I want to search for...
Permit #2021081012
Permit Details
Status: COED
| Parcel Id: 07-11-31-7010-00280-0160 |
| CONDITIONED SPACE: 1346 sqft |
| CONDITIONED SPACE: 1346 sqft |
| GARAGE: 524 sqft |
| GARAGE: 524 sqft |
| OPENED PORCH (WITH ROOF) : 307 sqft |
| OPENED PORCH (WITH ROOF) : 116 sqft |
| Total Square Footage: 4163 sqft |
| Block: 00280 |
| Subdivision: 2137 - SECTION 10-FLORIDA PARK |
| Job Phone: 386-447-7007 |
| Location Address: 31 FRENEAU LN |
| Type: DU - DUPLEX |
| Issue Date: 11/09/2021 |
| NOC: RECORDED |
| Applicant name: MAXIM TARANNIK |
| Owner: CARLOS F AND NANETTE MARQUES-FREITAS |
|
Address 52 FRANKFORD LANE PALM COAST, FL 32137 |
| Lot: 0160 |
| Contracted Stated Job Value: ¤349,800.00 |
| Job Description: Duplex |
| Type: CN |
Contractor
GOLDEN MAGNOLIA, INC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
1 ROCKEFELLER DRIVE PALM COAST, FL 32164 |
RR282811984 (Exp: 08/31/2025) | 386-447-7007 |
Sub Contractors
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
THOMAS JOSEPH WALL
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 314 PALAKTKA, FL 32177 |
CFC037193 (Exp: 08/31/2026) | 386-336-9050 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 07/24/2023 | FINAL APPROVED | TSTAUFFACHER |
| Note: 7/13/2023 - PREVIOUS INSPECTION NOTES 7/5/2023 - PREVIOUS INSPECTION NOTES 07/05/2023 energy calcs do not match installed units please provide new energy calcs to city for revision units not labeled A and B Broken window left unit Doorknobs not installed Not a complete list/ inspection stopped 6/29/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2450 5/11/2023 - PREVIOUS INSPECTION NOTES 4/27/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2490 9/20/2022 - PREVIOUS INSPECTION NOTES 9/16/2022 - PREVIOUS INSPECTION NOTES THIS IS A REINSPECTION Inspector Notes from Inspection 2445 Inspector Notes from Inspection 2420 THIS IS A REINSPECTION Inspector Notes from Inspection 2467 Trash on site. Site needs to be cleaned. No further inspections will be passed until trash is cleaned. 07-29-2022 1. Service wire not installed. 2. Wires in both electrical panels not installed. 3. UFER grounds not visible 4. Floor outlet added in right unit and filled with concrete. Please submit a revision to the building department. Uncover concrete for inspection. 5. Grounds not connected in both units. 6. Light not installed in left unit masterbedroom closet. 7. Back doors and right unit window will need a window nailing added. (Contractor noted that window is on backorder). 08-22-2022. 1. Service not installed - check at early power. 2. UFER ground not visible - check at early power. 3. Electrical panels conductors not phased out. Check at next inspection (insulation). 08-29-2022 - Three items above have not been addressed. Check at next inspection. 09-08-2022 - 1. FIREBLOCKING . Fireblocking needed at garage walls. R302.11.1 2. Service not installed - check at early power. 3. UFER ground not visible - check at early power. 09-14-2022 - Fireblocking will be addressed at insulation. Fire foam is needed at garage wall fireblocking penetrations. 09-16-2022 - Fire foam needed at garage walls penetrations. FIREBLOCKING INTEGRITY MUST BE MAINTAINED R302.11.2. When drilled through the fire blocking. 09-20-2022 1. Fire foam missed at left unit, right side of wall at ceiling near entry door. Insulation not installed at same area. FIREBLOCKING INTEGRITY MUST BE MAINTAINED R302.11.2. 2. Service not installed - check at early power. 3. UFER ground not visible - check at early power. 09-21-2022 1.Service not installed - check at early power. 2. UFER ground not visible - check at early power. 04-27-2023 Exterior of home is complete. Please submit an engineering letter to the building department and have on site along with the approved drawings, that the work has been installed as per plans. 05-11-2023. Above issue has not been resolved. Exterior of home is complete. Please submit an engineering letter to the building department and have on site along with the approved drawings, that the work has been installed as per plans. 5/24/23 Inspection administratively approved by CBO on submission of PE inspection letter. 06-29-2023 1. Kitchen outlets not installed. 2. Kitchen hood duct not correct M505. 3. Approved documents not on site. Not ready for inspection. 07-13-2023 1. Unit A: Broken front window. 2. Disposal switch not installed. 3. AHU drain pipe not insulated completely. 4. AC not proper clearance form grade. 5. Garage door will not close. Inspection stopped. Not ready for inspection. | |||
| BLD - BUILDING FINAL | 07/24/2023 | FINAL APPROVED | TSTAUFFACHER |
| BLD - BUILDING FINAL | 07/13/2023 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: 7/5/2023 - PREVIOUS INSPECTION NOTES 07/05/2023 energy calcs do not match installed units please provide new energy calcs to city for revision units not labeled A and B Broken window left unit Doorknobs not installed Not a complete list/ inspection stopped 6/29/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2450 5/11/2023 - PREVIOUS INSPECTION NOTES 4/27/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2490 9/20/2022 - PREVIOUS INSPECTION NOTES 9/16/2022 - PREVIOUS INSPECTION NOTES THIS IS A REINSPECTION Inspector Notes from Inspection 2445 Inspector Notes from Inspection 2420 THIS IS A REINSPECTION Inspector Notes from Inspection 2467 Trash on site. Site needs to be cleaned. No further inspections will be passed until trash is cleaned. 07-29-2022 1. Service wire not installed. 2. Wires in both electrical panels not installed. 3. UFER grounds not visible 4. Floor outlet added in right unit and filled with concrete. Please submit a revision to the building department. Uncover concrete for inspection. 5. Grounds not connected in both units. 6. Light not installed in left unit masterbedroom closet. 7. Back doors and right unit window will need a window nailing added. (Contractor noted that window is on backorder). 08-22-2022. 1. Service not installed - check at early power. 2. UFER ground not visible - check at early power. 3. Electrical panels conductors not phased out. Check at next inspection (insulation). 08-29-2022 - Three items above have not been addressed. Check at next inspection. 09-08-2022 - 1. FIREBLOCKING . Fireblocking needed at garage walls. R302.11.1 2. Service not installed - check at early power. 3. UFER ground not visible - check at early power. 09-14-2022 - Fireblocking will be addressed at insulation. Fire foam is needed at garage wall fireblocking penetrations. 09-16-2022 - Fire foam needed at garage walls penetrations. FIREBLOCKING INTEGRITY MUST BE MAINTAINED R302.11.2. When drilled through the fire blocking. 09-20-2022 1. Fire foam missed at left unit, right side of wall at ceiling near entry door. Insulation not installed at same area. FIREBLOCKING INTEGRITY MUST BE MAINTAINED R302.11.2. 2. Service not installed - check at early power. 3. UFER ground not visible - check at early power. 09-21-2022 1.Service not installed - check at early power. 2. UFER ground not visible - check at early power. 04-27-2023 Exterior of home is complete. Please submit an engineering letter to the building department and have on site along with the approved drawings, that the work has been installed as per plans. 05-11-2023. Above issue has not been resolved. Exterior of home is complete. Please submit an engineering letter to the building department and have on site along with the approved drawings, that the work has been installed as per plans. 5/24/23 Inspection administratively approved by CBO on submission of PE inspection letter. 06-29-2023 1. Kitchen outlets not installed. 2. Kitchen hood duct not correct M505. 3. Approved documents not on site. Not ready for inspection. 07-13-2023 1. Unit A: Broken front window. 2. Disposal switch not installed. 3. AHU drain pipe not insulated completely. 4. AC not proper clearance form grade. 5. Garage door will not close. Inspection stopped. Not ready for inspection. | |||
| BLD - BUILDING FINAL | 07/05/2023 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: 07/05/2023 energy calcs do not match installed units please provide new energy calcs to city for revision units not labeled A and B Broken window left unit Doorknobs not installed Not a complete list/ inspection stopped 6/29/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2450 5/11/2023 - PREVIOUS INSPECTION NOTES 4/27/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2490 9/20/2022 - PREVIOUS INSPECTION NOTES 9/16/2022 - PREVIOUS INSPECTION NOTES THIS IS A REINSPECTION Inspector Notes from Inspection 2445 Inspector Notes from Inspection 2420 THIS IS A REINSPECTION Inspector Notes from Inspection 2467 Trash on site. Site needs to be cleaned. No further inspections will be passed until trash is cleaned. 07-29-2022 1. Service wire not installed. 2. Wires in both electrical panels not installed. 3. UFER grounds not visible 4. Floor outlet added in right unit and filled with concrete. Please submit a revision to the building department. Uncover concrete for inspection. 5. Grounds not connected in both units. 6. Light not installed in left unit masterbedroom closet. 7. Back doors and right unit window will need a window nailing added. (Contractor noted that window is on backorder). 08-22-2022. 1. Service not installed - check at early power. 2. UFER ground not visible - check at early power. 3. Electrical panels conductors not phased out. Check at next inspection (insulation). 08-29-2022 - Three items above have not been addressed. Check at next inspection. 09-08-2022 - 1. FIREBLOCKING . Fireblocking needed at garage walls. R302.11.1 2. Service not installed - check at early power. 3. UFER ground not visible - check at early power. 09-14-2022 - Fireblocking will be addressed at insulation. Fire foam is needed at garage wall fireblocking penetrations. 09-16-2022 - Fire foam needed at garage walls penetrations. FIREBLOCKING INTEGRITY MUST BE MAINTAINED R302.11.2. When drilled through the fire blocking. 09-20-2022 1. Fire foam missed at left unit, right side of wall at ceiling near entry door. Insulation not installed at same area. FIREBLOCKING INTEGRITY MUST BE MAINTAINED R302.11.2. 2. Service not installed - check at early power. 3. UFER ground not visible - check at early power. 09-21-2022 1.Service not installed - check at early power. 2. UFER ground not visible - check at early power. 04-27-2023 Exterior of home is complete. Please submit an engineering letter to the building department and have on site along with the approved drawings, that the work has been installed as per plans. 05-11-2023. Above issue has not been resolved. Exterior of home is complete. Please submit an engineering letter to the building department and have on site along with the approved drawings, that the work has been installed as per plans. 5/24/23 Inspection administratively approved by CBO on submission of PE inspection letter. 06-29-2023 1. Kitchen outlets not installed. 2. Kitchen hood duct not correct M505. 3. Approved documents not on site. Not ready for inspection. | |||
| BLD - BUILDING FINAL | 06/29/2023 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: Inspector Notes from Inspection 2450 5/11/2023 - PREVIOUS INSPECTION NOTES 4/27/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2490 9/20/2022 - PREVIOUS INSPECTION NOTES 9/16/2022 - PREVIOUS INSPECTION NOTES THIS IS A REINSPECTION Inspector Notes from Inspection 2445 Inspector Notes from Inspection 2420 THIS IS A REINSPECTION Inspector Notes from Inspection 2467 Trash on site. Site needs to be cleaned. No further inspections will be passed until trash is cleaned. 07-29-2022 1. Service wire not installed. 2. Wires in both electrical panels not installed. 3. UFER grounds not visible 4. Floor outlet added in right unit and filled with concrete. Please submit a revision to the building department. Uncover concrete for inspection. 5. Grounds not connected in both units. 6. Light not installed in left unit masterbedroom closet. 7. Back doors and right unit window will need a window nailing added. (Contractor noted that window is on backorder). 08-22-2022. 1. Service not installed - check at early power. 2. UFER ground not visible - check at early power. 3. Electrical panels conductors not phased out. Check at next inspection (insulation). 08-29-2022 - Three items above have not been addressed. Check at next inspection. 09-08-2022 - 1. FIREBLOCKING . Fireblocking needed at garage walls. R302.11.1 2. Service not installed - check at early power. 3. UFER ground not visible - check at early power. 09-14-2022 - Fireblocking will be addressed at insulation. Fire foam is needed at garage wall fireblocking penetrations. 09-16-2022 - Fire foam needed at garage walls penetrations. FIREBLOCKING INTEGRITY MUST BE MAINTAINED R302.11.2. When drilled through the fire blocking. 09-20-2022 1. Fire foam missed at left unit, right side of wall at ceiling near entry door. Insulation not installed at same area. FIREBLOCKING INTEGRITY MUST BE MAINTAINED R302.11.2. 2. Service not installed - check at early power. 3. UFER ground not visible - check at early power. 09-21-2022 1.Service not installed - check at early power. 2. UFER ground not visible - check at early power. 04-27-2023 Exterior of home is complete. Please submit an engineering letter to the building department and have on site along with the approved drawings, that the work has been installed as per plans. 05-11-2023. Above issue has not been resolved. Exterior of home is complete. Please submit an engineering letter to the building department and have on site along with the approved drawings, that the work has been installed as per plans. 5/24/23 Inspection administratively approved by CBO on submission of PE inspection letter. 06-29-2023 1. Kitchen outlets not installed. 2. Kitchen hood duct not correct M1503 & M505. 3. Approved documents not on site. Not ready for inspection. Inspection stopped. | |||
| U -UTILITY RESIDENTIAL FINAL | 06/29/2023 | FINAL APPROVED | DHANEY |
| ROW - FINAL INSPECTION | 06/28/2023 | FINAL APPROVED | EMADISON |
| Note: 6/20/2023 - PREVIOUS INSPECTION NOTES ** 06/20/23 BUILDER IS STILL REQUIRED TO REMOVE "ALL" THE TRASH AND CONSTRUCTION DEBRIS FROM THE VACANT ON LEFT SIDE AND REAR AS NOTED IN PREVIOUS INSPECTIONS ______________________________________________________________________________________________________________________ 5/30/2023 12:26:15 PM- PREVIOUS INSPECTION NOTES 5/30/2023 12:24:10 PM- PREVIOUS INSPECTION NOTES 5/30/2023 - PREVIOUS INSPECTION NOTES ** 05/30/23 BUILDER NEEDS TO REPAIR SWALE ON LEFT SIDE OF LEFT SIDE DRIVEWAY AND SOD OUTLINED WITH WHITE PAINT NEED TO FILL AND SOD LOW SPOTS AND REMOVE HIGH SPOT AND SOD ** BUILDER NEEDS TO REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM PROPERTY AND VACANT THIS INCLUDES REMOVING ALL DEBRIS FROM DRIVEWAYS (SIGNS, POSTS, TUBS WITH DEBRIS, CONCRETE) ** ** SEED** NEEDS TO BE USED WITH THE STRAW TO AID IN EROSION CONTROL ** RIGHT & LEFT SIDE SIDEWALK SEWER CLEAN-OUTS ARE TO LOW IT IS A TRIPPING HAZARD AND NEEDS TO BE RAISED FLUSH WITH THE TOP OF SIDEWALK ELEVATION ________________________________________________________________________________________________________________________ 4/27/2023 - PREVIOUS INSPECTION NOTES ** 04/27/23 ** 04/26/23 BUILDER NEEDS TO REPAIR SWALE ON LEFT SIDE OF LEFT SIDE DRIVEWAY AND SOD OUTLINED WITH PINK PAINT ** BUILDER NEEDS TO REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM PROPERTY AND VACANT ** ** SEED** NEEDS TO BE USED WITH THE STRAW ______________________________________________________________________________________________________________________ ** BEFORE FINAL ROW INSPECTION IS APPROVED CORRECTIONS NEEDED** ** 04/26/23 BUILDER NEEDS TO REPAIR SWALE ON LEFT SIDE OF LEFT SIDE DRIVEWAY AND SOD OUTLINED WITH PINK PAINT ** BUILDER NEEDS TO REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM PROPERTY AND VACANT ** ** SEED** NEEDS TO BE USED WITH THE STRAW | |||
| ROW - FINAL INSPECTION | 06/20/2023 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 06/20/23 BUILDER IS STILL REQUIRED TO REMOVE "ALL" THE TRASH AND CONSTRUCTION DEBRIS FROM THE VACANT ON LEFT SIDE AND REAR AS NOTED IN PREVIOUS INSPECTIONS ______________________________________________________________________________________________________________________ 5/30/2023 12:26:15 PM- PREVIOUS INSPECTION NOTES 5/30/2023 12:24:10 PM- PREVIOUS INSPECTION NOTES 5/30/2023 - PREVIOUS INSPECTION NOTES ** 05/30/23 BUILDER NEEDS TO REPAIR SWALE ON LEFT SIDE OF LEFT SIDE DRIVEWAY AND SOD OUTLINED WITH WHITE PAINT NEED TO FILL AND SOD LOW SPOTS AND REMOVE HIGH SPOT AND SOD ** BUILDER NEEDS TO REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM PROPERTY AND VACANT THIS INCLUDES REMOVING ALL DEBRIS FROM DRIVEWAYS (SIGNS, POSTS, TUBS WITH DEBRIS, CONCRETE) ** ** SEED** NEEDS TO BE USED WITH THE STRAW TO AID IN EROSION CONTROL ** RIGHT & LEFT SIDE SIDEWALK SEWER CLEAN-OUTS ARE TO LOW IT IS A TRIPPING HAZARD AND NEEDS TO BE RAISED FLUSH WITH THE TOP OF SIDEWALK ELEVATION ________________________________________________________________________________________________________________________ 4/27/2023 - PREVIOUS INSPECTION NOTES ** 04/27/23 ** 04/26/23 BUILDER NEEDS TO REPAIR SWALE ON LEFT SIDE OF LEFT SIDE DRIVEWAY AND SOD OUTLINED WITH PINK PAINT ** BUILDER NEEDS TO REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM PROPERTY AND VACANT ** ** SEED** NEEDS TO BE USED WITH THE STRAW ______________________________________________________________________________________________________________________ ** BEFORE FINAL ROW INSPECTION IS APPROVED CORRECTIONS NEEDED** ** 04/26/23 BUILDER NEEDS TO REPAIR SWALE ON LEFT SIDE OF LEFT SIDE DRIVEWAY AND SOD OUTLINED WITH PINK PAINT ** BUILDER NEEDS TO REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM PROPERTY AND VACANT ** ** SEED** NEEDS TO BE USED WITH THE STRAW | |||
| ROW - FINAL INSPECTION | 05/31/2023 | CANCELLED BY APPLICANT | STHOMAS |
| Note: 5/30/2023 - PREVIOUS INSPECTION NOTES ** 05/30/23 BUILDER NEEDS TO REPAIR SWALE ON LEFT SIDE OF LEFT SIDE DRIVEWAY AND SOD OUTLINED WITH WHITE PAINT NEED TO FILL AND SOD LOW SPOTS AND REMOVE HIGH SPOT AND SOD ** BUILDER NEEDS TO REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM PROPERTY AND VACANT THIS INCLUDES REMOVING ALL DEBRIS FROM DRIVEWAYS (SIGNS, POSTS, TUBS WITH DEBRIS, CONCRETE) ** ** SEED** NEEDS TO BE USED WITH THE STRAW TO AID IN EROSION CONTROL ** RIGHT & LEFT SIDE SIDEWALK SEWER CLEAN-OUTS ARE TO LOW IT IS A TRIPPING HAZARD AND NEEDS TO BE RAISED FLUSH WITH THE TOP OF SIDEWALK ELEVATION ________________________________________________________________________________________________________________________ 4/27/2023 - PREVIOUS INSPECTION NOTES ** 04/27/23 ** 04/26/23 BUILDER NEEDS TO REPAIR SWALE ON LEFT SIDE OF LEFT SIDE DRIVEWAY AND SOD OUTLINED WITH PINK PAINT ** BUILDER NEEDS TO REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM PROPERTY AND VACANT ** ** SEED** NEEDS TO BE USED WITH THE STRAW ______________________________________________________________________________________________________________________ ** BEFORE FINAL ROW INSPECTION IS APPROVED CORRECTIONS NEEDED** ** 04/26/23 BUILDER NEEDS TO REPAIR SWALE ON LEFT SIDE OF LEFT SIDE DRIVEWAY AND SOD OUTLINED WITH PINK PAINT ** BUILDER NEEDS TO REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM PROPERTY AND VACANT ** ** SEED** NEEDS TO BE USED WITH THE STRAW | |||
| ROW - FINAL INSPECTION | 05/31/2023 | CANCELLED BY APPLICANT | STHOMAS |
| Note: 5/30/2023 12:24:10 PM- PREVIOUS INSPECTION NOTES 5/30/2023 - PREVIOUS INSPECTION NOTES ** 05/30/23 BUILDER NEEDS TO REPAIR SWALE ON LEFT SIDE OF LEFT SIDE DRIVEWAY AND SOD OUTLINED WITH WHITE PAINT NEED TO FILL AND SOD LOW SPOTS AND REMOVE HIGH SPOT AND SOD ** BUILDER NEEDS TO REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM PROPERTY AND VACANT THIS INCLUDES REMOVING ALL DEBRIS FROM DRIVEWAYS (SIGNS, POSTS, TUBS WITH DEBRIS, CONCRETE) ** ** SEED** NEEDS TO BE USED WITH THE STRAW TO AID IN EROSION CONTROL ** RIGHT & LEFT SIDE SIDEWALK SEWER CLEAN-OUTS ARE TO LOW IT IS A TRIPPING HAZARD AND NEEDS TO BE RAISED FLUSH WITH THE TOP OF SIDEWALK ELEVATION ________________________________________________________________________________________________________________________ 4/27/2023 - PREVIOUS INSPECTION NOTES ** 04/27/23 ** 04/26/23 BUILDER NEEDS TO REPAIR SWALE ON LEFT SIDE OF LEFT SIDE DRIVEWAY AND SOD OUTLINED WITH PINK PAINT ** BUILDER NEEDS TO REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM PROPERTY AND VACANT ** ** SEED** NEEDS TO BE USED WITH THE STRAW ______________________________________________________________________________________________________________________ ** BEFORE FINAL ROW INSPECTION IS APPROVED CORRECTIONS NEEDED** ** 04/26/23 BUILDER NEEDS TO REPAIR SWALE ON LEFT SIDE OF LEFT SIDE DRIVEWAY AND SOD OUTLINED WITH PINK PAINT ** BUILDER NEEDS TO REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM PROPERTY AND VACANT ** ** SEED** NEEDS TO BE USED WITH THE STRAW | |||
| ROW - FINAL INSPECTION | 05/30/2023 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 05/30/23 BUILDER NEEDS TO REPAIR SWALE ON LEFT SIDE OF LEFT SIDE DRIVEWAY AND SOD OUTLINED WITH WHITE PAINT NEED TO FILL AND SOD LOW SPOTS AND REMOVE HIGH SPOT AND SOD ** BUILDER NEEDS TO REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM PROPERTY AND VACANT THIS INCLUDES REMOVING ALL DEBRIS FROM DRIVEWAYS (SIGNS, POSTS, TUBS WITH DEBRIS, CONCRETE) ** ** SEED** NEEDS TO BE USED WITH THE STRAW TO AID IN EROSION CONTROL ** RIGHT & LEFT SIDE SIDEWALK SEWER CLEAN-OUTS ARE TO LOW IT IS A TRIPPING HAZARD AND NEEDS TO BE RAISED FLUSH WITH THE TOP OF SIDEWALK ELEVATION ________________________________________________________________________________________________________________________ 4/27/2023 - PREVIOUS INSPECTION NOTES ** 04/27/23 ** 04/26/23 BUILDER NEEDS TO REPAIR SWALE ON LEFT SIDE OF LEFT SIDE DRIVEWAY AND SOD OUTLINED WITH PINK PAINT ** BUILDER NEEDS TO REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM PROPERTY AND VACANT ** ** SEED** NEEDS TO BE USED WITH THE STRAW ______________________________________________________________________________________________________________________ ** BEFORE FINAL ROW INSPECTION IS APPROVED CORRECTIONS NEEDED** ** 04/26/23 BUILDER NEEDS TO REPAIR SWALE ON LEFT SIDE OF LEFT SIDE DRIVEWAY AND SOD OUTLINED WITH PINK PAINT ** BUILDER NEEDS TO REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM PROPERTY AND VACANT ** ** SEED** NEEDS TO BE USED WITH THE STRAW | |||
| WALL SHEATHING | 05/24/2023 | APPROVED - AS NOTED | PBUCKLEY |
| Note: 5/11/2023 - PREVIOUS INSPECTION NOTES 4/27/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2490 9/20/2022 - PREVIOUS INSPECTION NOTES 9/16/2022 - PREVIOUS INSPECTION NOTES THIS IS A REINSPECTION Inspector Notes from Inspection 2445 Inspector Notes from Inspection 2420 THIS IS A REINSPECTION Inspector Notes from Inspection 2467 Trash on site. Site needs to be cleaned. No further inspections will be passed until trash is cleaned. 07-29-2022 1. Service wire not installed. 2. Wires in both electrical panels not installed. 3. UFER grounds not visible 4. Floor outlet added in right unit and filled with concrete. Please submit a revision to the building department. Uncover concrete for inspection. 5. Grounds not connected in both units. 6. Light not installed in left unit masterbedroom closet. 7. Back doors and right unit window will need a window nailing added. (Contractor noted that window is on backorder). 08-22-2022. 1. Service not installed - check at early power. 2. UFER ground not visible - check at early power. 3. Electrical panels conductors not phased out. Check at next inspection (insulation). 08-29-2022 - Three items above have not been addressed. Check at next inspection. 09-08-2022 - 1. FIREBLOCKING . Fireblocking needed at garage walls. R302.11.1 2. Service not installed - check at early power. 3. UFER ground not visible - check at early power. 09-14-2022 - Fireblocking will be addressed at insulation. Fire foam is needed at garage wall fireblocking penetrations. 09-16-2022 - Fire foam needed at garage walls penetrations. FIREBLOCKING INTEGRITY MUST BE MAINTAINED R302.11.2. When drilled through the fire blocking. 09-20-2022 1. Fire foam missed at left unit, right side of wall at ceiling near entry door. Insulation not installed at same area. FIREBLOCKING INTEGRITY MUST BE MAINTAINED R302.11.2. 2. Service not installed - check at early power. 3. UFER ground not visible - check at early power. 09-21-2022 1.Service not installed - check at early power. 2. UFER ground not visible - check at early power. 04-27-2023 Exterior of home is complete. Please submit an engineering letter to the building department and have on site along with the approved drawings, that the work has been installed as per plans. 05-11-2023. Above issue has not been resolved. Exterior of home is complete. Please submit an engineering letter to the building department and have on site along with the approved drawings, that the work has been installed as per plans. 5/24/23 Inspection administratively approved by CBO on submission of PE inspection letter. | |||
| WALL SHEATHING | 05/11/2023 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: 4/27/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2490 9/20/2022 - PREVIOUS INSPECTION NOTES 9/16/2022 - PREVIOUS INSPECTION NOTES THIS IS A REINSPECTION Inspector Notes from Inspection 2445 Inspector Notes from Inspection 2420 THIS IS A REINSPECTION Inspector Notes from Inspection 2467 Trash on site. Site needs to be cleaned. No further inspections will be passed until trash is cleaned. 07-29-2022 1. Service wire not installed. 2. Wires in both electrical panels not installed. 3. UFER grounds not visible 4. Floor outlet added in right unit and filled with concrete. Please submit a revision to the building department. Uncover concrete for inspection. 5. Grounds not connected in both units. 6. Light not installed in left unit masterbedroom closet. 7. Back doors and right unit window will need a window nailing added. (Contractor noted that window is on backorder). 08-22-2022. 1. Service not installed - check at early power. 2. UFER ground not visible - check at early power. 3. Electrical panels conductors not phased out. Check at next inspection (insulation). 08-29-2022 - Three items above have not been addressed. Check at next inspection. 09-08-2022 - 1. FIREBLOCKING . Fireblocking needed at garage walls. R302.11.1 2. Service not installed - check at early power. 3. UFER ground not visible - check at early power. 09-14-2022 - Fireblocking will be addressed at insulation. Fire foam is needed at garage wall fireblocking penetrations. 09-16-2022 - Fire foam needed at garage walls penetrations. FIREBLOCKING INTEGRITY MUST BE MAINTAINED R302.11.2. When drilled through the fire blocking. 09-20-2022 1. Fire foam missed at left unit, right side of wall at ceiling near entry door. Insulation not installed at same area. FIREBLOCKING INTEGRITY MUST BE MAINTAINED R302.11.2. 2. Service not installed - check at early power. 3. UFER ground not visible - check at early power. 09-21-2022 1.Service not installed - check at early power. 2. UFER ground not visible - check at early power. 04-27-2023 Exterior of home is complete. Please submit an engineering letter to the building department and have on site along with the approved drawings, that the work has been installed as per plans. 05-11-2023. Above issue has not been resolved. Exterior of home is complete. Please submit an engineering letter to the building department and have on site along with the approved drawings, that the work has been installed as per plans. Approved drawings not on site. | |||
| WALL SHEATHING | 04/27/2023 | Disapproved - NO FEE | AGAETANO |
| Note: Inspector Notes from Inspection 2490 9/20/2022 - PREVIOUS INSPECTION NOTES 9/16/2022 - PREVIOUS INSPECTION NOTES THIS IS A REINSPECTION Inspector Notes from Inspection 2445 Inspector Notes from Inspection 2420 THIS IS A REINSPECTION Inspector Notes from Inspection 2467 Trash on site. Site needs to be cleaned. No further inspections will be passed until trash is cleaned. 07-29-2022 1. Service wire not installed. 2. Wires in both electrical panels not installed. 3. UFER grounds not visible 4. Floor outlet added in right unit and filled with concrete. Please submit a revision to the building department. Uncover concrete for inspection. 5. Grounds not connected in both units. 6. Light not installed in left unit masterbedroom closet. 7. Back doors and right unit window will need a window nailing added. (Contractor noted that window is on backorder). 08-22-2022. 1. Service not installed - check at early power. 2. UFER ground not visible - check at early power. 3. Electrical panels conductors not phased out. Check at next inspection (insulation). 08-29-2022 - Three items above have not been addressed. Check at next inspection. 09-08-2022 - 1. FIREBLOCKING . Fireblocking needed at garage walls. R302.11.1 2. Service not installed - check at early power. 3. UFER ground not visible - check at early power. 09-14-2022 - Fireblocking will be addressed at insulation. Fire foam is needed at garage wall fireblocking penetrations. 09-16-2022 - Fire foam needed at garage walls penetrations. FIREBLOCKING INTEGRITY MUST BE MAINTAINED R302.11.2. When drilled through the fire blocking. 09-20-2022 1. Fire foam missed at left unit, right side of wall at ceiling near entry door. Insulation not installed at same area. FIREBLOCKING INTEGRITY MUST BE MAINTAINED R302.11.2. 2. Service not installed - check at early power. 3. UFER ground not visible - check at early power. 09-21-2022 1.Service not installed - check at early power. 2. UFER ground not visible - check at early power. 04-27-2023 Exterior of home is complete. Please submit an engineering letter to the building department and have on site along with the approved drawings, that the work has been installed as per plans. | |||
| ROW - FINAL INSPECTION | 04/27/2023 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 04/27/23 ** 04/26/23 BUILDER NEEDS TO REPAIR SWALE ON LEFT SIDE OF LEFT SIDE DRIVEWAY AND SOD OUTLINED WITH PINK PAINT ** BUILDER NEEDS TO REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM PROPERTY AND VACANT ** ** SEED** NEEDS TO BE USED WITH THE STRAW ______________________________________________________________________________________________________________________ ** BEFORE FINAL ROW INSPECTION IS APPROVED CORRECTIONS NEEDED** ** 04/26/23 BUILDER NEEDS TO REPAIR SWALE ON LEFT SIDE OF LEFT SIDE DRIVEWAY AND SOD OUTLINED WITH PINK PAINT ** BUILDER NEEDS TO REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM PROPERTY AND VACANT ** ** SEED** NEEDS TO BE USED WITH THE STRAW | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 04/26/2023 | APPROVED | EMADISON |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/26/2023 | APPROVED | EMADISON |
| Note: ** 04/26/23 BUILDER NEEDS TO REPAIR SWALE ON LEFT SIDE OF LEFT SIDE DRIVEWAY AND SOD OUTLINED WITH PINK PAINT ** BUILDER NEEDS TO REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM PROPERTY AND VACANT ** ** SEED** NEEDS TO BE USED WITH THE STRAW | |||
| ROW - FINAL APRON (AFTER POUR) | 04/26/2023 | FINAL APPROVED | EMADISON |
| ELECTRIC - EARLY POWER | 03/13/2023 | APPROVED | AGAETANO |
| Note: 08-22-2022. 1. Service not installed - check at early power. 2. UFER ground not visible - check at early power. 3. Electrical panels conductors not phased out. Check at next inspection (insulation). | |||
| ROW- PRE-APRON (PRE-POUR) | 01/18/2023 | APPROVED | EMADISON |
| Note: ** 01/18/23 CORRECTIONS HAVE BEEN MADE READY TO POUR IN THE EVENT OF RAIN RECHECK THE CULVERT ELEVATIONS AND COMPACTION AROUND CULVERT. ** MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL _________________________________________________________________________________________________________________________ 1/17/2023 - PREVIOUS INSPECTION NOTES ** 01/17/23 NO CORRECTION WERE MADE DID SPEAK TO CONTRACTOR WHO IS ON HIS WAY OUT TO CORRECT THE ISSUES OF THE MITERED ENDS BEING FORMED TO MEET THE MINIMUM STANDARD AS DESCRIBED IN THE RESIDENTIAL CULVERT DETAIL, INSPECTION IS DISAPPROVED WITHOUT FEE New inspection due to canceled inspection 1/13/2023 - PREVIOUS INSPECTION NOTES ** 01/13/23 THE BUILDER NEEDS TO REVIEW THE CITY OF PALM COASTS RESIDENTIAL CULVERT DETAIL. ** THE MITERED SHOULD BE 18 INCHES AT THE TOP OF THE MITERED ENDS BOTH SETS OF DRIVEWAY CULVERTS ** THERE ARE NO EQUALS AS TO HOW THIS IS FORMED BUILDER NEEDS TO REVIEW PREVIOUS INSPECTOR NOTES AND MAKE THE APPROPRIATE CORRECTIONS TO HIS FORMS ON BOTH DRIVEWAYS.. 1/11/2023 - PREVIOUS INSPECTION NOTES ** 01/11/23 LEFT SIDE DRIVEWAY STILL NEEDS COMPACTION IN THE APRON ** LEFT SIDE CULVERT MITERED END THERE ARE NO EQUALS NEED TO BE 18 INCHES FROM CULVERT TO FORM 27 INCHES AND 21 INCHES ON RIGHT 21 INCHES AND 25 INCHES ** LEFT SIDE FOOTERS NEED TO BE DUG AND ALSO NEED REBAR. ** SEE ATTACHED PHOTOS FOR MITERED END FORM 1/9/2023 - PREVIOUS INSPECTION NOTES ** 01/09/23 LEFT SIDE DRIVEWAY NEEDS COMPACTION IN APRON AND AROUND THE CULVERT MATERIAL IS TOO SOFT ** LEFT SIDE DRIVEWAY ABOVE ROW NEEDS TO BE A MINIMUM OF 4 INCHES OF CONCRETE SEE AREA OUTLINED WITH RED PAINT NEEDS TO MATERIAL REMOVED. ** RIGHT SIDE DRIVEWAY APRON NEEDS TO BE A MINIMUM OF 5 INCHES OF CONCRETE AND MATERIAL COMPACTED IN APRON AND AROUND CULVERT WHICH NEEDS TO HAVE MATERIAL COVERING HALF WAY UP CULVERT. ___________________________________________________________________________________________________________________________ 1/6/2023 - PREVIOUS INSPECTION NOTES 01/06/23=CULVERT PIPES ARE OUT OF TOLERANCE BOTH END. PLEASE RESET THE PIPES ACCORDING SWALE PLAN ______________________________________________________________________________________________________________________ 1/5/2023 - PREVIOUS INSPECTION NOTES 01/05/23=Not ready for inspection. Not formed. PICTURE ATTACHED POSTING OF PERMIT SITE ADDRESS, PERMIT, APPROVED PLANS AND DOCUMENTS December 19, 2022 SITE ADDRESS: This is a reminder; the permit project site address must be posted on the job site upon issuance of the building permit and maintained for the duration of construction and until the final address numbers are posted on the completed building. Address identification numbers shall be on a contrasting background, plainly visible from the street and 4 inches tall, and 1/2-inch minimum stroke width. The primary purposes of posting the site address is to ensure first responders are able to locate the property in the event of an emergency and to assist building inspectors in locating properties for inspection. Numbers shall be posted on near the street fronting the property and maintained for the duration of the permit. Numbers can also be placed on the exterior wall of the home facing the street. Posting the legal description or lot and block is not an acceptable substitute. ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2 PERMIT DOCUMENTS: This is a reminder, the permit documents issued with the building permit, including, but not limited to; the issued building permit, City approved plans, Inspection Record Card, Product Approval and Roofing Worksheets and all other City issued documents are the property of the City of Palm Coast. Documents shall be kept clean and dry and, on the site, and made available to Building Inspectors for all inspections. CITY APPROVED PERMIT DOCUMENTS SHALL NOT BE USED FOR ANY PURPOSES BY CONTRACTORS OR SUB-CONTRACTORS. PERMIT DOCUMENTS THAT ARE FADED, ILLEGIBLE, WRINKLED, WATER DAMAGED OR STAINED OR FOR WHATEVER REASON ARE OTHERWISE UNUSABLE MUST BE RELACED BY THE CONTRACTOR BEFORE INSPECTION. INSPECTIONS WILL NOT BE PERFORMED WHERE CITY APPROVED PERMIT DOCUMENTS ARE NOT PRESENT OR IN AN UNUSABLE CONDITION. Florida Building Code-Building Section 105.7 and Florida Statute 468.604(1) | |||
| ROW- PRE-APRON (PRE-POUR) | 01/17/2023 | CANCELLED BY APPLICANT | WEB |
| Note: 1/13/2023 - PREVIOUS INSPECTION NOTES ** 01/13/23 THE BUILDER NEEDS TO REVIEW THE CITY OF PALM COASTS RESIDENTIAL CULVERT DETAIL. ** THE MITERED SHOULD BE 18 INCHES AT THE TOP OF THE MITERED ENDS BOTH SETS OF DRIVEWAY CULVERTS ** THERE ARE NO EQUALS AS TO HOW THIS IS FORMED BUILDER NEEDS TO REVIEW PREVIOUS INSPECTOR NOTES AND MAKE THE APPROPRIATE CORRECTIONS TO HIS FORMS ON BOTH DRIVEWAYS.. 1/11/2023 - PREVIOUS INSPECTION NOTES ** 01/11/23 LEFT SIDE DRIVEWAY STILL NEEDS COMPACTION IN THE APRON ** LEFT SIDE CULVERT MITERED END THERE ARE NO EQUALS NEED TO BE 18 INCHES FROM CULVERT TO FORM 27 INCHES AND 21 INCHES ON RIGHT 21 INCHES AND 25 INCHES ** LEFT SIDE FOOTERS NEED TO BE DUG AND ALSO NEED REBAR. ** SEE ATTACHED PHOTOS FOR MITERED END FORM 1/9/2023 - PREVIOUS INSPECTION NOTES ** 01/09/23 LEFT SIDE DRIVEWAY NEEDS COMPACTION IN APRON AND AROUND THE CULVERT MATERIAL IS TOO SOFT ** LEFT SIDE DRIVEWAY ABOVE ROW NEEDS TO BE A MINIMUM OF 4 INCHES OF CONCRETE SEE AREA OUTLINED WITH RED PAINT NEEDS TO MATERIAL REMOVED. ** RIGHT SIDE DRIVEWAY APRON NEEDS TO BE A MINIMUM OF 5 INCHES OF CONCRETE AND MATERIAL COMPACTED IN APRON AND AROUND CULVERT WHICH NEEDS TO HAVE MATERIAL COVERING HALF WAY UP CULVERT. ___________________________________________________________________________________________________________________________ 1/6/2023 - PREVIOUS INSPECTION NOTES 01/06/23=CULVERT PIPES ARE OUT OF TOLERANCE BOTH END. PLEASE RESET THE PIPES ACCORDING SWALE PLAN ______________________________________________________________________________________________________________________ 1/5/2023 - PREVIOUS INSPECTION NOTES 01/05/23=Not ready for inspection. Not formed. PICTURE ATTACHED POSTING OF PERMIT SITE ADDRESS, PERMIT, APPROVED PLANS AND DOCUMENTS December 19, 2022 SITE ADDRESS: This is a reminder; the permit project site address must be posted on the job site upon issuance of the building permit and maintained for the duration of construction and until the final address numbers are posted on the completed building. Address identification numbers shall be on a contrasting background, plainly visible from the street and 4 inches tall, and 1/2-inch minimum stroke width. The primary purposes of posting the site address is to ensure first responders are able to locate the property in the event of an emergency and to assist building inspectors in locating properties for inspection. Numbers shall be posted on near the street fronting the property and maintained for the duration of the permit. Numbers can also be placed on the exterior wall of the home facing the street. Posting the legal description or lot and block is not an acceptable substitute. ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2 PERMIT DOCUMENTS: This is a reminder, the permit documents issued with the building permit, including, but not limited to; the issued building permit, City approved plans, Inspection Record Card, Product Approval and Roofing Worksheets and all other City issued documents are the property of the City of Palm Coast. Documents shall be kept clean and dry and, on the site, and made available to Building Inspectors for all inspections. CITY APPROVED PERMIT DOCUMENTS SHALL NOT BE USED FOR ANY PURPOSES BY CONTRACTORS OR SUB-CONTRACTORS. PERMIT DOCUMENTS THAT ARE FADED, ILLEGIBLE, WRINKLED, WATER DAMAGED OR STAINED OR FOR WHATEVER REASON ARE OTHERWISE UNUSABLE MUST BE RELACED BY THE CONTRACTOR BEFORE INSPECTION. INSPECTIONS WILL NOT BE PERFORMED WHERE CITY APPROVED PERMIT DOCUMENTS ARE NOT PRESENT OR IN AN UNUSABLE CONDITION. Florida Building Code-Building Section 105.7 and Florida Statute 468.604(1) | |||
| ROW- PRE-APRON (PRE-POUR) | 01/17/2023 | Disapproved - NO FEE | EMADISON |
| Note: ** 01/17/23 NO CORRECTION WERE MADE DID SPEAK TO CONTRACTOR WHO IS ON HIS WAY OUT TO CORRECT THE ISSUES OF THE MITERED ENDS BEING FORMED TO MEET THE MINIMUM STANDARD AS DESCRIBED IN THE RESIDENTIAL CULVERT DETAIL, INSPECTION IS DISAPPROVED WITHOUT FEE New inspection due to canceled inspection 1/13/2023 - PREVIOUS INSPECTION NOTES ** 01/13/23 THE BUILDER NEEDS TO REVIEW THE CITY OF PALM COASTS RESIDENTIAL CULVERT DETAIL. ** THE MITERED SHOULD BE 18 INCHES AT THE TOP OF THE MITERED ENDS BOTH SETS OF DRIVEWAY CULVERTS ** THERE ARE NO EQUALS AS TO HOW THIS IS FORMED BUILDER NEEDS TO REVIEW PREVIOUS INSPECTOR NOTES AND MAKE THE APPROPRIATE CORRECTIONS TO HIS FORMS ON BOTH DRIVEWAYS.. 1/11/2023 - PREVIOUS INSPECTION NOTES ** 01/11/23 LEFT SIDE DRIVEWAY STILL NEEDS COMPACTION IN THE APRON ** LEFT SIDE CULVERT MITERED END THERE ARE NO EQUALS NEED TO BE 18 INCHES FROM CULVERT TO FORM 27 INCHES AND 21 INCHES ON RIGHT 21 INCHES AND 25 INCHES ** LEFT SIDE FOOTERS NEED TO BE DUG AND ALSO NEED REBAR. ** SEE ATTACHED PHOTOS FOR MITERED END FORM 1/9/2023 - PREVIOUS INSPECTION NOTES ** 01/09/23 LEFT SIDE DRIVEWAY NEEDS COMPACTION IN APRON AND AROUND THE CULVERT MATERIAL IS TOO SOFT ** LEFT SIDE DRIVEWAY ABOVE ROW NEEDS TO BE A MINIMUM OF 4 INCHES OF CONCRETE SEE AREA OUTLINED WITH RED PAINT NEEDS TO MATERIAL REMOVED. ** RIGHT SIDE DRIVEWAY APRON NEEDS TO BE A MINIMUM OF 5 INCHES OF CONCRETE AND MATERIAL COMPACTED IN APRON AND AROUND CULVERT WHICH NEEDS TO HAVE MATERIAL COVERING HALF WAY UP CULVERT. ___________________________________________________________________________________________________________________________ 1/6/2023 - PREVIOUS INSPECTION NOTES 01/06/23=CULVERT PIPES ARE OUT OF TOLERANCE BOTH END. PLEASE RESET THE PIPES ACCORDING SWALE PLAN ______________________________________________________________________________________________________________________ 1/5/2023 - PREVIOUS INSPECTION NOTES 01/05/23=Not ready for inspection. Not formed. PICTURE ATTACHED POSTING OF PERMIT SITE ADDRESS, PERMIT, APPROVED PLANS AND DOCUMENTS December 19, 2022 SITE ADDRESS: This is a reminder; the permit project site address must be posted on the job site upon issuance of the building permit and maintained for the duration of construction and until the final address numbers are posted on the completed building. Address identification numbers shall be on a contrasting background, plainly visible from the street and 4 inches tall, and 1/2-inch minimum stroke width. The primary purposes of posting the site address is to ensure first responders are able to locate the property in the event of an emergency and to assist building inspectors in locating properties for inspection. Numbers shall be posted on near the street fronting the property and maintained for the duration of the permit. Numbers can also be placed on the exterior wall of the home facing the street. Posting the legal description or lot and block is not an acceptable substitute. ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2 PERMIT DOCUMENTS: This is a reminder, the permit documents issued with the building permit, including, but not limited to; the issued building permit, City approved plans, Inspection Record Card, Product Approval and Roofing Worksheets and all other City issued documents are the property of the City of Palm Coast. Documents shall be kept clean and dry and, on the site, and made available to Building Inspectors for all inspections. CITY APPROVED PERMIT DOCUMENTS SHALL NOT BE USED FOR ANY PURPOSES BY CONTRACTORS OR SUB-CONTRACTORS. PERMIT DOCUMENTS THAT ARE FADED, ILLEGIBLE, WRINKLED, WATER DAMAGED OR STAINED OR FOR WHATEVER REASON ARE OTHERWISE UNUSABLE MUST BE RELACED BY THE CONTRACTOR BEFORE INSPECTION. INSPECTIONS WILL NOT BE PERFORMED WHERE CITY APPROVED PERMIT DOCUMENTS ARE NOT PRESENT OR IN AN UNUSABLE CONDITION. Florida Building Code-Building Section 105.7 and Florida Statute 468.604(1) | |||
| ROW- PRE-APRON (PRE-POUR) | 01/13/2023 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 01/13/23 THE BUILDER NEEDS TO REVIEW THE CITY OF PALM COASTS RESIDENTIAL CULVERT DETAIL. ** THE MITERED SHOULD BE 18 INCHES AT THE TOP OF THE MITERED ENDS BOTH SETS OF DRIVEWAY CULVERTS ** THERE ARE NO EQUALS AS TO HOW THIS IS FORMED BUILDER NEEDS TO REVIEW PREVIOUS INSPECTOR NOTES AND MAKE THE APPROPRIATE CORRECTIONS TO HIS FORMS ON BOTH DRIVEWAYS.. 1/11/2023 - PREVIOUS INSPECTION NOTES ** 01/11/23 LEFT SIDE DRIVEWAY STILL NEEDS COMPACTION IN THE APRON ** LEFT SIDE CULVERT MITERED END THERE ARE NO EQUALS NEED TO BE 18 INCHES FROM CULVERT TO FORM 27 INCHES AND 21 INCHES ON RIGHT 21 INCHES AND 25 INCHES ** LEFT SIDE FOOTERS NEED TO BE DUG AND ALSO NEED REBAR. ** SEE ATTACHED PHOTOS FOR MITERED END FORM 1/9/2023 - PREVIOUS INSPECTION NOTES ** 01/09/23 LEFT SIDE DRIVEWAY NEEDS COMPACTION IN APRON AND AROUND THE CULVERT MATERIAL IS TOO SOFT ** LEFT SIDE DRIVEWAY ABOVE ROW NEEDS TO BE A MINIMUM OF 4 INCHES OF CONCRETE SEE AREA OUTLINED WITH RED PAINT NEEDS TO MATERIAL REMOVED. ** RIGHT SIDE DRIVEWAY APRON NEEDS TO BE A MINIMUM OF 5 INCHES OF CONCRETE AND MATERIAL COMPACTED IN APRON AND AROUND CULVERT WHICH NEEDS TO HAVE MATERIAL COVERING HALF WAY UP CULVERT. ___________________________________________________________________________________________________________________________ 1/6/2023 - PREVIOUS INSPECTION NOTES 01/06/23=CULVERT PIPES ARE OUT OF TOLERANCE BOTH END. PLEASE RESET THE PIPES ACCORDING SWALE PLAN ______________________________________________________________________________________________________________________ 1/5/2023 - PREVIOUS INSPECTION NOTES 01/05/23=Not ready for inspection. Not formed. PICTURE ATTACHED POSTING OF PERMIT SITE ADDRESS, PERMIT, APPROVED PLANS AND DOCUMENTS December 19, 2022 SITE ADDRESS: This is a reminder; the permit project site address must be posted on the job site upon issuance of the building permit and maintained for the duration of construction and until the final address numbers are posted on the completed building. Address identification numbers shall be on a contrasting background, plainly visible from the street and 4 inches tall, and 1/2-inch minimum stroke width. The primary purposes of posting the site address is to ensure first responders are able to locate the property in the event of an emergency and to assist building inspectors in locating properties for inspection. Numbers shall be posted on near the street fronting the property and maintained for the duration of the permit. Numbers can also be placed on the exterior wall of the home facing the street. Posting the legal description or lot and block is not an acceptable substitute. ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2 PERMIT DOCUMENTS: This is a reminder, the permit documents issued with the building permit, including, but not limited to; the issued building permit, City approved plans, Inspection Record Card, Product Approval and Roofing Worksheets and all other City issued documents are the property of the City of Palm Coast. Documents shall be kept clean and dry and, on the site, and made available to Building Inspectors for all inspections. CITY APPROVED PERMIT DOCUMENTS SHALL NOT BE USED FOR ANY PURPOSES BY CONTRACTORS OR SUB-CONTRACTORS. PERMIT DOCUMENTS THAT ARE FADED, ILLEGIBLE, WRINKLED, WATER DAMAGED OR STAINED OR FOR WHATEVER REASON ARE OTHERWISE UNUSABLE MUST BE RELACED BY THE CONTRACTOR BEFORE INSPECTION. INSPECTIONS WILL NOT BE PERFORMED WHERE CITY APPROVED PERMIT DOCUMENTS ARE NOT PRESENT OR IN AN UNUSABLE CONDITION. Florida Building Code-Building Section 105.7 and Florida Statute 468.604(1) | |||
| ROW- PRE-APRON (PRE-POUR) | 01/11/2023 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 01/11/23 LEFT SIDE DRIVEWAY STILL NEEDS COMPACTION IN THE APRON ** LEFT SIDE CULVERT MITERED END THERE ARE NO EQUALS NEED TO BE 18 INCHES FROM CULVERT TO FORM 27 INCHES AND 21 INCHES ON RIGHT 21 INCHES AND 25 INCHES ** LEFT SIDE FOOTERS NEED TO BE DUG AND ALSO NEED REBAR. ** SEE ATTACHED PHOTOS FOR MITERED END FORM 1/9/2023 - PREVIOUS INSPECTION NOTES ** 01/09/23 LEFT SIDE DRIVEWAY NEEDS COMPACTION IN APRON AND AROUND THE CULVERT MATERIAL IS TOO SOFT ** LEFT SIDE DRIVEWAY ABOVE ROW NEEDS TO BE A MINIMUM OF 4 INCHES OF CONCRETE SEE AREA OUTLINED WITH RED PAINT NEEDS TO MATERIAL REMOVED. ** RIGHT SIDE DRIVEWAY APRON NEEDS TO BE A MINIMUM OF 5 INCHES OF CONCRETE AND MATERIAL COMPACTED IN APRON AND AROUND CULVERT WHICH NEEDS TO HAVE MATERIAL COVERING HALF WAY UP CULVERT. ___________________________________________________________________________________________________________________________ 1/6/2023 - PREVIOUS INSPECTION NOTES 01/06/23=CULVERT PIPES ARE OUT OF TOLERANCE BOTH END. PLEASE RESET THE PIPES ACCORDING SWALE PLAN ______________________________________________________________________________________________________________________ 1/5/2023 - PREVIOUS INSPECTION NOTES 01/05/23=Not ready for inspection. Not formed. PICTURE ATTACHED POSTING OF PERMIT SITE ADDRESS, PERMIT, APPROVED PLANS AND DOCUMENTS December 19, 2022 SITE ADDRESS: This is a reminder; the permit project site address must be posted on the job site upon issuance of the building permit and maintained for the duration of construction and until the final address numbers are posted on the completed building. Address identification numbers shall be on a contrasting background, plainly visible from the street and 4 inches tall, and 1/2-inch minimum stroke width. The primary purposes of posting the site address is to ensure first responders are able to locate the property in the event of an emergency and to assist building inspectors in locating properties for inspection. Numbers shall be posted on near the street fronting the property and maintained for the duration of the permit. Numbers can also be placed on the exterior wall of the home facing the street. Posting the legal description or lot and block is not an acceptable substitute. ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2 PERMIT DOCUMENTS: This is a reminder, the permit documents issued with the building permit, including, but not limited to; the issued building permit, City approved plans, Inspection Record Card, Product Approval and Roofing Worksheets and all other City issued documents are the property of the City of Palm Coast. Documents shall be kept clean and dry and, on the site, and made available to Building Inspectors for all inspections. CITY APPROVED PERMIT DOCUMENTS SHALL NOT BE USED FOR ANY PURPOSES BY CONTRACTORS OR SUB-CONTRACTORS. PERMIT DOCUMENTS THAT ARE FADED, ILLEGIBLE, WRINKLED, WATER DAMAGED OR STAINED OR FOR WHATEVER REASON ARE OTHERWISE UNUSABLE MUST BE RELACED BY THE CONTRACTOR BEFORE INSPECTION. INSPECTIONS WILL NOT BE PERFORMED WHERE CITY APPROVED PERMIT DOCUMENTS ARE NOT PRESENT OR IN AN UNUSABLE CONDITION. Florida Building Code-Building Section 105.7 and Florida Statute 468.604(1) | |||
| ROW- PRE-APRON (PRE-POUR) | 01/09/2023 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 01/09/23 LEFT SIDE DRIVEWAY NEEDS COMPACTION IN APRON AND AROUND THE CULVERT MATERIAL IS TOO SOFT ** LEFT SIDE DRIVEWAY ABOVE ROW NEEDS TO BE A MINIMUM OF 4 INCHES OF CONCRETE SEE AREA OUTLINED WITH RED PAINT NEEDS TO MATERIAL REMOVED. ** RIGHT SIDE DRIVEWAY APRON NEEDS TO BE A MINIMUM OF 5 INCHES OF CONCRETE AND MATERIAL COMPACTED IN APRON AND AROUND CULVERT WHICH NEEDS TO HAVE MATERIAL COVERING HALF WAY UP CULVERT. ___________________________________________________________________________________________________________________________ 1/6/2023 - PREVIOUS INSPECTION NOTES 01/06/23=CULVERT PIPES ARE OUT OF TOLERANCE BOTH END. PLEASE RESET THE PIPES ACCORDING SWALE PLAN ______________________________________________________________________________________________________________________ 1/5/2023 - PREVIOUS INSPECTION NOTES 01/05/23=Not ready for inspection. Not formed. PICTURE ATTACHED POSTING OF PERMIT SITE ADDRESS, PERMIT, APPROVED PLANS AND DOCUMENTS December 19, 2022 SITE ADDRESS: This is a reminder; the permit project site address must be posted on the job site upon issuance of the building permit and maintained for the duration of construction and until the final address numbers are posted on the completed building. Address identification numbers shall be on a contrasting background, plainly visible from the street and 4 inches tall, and 1/2-inch minimum stroke width. The primary purposes of posting the site address is to ensure first responders are able to locate the property in the event of an emergency and to assist building inspectors in locating properties for inspection. Numbers shall be posted on near the street fronting the property and maintained for the duration of the permit. Numbers can also be placed on the exterior wall of the home facing the street. Posting the legal description or lot and block is not an acceptable substitute. ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2 PERMIT DOCUMENTS: This is a reminder, the permit documents issued with the building permit, including, but not limited to; the issued building permit, City approved plans, Inspection Record Card, Product Approval and Roofing Worksheets and all other City issued documents are the property of the City of Palm Coast. Documents shall be kept clean and dry and, on the site, and made available to Building Inspectors for all inspections. CITY APPROVED PERMIT DOCUMENTS SHALL NOT BE USED FOR ANY PURPOSES BY CONTRACTORS OR SUB-CONTRACTORS. PERMIT DOCUMENTS THAT ARE FADED, ILLEGIBLE, WRINKLED, WATER DAMAGED OR STAINED OR FOR WHATEVER REASON ARE OTHERWISE UNUSABLE MUST BE RELACED BY THE CONTRACTOR BEFORE INSPECTION. INSPECTIONS WILL NOT BE PERFORMED WHERE CITY APPROVED PERMIT DOCUMENTS ARE NOT PRESENT OR IN AN UNUSABLE CONDITION. Florida Building Code-Building Section 105.7 and Florida Statute 468.604(1) | |||
| ROW- PRE-APRON (PRE-POUR) | 01/06/2023 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: 01/06/23=CULVERT PIPES ARE OUT OF TOLERANCE BOTH END. PLEASE RESET THE PIPES ACCORDING SWALE PLAN ______________________________________________________________________________________________________________________ 1/5/2023 - PREVIOUS INSPECTION NOTES 01/05/23=Not ready for inspection. Not formed. PICTURE ATTACHED POSTING OF PERMIT SITE ADDRESS, PERMIT, APPROVED PLANS AND DOCUMENTS December 19, 2022 SITE ADDRESS: This is a reminder; the permit project site address must be posted on the job site upon issuance of the building permit and maintained for the duration of construction and until the final address numbers are posted on the completed building. Address identification numbers shall be on a contrasting background, plainly visible from the street and 4 inches tall, and 1/2-inch minimum stroke width. The primary purposes of posting the site address is to ensure first responders are able to locate the property in the event of an emergency and to assist building inspectors in locating properties for inspection. Numbers shall be posted on near the street fronting the property and maintained for the duration of the permit. Numbers can also be placed on the exterior wall of the home facing the street. Posting the legal description or lot and block is not an acceptable substitute. ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2 PERMIT DOCUMENTS: This is a reminder, the permit documents issued with the building permit, including, but not limited to; the issued building permit, City approved plans, Inspection Record Card, Product Approval and Roofing Worksheets and all other City issued documents are the property of the City of Palm Coast. Documents shall be kept clean and dry and, on the site, and made available to Building Inspectors for all inspections. CITY APPROVED PERMIT DOCUMENTS SHALL NOT BE USED FOR ANY PURPOSES BY CONTRACTORS OR SUB-CONTRACTORS. PERMIT DOCUMENTS THAT ARE FADED, ILLEGIBLE, WRINKLED, WATER DAMAGED OR STAINED OR FOR WHATEVER REASON ARE OTHERWISE UNUSABLE MUST BE RELACED BY THE CONTRACTOR BEFORE INSPECTION. INSPECTIONS WILL NOT BE PERFORMED WHERE CITY APPROVED PERMIT DOCUMENTS ARE NOT PRESENT OR IN AN UNUSABLE CONDITION. Florida Building Code-Building Section 105.7 and Florida Statute 468.604(1) | |||
| ROW- PRE-APRON (PRE-POUR) | 01/05/2023 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: 01/05/23=Not ready for inspection. Not formed. PICTURE ATTACHED POSTING OF PERMIT SITE ADDRESS, PERMIT, APPROVED PLANS AND DOCUMENTS December 19, 2022 SITE ADDRESS: This is a reminder; the permit project site address must be posted on the job site upon issuance of the building permit and maintained for the duration of construction and until the final address numbers are posted on the completed building. Address identification numbers shall be on a contrasting background, plainly visible from the street and 4 inches tall, and 1/2-inch minimum stroke width. The primary purposes of posting the site address is to ensure first responders are able to locate the property in the event of an emergency and to assist building inspectors in locating properties for inspection. Numbers shall be posted on near the street fronting the property and maintained for the duration of the permit. Numbers can also be placed on the exterior wall of the home facing the street. Posting the legal description or lot and block is not an acceptable substitute. ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2 PERMIT DOCUMENTS: This is a reminder, the permit documents issued with the building permit, including, but not limited to; the issued building permit, City approved plans, Inspection Record Card, Product Approval and Roofing Worksheets and all other City issued documents are the property of the City of Palm Coast. Documents shall be kept clean and dry and, on the site, and made available to Building Inspectors for all inspections. CITY APPROVED PERMIT DOCUMENTS SHALL NOT BE USED FOR ANY PURPOSES BY CONTRACTORS OR SUB-CONTRACTORS. PERMIT DOCUMENTS THAT ARE FADED, ILLEGIBLE, WRINKLED, WATER DAMAGED OR STAINED OR FOR WHATEVER REASON ARE OTHERWISE UNUSABLE MUST BE RELACED BY THE CONTRACTOR BEFORE INSPECTION. INSPECTIONS WILL NOT BE PERFORMED WHERE CITY APPROVED PERMIT DOCUMENTS ARE NOT PRESENT OR IN AN UNUSABLE CONDITION. Florida Building Code-Building Section 105.7 and Florida Statute 468.604(1) | |||
| U-CROSS CONNECTION | 10/13/2022 | APPROVED - AS NOTED | DHANEY |
| Note: Yard not installed yet - no cross CN. . | |||
| U - SEWER TIE IN | 10/13/2022 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| GRAVITY SEWER TEST | 10/13/2022 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| INSULATION | 09/21/2022 | APPROVED - AS NOTED | AGAETANO |
| Note: 9/20/2022 - PREVIOUS INSPECTION NOTES 9/16/2022 - PREVIOUS INSPECTION NOTES THIS IS A REINSPECTION Inspector Notes from Inspection 2445 Inspector Notes from Inspection 2420 THIS IS A REINSPECTION Inspector Notes from Inspection 2467 Trash on site. Site needs to be cleaned. No further inspections will be passed until trash is cleaned. 07-29-2022 1. Service wire not installed. 2. Wires in both electrical panels not installed. 3. UFER grounds not visible 4. Floor outlet added in right unit and filled with concrete. Please submit a revision to the building department. Uncover concrete for inspection. 5. Grounds not connected in both units. 6. Light not installed in left unit masterbedroom closet. 7. Back doors and right unit window will need a window nailing added. (Contractor noted that window is on backorder). 08-22-2022. 1. Service not installed - check at early power. 2. UFER ground not visible - check at early power. 3. Electrical panels conductors not phased out. Check at next inspection (insulation). 08-29-2022 - Three items above have not been addressed. Check at next inspection. 09-08-2022 - 1. FIREBLOCKING . Fireblocking needed at garage walls. R302.11.1 2. Service not installed - check at early power. 3. UFER ground not visible - check at early power. 09-14-2022 - Fireblocking will be addressed at insulation. Fire foam is needed at garage wall fireblocking penetrations. 09-16-2022 - Fire foam needed at garage walls penetrations. FIREBLOCKING INTEGRITY MUST BE MAINTAINED R302.11.2. When drilled through the fire blocking. 09-20-2022 1. Fire foam missed at left unit, right side of wall at ceiling near entry door. Insulation not installed at same area. FIREBLOCKING INTEGRITY MUST BE MAINTAINED R302.11.2. 2. Service not installed - check at early power. 3. UFER ground not visible - check at early power. 09-21-2022 1.Service not installed - check at early power. 2. UFER ground not visible - check at early power. | |||
| INSULATION | 09/20/2022 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: 9/16/2022 - PREVIOUS INSPECTION NOTES THIS IS A REINSPECTION Inspector Notes from Inspection 2445 Inspector Notes from Inspection 2420 THIS IS A REINSPECTION Inspector Notes from Inspection 2467 Trash on site. Site needs to be cleaned. No further inspections will be passed until trash is cleaned. 07-29-2022 1. Service wire not installed. 2. Wires in both electrical panels not installed. 3. UFER grounds not visible 4. Floor outlet added in right unit and filled with concrete. Please submit a revision to the building department. Uncover concrete for inspection. 5. Grounds not connected in both units. 6. Light not installed in left unit masterbedroom closet. 7. Back doors and right unit window will need a window nailing added. (Contractor noted that window is on backorder). 08-22-2022. 1. Service not installed - check at early power. 2. UFER ground not visible - check at early power. 3. Electrical panels conductors not phased out. Check at next inspection (insulation). 08-29-2022 - Three items above have not been addressed. Check at next inspection. 09-08-2022 - 1. FIREBLOCKING . Fireblocking needed at garage walls. R302.11.1 2. Service not installed - check at early power. 3. UFER ground not visible - check at early power. 09-14-2022 - Fireblocking will be addressed at insulation. Fire foam is needed at garage wall fireblocking penetrations. 09-16-2022 - Fire foam needed at garage walls penetrations. FIREBLOCKING INTEGRITY MUST BE MAINTAINED R302.11.2. When drilled through the fire blocking. 09-20-2022 1. Fire foam missed at left unit, right side of wall at ceiling near entry door. Insulation not installed at same area. FIREBLOCKING INTEGRITY MUST BE MAINTAINED R302.11.2. 2. Service not installed - check at early power. 3. UFER ground not visible - check at early power. | |||
| INSULATION | 09/16/2022 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: THIS IS A REINSPECTION Inspector Notes from Inspection 2445 Inspector Notes from Inspection 2420 THIS IS A REINSPECTION Inspector Notes from Inspection 2467 Trash on site. Site needs to be cleaned. No further inspections will be passed until trash is cleaned. 07-29-2022 1. Service wire not installed. 2. Wires in both electrical panels not installed. 3. UFER grounds not visible 4. Floor outlet added in right unit and filled with concrete. Please submit a revision to the building department. Uncover concrete for inspection. 5. Grounds not connected in both units. 6. Light not installed in left unit masterbedroom closet. 7. Back doors and right unit window will need a window nailing added. (Contractor noted that window is on backorder). 08-22-2022. 1. Service not installed - check at early power. 2. UFER ground not visible - check at early power. 3. Electrical panels conductors not phased out. Check at next inspection (insulation). 08-29-2022 - Three items above have not been addressed. Check at next inspection. 09-08-2022 - 1. FIREBLOCKING . Fireblocking needed at garage walls. R302.11.1 2. Service not installed - check at early power. 3. UFER ground not visible - check at early power. 09-14-2022 - Fireblocking will be addressed at insulation. Fire foam is needed at garage wall fireblocking penetrations. 09-16-2022 - Fire foam needed at garage walls penetrations. FIREBLOCKING INTEGRITY MUST BE MAINTAINED R302.11.2. When drilled through the fire blocking. | |||
| LATH/BRICK/ WATER BARRIER | 09/14/2022 | APPROVED | AGAETANO |
| Note: THIS IS A REINSPECTION Inspector Notes from Inspection 2445 Inspector Notes from Inspection 2420 THIS IS A REINSPECTION Inspector Notes from Inspection 2467 Trash on site. Site needs to be cleaned. No further inspections will be passed until trash is cleaned. 07-29-2022 1. Service wire not installed. 2. Wires in both electrical panels not installed. 3. UFER grounds not visible 4. Floor outlet added in right unit and filled with concrete. Please submit a revision to the building department. Uncover concrete for inspection. 5. Grounds not connected in both units. 6. Light not installed in left unit masterbedroom closet. 7. Back doors and right unit window will need a window nailing added. (Contractor noted that window is on backorder). 08-22-2022. 1. Service not installed - check at early power. 2. UFER ground not visible - check at early power. 3. Electrical panels conductors not phased out. Check at next inspection (insulation). 08-29-2022 - Three items above have not been addressed. Check at next inspection. 09-07-2022 1. Service and UFER ground not installed. Check at early power. UFER will need to be exposed. 2. Fireblocking needed at garage walls. R302.11.1 09-14-2022 - Fireblocking will be addressed at insulation. Fire foam is needed at garage wall fireblocking penetrations. | |||
| INSULATION | 09/08/2022 | Disapproved - NO FEE | AGAETANO |
| Note: Inspector Notes from Inspection 2445 Inspector Notes from Inspection 2420 THIS IS A REINSPECTION Inspector Notes from Inspection 2467 Trash on site. Site needs to be cleaned. No further inspections will be passed until trash is cleaned. 07-29-2022 1. Service wire not installed. 2. Wires in both electrical panels not installed. 3. UFER grounds not visible 4. Floor outlet added in right unit and filled with concrete. Please submit a revision to the building department. Uncover concrete for inspection. 5. Grounds not connected in both units. 6. Light not installed in left unit masterbedroom closet. 7. Back doors and right unit window will need a window nailing added. (Contractor noted that window is on backorder). 08-22-2022. 1. Service not installed - check at early power. 2. UFER ground not visible - check at early power. 3. Electrical panels conductors not phased out. Check at next inspection (insulation). 08-29-2022 - Three items above have not been addressed. Check at next inspection. 09-08-2022 - 1. FIREBLOCKING . Fireblocking needed at garage walls. R302.11.1 2. Service not installed - check at early power. 3. UFER ground not visible - check at early power. | |||
| LATH/BRICK/ WATER BARRIER | 09/07/2022 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: Inspector Notes from Inspection 2445 Inspector Notes from Inspection 2420 THIS IS A REINSPECTION Inspector Notes from Inspection 2467 Trash on site. Site needs to be cleaned. No further inspections will be passed until trash is cleaned. 07-29-2022 1. Service wire not installed. 2. Wires in both electrical panels not installed. 3. UFER grounds not visible 4. Floor outlet added in right unit and filled with concrete. Please submit a revision to the building department. Uncover concrete for inspection. 5. Grounds not connected in both units. 6. Light not installed in left unit masterbedroom closet. 7. Back doors and right unit window will need a window nailing added. (Contractor noted that window is on backorder). 08-22-2022. 1. Service not installed - check at early power. 2. UFER ground not visible - check at early power. 3. Electrical panels conductors not phased out. Check at next inspection (insulation). 08-29-2022 - Three items above have not been addressed. Check at next inspection. 09-07-2022 1. Service and UFER ground not installed. Check at early power. UFER will need to be exposed. 2. Fireblocking needed at garage walls. R302.11.1 | |||
| FIREWALL FINAL | 08/29/2022 | APPROVED - AS NOTED | AGAETANO |
| Note: Inspector Notes from Inspection 2420 THIS IS A REINSPECTION Inspector Notes from Inspection 2467 Trash on site. Site needs to be cleaned. No further inspections will be passed until trash is cleaned. 07-29-2022 1. Service wire not installed. 2. Wires in both electrical panels not installed. 3. UFER grounds not visible 4. Floor outlet added in right unit and filled with concrete. Please submit a revision to the building department. Uncover concrete for inspection. 5. Grounds not connected in both units. 6. Light not installed in left unit masterbedroom closet. 7. Back doors and right unit window will need a window nailing added. (Contractor noted that window is on backorder). 08-22-2022. 1. Service not installed - check at early power. 2. UFER ground not visible - check at early power. 3. Electrical panels conductors not phased out. Check at next inspection (insulation). 08-29-2022 - Three items above have not been addressed. Check at next inspection. | |||
| ALL ROUGH | 08/22/2022 | APPROVED - AS NOTED | AGAETANO |
| Note: THIS IS A REINSPECTION Inspector Notes from Inspection 2467 Trash on site. Site needs to be cleaned. No further inspections will be passed until trash is cleaned. 07-29-2022 1. Service wire not installed. 2. Wires in both electrical panels not installed. 3. UFER grounds not visible 4. Floor outlet added in right unit and filled with concrete. Please submit a revision to the building department. Uncover concrete for inspection. 5. Grounds not connected in both units. 6. Light not installed in left unit masterbedroom closet. 7. Back doors and right unit window will need a window nailing added. (Contractor noted that window is on backorder). 08-22-2022. 1. Service not installed - check at early power. 2. UFER ground not visible - check at early power. 3. Electrical panels conductors not phased out. Check at next inspection (insulation). | |||
| FIREWALL FINAL | 08/18/2022 | CANCELLED BY APPLICANT | WEB |
| Note: THIS IS A REINSPECTION DOCUMENTS: NEED THE APPROVED DOCUMENTS ON SITE FOR INSPECTION 107.3,1. (no plans on site) | |||
| FIREWALL FINAL | 08/05/2022 | Disapproved -FEE REQUIRED | LMILLER |
| Note: DOCUMENTS: NEED THE APPROVED DOCUMENTS ON SITE FOR INSPECTION 107.3,1. (no plans on site) | |||
| FIREWALL DRYWALL NAILING | 07/29/2022 | APPROVED | AGAETANO |
| Note: Inspector Notes from Inspection 2467 Trash on site. Site needs to be cleaned. No further inspections will be passed until trash is cleaned. | |||
| ALL ROUGH | 07/29/2022 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: Inspector Notes from Inspection 2467 Trash on site. Site needs to be cleaned. No further inspections will be passed until trash is cleaned. 07-29-2022 1. Service wire not installed. 2. Wires in both electrical panels not installed. 3. UFER grounds not visible 4. Floor outlet added in right unit and filled with concrete. Please submit a revision to the building department. Uncover concrete for inspection. 5. Grounds not connected in both units. 6. Light not installed in left unit masterbedrrom closet. 7. Back doors and right unit window will need a window nailing added. (Contractor noted that window is on backorder). | |||
| ROOF VALLEY & METAL | 07/05/2022 | APPROVED - AS NOTED | AGAETANO |
| Note: Trash on site. Site needs to be cleaned. No further inspections will be passed until trash is cleaned. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/24/2022 | APPROVED | AGAETANO |
| Note: THIS IS A REINSPECTION Multuple straps missing. Check all. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/21/2022 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: Multuple straps missing. Check all. | |||
| FOUND SURVEY APPROVED (OFFICE) | 06/10/2022 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 05/26/2022 | APPROVED | AGAETANO |
| MONOLITHIC SLAB | 02/17/2022 | APPROVED | AGAETANO |
| Note: THIS IS A REINSPECTION New inspection due to canceled inspection THIS IS A REINSPECTION THIS IS A REINSPECTION 02-09-2022. Please provide a set of dry, readable, and approved drawings for inspection. 02-14-2022. Termite bond sticker not posted. | |||
| MONOLITHIC SLAB | 02/14/2022 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: New inspection due to canceled inspection THIS IS A REINSPECTION THIS IS A REINSPECTION 02-09-2022. Please provide a set of dry, readable, and approved drawings for inspection. 02-14-2022. Termite bond sticker not posted. | |||
| MONOLITHIC SLAB | 02/11/2022 | CANCELLED BY APPLICANT | WEB |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 02-09-2022. Please provide a set of dry, readable, and approved drawings for inspection. | |||
| MONOLITHIC SLAB | 02/10/2022 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: THIS IS A REINSPECTION 02-09-2022. Please provide a set of dry, readable, and approved drawings for inspection. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 01/28/2022 | APPROVED | MGIBSON |
| Note: THIS IS A REINSPECTION UNCOVER AND EXSPOSE ALL PLUMBING FOR INSPECTION. MISSED INSPECTION | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 01/26/2022 | Disapproved -FEE REQUIRED | MGIBSON |
| Note: UNCOVER AND EXSPOSE ALL PLUMBING FOR INSPECTION. MISSED INSPECTION NO TEST ON WATER OR SANITARY SYSTEM | |||
| MONOLITHIC SLAB | 01/26/2022 | CANCELLED BY APPLICANT | KSANDOE |
| WATER METER INSTALLATION REQUEST | 12/01/2021 | APPROVED | TCHURCHILL |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 07/06/2023 | 07/10/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/17/2023 | 05/24/2023 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 04/24/2023 | 04/24/2023 |
| Note: Marked INFORMATION By: LIBBY MUSGROVE - - LMUSGROVE@PALMCOASTGOV.COM document name & file name must match - Ex. Site plan=Site plan. no extra names or numbers | |||
| ELEC | COMPLETE | 08/16/2022 | 08/16/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/10/2022 | 06/10/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/10/2022 | 06/10/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/24/2022 | 03/29/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/24/2022 | 03/24/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 03/18/2022 | 03/18/2022 |
| Note: Marked INFORMATION By: MARGA DEFREITAS - - MDEFREITAS@PALMCOASTGOV.COM YOU NEED THE FOUNDATION FIRST NOT A FINALSURVEY | |||
| ZON | COMPLETE | 10/11/2021 | 10/12/2021 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 10/11/2021 | 10/11/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 10/11/2021 | 10/14/2021 |
| Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/11/2021 | 10/11/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 09/15/2021 | 09/17/2021 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| MECH | HOLD | 09/15/2021 | 09/15/2021 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Energy calcs need to be signed by the builder. (Second Request) | |||
| BLD | COMPLETE | 09/15/2021 | 09/16/2021 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 09/15/2021 | 09/15/2021 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM REPEAT COMMENTS: Landscape plan still does not demonstrate that the code requirements for sizes of the foundation plantings. All shrubs must be a minimum of 3 gal and the mechanical equipment must have a minimum of 7 gal screening plantings. Mechanical equipment pads located in 5' side easement. | |||
| SW1 | HOLD | 09/15/2021 | 09/22/2021 |
| Note: Held By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM Drainage 'swale' noted should flow down the property line as a "Common Swale". When? ALWAYS next to a vacant. Whenever possible next to an existing home where the elevation 10 ft off the property line are higher than the property line. In this site plan both sides should drain down the property line as a common swale. Currently depicted as a swale flow between the property line and the new construction. | |||
| ENGIN1 | COMPLETE | 09/15/2021 | 09/15/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 08/20/2021 | 08/20/2021 |
| Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Ac Pad mechanical equiptment pads located in 5 ft utility easment. Land scape plan: missing the legend with tree descriptons and grass being used and whether or not it will require an irrigation system. | |||
| BLD | HOLD | 08/18/2021 | 08/20/2021 |
| Note: Held By: HAROLD ALLEN - - HALLEN@PALMCOASTGOV.COM REVIEW COMMENTS: 1. On Sheet 1 of 9 note calls out Plans have been designed to the 2017 Florida Building Code. As of January 1, 2021 Florida State adopted the 2020 Florida Building Code 7th Edition. 2. ASCE 7-10 is referenced. As mentioned above, this is an older Code reference. 3. R703.8 is called for flashing. Per section R703 is for Anchored Stone and Masonry Veneer. A revision is required to reflect the correct Code section. 4. Provide a current City of Palm Coast Roofing Worksheet. | |||
| CUSVC | COMPLETE | 08/18/2021 | 08/25/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | HOLD | 08/18/2021 | 08/19/2021 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Submit electric load calcs and riser diagram | |||
| ENGIN1 | COMPLETE | 08/18/2021 | 08/18/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 08/18/2021 | 08/19/2021 |
| Note: Released By: TONI CHURCHILL - - | |||
| MECH | HOLD | 08/18/2021 | 08/19/2021 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Energy calcs need to be signed by the builder | |||
| SW1 | HOLD | 08/18/2021 | 08/25/2021 |
| Note: Held By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM This is a plot plan not a site plan we need a topographical site plan with proposed drainage features and existing and proposed grade plan for the stormwater drainage | |||
| ZON | COMPLETE | 08/18/2021 | 08/20/2021 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Ac Pad mechanical equiptment pads located in 5 ft utility easment. Land scape plan: missing the legend with tree descriptons and grass being used and whether or not it will require an irrigation system. | |||
| SWALE | COMPLETE | 08/18/2021 | 11/10/2021 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 07/25/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/25/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/25/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/25/2023 |
| CONTRACTOR CHANGE | ¤40.00 | 07/25/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 07/25/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 07/25/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 07/25/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 07/25/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 07/25/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 07/25/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 07/25/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 07/25/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 07/25/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/25/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/25/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/25/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/25/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/25/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/25/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/30/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/30/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/07/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/07/2022 |
| METER - DEPOSIT | ¤120.00 | 11/09/2021 |
| WATER- TURN ON | ¤50.00 | 11/09/2021 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 11/09/2021 |
| INSPECTION - RESIDENTIAL | ¤987.25 | 11/09/2021 |
| PLAN REVIEW - RESIDENTIAL | ¤280.02 | 11/09/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤22.02) | 11/09/2021 |
| IMPACT FEE FIRE | ¤734.00 | 11/09/2021 |
| IMPACT FEE PARKS | ¤2,398.24 | 11/09/2021 |
| IMPACT FEE SCHOOL | ¤7,200.00 | 11/09/2021 |
| IMPACT FEE TRANSPORTATION | ¤2,666.00 | 11/09/2021 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 11/09/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤71.95) | 11/09/2021 |
| SURCHARGE FS 533.721 | ¤13.61 | 11/09/2021 |
| SURCHARGE - FS 468.631 | ¤20.42 | 11/09/2021 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 11/09/2021 |
| SW ENG INSPECTION 60 | ¤60.00 | 11/09/2021 |
| SW ENG PRE APRON | ¤30.00 | 11/09/2021 |
| SW ENG - REVIEW 20 | ¤20.00 | 11/09/2021 |
| SW ENG RES REVIEW 200 | ¤200.00 | 11/09/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤79.98) | 11/09/2021 |
| SEWER CREDIT | (¤2,016.00) | 11/09/2021 |
| SEWER INSPECTION | ¤25.00 | 11/09/2021 |
| SEWER CAPITAL FACILITY | ¤9,329.10 | 11/09/2021 |
| WATER CAPITAL FACILITY FEE | ¤6,848.90 | 11/09/2021 |
| SITE PLAN 30 | ¤30.00 | 11/09/2021 |
| CONNECTION FEES | ¤2,035.66 | 11/09/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤31,780.75 |