SIDE DRIVEWAY APRON NEEDS TO BE A MINIMUM OF 5 INCHES OF CONCRETE AND MATERIAL COMPACTED IN APRON AND AROUND CULVERT WHICH NEEDS TO HAVE MATERIAL COVERING HALF WAY UP CULVERT. ___________________________________________________________________________________________________________________________ 1/6/2023 - PREVIOUS INSPECTION NOTES 01/06/23=CULVERT PIPES ARE OUT OF TOLERANCE BOTH END. PLEASE RESET THE PIPES ACCORDING SWALE PLAN ______________________________________________________________________________________________________________________ 1/5/2023 - PREVIOUS INSPECTION NOTES 01/05/23=Not ready for inspection. Not formed. PICTURE ATTACHED POSTING OF PERMIT SITE ADDRESS, PERMIT, APPROVED PLANS AND DOCUMENTS December 19, 2022 SITE ADDRESS: This is a reminder; the permit project site address must be posted on the job site upon issuance of the building permit and maintained for the duration of construction and until the final address numbers are posted on the completed building. Address identification numbers shall be on a contrasting background, plainly visible from the street and 4 inches tall, and 1/2-inch minimum stroke width. The primary purposes of posting the site address is to ensure first responders are able to locate the property in the event of an emergency and to assist building inspectors in locating properties for inspection. Numbers shall be posted on near the street fronting the property and maintained for the duration of the permit. Numbers can also be placed on the exterior wall of the home facing the street. Posting the legal description or lot and block is not an acceptable substitute. ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2 PERMIT DOCUMENTS: This is a reminder, the permit documents issued with the building permit, including, but not limited to; the issued building permit, City approved plans, Inspection Record Card, Product Approval and Roofing Worksheets and all other City issued documents are the property of the City of Palm Coast. Documents shall be kept clean and dry and, on the site, and made available to Building Inspectors for all inspections. CITY APPROVED PERMIT DOCUMENTS SHALL NOT BE USED FOR ANY PURPOSES BY CONTRACTORS OR SUB-CONTRACTORS. PERMIT DOCUMENTS THAT ARE FADED, ILLEGIBLE, WRINKLED, WATER DAMAGED OR STAINED OR FOR WHATEVER REASON ARE OTHERWISE UNUSABLE MUST BE RELACED BY THE CONTRACTOR BEFORE INSPECTION. INSPECTIONS WILL NOT BE PERFORMED WHERE CITY APPROVED PERMIT DOCUMENTS ARE NOT PRESENT OR IN AN UNUSABLE CONDITION. Florida Building Code-Building Section 105.7 and Florida Statute 468.604(1)
ROW- PRE-APRON (PRE-POUR) 01/17/2023 Disapproved - NO FEE EMADISON
Note: ** 01/17/23 NO CORRECTION WERE MADE DID SPEAK TO CONTRACTOR WHO IS ON HIS WAY OUT TO CORRECT THE ISSUES OF THE MITERED ENDS BEING FORMED TO MEET THE MINIMUM STANDARD AS DESCRIBED IN THE RESIDENTIAL CULVERT DETAIL, INSPECTION IS DISAPPROVED WITHOUT FEE New inspection due to canceled inspection 1/13/2023 - PREVIOUS INSPECTION NOTES ** 01/13/23 THE BUILDER NEEDS TO REVIEW THE CITY OF PALM COASTS RESIDENTIAL CULVERT DETAIL. ** THE MITERED SHOULD BE 18 INCHES AT THE TOP OF THE MITERED ENDS BOTH SETS OF DRIVEWAY CULVERTS ** THERE ARE NO EQUALS AS TO HOW THIS IS FORMED BUILDER NEEDS TO REVIEW PREVIOUS INSPECTOR NOTES AND MAKE THE APPROPRIATE CORRECTIONS TO HIS FORMS ON BOTH DRIVEWAYS.. 1/11/2023 - PREVIOUS INSPECTION NOTES ** 01/11/23 LEFT SIDE DRIVEWAY STILL NEEDS COMPACTION IN THE APRON ** LEFT SIDE CULVERT MITERED END THERE ARE NO EQUALS NEED TO BE 18 INCHES FROM CULVERT TO FORM 27 INCHES AND 21 INCHES ON RIGHT 21 INCHES AND 25 INCHES ** LEFT SIDE FOOTERS NEED TO BE DUG AND ALSO NEED REBAR. ** SEE ATTACHED PHOTOS FOR MITERED END FORM 1/9/2023 - PREVIOUS INSPECTION NOTES ** 01/09/23 LEFT SIDE DRIVEWAY NEEDS COMPACTION IN APRON AND AROUND THE CULVERT MATERIAL IS TOO SOFT ** LEFT SIDE DRIVEWAY ABOVE ROW NEEDS TO BE A MINIMUM OF 4 INCHES OF CONCRETE SEE AREA OUTLINED WITH RED PAINT NEEDS TO MATERIAL REMOVED. ** RIGHT SIDE DRIVEWAY APRON NEEDS TO BE A MINIMUM OF 5 INCHES OF CONCRETE AND MATERIAL COMPACTED IN APRON AND AROUND CULVERT WHICH NEEDS TO HAVE MATERIAL COVERING HALF WAY UP CULVERT. ___________________________________________________________________________________________________________________________ 1/6/2023 - PREVIOUS INSPECTION NOTES 01/06/23=CULVERT PIPES ARE OUT OF TOLERANCE BOTH END. PLEASE RESET THE PIPES ACCORDING SWALE PLAN ______________________________________________________________________________________________________________________ 1/5/2023 - PREVIOUS INSPECTION NOTES 01/05/23=Not ready for inspection. Not formed. PICTURE ATTACHED POSTING OF PERMIT SITE ADDRESS, PERMIT, APPROVED PLANS AND DOCUMENTS December 19, 2022 SITE ADDRESS: This is a reminder; the permit project site address must be posted on the job site upon issuance of the building permit and maintained for the duration of construction and until the final address numbers are posted on the completed building. Address identification numbers shall be on a contrasting background, plainly visible from the street and 4 inches tall, and 1/2-inch minimum stroke width. The primary purposes of posting the site address is to ensure first responders are able to locate the property in the event of an emergency and to assist building inspectors in locating properties for inspection. Numbers shall be posted on near the street fronting the property and maintained for the duration of the permit. Numbers can also be placed on the exterior wall of the home facing the street. Posting the legal description or lot and block is not an acceptable substitute. ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2 PERMIT DOCUMENTS: This is a reminder, the permit documents issued with the building permit, including, but not limited to; the issued building permit, City approved plans, Inspection Record Card, Product Approval and Roofing Worksheets and all other City issued documents are the property of the City of Palm Coast. Documents shall be kept clean and dry and, on the site, and made available to Building Inspectors for all inspections. CITY APPROVED PERMIT DOCUMENTS SHALL NOT BE USED FOR ANY PURPOSES BY CONTRACTORS OR SUB-CONTRACTORS. PERMIT DOCUMENTS THAT ARE FADED, ILLEGIBLE, WRINKLED, WATER DAMAGED OR STAINED OR FOR WHATEVER REASON ARE OTHERWISE UNUSABLE MUST BE RELACED BY THE CONTRACTOR BEFORE INSPECTION. INSPECTIONS WILL NOT BE PERFORMED WHERE CITY APPROVED PERMIT DOCUMENTS ARE NOT PRESENT OR IN AN UNUSABLE CONDITION. Florida Building Code-Building Section 105.7 and Florida Statute 468.604(1)
ROW- PRE-APRON (PRE-POUR) 01/13/2023 Disapproved -FEE REQUIRED EMADISON
Note: ** 01/13/23 THE BUILDER NEEDS TO REVIEW THE CITY OF PALM COASTS RESIDENTIAL CULVERT DETAIL. ** THE MITERED SHOULD BE 18 INCHES AT THE TOP OF THE MITERED ENDS BOTH SETS OF DRIVEWAY CULVERTS ** THERE ARE NO EQUALS AS TO HOW THIS IS FORMED BUILDER NEEDS TO REVIEW PREVIOUS INSPECTOR NOTES AND MAKE THE APPROPRIATE CORRECTIONS TO HIS FORMS ON BOTH DRIVEWAYS.. 1/11/2023 - PREVIOUS INSPECTION NOTES ** 01/11/23 LEFT SIDE DRIVEWAY STILL NEEDS COMPACTION IN THE APRON ** LEFT SIDE CULVERT MITERED END THERE ARE NO EQUALS NEED TO BE 18 INCHES FROM CULVERT TO FORM 27 INCHES AND 21 INCHES ON RIGHT 21 INCHES AND 25 INCHES ** LEFT SIDE FOOTERS NEED TO BE DUG AND ALSO NEED REBAR. ** SEE ATTACHED PHOTOS FOR MITERED END FORM 1/9/2023 - PREVIOUS INSPECTION NOTES ** 01/09/23 LEFT SIDE DRIVEWAY NEEDS COMPACTION IN APRON AND AROUND THE CULVERT MATERIAL IS TOO SOFT ** LEFT SIDE DRIVEWAY ABOVE ROW NEEDS TO BE A MINIMUM OF 4 INCHES OF CONCRETE SEE AREA OUTLINED WITH RED PAINT NEEDS TO MATERIAL REMOVED. ** RIGHT SIDE DRIVEWAY APRON NEEDS TO BE A MINIMUM OF 5 INCHES OF CONCRETE AND MATERIAL COMPACTED IN APRON AND AROUND CULVERT WHICH NEEDS TO HAVE MATERIAL COVERING HALF WAY UP CULVERT. ___________________________________________________________________________________________________________________________ 1/6/2023 - PREVIOUS INSPECTION NOTES 01/06/23=CULVERT PIPES ARE OUT OF TOLERANCE BOTH END. PLEASE RESET THE PIPES ACCORDING SWALE PLAN ______________________________________________________________________________________________________________________ 1/5/2023 - PREVIOUS INSPECTION NOTES 01/05/23=Not ready for inspection. Not formed. PICTURE ATTACHED POSTING OF PERMIT SITE ADDRESS, PERMIT, APPROVED PLANS AND DOCUMENTS December 19, 2022 SITE ADDRESS: This is a reminder; the permit project site address must be posted on the job site upon issuance of the building permit and maintained for the duration of construction and until the final address numbers are posted on the completed building. Address identification numbers shall be on a contrasting background, plainly visible from the street and 4 inches tall, and 1/2-inch minimum stroke width. The primary purposes of posting the site address is to ensure first responders are able to locate the property in the event of an emergency and to assist building inspectors in locating properties for inspection. Numbers shall be posted on near the street fronting the property and maintained for the duration of the permit. Numbers can also be placed on the exterior wall of the home facing the street. Posting the legal description or lot and block is not an acceptable substitute. ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2 PERMIT DOCUMENTS: This is a reminder, the permit documents issued with the building permit, including, but not limited to; the issued building permit, City approved plans, Inspection Record Card, Product Approval and Roofing Worksheets and all other City issued documents are the property of the City of Palm Coast. Documents shall be kept clean and dry and, on the site, and made available to Building Inspectors for all inspections. CITY APPROVED PERMIT DOCUMENTS SHALL NOT BE USED FOR ANY PURPOSES BY CONTRACTORS OR SUB-CONTRACTORS. PERMIT DOCUMENTS THAT ARE FADED, ILLEGIBLE, WRINKLED, WATER DAMAGED OR STAINED OR FOR WHATEVER REASON ARE OTHERWISE UNUSABLE MUST BE RELACED BY THE CONTRACTOR BEFORE INSPECTION. INSPECTIONS WILL NOT BE PERFORMED WHERE CITY APPROVED PERMIT DOCUMENTS ARE NOT PRESENT OR IN AN UNUSABLE CONDITION. Florida Building Code-Building Section 105.7 and Florida Statute 468.604(1)
ROW- PRE-APRON (PRE-POUR) 01/11/2023 Disapproved -FEE REQUIRED EMADISON
Note: ** 01/11/23 LEFT SIDE DRIVEWAY STILL NEEDS COMPACTION IN THE APRON ** LEFT SIDE CULVERT MITERED END THERE ARE NO EQUALS NEED TO BE 18 INCHES FROM CULVERT TO FORM 27 INCHES AND 21 INCHES ON RIGHT 21 INCHES AND 25 INCHES ** LEFT SIDE FOOTERS NEED TO BE DUG AND ALSO NEED REBAR. ** SEE ATTACHED PHOTOS FOR MITERED END FORM 1/9/2023 - PREVIOUS INSPECTION NOTES ** 01/09/23 LEFT SIDE DRIVEWAY NEEDS COMPACTION IN APRON AND AROUND THE CULVERT MATERIAL IS TOO SOFT ** LEFT SIDE DRIVEWAY ABOVE ROW NEEDS TO BE A MINIMUM OF 4 INCHES OF CONCRETE SEE AREA OUTLINED WITH RED PAINT NEEDS TO MATERIAL REMOVED. ** RIGHT SIDE DRIVEWAY APRON NEEDS TO BE A MINIMUM OF 5 INCHES OF CONCRETE AND MATERIAL COMPACTED IN APRON AND AROUND CULVERT WHICH NEEDS TO HAVE MATERIAL COVERING HALF WAY UP CULVERT. ___________________________________________________________________________________________________________________________ 1/6/2023 - PREVIOUS INSPECTION NOTES 01/06/23=CULVERT PIPES ARE OUT OF TOLERANCE BOTH END. PLEASE RESET THE PIPES ACCORDING SWALE PLAN ______________________________________________________________________________________________________________________ 1/5/2023 - PREVIOUS INSPECTION NOTES 01/05/23=Not ready for inspection. Not formed. PICTURE ATTACHED POSTING OF PERMIT SITE ADDRESS, PERMIT, APPROVED PLANS AND DOCUMENTS December 19, 2022 SITE ADDRESS: This is a reminder; the permit project site address must be posted on the job site upon issuance of the building permit and maintained for the duration of construction and until the final address numbers are posted on the completed building. Address identification numbers shall be on a contrasting background, plainly visible from the street and 4 inches tall, and 1/2-inch minimum stroke width. The primary purposes of posting the site address is to ensure first responders are able to locate the property in the event of an emergency and to assist building inspectors in locating properties for inspection. Numbers shall be posted on near the street fronting the property and maintained for the duration of the permit. Numbers can also be placed on the exterior wall of the home facing the street. Posting the legal description or lot and block is not an acceptable substitute. ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2 PERMIT DOCUMENTS: This is a reminder, the permit documents issued with the building permit, including, but not limited to; the issued building permit, City approved plans, Inspection Record Card, Product Approval and Roofing Worksheets and all other City issued documents are the property of the City of Palm Coast. Documents shall be kept clean and dry and, on the site, and made available to Building Inspectors for all inspections. CITY APPROVED PERMIT DOCUMENTS SHALL NOT BE USED FOR ANY PURPOSES BY CONTRACTORS OR SUB-CONTRACTORS. PERMIT DOCUMENTS THAT ARE FADED, ILLEGIBLE, WRINKLED, WATER DAMAGED OR STAINED OR FOR WHATEVER REASON ARE OTHERWISE UNUSABLE MUST BE RELACED BY THE CONTRACTOR BEFORE INSPECTION. INSPECTIONS WILL NOT BE PERFORMED WHERE CITY APPROVED PERMIT DOCUMENTS ARE NOT PRESENT OR IN AN UNUSABLE CONDITION. Florida Building Code-Building Section 105.7 and Florida Statute 468.604(1)
ROW- PRE-APRON (PRE-POUR) 01/09/2023 Disapproved -FEE REQUIRED EMADISON
Note: ** 01/09/23 LEFT SIDE DRIVEWAY NEEDS COMPACTION IN APRON AND AROUND THE CULVERT MATERIAL IS TOO SOFT ** LEFT SIDE DRIVEWAY ABOVE ROW NEEDS TO BE A MINIMUM OF 4 INCHES OF CONCRETE SEE AREA OUTLINED WITH RED PAINT NEEDS TO MATERIAL REMOVED. ** RIGHT SIDE DRIVEWAY APRON NEEDS TO BE A MINIMUM OF 5 INCHES OF CONCRETE AND MATERIAL COMPACTED IN APRON AND AROUND CULVERT WHICH NEEDS TO HAVE MATERIAL COVERING HALF WAY UP CULVERT. ___________________________________________________________________________________________________________________________ 1/6/2023 - PREVIOUS INSPECTION NOTES 01/06/23=CULVERT PIPES ARE OUT OF TOLERANCE BOTH END. PLEASE RESET THE PIPES ACCORDING SWALE PLAN ______________________________________________________________________________________________________________________ 1/5/2023 - PREVIOUS INSPECTION NOTES 01/05/23=Not ready for inspection. Not formed. PICTURE ATTACHED POSTING OF PERMIT SITE ADDRESS, PERMIT, APPROVED PLANS AND DOCUMENTS December 19, 2022 SITE ADDRESS: This is a reminder; the permit project site address must be posted on the job site upon issuance of the building permit and maintained for the duration of construction and until the final address numbers are posted on the completed building. Address identification numbers shall be on a contrasting background, plainly visible from the street and 4 inches tall, and 1/2-inch minimum stroke width. The primary purposes of posting the site address is to ensure first responders are able to locate the property in the event of an emergency and to assist building inspectors in locating properties for inspection. Numbers shall be posted on near the street fronting the property and maintained for the duration of the permit. Numbers can also be placed on the exterior wall of the home facing the street. Posting the legal description or lot and block is not an acceptable substitute. ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2 PERMIT DOCUMENTS: This is a reminder, the permit documents issued with the building permit, including, but not limited to; the issued building permit, City approved plans, Inspection Record Card, Product Approval and Roofing Worksheets and all other City issued documents are the property of the City of Palm Coast. Documents shall be kept clean and dry and, on the site, and made available to Building Inspectors for all inspections. CITY APPROVED PERMIT DOCUMENTS SHALL NOT BE USED FOR ANY PURPOSES BY CONTRACTORS OR SUB-CONTRACTORS. PERMIT DOCUMENTS THAT ARE FADED, ILLEGIBLE, WRINKLED, WATER DAMAGED OR STAINED OR FOR WHATEVER REASON ARE OTHERWISE UNUSABLE MUST BE RELACED BY THE CONTRACTOR BEFORE INSPECTION. INSPECTIONS WILL NOT BE PERFORMED WHERE CITY APPROVED PERMIT DOCUMENTS ARE NOT PRESENT OR IN AN UNUSABLE CONDITION. Florida Building Code-Building Section 105.7 and Florida Statute 468.604(1)
ROW- PRE-APRON (PRE-POUR) 01/06/2023 Disapproved -FEE REQUIRED GBERTOLA
Note: 01/06/23=CULVERT PIPES ARE OUT OF TOLERANCE BOTH END. PLEASE RESET THE PIPES ACCORDING SWALE PLAN ______________________________________________________________________________________________________________________ 1/5/2023 - PREVIOUS INSPECTION NOTES 01/05/23=Not ready for inspection. Not formed. PICTURE ATTACHED POSTING OF PERMIT SITE ADDRESS, PERMIT, APPROVED PLANS AND DOCUMENTS December 19, 2022 SITE ADDRESS: This is a reminder; the permit project site address must be posted on the job site upon issuance of the building permit and maintained for the duration of construction and until the final address numbers are posted on the completed building. Address identification numbers shall be on a contrasting background, plainly visible from the street and 4 inches tall, and 1/2-inch minimum stroke width. The primary purposes of posting the site address is to ensure first responders are able to locate the property in the event of an emergency and to assist building inspectors in locating properties for inspection. Numbers shall be posted on near the street fronting the property and maintained for the duration of the permit. Numbers can also be placed on the exterior wall of the home facing the street. Posting the legal description or lot and block is not an acceptable substitute. ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2 PERMIT DOCUMENTS: This is a reminder, the permit documents issued with the building permit, including, but not limited to; the issued building permit, City approved plans, Inspection Record Card, Product Approval and Roofing Worksheets and all other City issued documents are the property of the City of Palm Coast. Documents shall be kept clean and dry and, on the site, and made available to Building Inspectors for all inspections. CITY APPROVED PERMIT DOCUMENTS SHALL NOT BE USED FOR ANY PURPOSES BY CONTRACTORS OR SUB-CONTRACTORS. PERMIT DOCUMENTS THAT ARE FADED, ILLEGIBLE, WRINKLED, WATER DAMAGED OR STAINED OR FOR WHATEVER REASON ARE OTHERWISE UNUSABLE MUST BE RELACED BY THE CONTRACTOR BEFORE INSPECTION. INSPECTIONS WILL NOT BE PERFORMED WHERE CITY APPROVED PERMIT DOCUMENTS ARE NOT PRESENT OR IN AN UNUSABLE CONDITION. Florida Building Code-Building Section 105.7 and Florida Statute 468.604(1)
ROW- PRE-APRON (PRE-POUR) 01/05/2023 Disapproved -FEE REQUIRED GBERTOLA
Note: 01/05/23=Not ready for inspection. Not formed. PICTURE ATTACHED POSTING OF PERMIT SITE ADDRESS, PERMIT, APPROVED PLANS AND DOCUMENTS December 19, 2022 SITE ADDRESS: This is a reminder; the permit project site address must be posted on the job site upon issuance of the building permit and maintained for the duration of construction and until the final address numbers are posted on the completed building. Address identification numbers shall be on a contrasting background, plainly visible from the street and 4 inches tall, and 1/2-inch minimum stroke width. The primary purposes of posting the site address is to ensure first responders are able to locate the property in the event of an emergency and to assist building inspectors in locating properties for inspection. Numbers shall be posted on near the street fronting the property and maintained for the duration of the permit. Numbers can also be placed on the exterior wall of the home facing the street. Posting the legal description or lot and block is not an acceptable substitute. ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2 PERMIT DOCUMENTS: This is a reminder, the permit documents issued with the building permit, including, but not limited to; the issued building permit, City approved plans, Inspection Record Card, Product Approval and Roofing Worksheets and all other City issued documents are the property of the City of Palm Coast. Documents shall be kept clean and dry and, on the site, and made available to Building Inspectors for all inspections. CITY APPROVED PERMIT DOCUMENTS SHALL NOT BE USED FOR ANY PURPOSES BY CONTRACTORS OR SUB-CONTRACTORS. PERMIT DOCUMENTS THAT ARE FADED, ILLEGIBLE, WRINKLED, WATER DAMAGED OR STAINED OR FOR WHATEVER REASON ARE OTHERWISE UNUSABLE MUST BE RELACED BY THE CONTRACTOR BEFORE INSPECTION. INSPECTIONS WILL NOT BE PERFORMED WHERE CITY APPROVED PERMIT DOCUMENTS ARE NOT PRESENT OR IN AN UNUSABLE CONDITION. Florida Building Code-Building Section 105.7 and Florida Statute 468.604(1)
U-CROSS CONNECTION 10/13/2022 APPROVED - AS NOTED DHANEY
Note: Yard not installed yet - no cross CN. .
U - SEWER TIE IN 10/13/2022 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
GRAVITY SEWER TEST 10/13/2022 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
INSULATION 09/21/2022 APPROVED - AS NOTED AGAETANO
Note: 9/20/2022 - PREVIOUS INSPECTION NOTES 9/16/2022 - PREVIOUS INSPECTION NOTES THIS IS A REINSPECTION Inspector Notes from Inspection 2445 Inspector Notes from Inspection 2420 THIS IS A REINSPECTION Inspector Notes from Inspection 2467 Trash on site. Site needs to be cleaned. No further inspections will be passed until trash is cleaned. 07-29-2022 1. Service wire not installed. 2. Wires in both electrical panels not installed. 3. UFER grounds not visible 4. Floor outlet added in right unit and filled with concrete. Please submit a revision to the building department. Uncover concrete for inspection. 5. Grounds not connected in both units. 6. Light not installed in left unit masterbedroom closet. 7. Back doors and right unit window will need a window nailing added. (Contractor noted that window is on backorder). 08-22-2022. 1. Service not installed - check at early power. 2. UFER ground not visible - check at early power. 3. Electrical panels conductors not phased out. Check at next inspection (insulation). 08-29-2022 - Three items above have not been addressed. Check at next inspection. 09-08-2022 - 1. FIREBLOCKING . Fireblocking needed at garage walls. R302.11.1 2. Service not installed - check at early power. 3. UFER ground not visible - check at early power. 09-14-2022 - Fireblocking will be addressed at insulation. Fire foam is needed at garage wall fireblocking penetrations. 09-16-2022 - Fire foam needed at garage walls penetrations. FIREBLOCKING INTEGRITY MUST BE MAINTAINED R302.11.2. When drilled through the fire blocking. 09-20-2022 1. Fire foam missed at left unit, right side of wall at ceiling near entry door. Insulation not installed at same area. FIREBLOCKING INTEGRITY MUST BE MAINTAINED R302.11.2. 2. Service not installed - check at early power. 3. UFER ground not visible - check at early power. 09-21-2022 1.Service not installed - check at early power. 2. UFER ground not visible - check at early power.
INSULATION 09/20/2022 Disapproved -FEE REQUIRED AGAETANO
Note: 9/16/2022 - PREVIOUS INSPECTION NOTES THIS IS A REINSPECTION Inspector Notes from Inspection 2445 Inspector Notes from Inspection 2420 THIS IS A REINSPECTION Inspector Notes from Inspection 2467 Trash on site. Site needs to be cleaned. No further inspections will be passed until trash is cleaned. 07-29-2022 1. Service wire not installed. 2. Wires in both electrical panels not installed. 3. UFER grounds not visible 4. Floor outlet added in right unit and filled with concrete. Please submit a revision to the building department. Uncover concrete for inspection. 5. Grounds not connected in both units. 6. Light not installed in left unit masterbedroom closet. 7. Back doors and right unit window will need a window nailing added. (Contractor noted that window is on backorder). 08-22-2022. 1. Service not installed - check at early power. 2. UFER ground not visible - check at early power. 3. Electrical panels conductors not phased out. Check at next inspection (insulation). 08-29-2022 - Three items above have not been addressed. Check at next inspection. 09-08-2022 - 1. FIREBLOCKING . Fireblocking needed at garage walls. R302.11.1 2. Service not installed - check at early power. 3. UFER ground not visible - check at early power. 09-14-2022 - Fireblocking will be addressed at insulation. Fire foam is needed at garage wall fireblocking penetrations. 09-16-2022 - Fire foam needed at garage walls penetrations. FIREBLOCKING INTEGRITY MUST BE MAINTAINED R302.11.2. When drilled through the fire blocking. 09-20-2022 1. Fire foam missed at left unit, right side of wall at ceiling near entry door. Insulation not installed at same area. FIREBLOCKING INTEGRITY MUST BE MAINTAINED R302.11.2. 2. Service not installed - check at early power. 3. UFER ground not visible - check at early power.
INSULATION 09/16/2022 Disapproved -FEE REQUIRED AGAETANO
Note: THIS IS A REINSPECTION Inspector Notes from Inspection 2445 Inspector Notes from Inspection 2420 THIS IS A REINSPECTION Inspector Notes from Inspection 2467 Trash on site. Site needs to be cleaned. No further inspections will be passed until trash is cleaned. 07-29-2022 1. Service wire not installed. 2. Wires in both electrical panels not installed. 3. UFER grounds not visible 4. Floor outlet added in right unit and filled with concrete. Please submit a revision to the building department. Uncover concrete for inspection. 5. Grounds not connected in both units. 6. Light not installed in left unit masterbedroom closet. 7. Back doors and right unit window will need a window nailing added. (Contractor noted that window is on backorder). 08-22-2022. 1. Service not installed - check at early power. 2. UFER ground not visible - check at early power. 3. Electrical panels conductors not phased out. Check at next inspection (insulation). 08-29-2022 - Three items above have not been addressed. Check at next inspection. 09-08-2022 - 1. FIREBLOCKING . Fireblocking needed at garage walls. R302.11.1 2. Service not installed - check at early power. 3. UFER ground not visible - check at early power. 09-14-2022 - Fireblocking will be addressed at insulation. Fire foam is needed at garage wall fireblocking penetrations. 09-16-2022 - Fire foam needed at garage walls penetrations. FIREBLOCKING INTEGRITY MUST BE MAINTAINED R302.11.2. When drilled through the fire blocking.
LATH/BRICK/ WATER BARRIER 09/14/2022 APPROVED AGAETANO
Note: THIS IS A REINSPECTION Inspector Notes from Inspection 2445 Inspector Notes from Inspection 2420 THIS IS A REINSPECTION Inspector Notes from Inspection 2467 Trash on site. Site needs to be cleaned. No further inspections will be passed until trash is cleaned. 07-29-2022 1. Service wire not installed. 2. Wires in both electrical panels not installed. 3. UFER grounds not visible 4. Floor outlet added in right unit and filled with concrete. Please submit a revision to the building department. Uncover concrete for inspection. 5. Grounds not connected in both units. 6. Light not installed in left unit masterbedroom closet. 7. Back doors and right unit window will need a window nailing added. (Contractor noted that window is on backorder). 08-22-2022. 1. Service not installed - check at early power. 2. UFER ground not visible - check at early power. 3. Electrical panels conductors not phased out. Check at next inspection (insulation). 08-29-2022 - Three items above have not been addressed. Check at next inspection. 09-07-2022 1. Service and UFER ground not installed. Check at early power. UFER will need to be exposed. 2. Fireblocking needed at garage walls. R302.11.1 09-14-2022 - Fireblocking will be addressed at insulation. Fire foam is needed at garage wall fireblocking penetrations.
INSULATION 09/08/2022 Disapproved - NO FEE AGAETANO
Note: Inspector Notes from Inspection 2445 Inspector Notes from Inspection 2420 THIS IS A REINSPECTION Inspector Notes from Inspection 2467 Trash on site. Site needs to be cleaned. No further inspections will be passed until trash is cleaned. 07-29-2022 1. Service wire not installed. 2. Wires in both electrical panels not installed. 3. UFER grounds not visible 4. Floor outlet added in right unit and filled with concrete. Please submit a revision to the building department. Uncover concrete for inspection. 5. Grounds not connected in both units. 6. Light not installed in left unit masterbedroom closet. 7. Back doors and right unit window will need a window nailing added. (Contractor noted that window is on backorder). 08-22-2022. 1. Service not installed - check at early power. 2. UFER ground not visible - check at early power. 3. Electrical panels conductors not phased out. Check at next inspection (insulation). 08-29-2022 - Three items above have not been addressed. Check at next inspection. 09-08-2022 - 1. FIREBLOCKING . Fireblocking needed at garage walls. R302.11.1 2. Service not installed - check at early power. 3. UFER ground not visible - check at early power.
LATH/BRICK/ WATER BARRIER 09/07/2022 Disapproved -FEE REQUIRED AGAETANO
Note: Inspector Notes from Inspection 2445 Inspector Notes from Inspection 2420 THIS IS A REINSPECTION Inspector Notes from Inspection 2467 Trash on site. Site needs to be cleaned. No further inspections will be passed until trash is cleaned. 07-29-2022 1. Service wire not installed. 2. Wires in both electrical panels not installed. 3. UFER grounds not visible 4. Floor outlet added in right unit and filled with concrete. Please submit a revision to the building department. Uncover concrete for inspection. 5. Grounds not connected in both units. 6. Light not installed in left unit masterbedroom closet. 7. Back doors and right unit window will need a window nailing added. (Contractor noted that window is on backorder). 08-22-2022. 1. Service not installed - check at early power. 2. UFER ground not visible - check at early power. 3. Electrical panels conductors not phased out. Check at next inspection (insulation). 08-29-2022 - Three items above have not been addressed. Check at next inspection. 09-07-2022 1. Service and UFER ground not installed. Check at early power. UFER will need to be exposed. 2. Fireblocking needed at garage walls. R302.11.1
FIREWALL FINAL 08/29/2022 APPROVED - AS NOTED AGAETANO
Note: Inspector Notes from Inspection 2420 THIS IS A REINSPECTION Inspector Notes from Inspection 2467 Trash on site. Site needs to be cleaned. No further inspections will be passed until trash is cleaned. 07-29-2022 1. Service wire not installed. 2. Wires in both electrical panels not installed. 3. UFER grounds not visible 4. Floor outlet added in right unit and filled with concrete. Please submit a revision to the building department. Uncover concrete for inspection. 5. Grounds not connected in both units. 6. Light not installed in left unit masterbedroom closet. 7. Back doors and right unit window will need a window nailing added. (Contractor noted that window is on backorder). 08-22-2022. 1. Service not installed - check at early power. 2. UFER ground not visible - check at early power. 3. Electrical panels conductors not phased out. Check at next inspection (insulation). 08-29-2022 - Three items above have not been addressed. Check at next inspection.
ALL ROUGH 08/22/2022 APPROVED - AS NOTED AGAETANO
Note: THIS IS A REINSPECTION Inspector Notes from Inspection 2467 Trash on site. Site needs to be cleaned. No further inspections will be passed until trash is cleaned. 07-29-2022 1. Service wire not installed. 2. Wires in both electrical panels not installed. 3. UFER grounds not visible 4. Floor outlet added in right unit and filled with concrete. Please submit a revision to the building department. Uncover concrete for inspection. 5. Grounds not connected in both units. 6. Light not installed in left unit masterbedroom closet. 7. Back doors and right unit window will need a window nailing added. (Contractor noted that window is on backorder). 08-22-2022. 1. Service not installed - check at early power. 2. UFER ground not visible - check at early power. 3. Electrical panels conductors not phased out. Check at next inspection (insulation).
FIREWALL FINAL 08/18/2022 CANCELLED BY APPLICANT WEB
Note: THIS IS A REINSPECTION DOCUMENTS: NEED THE APPROVED DOCUMENTS ON SITE FOR INSPECTION 107.3,1. (no plans on site)
FIREWALL FINAL 08/05/2022 Disapproved -FEE REQUIRED LMILLER
Note: DOCUMENTS: NEED THE APPROVED DOCUMENTS ON SITE FOR INSPECTION 107.3,1. (no plans on site)
FIREWALL DRYWALL NAILING 07/29/2022 APPROVED AGAETANO
Note: Inspector Notes from Inspection 2467 Trash on site. Site needs to be cleaned. No further inspections will be passed until trash is cleaned.
ALL ROUGH 07/29/2022 Disapproved -FEE REQUIRED AGAETANO
Note: Inspector Notes from Inspection 2467 Trash on site. Site needs to be cleaned. No further inspections will be passed until trash is cleaned. 07-29-2022 1. Service wire not installed. 2. Wires in both electrical panels not installed. 3. UFER grounds not visible 4. Floor outlet added in right unit and filled with concrete. Please submit a revision to the building department. Uncover concrete for inspection. 5. Grounds not connected in both units. 6. Light not installed in left unit masterbedrrom closet. 7. Back doors and right unit window will need a window nailing added. (Contractor noted that window is on backorder).
ROOF VALLEY & METAL 07/05/2022 APPROVED - AS NOTED AGAETANO
Note: Trash on site. Site needs to be cleaned. No further inspections will be passed until trash is cleaned.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/24/2022 APPROVED AGAETANO
Note: THIS IS A REINSPECTION Multuple straps missing. Check all.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/21/2022 Disapproved -FEE REQUIRED AGAETANO
Note: Multuple straps missing. Check all.
FOUND SURVEY APPROVED (OFFICE) 06/10/2022 APPROVED TBAKER
TIE BEAM / LINTEL 05/26/2022 APPROVED AGAETANO
MONOLITHIC SLAB 02/17/2022 APPROVED AGAETANO
Note: THIS IS A REINSPECTION New inspection due to canceled inspection THIS IS A REINSPECTION THIS IS A REINSPECTION 02-09-2022. Please provide a set of dry, readable, and approved drawings for inspection. 02-14-2022. Termite bond sticker not posted.
MONOLITHIC SLAB 02/14/2022 Disapproved -FEE REQUIRED AGAETANO
Note: New inspection due to canceled inspection THIS IS A REINSPECTION THIS IS A REINSPECTION 02-09-2022. Please provide a set of dry, readable, and approved drawings for inspection. 02-14-2022. Termite bond sticker not posted.
MONOLITHIC SLAB 02/11/2022 CANCELLED BY APPLICANT WEB
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 02-09-2022. Please provide a set of dry, readable, and approved drawings for inspection.
MONOLITHIC SLAB 02/10/2022 Disapproved -FEE REQUIRED AGAETANO
Note: THIS IS A REINSPECTION 02-09-2022. Please provide a set of dry, readable, and approved drawings for inspection.
PLUMBING 1ST ROUGH UNDERGROUND 01/28/2022 APPROVED MGIBSON
Note: THIS IS A REINSPECTION UNCOVER AND EXSPOSE ALL PLUMBING FOR INSPECTION. MISSED INSPECTION
PLUMBING 1ST ROUGH UNDERGROUND 01/26/2022 Disapproved -FEE REQUIRED MGIBSON
Note: UNCOVER AND EXSPOSE ALL PLUMBING FOR INSPECTION. MISSED INSPECTION NO TEST ON WATER OR SANITARY SYSTEM
MONOLITHIC SLAB 01/26/2022 CANCELLED BY APPLICANT KSANDOE
WATER METER INSTALLATION REQUEST 12/01/2021 APPROVED TCHURCHILL

Review History

Department Status Date In Date Out
MECH COMPLETE 07/06/2023 07/10/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 05/17/2023 05/24/2023
Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM
BADMIN INFORMATION 04/24/2023 04/24/2023
Note: Marked INFORMATION By: LIBBY MUSGROVE - - LMUSGROVE@PALMCOASTGOV.COM document name & file name must match - Ex. Site plan=Site plan. no extra names or numbers
ELEC COMPLETE 08/16/2022 08/16/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 06/10/2022 06/10/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 06/10/2022 06/10/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 03/24/2022 03/29/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 03/24/2022 03/24/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BADMIN INFORMATION 03/18/2022 03/18/2022
Note: Marked INFORMATION By: MARGA DEFREITAS - - MDEFREITAS@PALMCOASTGOV.COM YOU NEED THE FOUNDATION FIRST NOT A FINALSURVEY
ZON COMPLETE 10/11/2021 10/12/2021
Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM
MECH COMPLETE 10/11/2021 10/11/2021
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 10/11/2021 10/14/2021
Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM
ENGIN1 COMPLETE 10/11/2021 10/11/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ELEC COMPLETE 09/15/2021 09/17/2021
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
MECH HOLD 09/15/2021 09/15/2021
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Energy calcs need to be signed by the builder. (Second Request)
BLD COMPLETE 09/15/2021 09/16/2021
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ZON HOLD 09/15/2021 09/15/2021
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM REPEAT COMMENTS: Landscape plan still does not demonstrate that the code requirements for sizes of the foundation plantings. All shrubs must be a minimum of 3 gal and the mechanical equipment must have a minimum of 7 gal screening plantings. Mechanical equipment pads located in 5' side easement.
SW1 HOLD 09/15/2021 09/22/2021
Note: Held By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM Drainage 'swale' noted should flow down the property line as a "Common Swale". When? ALWAYS next to a vacant. Whenever possible next to an existing home where the elevation 10 ft off the property line are higher than the property line. In this site plan both sides should drain down the property line as a common swale. Currently depicted as a swale flow between the property line and the new construction.
ENGIN1 COMPLETE 09/15/2021 09/15/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON HOLD 08/20/2021 08/20/2021
Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Ac Pad mechanical equiptment pads located in 5 ft utility easment. Land scape plan: missing the legend with tree descriptons and grass being used and whether or not it will require an irrigation system.
BLD HOLD 08/18/2021 08/20/2021
Note: Held By: HAROLD ALLEN - - HALLEN@PALMCOASTGOV.COM REVIEW COMMENTS: 1. On Sheet 1 of 9 note calls out Plans have been designed to the 2017 Florida Building Code. As of January 1, 2021 Florida State adopted the 2020 Florida Building Code 7th Edition. 2. ASCE 7-10 is referenced. As mentioned above, this is an older Code reference. 3. R703.8 is called for flashing. Per section R703 is for Anchored Stone and Masonry Veneer. A revision is required to reflect the correct Code section. 4. Provide a current City of Palm Coast Roofing Worksheet.
CUSVC COMPLETE 08/18/2021 08/25/2021
Note: Released By: HALEIGH HAND - -
ELEC HOLD 08/18/2021 08/19/2021
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Submit electric load calcs and riser diagram
ENGIN1 COMPLETE 08/18/2021 08/18/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 08/18/2021 08/19/2021
Note: Released By: TONI CHURCHILL - -
MECH HOLD 08/18/2021 08/19/2021
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Energy calcs need to be signed by the builder
SW1 HOLD 08/18/2021 08/25/2021
Note: Held By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM This is a plot plan not a site plan we need a topographical site plan with proposed drainage features and existing and proposed grade plan for the stormwater drainage
ZON COMPLETE 08/18/2021 08/20/2021
Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Ac Pad mechanical equiptment pads located in 5 ft utility easment. Land scape plan: missing the legend with tree descriptons and grass being used and whether or not it will require an irrigation system.
SWALE COMPLETE 08/18/2021 11/10/2021
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 07/25/2023
REINSPECTION RESIDENTIAL ¤40.00 07/25/2023
REINSPECTION RESIDENTIAL ¤40.00 07/25/2023
REINSPECTION RESIDENTIAL ¤40.00 07/25/2023
CONTRACTOR CHANGE ¤40.00 07/25/2023
CONTRACTOR CHANGE ¤20.00 07/25/2023
SW ENG REINSPECTION 20 ¤20.00 07/25/2023
SW ENG REINSPECTION 20 ¤20.00 07/25/2023
SW ENG REINSPECTION 20 ¤20.00 07/25/2023
SW ENG REINSPECTION 30 ¤30.00 07/25/2023
SW ENG REINSPECTION 30 ¤30.00 07/25/2023
SW ENG REINSPECTION 30 ¤30.00 07/25/2023
SW ENG REINSPECTION 30 ¤30.00 07/25/2023
SW ENG REINSPECTION 30 ¤30.00 07/25/2023
REINSPECTION RESIDENTIAL ¤40.00 07/25/2023
REINSPECTION RESIDENTIAL ¤40.00 07/25/2023
REINSPECTION RESIDENTIAL ¤40.00 07/25/2023
REINSPECTION RESIDENTIAL ¤40.00 07/25/2023
REINSPECTION RESIDENTIAL ¤40.00 07/25/2023
REINSPECTION RESIDENTIAL ¤40.00 07/25/2023
REINSPECTION RESIDENTIAL ¤40.00 03/30/2022
REINSPECTION RESIDENTIAL ¤40.00 03/30/2022
REINSPECTION RESIDENTIAL ¤40.00 02/07/2022
REINSPECTION RESIDENTIAL ¤40.00 02/07/2022
METER - DEPOSIT ¤120.00 11/09/2021
WATER- TURN ON ¤50.00 11/09/2021
ADMINISTRATIVE RESIDENTIAL ¤30.00 11/09/2021
INSPECTION - RESIDENTIAL ¤987.25 11/09/2021
PLAN REVIEW - RESIDENTIAL ¤280.02 11/09/2021
3% FIRE IMPACT FEE CREDIT (¤22.02) 11/09/2021
IMPACT FEE FIRE ¤734.00 11/09/2021
IMPACT FEE PARKS ¤2,398.24 11/09/2021
IMPACT FEE SCHOOL ¤7,200.00 11/09/2021
IMPACT FEE TRANSPORTATION ¤2,666.00 11/09/2021
WATER -IRRIGATION INSPECTION ¤50.00 11/09/2021
3% PARKS IMPACT FEE CREDIT (¤71.95) 11/09/2021
SURCHARGE FS 533.721 ¤13.61 11/09/2021
SURCHARGE - FS 468.631 ¤20.42 11/09/2021
SW ENG - FOUNDATION SURVEY ¤20.00 11/09/2021
SW ENG INSPECTION 60 ¤60.00 11/09/2021
SW ENG PRE APRON ¤30.00 11/09/2021
SW ENG - REVIEW 20 ¤20.00 11/09/2021
SW ENG RES REVIEW 200 ¤200.00 11/09/2021
3% TRANS IMPACT FEE CREDIT (¤79.98) 11/09/2021
SEWER CREDIT (¤2,016.00) 11/09/2021
SEWER INSPECTION ¤25.00 11/09/2021
SEWER CAPITAL FACILITY ¤9,329.10 11/09/2021
WATER CAPITAL FACILITY FEE ¤6,848.90 11/09/2021
SITE PLAN 30 ¤30.00 11/09/2021
CONNECTION FEES ¤2,035.66 11/09/2021
Fees Total Due: ¤0.00 Total Paid: ¤31,780.75