I want to search for...

Permit #2021081207

Permit Details

Status: COED

Parcel Id: 42-10-30-3210-00000-1480
CONDITIONED SPACE: 2250 sqft
CONDITIONED SPACE: 886 sqft
GARAGE: 665 sqft
OPENED PORCH (WITH ROOF) : 51 sqft
OPENED PORCH (WITH ROOF) : 327 sqft
OPENED PORCH (WITH ROOF) : 147 sqft
Total Square Footage: 4326 sqft
Block: 00000
Subdivision: -
Job Phone: (386) 446-5850
Location Address: 315 HIBISCUS WAY
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 09/23/2021
NOC: RECORDED
Applicant name: CHARLES DALLAS RINEK
Owner: WATHEN, JOHN

Address

6 CHELSEA CT

PALM COAST, FL 32137

Lot: 1480
Contracted Stated Job Value: ¤650,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

CHARLES RINEK CONSTRUCTION, INC.
Status Location Address State License Number Phone Fax
ACTIVE

P. O. Box 352502

Palm Coast, FL 32137

CGC046080 (Exp: 08/31/2026) (386) 446-5850 (386)445-9992

Sub Contractors

JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
SHAWN MICHAEL HISS
Status Location Address State License Number Phone
ACTIVE

1315 LPGA BLVD

HOLLY HILL, FL 32117

CAC1813585 (Exp: 08/31/2026) (386)672-8688
ERIC FRANCO
Status Location Address Mailing Address State License Number Phone
INACTIVE

840 DELTONA BLVD

DELTONA, FL 32725

STE F2

DELTONA, FL 32725

CCC1327280 (Exp: 08/31/2026) 386-575-4007
PHILIP ALAN KENOVICH
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 1470

HOLLY HILL, FL 32117

LG270 (Exp: 08/31/2026) (386)672-2507
ROBERT J CATES
Status Location Address State License Number Phone
INACTIVE

400 NORTH US HIGHWAY 1

ORMOND BEACH, FL 32174

EC13003957 (Exp: 08/31/2026) 386-672-8494

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 10/25/2023 CANCELLED BY APPLICANT WEB
Note: 10/24/2023 - PREVIOUS INSPECTION NOTES 10/20/2023 - PREVIOUS INSPECTION NOTES 10-20-2023 1. No hot water. 2. No light or switched receptacle in left bedroom. 3. Loose outlets. Check all. 4. Summer kitchen GFCI outlet needs WP cover. 5. Test caps on summer kitchen. 6. Summer kitchen plumbing not installed. 7. Pool bath AC vent in ceiling is covered. 8. Multiple sinks do not drain properly. 9. Summer kitchen hood is on same circuit as GFCI outlets. Inspection stopped. 10-24-2023 1. AHU duct on second floor not sealed at walls and ceiling. 2. Energy calcs do not match. 3. AC breaker sizes not within range.
BLD - BUILDING FINAL 10/25/2023 FINAL APPROVED AGAETANO
Note: New inspection due to canceled inspection 10/24/2023 - PREVIOUS INSPECTION NOTES 10/20/2023 - PREVIOUS INSPECTION NOTES 10-20-2023 1. No hot water. 2. No light or switched receptacle in left bedroom. 3. Loose outlets. Check all. 4. Summer kitchen GFCI outlet needs WP cover. 5. Test caps on summer kitchen. 6. Summer kitchen plumbing not installed. 7. Pool bath AC vent in ceiling is covered. 8. Multiple sinks do not drain properly. 9. Summer kitchen hood is on same circuit as GFCI outlets. Inspection stopped. 10-24-2023 1. AHU duct on second floor not sealed at walls and ceiling. 2. Energy calcs do not match. 3. AC breaker sizes not within range.
BLD - BUILDING FINAL 10/24/2023 Disapproved - NO FEE AGAETANO
Note: 10/20/2023 - PREVIOUS INSPECTION NOTES 10-20-2023 1. No hot water. 2. No light or switched receptacle in left bedroom. 3. Loose outlets. Check all. 4. Summer kitchen GFCI outlet needs WP cover. 5. Test caps on summer kitchen. 6. Summer kitchen plumbing not installed. 7. Pool bath AC vent in ceiling is covered. 8. Multiple sinks do not drain properly. 9. Summer kitchen hood is on same circuit as GFCI outlets. Inspection stopped. 10-24-2023 1. AHU duct on second floor not sealed at walls and ceiling. 2. Energy calcs do not match. 3. AC breaker sizes not within range.
FINAL SURVEY (OFFICE USE ONLY) 10/24/2023 APPROVED EMADISON
Note: ** 10/24/23 BUILDERS FINAL SURVEY WAS APPROVED ON 10/9/23 AND YOUR FIELD SURVEY WAS FINALED ON 10/19/23. ALONG WITH YOUR ROW STORMWATER FINAL AND ROW APRON FINAL (AFTER POUR)
BLD - BUILDING FINAL 10/20/2023 Disapproved - NO FEE AGAETANO
Note: 10-20-2023 1. No hot water. 2. No light or switched receptacle in left bedroom. 3. Loose outlets. Check all. 4. Summer kitchen GFCI outlet needs WP cover. 5. Test caps on summer kitchen. 6. Summer kitchen plumbing not installed. 7. Pool bath AC vent in ceiling is covered. 8. Multiple sinks do not drain properly. 9. Summer kitchen hood is on same circuit as GFCI outlets. Inspection stopped.
U -UTILITY RESIDENTIAL FINAL 10/20/2023 FINAL APPROVED LFITZGERALD
ROW - FINAL APRON (AFTER POUR) 10/19/2023 APPROVED EMADISON
ROW FIELD SURVEY /GRADING CERTIFICATION 10/19/2023 APPROVED EMADISON
Note: 10/18/2023 - PREVIOUS INSPECTION NOTES ** 10/18/23 POP-UP DRSINS ALL MOVED ** POP-UP DRAINS NEED TO BE INSTALL CORRECTLY, THEY NEED TO BE ON TOP OF SOD NOT UNDERNEATH AS THIS WILL CONTINUE TO CREATE WASH-OUTS _______________________________________________________________________________________________________________________ 10/9/2023 - PREVIOUS INSPECTION NOTES ** 10/09/23 NEED TO MOVE (3) POP-UP DRAINS OUT OF THE ROW IN FRONT OF HOUSE AND INSTALL CORRECTLY ** NEED TO MOVE POP-UP DRAINS UP SLOPE IN REAR YARD AND INSTALL CORRECTLY RING FOR DRAIN NEEDS TO SIT ON TOP OF SOD NOT BELOW CREATES WASH OUT ** NEED REPAIR ALL WASHOUTS IN REAR FILL AND COMPACT MATERIAL THEN SOD ** ALSO NEED TO REMOVE ERODED SEDIMENT FROM WATERWAY IN REAR ON RIGHT SIDE
ROW - STORMWATER FINAL 10/19/2023 APPROVED EMADISON
ROW FIELD SURVEY /GRADING CERTIFICATION 10/18/2023 Disapproved - NO FEE EMADISON
Note: ** 10/18/23 POP-UP DRSINS ALL MOVED ** POP-UP DRAINS NEED TO BE INSTALL CORRECTLY, THEY NEED TO BE ON TOP OF SOD NOT UNDERNEATH AS THIS WILL CONTINUE TO CREATE WASH-OUTS _______________________________________________________________________________________________________________________ 10/9/2023 - PREVIOUS INSPECTION NOTES ** 10/09/23 NEED TO MOVE (3) POP-UP DRAINS OUT OF THE ROW IN FRONT OF HOUSE AND INSTALL CORRECTLY ** NEED TO MOVE POP-UP DRAINS UP SLOPE IN REAR YARD AND INSTALL CORRECTLY RING FOR DRAIN NEEDS TO SIT ON TOP OF SOD NOT BELOW CREATES WASH OUT ** NEED REPAIR ALL WASHOUTS IN REAR FILL AND COMPACT MATERIAL THEN SOD ** ALSO NEED TO REMOVE ERODED SEDIMENT FROM WATERWAY IN REAR ON RIGHT SIDE
ROW- FINAL SURVEY/GRADING CERTIFICATION 10/09/2023 APPROVED EMADISON
ROW FIELD SURVEY /GRADING CERTIFICATION 10/09/2023 Disapproved - NO FEE EMADISON
Note: ** 10/09/23 NEED TO MOVE (3) POP-UP DRAINS OUT OF THE ROW IN FRONT OF HOUSE AND INSTALL CORRECTLY ** NEED TO MOVE POP-UP DRAINS UP SLOPE IN REAR YARD AND INSTALL CORRECTLY RING FOR DRAIN NEEDS TO SIT ON TOP OF SOD NOT BELOW CREATES WASH OUT ** NEED REPAIR ALL WASHOUTS IN REAR FILL AND COMPACT MATERIAL THEN SOD ** ALSO NEED TO REMOVE ERODED SEDIMENT FROM WATERWAY IN REAR ON RIGHT SIDE
FINAL SURVEY (OFFICE USE ONLY) 10/09/2023 APPROVED EMADISON
Note: 10/3/2023 - PREVIOUS INSPECTION NOTES ** 10/03/23 FINAL SURVEY NEEDS TO HAVE THE FOLLOWING: ** Sec 300.01 D2 The elevations on all adjacent identified (e.g. vacant or improved etc.) properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. All undeveloped properties must be properly identified on the site plan and Final Survey. There must be sufficient elevation shots to indicate the intended drainage pattern. ** FINAL ELEVATIONS ON A20 FT GRID INSIDE THE PROPERTY LINES ** Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for wood frame structures. ** THE SUBMITTED FINAL SURVEY IS IDENTICAL TO THE PROPOSED SITE PLAN
U-CROSS CONNECTION 10/06/2023 APPROVED DHANEY
FINAL SURVEY (OFFICE USE ONLY) 10/03/2023 Disapproved - NO FEE EMADISON
Note: ** 10/03/23 FINAL SURVEY NEEDS TO HAVE THE FOLLOWING: ** Sec 300.01 D2 The elevations on all adjacent identified (e.g. vacant or improved etc.) properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. All undeveloped properties must be properly identified on the site plan and Final Survey. There must be sufficient elevation shots to indicate the intended drainage pattern. ** FINAL ELEVATIONS ON A20 FT GRID INSIDE THE PROPERTY LINES ** Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for wood frame structures. ** THE SUBMITTED FINAL SURVEY IS IDENTICAL TO THE PROPOSED SITE PLAN
ROW- PRE-APRON (PRE-POUR) 06/06/2023 APPROVED EMADISON
Note: ** 06/06/23 READY TO SET PAVERS _________________________________________________________________________________________________________________ 4/26/2023 - PREVIOUS INSPECTION NOTES ** 04/26/23 READY TO POUR APRON AND PAVER RESTRAINTS ** MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) ** SCHEDULE NEXT PRE-POUR ONCE ALL PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET ANY PAVERS UNTIL THE NEXT PRE-POUR INSPECTION HAS BEEN APPROVED ___________________ 4/25/2023 - PREVIOUS INSPECTION NOTES ** 04/25/23 BUILDER NEEDS TO PROVIDE A RESIDENTIAL PAVER DETAIL PLAN FOR THE PROPOSED DRIVEWAY
ROW- PRE-APRON (PRE-POUR) 04/26/2023 PARTIALLY APPROVED EMADISON
Note: ** 04/26/23 READY TO POUR APRON AND PAVER RESTRAINTS ** MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) ** SCHEDULE NEXT PRE-POUR ONCE ALL PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET ANY PAVERS UNTIL THE NEXT PRE-POUR INSPECTION HAS BEEN APPROVED ___________________ 4/25/2023 - PREVIOUS INSPECTION NOTES ** 04/25/23 BUILDER NEEDS TO PROVIDE A RESIDENTIAL PAVER DETAIL PLAN FOR THE PROPOSED DRIVEWAY
ROW- PAVER RESTRAINTS 04/26/2023 APPROVED EMADISON
Note: ** 04/26/23 READY TO POUR PAVER RESTRAINTS AND APRON ** MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) __________________________________________________________________________________________________________________________ 4/25/2023 - PREVIOUS INSPECTION NOTES ** 04/25/23 PAVER RESTRAINTS NEED TO BE DUG CORECTLY 8 INCHES DEEP X 4 INCHES WIDE AT A MINIMUM
ROW- PAVER RESTRAINTS 04/25/2023 Disapproved - NO FEE EMADISON
Note: ** 04/25/23 PAVER RESTRAINTS NEED TO BE DUG CORECTLY 8 INCHES DEEP X 4 INCHES WIDE AT A MINIMUM
ROW- PRE-APRON (PRE-POUR) 04/25/2023 Disapproved -FEE REQUIRED EMADISON
Note: ** 04/25/23 BUILDER NEEDS TO PROVIDE A RESIDENTIAL PAVER DETAIL PLAN FOR THE PROPOSED DRIVEWAY
ELECTRIC - EARLY POWER 02/03/2023 APPROVED - AS NOTED AGAETANO
Note: 02-03-2023 Second floor needs fall protection at bedroom laundry shute.
ELECTRIC-TUG 02/03/2023 CANCELLED BY INSPECTOR AGAETANO
LATH/BRICK/ WATER BARRIER 11/30/2022 APPROVED AGAETANO
Note: 11/29/2022 - PREVIOUS INSPECTION NOTES 11-29-2022 Contractor not ready.
LATH/BRICK/ WATER BARRIER 11/29/2022 Disapproved - NO FEE AGAETANO
Note: 11-29-2022 Contractor not ready.
WINDOW NAILING 11/14/2022 APPROVED AGAETANO
Note: Inspector Notes from Inspection 2490 Inspector Notes from Inspection 2420 New inspection due to canceled inspection THIS IS A REINSPECTION 09-02-2022 1. Conductors not phased out in electrical panel. 2. Floor outlets have been added in piano room and great room. Please submit a revision to the building department. 3. Outlets in piano room niche grounds need to be connected. All grounds need to be connected – NEC 110.14A 4. Service not installed. Service wire is run. Check the service at next inspection. 09-23-2022 1. Piano niche boxes and wires not fastened. 2. Service not installed. 3. Garage entry door not installed. Contractor will need to request a window / door nailing inspection. Check at next inspection. 10-26-2022 Please cover garage entry door prior to drywall installation.
WINDOW NAILING 10/27/2022 Disapproved - NO FEE AGAETANO
Note: Inspector Notes from Inspection 2420 New inspection due to canceled inspection THIS IS A REINSPECTION 09-02-2022 1. Conductors not phased out in electrical panel. 2. Floor outlets have been added in piano room and great room. Please submit a revision to the building department. 3. Outlets in piano room niche grounds need to be connected. All grounds need to be connected – NEC 110.14A 4. Service not installed. Service wire is run. Check the service at next inspection. 09-23-2022 1. Piano niche boxes and wires not fastened. 2. Service not installed. 3. Garage entry door not installed. Contractor will need to request a window / door nailing inspection. Check at next inspection. 10-26-2022 Both garage entry doors are not installed.
INSULATION 10/27/2022 APPROVED - AS NOTED AGAETANO
Note: Inspector Notes from Inspection 2420 New inspection due to canceled inspection THIS IS A REINSPECTION 09-02-2022 1. Conductors not phased out in electrical panel. 2. Floor outlets have been added in piano room and great room. Please submit a revision to the building department. 3. Outlets in piano room niche grounds need to be connected. All grounds need to be connected – NEC 110.14A 4. Service not installed. Service wire is run. Check the service at next inspection. 09-23-2022 1. Piano niche boxes and wires not fastened. 2. Service not installed. 3. Garage entry door not installed. Contractor will need to request a window / door nailing inspection. Check at next inspection. 10-26-2022 Please cover garage entry door prior to drywall installation.
INSULATION 10/20/2022 Disapproved - NO FEE AGAETANO
Note: 09-23-2022 1. Piano niche boxes and wires not fastened. 2. Service not installed. Check at next inspection. 10-20-2022 First and second floor doors need to be installed or covered with TYVEK or plywood for inspection.
ALL ROUGH 09/23/2022 CANCELLED BY APPLICANT WEB
Note: THIS IS A REINSPECTION 09-02-2022 1. Conductors not phased out in electrical panel. 2. Floor outlets have been added in piano room and great room. Please submit a revision to the building department. 3. Outlets in piano room niche grounds need to be connected. All grounds need to be connected – NEC 110.14A 4. Service not installed. Service wire is run. Check the service at next inspection.
ALL ROUGH 09/23/2022 APPROVED - AS NOTED AGAETANO
Note: New inspection due to canceled inspection THIS IS A REINSPECTION 09-02-2022 1. Conductors not phased out in electrical panel. 2. Floor outlets have been added in piano room and great room. Please submit a revision to the building department. 3. Outlets in piano room niche grounds need to be connected. All grounds need to be connected – NEC 110.14A 4. Service not installed. Service wire is run. Check the service at next inspection. 09-23-2022 1. Piano niche boxes and wires not fastened. 2. Service not installed. 3. Garage entry door not installed. Contractor will need to request a window / door nailing inspection. Check at next inspection.
ALL ROUGH 09/02/2022 Disapproved - NO FEE AGAETANO
Note: 09-02-2022 1. Conductors not phased out in electrical panel. 2. Floor outlets have been added in piano room and great room. Please submit a revision to the building department. 3. Outlets in piano room niche grounds need to be connected. All grounds need to be connected – NEC 110.14A 4. Service not installed. Service wire is run. Check the service at next inspection.
ROOF VALLEY & METAL 06/08/2022 APPROVED LMILLER
WALL SHEATHING 03/10/2022 APPROVED AGAETANO
Note: THIS IS A REINSPECTION Left lower side of building is not nailed propery(below the red chalk line). THE FRONT AND BACK ENTRY WAYS ARE NOT APPROVED FOR WALL SHEATHING. CONTRACTOR WILL REQUEST A STRAPPING INSPECTION AT THOSE AREAS.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/07/2022 APPROVED AGAETANO
FOUND SURVEY APPROVED (OFFICE) 03/02/2022 APPROVED TBAKER
WALL SHEATHING 02/25/2022 Disapproved - NO FEE AGAETANO
Note: Left lower side of building is not nailed propery(below the red chalk line). THE FRONT AND BACK ENTRY WAYS ARE NOT APPROVED FOR WALL SHEATHING. CONTRACTOR WILL REQUEST A STRAPPING INSPECTION AT THOSE AREAS.
TIE BEAM / LINTEL 01/04/2022 APPROVED AGAETANO
WATER METER INSTALLATION REQUEST 12/14/2021 APPROVED CSTONE
MONOLITHIC SLAB 11/10/2021 APPROVED DCUSHING
GRAVITY SEWER TEST 10/26/2021 APPROVED MGIBSON
Note: THIS IS A REINSPECTION SEE FIRST ROUGH NOTE
PLUMBING 1ST ROUGH UNDERGROUND 10/26/2021 APPROVED MGIBSON
Note: THIS IS A REINSPECTION TEST BALL LET GO NO HEAD TEST ON FIRST ROUGH, OR GRAVITY SEWER
GRAVITY SEWER TEST 10/25/2021 Disapproved - NO FEE MGIBSON
Note: SEE FIRST ROUGH NOTE
PLUMBING 1ST ROUGH UNDERGROUND 10/25/2021 Disapproved - NO FEE MGIBSON
Note: TEST BALL LET GO NO HEAD TEST ON FIRST ROUGH, OR GRAVITY SEWER
U - SEWER TIE IN 10/25/2021 APPROVED MGIBSON

Review History

Department Status Date In Date Out
MECH COMPLETE 10/25/2023 10/25/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH COMPLETE 10/24/2023 10/25/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
GAS COMPLETE 10/23/2023 10/23/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD HOLD 10/20/2023 10/23/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Revise final survey. Survey submitted shows propoane tank
BADMIN INFORMATION 10/06/2023 10/06/2023
Note: Marked INFORMATION By: TIANA BELGROVE - (386)986-3780 - TBELGROVE@PALMCOASTGOV.COM Documents/Files named incorrectly Please rename your files in accordance with the naming convention outlined in our ‘document requirements’ located on the permit portal page http://docs.palmcoastgov.com/departments/building/online/document-requirements.pdf It is important that all submittals follow the guidelines for efficient plan review and record retention accuracy. You may add to your file name AFTER the above naming convention has been met. Examples Document type: Plans File name : Plans Document type: Foundation Survey File name: Foundation Survey Document type: Manufactures Specifications File Name: Pool Alarm Document type: Manufactures Specifications File Name: Generator
BADMIN INFORMATION 10/02/2023 10/02/2023
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Documents/Files named incorrectly o Please rename your files in accordance with the naming convention outlined in our ‘document requirements’ located on the permit portal page http://docs.palmcoastgov.com/departments/building/online/document-requirements.pdf o It is important that all submittals follow the guidelines for efficient plan review and record retention accuracy. o You may add to your file name AFTER the above naming convention has been met. Examples Document type: Plans File name : Plans Document type: Foundation Survey File name: Foundation Survey Document type: Manufactures Specifications File Name: Pool Alarm Document type: Manufactures Specifications File Name: Generator
BADMIN INFORMATION 09/15/2023 09/15/2023
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM FOR FUTURE SUBMITTALS Documents/Files named incorrectly o Please rename your files in accordance with the naming convention outlined in our ‘document requirements’ located on the permit portal page http://docs.palmcoastgov.com/departments/building/online/document-requirements.pdf o It is important that all submittals follow the guidelines for efficient plan review and record retention accuracy. o You may add to your file name AFTER the above naming convention has been met. Examples Document type: Plans File name : Plans Document type: Foundation Survey File name: Foundation Survey Document type: Manufactures Specifications File Name: Pool Alarm Document type: Manufactures Specifications File Name: Generator
BLD COMPLETE 06/29/2023 06/30/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BADMIN INFORMATION 06/13/2023 06/13/2023
Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM RENAME TO BLOWER DOOR.PDF
ENGIN1 COMPLETE 04/25/2023 04/26/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 04/25/2023 05/02/2023
Note: Released By: EDWARD MADISON - - EMADISON@PALMCOASTGOV.COM
BLD COMPLETE 10/26/2022 10/27/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ELEC COMPLETE 09/07/2022 09/08/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 03/01/2022 03/02/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 03/01/2022 03/01/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
MECH COMPLETE 09/08/2021 09/08/2021
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 09/08/2021 09/09/2021
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ELEC COMPLETE 09/08/2021 09/09/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON COMPLETE 09/08/2021 09/08/2021
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
URB COMPLETE 09/08/2021 09/09/2021
Note: Released By: JOHN BEAUDET - (386)986-2456 -
SW1 COMPLETE 09/08/2021 09/15/2021
Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/08/2021 09/08/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
URB HOLD 08/25/2021 08/25/2021
Note: Held By: JOHN BEAUDET - (386)986-2456 - 8/25/21 (JB) NEED TO ADD 1 ADDITIONAL HARDWOOD TREE, 5 ARE REQUIRED. PALMS CANNOT RECEIVE MORE THEN 25% OF THE TOTAL TREE CREDITS
BLD HOLD 08/23/2021 08/24/2021
Note: Held By: HAROLD ALLEN - - HALLEN@PALMCOASTGOV.COM REVIEW COMMENTS: 1. Proposed stair is shown in section with limited information. Provide under stair protection per R302.7, 2020 Florida Building Code Residential 7th Edition. 2. Provide Product Approval number for proposed soffit materials. 3. Square footage shown on the submitted Energy Forms does not match the proposed square footage on the submitted plans.
CUSVC COMPLETE 08/23/2021 08/27/2021
Note: Released By: HALEIGH HAND - -
ELEC HOLD 08/23/2021 08/24/2021
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Submit manufacturer specs on generator
ENGIN1 COMPLETE 08/23/2021 08/23/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 08/23/2021 08/25/2021
Note: Released By: TONI CHURCHILL - -
MECH HOLD 08/23/2021 08/24/2021
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Square footage on Energy calcs does not match the house plans.
SW1 HOLD 08/23/2021 08/30/2021
Note: Held By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM and patterns must be clearly depicted and include flow arrows
ZON HOLD 08/23/2021 08/25/2021
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Site plan/survey must show material and width of driveway and front entry walkway Please show rear setback from house to property line not pool on site plan/survey Plans show an exterior garage door on left side. Will there be a door pad? There is a 7.5ft easement on that side and the pad can not be located in that easement.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 10/25/2023
SW ENG REINSPECTION 30 ¤30.00 10/25/2023
PLAN REVIEW - REVISION ¤32.50 10/25/2023
PLAN REVIEW - REVISION ¤32.50 10/25/2023
CONNECTION FEES ¤25.00 09/23/2021
SW ENG - REVIEW 20 ¤20.00 09/23/2021
SW ENG RES REVIEW 200 ¤200.00 09/23/2021
3% TRANS IMPACT FEE CREDIT (¤94.17) 09/23/2021
SEWER INSPECTION ¤25.00 09/23/2021
SITE PLAN 30 ¤30.00 09/23/2021
3% FIRE IMPACT FEE CREDIT (¤11.01) 09/23/2021
IMPACT FEE FIRE ¤367.00 09/23/2021
IMPACT FEE PARKS ¤1,199.12 09/23/2021
IMPACT FEE SCHOOL ¤3,600.00 09/23/2021
IMPACT FEE TRANSPORTATION ¤3,139.00 09/23/2021
WATER -IRRIGATION INSPECTION ¤25.00 09/23/2021
3% PARKS IMPACT FEE CREDIT (¤35.97) 09/23/2021
SURCHARGE FS 533.721 ¤24.15 09/23/2021
SURCHARGE - FS 468.631 ¤36.22 09/23/2021
SW ENG - FOUNDATION SURVEY ¤20.00 09/23/2021
SW ENG INSPECTION 60 ¤60.00 09/23/2021
SW ENG PRE APRON ¤30.00 09/23/2021
METER - DEPOSIT ¤60.00 09/23/2021
METER - DEPOSIT ¤60.00 09/23/2021
WATER-METER ¤441.07 09/23/2021
WATER-METER ¤441.07 09/23/2021
WATER- TURN ON ¤25.00 09/23/2021
ADMINISTRATIVE RESIDENTIAL ¤30.00 09/23/2021
INSPECTION - RESIDENTIAL ¤1,787.50 09/23/2021
PLAN REVIEW - RESIDENTIAL ¤507.00 09/23/2021
Fees Total Due: ¤0.00 Total Paid: ¤12,145.98