Permit #2021081048
Permit Details
Status: COED
| Parcel Id: 35-11-31-4075-00000-1490 |
| CONDITIONED SPACE: 2177 sqft |
| GARAGE: 648 sqft |
| OPENED PORCH (WITH ROOF) : 38 sqft |
| OPENED PORCH (WITH ROOF) : 220 sqft |
| Total Square Footage: 3083 sqft |
| Block: 00000 |
| Subdivision: 2296 - MARINA DEL PALMA SUBDIVISION |
| Job Phone: 863-647-5815 |
| Location Address: 6 MENORCA WAY |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/11/2021 |
| NOC: RECORDED |
| Applicant name: MARK ALLAN HULBERT |
| Owner: PETO, JAMES & CAROL |
|
Address 2719 SHIPWHEEL DR NORTH MYRTLE BEACH, SC 29582 |
| Lot: 1490 |
| Contracted Stated Job Value: ¤330,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
HULBERT HOMES INC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 6254 LAKELAND, FL 33813 |
CRC1331304 (Exp: 08/31/2026) | 863-647-5815 |
Sub Contractors
ANTONIO VINCENZO DAHM
| Status | Location Address | State License Number | Phone |
| ACTIVE |
10 RYBAR LANE PALM COAST, FL 32164 |
CFC1429951 (Exp: 08/31/2026) | 386-237-5692 |
STEPHEN COURTEAUX
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
85 North Yonge Street Ormond Beach, FL 32174 |
EC13001748 (Exp: 08/31/2026) | (386) 672-4900 | 386-676-7472 |
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
BRETT CHRISTIAN GIBSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
250 SEGOVIA RD ST AUGUSTINE, FL 32086 |
CAC1818423 (Exp: 08/31/2026) | 904-229-8131 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - STORMWATER FINAL | 10/17/2022 | APPROVED - AS NOTED | PFLANAGAN |
| Note: TALK TO CM ON SITE AND HE IS GOING TO PUT SOD ALONG THE ROAD AND THE MULCH BY AC TODAY SO PASSING AS NOTED -------------------------------------------------------------------------------------------- 10/12/2022 - PREVIOUS INSPECTION NOTES Mulch is not allowed in the easement. Especially right along the property line. Two rows of sod needed where to mulch bed reaches the property line. Also sod needed across the back of curb on both adjacent lots where the original sod buffer has been destroyed. This is to prevent sand washout into the curb and Catch Basin nearby. NOTE TO INSPECTOR TOLD THEM ON TEHE FIELD INSPECTION THAT THEY NEED TO HAVE A ROW OF SOD ON RIGHT SIDE OF HOME WHERE THE MULCH SO MULCH DOES NO WASH OUT FROM THE BED | |||
| U -UTILITY RESIDENTIAL FINAL | 10/12/2022 | FINAL APPROVED | JHARDING |
| ROW - STORMWATER FINAL | 10/12/2022 | Disapproved -FEE REQUIRED | RGROSS |
| Note: Mulch is not allowed in the easement. Especially right along the property line. Two rows of sod needed where to mulch bed reaches the property line. Also sod needed across the back of curb on both adjacent lots where the original sod buffer has been destroyed. This is to prevent sand washout into the curb and Catch Basin nearby. NOTE TO INSPECTOR TOLD THEM ON TEHE FIELD INSPECTION THAT THEY NEED TO HAVE A ROW OF SOD ON RIGHT SIDE OF HOME WHERE THE MULCH SO MULCH DOES NO WASH OUT FROM THE BED | |||
| BLD - BUILDING FINAL | 10/12/2022 | FINAL APPROVED | DCUSHING |
| ROW - FINAL APRON (AFTER POUR) | 10/11/2022 | APPROVED | PFLANAGAN |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 10/11/2022 | APPROVED | PFLANAGAN |
| Note: 10/3/2022 - PREVIOUS INSPECTION NOTES THE LEFT SIDE HAS A HIGH SPOT AND WONT LET THE WATER TO FLOW TO THE FRONT AND BACK RIGHT CORNER SOD ELEVATION IS NOT THE MINIMUM BELOW FFE NEED TO BE 4" BELOW FFE | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/11/2022 | APPROVED | PFLANAGAN |
| Note: NEED TO HAVE A ROW OF SOD ON RIGHT SIDE OF HOME WHERE THE MULCH SO MULCH DOES NO WASH OUT FROM THE BED | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 10/03/2022 | Disapproved - NO FEE | PFLANAGAN |
| Note: THE LEFT SIDE HAS A HIGH SPOT AND WONT LET THE WATER TO FLOW TO THE FRONT AND BACK RIGHT CORNER SOD ELEVATION IS NOT THE MINIMUM BELOW FFE NEED TO BE 4" BELOW FFE | |||
| U-CROSS CONNECTION | 10/03/2022 | APPROVED - AS NOTED | LFITZGERALD |
| Note: has potable irrigation with PVB installed-no cross connection | |||
| ROW- PRE-APRON (PRE-POUR) | 09/13/2022 | APPROVED | PFLANAGAN |
| Note: 9/13/22 READY FOR TO LAY PAVERS 8/1/22 READY TO POUR SIDEWALK, DRIVEWAY APRON AND PAVER RESTRAINTS ONLY BEFORE NEXT PRE POUR ALL BASE NEED TO BE COMPACTED AND SPREAD ----------------------------------------------------------------------------------------------------------------------------- NOTE TO INSPECTOR: Apron flare approved for less than 36 inches due to a Storm basin. ----------------------------------------------------------------------------------------------------------------------------------- 7/7/22 NEED HAVE 4IN OF CONCRETE FOR SIDE WALK THE RIGHT SIDEWALK IS FILLED WITH SAND AND DIRT NEED TO BE DUG OUT AND PAVER RESTRAINTS ON RIGHT SIDE GOT PUSHED IN DO TO SOMEONE DRIVING OVER IT ALL NEED TO BE CORRECTED BEFORE PASSING | |||
| ELECTRIC - EARLY POWER | 09/06/2022 | APPROVED - AS NOTED | LMILLER |
| Note: Notified fpl AT 3:03PM | |||
| ROW- PAVER RESTRAINTS | 08/01/2022 | APPROVED - AS NOTED | PFLANAGAN |
| Note: Inspector Notes from Inspection 9270 8/1/22 READY TO POUR SIDEWALK, DRIVEWAY APRON AND PAVER RESTRAINTS ONLY ----------------------------------------------------------------------------------------------------------------------------- NOTE TO INSPECTOR: Apron flare approved for less than 36 inches due to a Storm basin. ----------------------------------------------------------------------------------------------------------------------------------- 7/7/22 NEED HAVE 4IN OF CONCRETE FOR SIDE WALK THE RIGHT SIDEWALK IS FILLED WITH SAND AND DIRT NEED TO BE DUG OUT AND PAVER RESTRAINTS ON RIGHT SIDE GOT PUSHED IN DO TO SOMEONE DRIVING OVER IT ALL NEED TO BE CORRECTED BEFORE PASSING | |||
| ROW- PRE-APRON (PRE-POUR) | 08/01/2022 | APPROVED - AS NOTED | PFLANAGAN |
| Note: 8/1/22 READY TO POUR SIDEWALK, DRIVEWAY APRON AND PAVER RESTRAINTS ONLY BEFORE NEXT PRE POUR ALL BASE NEED TO BE COMPACTED AND SPREAD ----------------------------------------------------------------------------------------------------------------------------- NOTE TO INSPECTOR: Apron flare approved for less than 36 inches due to a Storm basin. ----------------------------------------------------------------------------------------------------------------------------------- 7/7/22 NEED HAVE 4IN OF CONCRETE FOR SIDE WALK THE RIGHT SIDEWALK IS FILLED WITH SAND AND DIRT NEED TO BE DUG OUT AND PAVER RESTRAINTS ON RIGHT SIDE GOT PUSHED IN DO TO SOMEONE DRIVING OVER IT ALL NEED TO BE CORRECTED BEFORE PASSING | |||
| ROW- PRE-APRON (PRE-POUR) | 07/07/2022 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: NOTE TO INSPECTOR: Apron flare approved for less than 36 inches due to a Storm basin. ----------------------------------------------------------------------------------------------------------------------------------- 7/7/22 NEED HAVE 4IN OF CONCRETE FOR SIDE WALK THE RIGHT SIDEWALK IS FILLED WITH SAND AND DIRT NEED TO BE DUG OUT AND PAVER RESTRAINTS ON RIGHT SIDE GOT PUSHED IN DO TO SOMEONE DRIVING OVER IT ALL NEED TO BE CORRECTED BEFORE PASSING | |||
| LATH/BRICK/ WATER BARRIER | 06/13/2022 | APPROVED | DCUSHING |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 1. Right garage door not installed, no door stop installed. 2. Right garage window window stop not fastened properly. 3. Entry and garage wire not fastened properly. Lathe Brick 7” nailing code ASTM 1063C 4-14-22 Partially approved as follows missing garage side door (OK to stucco all but right side of house as facing from road) Call in Window Nailing inspection and Brick/Lath inspection when Garage walk doors are installed | |||
| WINDOW NAILING | 06/13/2022 | APPROVED | DCUSHING |
| Note: THIS IS A REINSPECTION missing garage walk doors (extierior and interior) recall when installed | |||
| LATH/BRICK/ WATER BARRIER | 04/14/2022 | PARTIALLY APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION 1. Right garage door not installed, no door stop installed. 2. Right garage window window stop not fastened properly. 3. Entry and garage wire not fastened properly. Lathe Brick 7” nailing code ASTM 1063C 4-14-22 Partially approved as follows missing garage side door (OK to stucco all but right side of house as facing from road) Call in Window Nailing inspection and Brick/Lath inspection when Garage walk doors are installed | |||
| WINDOW NAILING | 04/13/2022 | PARTIALLY APPROVED | LMILLER |
| Note: missing garage walk doors (extierior and interior) recall when installed | |||
| INSULATION | 04/13/2022 | APPROVED - AS NOTED | LMILLER |
| Note: THIS IS A REINSPECTION still missing SER at panel (was asked for at all-rough 4-13-22 still missing walk doors in garage | |||
| LATH/BRICK/ WATER BARRIER | 04/12/2022 | Disapproved - NO FEE | AGAETANO |
| Note: 1. Right garage door not installed, no door stop installed. 2. Right garage window window stop not fastened properly. 3. Entry and garage wire not fastened properly. Lathe Brick 7” nailing code ASTM 1063C | |||
| GRAVITY SEWER TEST | 03/23/2022 | APPROVED | TSTAUFFACHER |
| U - SEWER TIE IN | 03/23/2022 | APPROVED | TSTAUFFACHER |
| INSULATION | 03/21/2022 | Disapproved -FEE REQUIRED | LMILLER |
| Note: still missing SER at panel (was asked for at all-rough | |||
| ALL ROUGH | 03/10/2022 | APPROVED - AS NOTED | JWALKER |
| Note: need approved ledger detail and drop truss detail for soffit extension/overhangs on gables by all-rough 3/10/22 Service line not installed to electrical panel Install nail plate for 14-2 wire at back bedroom left side wall top chord. Install the cross bracing at the front gable, the detail is shown lon the gable end revision drawing. A window nailing inspection will be added due to windows and door not being installed. Maintian the current installed weather protection | |||
| WALL SHEATHING | 03/09/2022 | APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION maximum spacing on seams and in the field exceeded 3-8-22 maximum spacing on seam exceeded (left gable) 3-9-22 notes above resolved | |||
| WALL SHEATHING | 03/08/2022 | Disapproved -FEE REQUIRED | LMILLER |
| Note: THIS IS A REINSPECTION maximum spacing on seams and in the field exceeded 3-8-22 maximum spacing on seam exceeded (left gable) | |||
| WALL SHEATHING | 03/04/2022 | Disapproved -FEE REQUIRED | LMILLER |
| Note: maximum spacing on seams and in the field exceeded | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/03/2022 | APPROVED - AS NOTED | LMILLER |
| Note: THIS IS A REINSPECTION THIS IS NOT A COMPLETE LIST: Anchor bolts missing 2x2 washer on bearing walls No strapping visible on fron garage gable No ledger detail in plans No drop truss detail for soffit extension/overhangs on gables 3-3-22 Passed as noted, need approved ledger detail and drop truss detail for soffit extension/overhangs on gables by all-rough Need to check at all-rough | |||
| ROOF VALLEY & METAL | 03/02/2022 | APPROVED | LMILLER |
| ELECTRIC-TUG | 02/14/2022 | APPROVED - AS NOTED | MKRASKI |
| Note: Emailed FPL @ 8:30 AM | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/03/2022 | Disapproved -FEE REQUIRED | TSTAUFFACHER |
| Note: THIS IS NOT A COMPLETE LIST: Anchor bolts missing 2x2 washer on bearing walls No strapping visible on fron garage gable No ledger detail in plans No drop truss detail for soffit extension/overhangs on gables | |||
| FOUND SURVEY APPROVED (OFFICE) | 02/01/2022 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 12/16/2021 | APPROVED | LMILLER |
| MONOLITHIC SLAB | 11/16/2021 | APPROVED | LMILLER |
| WATER METER INSTALLATION REQUEST | 11/15/2021 | APPROVED | CSTONE |
| PLUMBING 1ST ROUGH UNDERGROUND | 11/12/2021 | APPROVED | MGIBSON |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 03/03/2022 | 03/04/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/01/2022 | 02/01/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/01/2022 | 02/01/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 10/11/2021 | 10/11/2021 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/05/2021 | 10/05/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/05/2021 | 10/05/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 10/05/2021 | 10/06/2021 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 09/29/2021 | 09/30/2021 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM House doesn't meet the minimum rear setback of 25ft | |||
| ELEC | COMPLETE | 09/20/2021 | 09/21/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | HOLD | 09/20/2021 | 09/20/2021 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Windows facing right of way must having banding wrapped around them House doesn't meet the minimum rear setback of 25ft Please provide height and color of fence around AC pad | |||
| BLD | COMPLETE | 09/20/2021 | 09/20/2021 |
| Note: Released By: JPI | |||
| SW1 | COMPLETE | 09/20/2021 | 09/27/2021 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/20/2021 | 09/20/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| URB | COMPLETE | 08/23/2021 | 08/24/2021 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - | |||
| BLD | HOLD | 08/19/2021 | 08/24/2021 |
| Note: Held By: JPI 1. Product Approval Specification Sheet: a. For ALL products on the Product Approval Specification Sheet, identify the product with the full Approval Number (i.e. 20461.#-R6) that corresponds with the product being used. Products could not be reviewed or verified without the complete product approval number. b. Roofing Underlayment omitted; provide approved product, product description & type, manufacturer, and product approval number. c. Window Mullions omitted; provide approved product, product description & type, manufacturer, and product approval number. d. Florida Product Approval Numbers on Cover Sheet “C” do NOT appear to match those on the Product Approval Specification Sheet. 2. Roofing Worksheet is INCOMPLETE; provide underlayment type and manufacturer along with Florida Product Approval Number. | |||
| CUSVC | COMPLETE | 08/19/2021 | 08/26/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | HOLD | 08/19/2021 | 08/19/2021 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Submit electric load calcs and riser diagram | |||
| ENGIN1 | COMPLETE | 08/19/2021 | 08/19/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 08/19/2021 | 08/23/2021 |
| Note: Released By: TONI CHURCHILL - - | |||
| MECH | COMPLETE | 08/19/2021 | 08/19/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 08/19/2021 | 08/26/2021 |
| Note: Held By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM Site plan missing just about every requirement on the SW1 Checklist found in the attachments dated 8/26/21. Also see the informational package dated 8/26/21 that has an example of an approved site plan and what is needed. | |||
| ZON | HOLD | 08/19/2021 | 08/23/2021 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Windows facing right of way must having banding wrapped around them Garage depth cannot exceed the maximum depth of 30ft Site plan must show platted easements, AC pad location and door pad location Site plan must show covered patio in layout Site plan must show front entry walkway width and material of walkway and driveway Landscape plan must show door pad and ac pad locations |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 20 | ¤20.00 | 10/17/2022 |
| SW ENG REINSPECTION 30 | ¤30.00 | 10/12/2022 |
| PLAN REVIEW - REVISION | ¤32.50 | 10/12/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 10/12/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 10/12/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 10/12/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 10/12/2022 |
| CONTRACTOR CHANGE | ¤40.00 | 10/12/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 10/11/2021 |
| IMPACT FEE FIRE | ¤367.00 | 10/11/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 10/11/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 10/11/2021 |
| IMPACT FEE TRANSPORTATION | ¤3,139.00 | 10/11/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 10/11/2021 |
| SURCHARGE FS 533.721 | ¤12.56 | 10/11/2021 |
| SURCHARGE - FS 468.631 | ¤18.84 | 10/11/2021 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 10/11/2021 |
| SW ENG INSPECTION 60 | ¤60.00 | 10/11/2021 |
| SW ENG PRE APRON | ¤30.00 | 10/11/2021 |
| CONNECTION FEES | ¤25.00 | 10/11/2021 |
| METER - DEPOSIT | ¤60.00 | 10/11/2021 |
| WATER-METER | ¤441.07 | 10/11/2021 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 10/11/2021 |
| INSPECTION - RESIDENTIAL | ¤907.50 | 10/11/2021 |
| PLAN REVIEW - RESIDENTIAL | ¤257.40 | 10/11/2021 |
| SW ENG - REVIEW 20 | ¤20.00 | 10/11/2021 |
| SW ENG RES REVIEW 200 | ¤200.00 | 10/11/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤94.17) | 10/11/2021 |
| SEWER INSPECTION | ¤25.00 | 10/11/2021 |
| SEWER CAPITAL FACILITY | ¤2,432.74 | 10/11/2021 |
| WATER CAPITAL FACILITY FEE | ¤2,274.74 | 10/11/2021 |
| SITE PLAN 30 | ¤30.00 | 10/11/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,291.32 |