I want to search for...
Permit #2021081219
Permit Details
Status: COED
| Parcel Id: 07-11-31-7022-00030-0460 |
| CONDITIONED SPACE: 1853 sqft |
| GARAGE: 446 sqft |
| OPENED PORCH (WITH ROOF) : 142 sqft |
| OPENED PORCH (WITH ROOF) : 80 sqft |
| Total Square Footage: 2521 sqft |
| Block: 00030 |
| Subdivision: 2217 - SECTION 22-WYNNFIELD |
| Job Phone: 386-931-5395 |
| Location Address: 133 WESTCHESTER LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 09/09/2021 |
| NOC: RECORDED |
| Applicant name: RYAN JAMES PERRY |
| Owner: RONALD G JOHNSON |
|
Address 17 A BRELYN PLACE PALM COAST, FL 32137 |
| Lot: 0460 |
| Contracted Stated Job Value: ¤350,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
WATERSIDE HOMES RENOVATIONS AND DESIGNS INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
10 BISCAYNE DRIVE PALM COAST, FL 32137 |
CBC1263021 (Exp: 08/31/2026) | 386-931-5395 |
Sub Contractors
PETER JOSEPH LYDEN
| Status | Location Address | State License Number | Phone |
| CANCEL |
17 UNIMAY CT BUNNELL, FL 32110 |
EC0002436 (Exp: 08/31/2022) | 386-931-2568 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
RYAN JAMES PERRY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
10 BISCAYNE DRIVE PALM COAST, FL 32137 |
CBC1263021 (Exp: 08/31/2026) | 386-931-5395 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 912 PALM COAST, FL 32164 |
CAC1820539 (Exp: 08/31/2026) | 386-264-0550 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 08/16/2022 | FINAL APPROVED | DCUSHING |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 1. Smerf for tankless water heater can not be exposed 2. All ceiling penitrations must be sealed 3. Sink in laundry room does not have hot water 4. Smoke detector has low battery and beeping 5. Dust cover on smoke detector in master bed room must be removed 8/12/22 Doors locked and need access for inspection | |||
| BLD - BUILDING FINAL | 08/12/2022 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: THIS IS A REINSPECTION 1. Smerf for tankless water heater can not be exposed 2. All ceiling penitrations must be sealed 3. Sink in laundry room does not have hot water 4. Smoke detector has low battery and beeping 5. Dust cover on smoke detector in master bed room must be removed 8/12/22 Doors locked and need access for inspection | |||
| BLD - BUILDING FINAL | 08/08/2022 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Smerf for tankless water heater can not be exposed 2. All ceiling penitrations must be sealed 3. Sink in laundry room does not have hot water 4. Smoke detector has low battery and beeping 5. Dust cover on smoke detector in master bed room must be removed | |||
| U-CROSS CONNECTION | 08/03/2022 | APPROVED - AS NOTED | LFITZGERALD |
| Note: THIS IS A REINSPECTION -has potable irrigation with PVB installed-no cross connection vacume breaker required to be a pressure vacume breaker( brass apparatus) not the current atmospheric vacume breaker | |||
| U-CROSS CONNECTION | 07/19/2022 | Disapproved - NO FEE | LFITZGERALD |
| Note: vacume breaker required to be a pressure vacume breaker( brass apparatus) not the current atmospheric vacume breaker | |||
| ROW - FINAL APRON (AFTER POUR) | 07/19/2022 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| U -UTILITY RESIDENTIAL FINAL | 07/19/2022 | FINAL APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION sewer clean out riser pipe required to be flush with grades and have a flush mount cap | |||
| U -UTILITY RESIDENTIAL FINAL | 07/08/2022 | Disapproved -FEE REQUIRED | LFITZGERALD |
| Note: sewer clean out riser pipe required to be flush with grades and have a flush mount cap | |||
| ROW - FINAL APRON (AFTER POUR) | 07/08/2022 | CANCELLED BY APPLICANT | WEB |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/07/2022 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| ROW - STORMWATER FINAL | 07/07/2022 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| FINAL SURVEY (OFFICE USE ONLY) | 07/07/2022 | APPROVED | GBERTOLA |
| Note: 07/7/22=CORRECTION WERE MADE THE CULVERT PIPE IS PITCHED THE WORNG WAY NEED TO HAVE THE CULVERT PITCHED TO THE LEFT NOT TO THE RIGHT | |||
| FINAL SURVEY (OFFICE USE ONLY) | 06/29/2022 | Disapproved - NO FEE | PFLANAGAN |
| Note: THE CULVERT PIPE IS PITCHED THE WORNG WAY NEED TO HAVE THE CULVERT PITCHED TO THE LEFT NOT TO THE RIGHT | |||
| ELECTRIC - EARLY POWER | 06/28/2022 | APPROVED - AS NOTED | MKRASKI |
| Note: Emailed FPL @ 9:40 AM | |||
| ROW- PRE-APRON (PRE-POUR) | 05/31/2022 | APPROVED - AS NOTED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. | |||
| U - SEWER TIE IN | 04/07/2022 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 04/07/2022 | APPROVED | MGIBSON |
| INSULATION | 03/09/2022 | APPROVED | FWILLIS |
| LATH/BRICK/ WATER BARRIER | 03/09/2022 | APPROVED | FWILLIS |
| ALL ROUGH | 01/26/2022 | APPROVED | MKRASKI |
| ALL ROUGH | 01/21/2022 | Disapproved - NO FEE | RMARTIN |
| Note: NEED TO NAIL PLATE ABOVE ELECTRIC PANEL, NEED APPROVED STRAPS ON ROMEX AT EXTERIOR WALLS, NEED 5' HEAD PRESSURE, NEED TO SEAL DRYER DUCT MISSING SEAM JUST ABOVE TOP PLATE | |||
| ROOF VALLEY & METAL | 12/29/2021 | APPROVED | FWILLIS |
| WALL SHEATHING | 12/15/2021 | APPROVED | KSANDOE |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/15/2021 | APPROVED | KSANDOE |
| ELECTRIC-TUG | 11/15/2021 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 10:11 am | |||
| TIE BEAM / LINTEL | 11/12/2021 | APPROVED | KSANDOE |
| FOUND SURVEY APPROVED (OFFICE) | 11/09/2021 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 10/27/2021 | APPROVED | FWILLIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 10/19/2021 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 09/28/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 07/08/2022 | 07/08/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 06/28/2022 | 06/28/2022 |
| Note: Marked INFORMATION By: MICHELLE RAMOS - - MRAMOS@PALMCOASTGOV.COM Unable to schedule final inspection because there is a prior inspection needed. Had to reject final survey. | |||
| ENGIN1 | COMPLETE | 11/09/2021 | 11/09/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/09/2021 | 11/09/2021 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 08/30/2021 | 08/30/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/30/2021 | 08/31/2021 |
| Note: Released By: HAROLD ALLEN - - HALLEN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/30/2021 | 08/30/2021 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/30/2021 | 08/30/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 08/30/2021 | 09/03/2021 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| BLD | HOLD | 08/23/2021 | 08/24/2021 |
| Note: Held By: HAROLD ALLEN - - HALLEN@PALMCOASTGOV.COM REVIEW COMMENTS: 1. A revision to the City of Palm Coast Roofing Worksheet is required. Provide Product Approval number for the proposed underlayment. | |||
| CUSVC | COMPLETE | 08/23/2021 | 08/26/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 08/23/2021 | 08/23/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/23/2021 | 08/23/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 08/23/2021 | 08/24/2021 |
| Note: Released By: TONI CHURCHILL - - | |||
| MECH | HOLD | 08/23/2021 | 08/24/2021 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Duct Layout needs to be signed by contractor. Not just Cody | |||
| SW1 | COMPLETE | 08/23/2021 | 08/27/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| ZON | HOLD | 08/23/2021 | 08/26/2021 |
| Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM please provide the width of kthe propsed sidewalk Banding is required in the rear of home (windows are facing the right of way .) please provide the setbacks for the left side of the home | |||
| SWALE | COMPLETE | 08/23/2021 | 11/15/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 08/16/2022 |
| REINSPECTION FEE | ¤40.00 | 08/16/2022 |
| SURCHARGE FS 533.721 | ¤13.29 | 09/09/2021 |
| SURCHARGE - FS 468.631 | ¤19.93 | 09/09/2021 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 09/09/2021 |
| SW ENG INSPECTION 60 | ¤60.00 | 09/09/2021 |
| SW ENG PRE APRON | ¤30.00 | 09/09/2021 |
| SW ENG - REVIEW 20 | ¤20.00 | 09/09/2021 |
| SW ENG RES REVIEW 200 | ¤200.00 | 09/09/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 09/09/2021 |
| SEWER INSPECTION | ¤25.00 | 09/09/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 09/09/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 09/09/2021 |
| SITE PLAN 30 | ¤30.00 | 09/09/2021 |
| CONNECTION FEES | ¤1,017.83 | 09/09/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 09/09/2021 |
| IMPACT FEE FIRE | ¤367.00 | 09/09/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 09/09/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 09/09/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 09/09/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 09/09/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 09/09/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 09/09/2021 |
| METER - DEPOSIT | ¤60.00 | 09/09/2021 |
| METER - DEPOSIT | ¤60.00 | 09/09/2021 |
| WATER-METER | ¤441.07 | 09/09/2021 |
| WATER- TURN ON | ¤25.00 | 09/09/2021 |
| WATER- TURN ON | ¤25.00 | 09/09/2021 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 09/09/2021 |
| INSPECTION - RESIDENTIAL | ¤962.50 | 09/09/2021 |
| PLAN REVIEW - RESIDENTIAL | ¤273.00 | 09/09/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤18,309.72 |