I want to search for...

Permit #2021090012

Permit Details

Status: COED

Parcel Id: 07-11-31-7017-00010-0420
CONDITIONED SPACE: 2001 sqft
GARAGE: 542 sqft
OPENED PORCH (WITH ROOF) : 410 sqft
OPENED PORCH (WITH ROOF) : 146 sqft
Total Square Footage: 3099 sqft
Block: 00010
Subdivision: 2129 - SECTION 17-BELLE TERRE
Job Phone: 530-308-7323
Location Address: 113 BOULDER ROCK DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 02/07/2022
NOC: RECORDED
Applicant name: DONALD CABRAL
Owner: JUAN & ANA GOMEZ

Address

7574 MANAKIN PLACE

FORMILL, SC 29707

Lot: 0420
Contracted Stated Job Value: ¤294,000.00
Job Description: Single Family Home
Type: CN

Contractor

DC CONSTRUCTION PALM COAST LLC
Status Location Address State License Number
ACTIVE

109 UNIVERSAL TRAIL

,

CGC1531039 (Exp: 08/31/2026)

Sub Contractors

SCOTT PATRICK RAYMOND
Status Location Address State License Number
ACTIVE

61 FRENEAU LN

PALM COAST, FL 32137

RF11067787 (Exp: 08/31/2027)
SCOTT R WOODARD
Status Location Address State License Number Phone
ACTIVE

51 PINEAPPLE DRIVE

PALM COAST, FL 32164

ES12000383 (Exp: 08/31/2026) 386-264-4964

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 04/30/2024 FINAL APPROVED JSTEWART
Note: 4/26/2024 - PREVIOUS INSPECTION NOTES 4/26/24- 1. Please seal all ceiling and wall penetrations in the Garage. R402.4, 2. Please seal Plenum ceiling penetration at AHU closet. R402.4, 3. Please install 3 Locking caps at ODU service ports. FBC.M 1411.6 4. Please Identify Heater installed for Breaker size. FBC.R. M1303.1 5. Please post Termite certificate. 105.11 6. Please Post Insulation certificate. R303.1.1.2 7. Please seal plumbing wall penetrations at Hot water tank.
BLD - BUILDING FINAL 04/26/2024 Disapproved -FEE REQUIRED JSTEWART
Note: 4/26/24- 1. Please seal all ceiling and wall penetrations in the Garage. R402.4, 2. Please seal Plenum ceiling penetration at AHU closet. R402.4, 3. Please install 3 Locking caps at ODU service ports. FBC.M 1411.6 4. Please Identify Heater installed for Breaker size. FBC.R. M1303.1 5. Please post Termite certificate. 105.11 6. Please Post Insulation certificate. R303.1.1.2 7. Please seal plumbing wall penetrations at Hot water tank.
U-CROSS CONNECTION 04/26/2024 APPROVED DHANEY
PLUMBING FINAL 04/26/2024 CANCELLED BY INSPECTOR JSTEWART
Note: 4/26/24- not needed.
U -UTILITY RESIDENTIAL FINAL 04/26/2024 FINAL APPROVED DHANEY
ROW- FINAL SURVEY/GRADING CERTIFICATION 04/25/2024 APPROVED PFLANAGAN
Note: CORRECTIONS MADE ----------------------------------------------------------------------- MEET WITH CONTRACTOR FOR FINAL SURVEY ISSUES AND THE CULVERT IS GOOD I SHOT IT ON 4/8/24 PER PARREN ----------------------------------------------------------------------- 4/3/2024 - PREVIOUS INSPECTION NOTES 1) THE CULVERT PIPE IS OUT OF TOLERANCE WITH THE PLAN DETAIL. Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan. 2) ALL ELEVATIONS AGAINST THE HOUSE NEEDS TO BE 4" BELOW FFE. Section 300.01 (A)(1)(C)(6) .Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for wood frame structures. 3) LEFT SIDE DRAINAGE PATTERN NEEDS TO HAVE POSITIVE FALL EVERY 20' TO THE FRONT ROADSIDE SWALE. Sec.300.01 (4,5,6) The tolerance along side lot lines is no more than 20 feet, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. 4) NEED TO CAPTURE THE HOUSE TO THE RIGHT OF YOURS THAT ITS IS IMPROVED AND CAPTURE THE CULVERT PIPE INVERTS. 5) THE FINAL SURVEY NEEDS TO HAVE 10' OFF SET ELEVATIONS IN THE LOT TO THE RIGHT OF YOURS AND IN THE RESERVE PARCEL TO DETEMINE IF WATER WILL IMPACT THE ADJACENT LOTS.Sec 300.01 D2 The elevations on all adjacent identified (e.g. vacant or improved etc.) properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. All undeveloped properties must be properly identified on the site plan and Final Survey. ------------------------------------------------------------------------------------------ 3/28/2024 - PREVIOUS INSPECTION NOTES 3/28/24 PLEASE CLEARLY DEPICT YOUR CULVERT PIPE ELEVATION WITH A CAPTION SO I CAN CHECK IT AGAINST THE COPC SWALE PLAN DIAGRAM.
ROW FIELD SURVEY /GRADING CERTIFICATION 04/25/2024 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved.
ROW - STORMWATER FINAL 04/25/2024 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved.
ROW - FINAL APRON (AFTER POUR) 04/25/2024 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved.
ROW- PROJECT STATUS 04/08/2024 APPROVED PFLANAGAN
Note: MEETING WITH CONTRACTOR ABOUT FINAL SURVEY
PLUMBING FINAL 04/08/2024 CANCELLED BY APPLICANT WEB
ROW- FINAL SURVEY/GRADING CERTIFICATION 04/03/2024 Disapproved - NO FEE PFLANAGAN
Note: 1) THE CULVERT PIPE IS OUT OF TOLERANCE WITH THE PLAN DETAIL. Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan. 2) ALL ELEVATIONS AGAINST THE HOUSE NEEDS TO BE 4" BELOW FFE. Section 300.01 (A)(1)(C)(6) .Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for wood frame structures. 3) LEFT SIDE DRAINAGE PATTERN NEEDS TO HAVE POSITIVE FALL EVERY 20' TO THE FRONT ROADSIDE SWALE. Sec.300.01 (4,5,6) The tolerance along side lot lines is no more than 20 feet, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. 4) NEED TO CAPTURE THE HOUSE TO THE RIGHT OF YOURS THAT ITS IS IMPROVED AND CAPTURE THE CULVERT PIPE INVERTS. 5) THE FINAL SURVEY NEEDS TO HAVE 10' OFF SET ELEVATIONS IN THE LOT TO THE RIGHT OF YOURS AND IN THE RESERVE PARCEL TO DETEMINE IF WATER WILL IMPACT THE ADJACENT LOTS.Sec 300.01 D2 The elevations on all adjacent identified (e.g. vacant or improved etc.) properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. All undeveloped properties must be properly identified on the site plan and Final Survey. ------------------------------------------------------------------------------------------ 3/28/2024 - PREVIOUS INSPECTION NOTES 3/28/24 PLEASE CLEARLY DEPICT YOUR CULVERT PIPE ELEVATION WITH A CAPTION SO I CAN CHECK IT AGAINST THE COPC SWALE PLAN DIAGRAM.
ROW- FINAL SURVEY/GRADING CERTIFICATION 03/28/2024 Disapproved - NO FEE FSLADISH
Note: 3/28/24 PLEASE CLEARLY DEPICT YOUR CULVERT PIPE ELEVATION WITH A CAPTION SO I CAN CHECK IT AGAINST THE COPC SWALE PLAN DIAGRAM.
ELECTRIC - EARLY POWER 03/27/2024 APPROVED - AS NOTED MKRASKI
Note: Emailed FPL 10am
PLUMBING FINAL 03/27/2024 CANCELLED BY APPLICANT WEB
Note: Inspector Notes from Inspection 9450 THIS WAS A VIRTUAL INSPECTION
ROW- PRE-APRON (PRE-POUR) 10/26/2023 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION, THE CULVERT PIPE IS GOOD AND READY TO POUR; THE BUILDER SHOULD DOUBLE-CHECK THE CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300E RESIDENTIAL CULVERT DETAIL
U - SEWER TIE IN 10/24/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
GRAVITY SEWER TEST 10/24/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
LATH/BRICK/ WATER BARRIER 08/24/2023 APPROVED JSTEWART
Note: 8/23/2023 - PREVIOUS INSPECTION NOTES 8/23/23- Previous note not rectified......Note to builder Door installer showed up as I was leaving, I explained what needed to be done to be in compliance. reschedule when Notes have been done. 8/21/2023 - PREVIOUS INSPECTION NOTES 8/21/23- Previous note not rectified......Front entry door needs Water barrier (flashing). R703.4 Flashing. Note to builder front entry door Missing anchors once fixed schedule window nailing inspection (front door and SGD). 8/16/2023 - PREVIOUS INSPECTION NOTES 8/16/23- Window Nailing Inspection (doors not installed at all rough) needs to be aproved prior to Lath/brick/water barrier. Front entry door Not installed to FL Product aproval code (No anchors, tacked with finsh nails). Front entry door top spacing is larger then 1/4" FBC 612.7.2.1 . Front entry door needs Water barrier (flashing). R703.4 Flashing. Please complete the requested Notes in order of the Inspections.
WINDOW NAILING 08/24/2023 APPROVED JSTEWART
Note: 7/25/23- Front door, rear slider, and garage to house are onsite please install and have inspection prior to Insulation inspection.
INSULATION 08/23/2023 APPROVED JSTEWART
Note: 8/15/2023 - PREVIOUS INSPECTION NOTES 8/15/23- Front door and garage to house doors are not installed. Please read notes on added window nailing inspection, this inspection was added for the doors not being installed at the all rough, notes also state need to have window nailing inspection prior to Insulation. Please install doors onsite, have inspection, then call in Insulation inspection. Anchors on garage door bucks not rectified. 8/1/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 7/25/23- Front door, rear slider, and garage to house doors are onsite. Added a window Nailing inspection. please install prior to insulation. Garage door bucks are not anchored per plan Will check at insulation. Please obtain revision on product aproval #'s for windows installed (latest revision submitted was rejected). 7/24/2023 - PREVIOUS INSPECTION NOTES 7/24/23 1. Repair ALL previous items before3 calling in re-inspection Stopped inspection 7/17/2023 - PREVIOUS INSPECTION NOTES 1. Windows missing anchoring (check all) 2. Garage door bucks not anchored per detail 3. Product approval does not match windows installed Stopped inspection not ready 8/1/23 - SGD IN THE REAR NOT INSTALLED FIRE FOAM IN TOP PLATE NOT APPROVED FIRE STOP. REMOVE AND REPLACE WITH APPROVED UL FIRE STOP. OR HAVE AN EMPTY TUBE OF WHAT WAS USED SHOWING APPROVED FIRE STOP.
LATH/BRICK/ WATER BARRIER 08/23/2023 Disapproved -FEE REQUIRED JSTEWART
Note: 8/23/23- Previous note not rectified......Note to builder Door installer showed up as I was leaving, I explained what needed to be done to be in compliance. reschedule when Notes have been done. 8/21/2023 - PREVIOUS INSPECTION NOTES 8/21/23- Previous note not rectified......Front entry door needs Water barrier (flashing). R703.4 Flashing. Note to builder front entry door Missing anchors once fixed schedule window nailing inspection (front door and SGD). 8/16/2023 - PREVIOUS INSPECTION NOTES 8/16/23- Window Nailing Inspection (doors not installed at all rough) needs to be aproved prior to Lath/brick/water barrier. Front entry door Not installed to FL Product aproval code (No anchors, tacked with finsh nails). Front entry door top spacing is larger then 1/4" FBC 612.7.2.1 . Front entry door needs Water barrier (flashing). R703.4 Flashing. Please complete the requested Notes in order of the Inspections.
LATH/BRICK/ WATER BARRIER 08/21/2023 Disapproved -FEE REQUIRED JSTEWART
Note: 8/21/23- Previous note not rectified......Front entry door needs Water barrier (flashing). R703.4 Flashing. Note to builder front entry door Missing anchors once fixed schedule window nailing inspection (front door and SGD). 8/16/2023 - PREVIOUS INSPECTION NOTES 8/16/23- Window Nailing Inspection (doors not installed at all rough) needs to be aproved prior to Lath/brick/water barrier. Front entry door Not installed to FL Product aproval code (No anchors, tacked with finsh nails). Front entry door top spacing is larger then 1/4" FBC 612.7.2.1 . Front entry door needs Water barrier (flashing). R703.4 Flashing. Please complete the requested Notes in order of the Inspections.
LATH/BRICK/ WATER BARRIER 08/16/2023 Disapproved -FEE REQUIRED JSTEWART
Note: 8/16/23- Window Nailing Inspection (doors not installed at all rough) needs to be aproved prior to Lath/brick/water barrier. Front entry door Not installed to FL Product aproval code (No anchors, tacked with finsh nails). Front entry door top spacing is larger then 1/4" FBC 612.7.2.1 . Front entry door needs Water barrier (flashing). R703.4 Flashing. Please complete the requested Notes in order of the Inspections.
INSULATION 08/15/2023 Disapproved -FEE REQUIRED JSTEWART
Note: 8/15/23- Front door and garage to house doors are not installed. Please read notes on added window nailing inspection, this inspection was added for the doors not being installed at the all rough, notes also state need to have window nailing inspection prior to Insulation. Please install doors onsite, have inspection, then call in Insulation inspection. Anchors on garage door bucks not rectified. 8/1/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 7/25/23- Front door, rear slider, and garage to house doors are onsite. Added a window Nailing inspection. please install prior to insulation. Garage door bucks are not anchored per plan Will check at insulation. Please obtain revision on product aproval #'s for windows installed (latest revision submitted was rejected). 7/24/2023 - PREVIOUS INSPECTION NOTES 7/24/23 1. Repair ALL previous items before3 calling in re-inspection Stopped inspection 7/17/2023 - PREVIOUS INSPECTION NOTES 1. Windows missing anchoring (check all) 2. Garage door bucks not anchored per detail 3. Product approval does not match windows installed Stopped inspection not ready 8/1/23 - SGD IN THE REAR NOT INSTALLED FIRE FOAM IN TOP PLATE NOT APPROVED FIRE STOP. REMOVE AND REPLACE WITH APPROVED UL FIRE STOP. OR HAVE AN EMPTY TUBE OF WHAT WAS USED SHOWING APPROVED FIRE STOP.
INSULATION 08/01/2023 Disapproved -FEE REQUIRED FWILLIS
Note: Inspector Notes from Inspection 2420 7/25/23- Front door, rear slider, and garage to house doors are onsite. Added a window Nailing inspection. please install prior to insulation. Garage door bucks are not anchored per plan Will check at insulation. Please obtain revision on product aproval #'s for windows installed (latest revision submitted was rejected). 7/24/2023 - PREVIOUS INSPECTION NOTES 7/24/23 1. Repair ALL previous items before3 calling in re-inspection Stopped inspection 7/17/2023 - PREVIOUS INSPECTION NOTES 1. Windows missing anchoring (check all) 2. Garage door bucks not anchored per detail 3. Product approval does not match windows installed Stopped inspection not ready 8/1/23 - SGD IN THE REAR NOT INSTALLED FIRE FOAM IN TOP PLATE NOT APPROVED FIRE STOP. REMOVE AND REPLACE WITH APPROVED UL FIRE STOP. OR HAVE AN EMPTY TUBE OF WHAT WAS USED SHOWING APPROVED FIRE STOP.
ALL ROUGH 07/25/2023 APPROVED - AS NOTED JSTEWART
Note: 7/25/23- Front door, rear slider, and garage to house doors are onsite. Added a window Nailing inspection. please install prior to insulation. Garage door bucks are not anchored per plan Will check at insulation. Please obtain revision on product aproval #'s for windows installed (latest revision submitted was rejected). 7/24/2023 - PREVIOUS INSPECTION NOTES 7/24/23 1. Repair ALL previous items before3 calling in re-inspection Stopped inspection 7/17/2023 - PREVIOUS INSPECTION NOTES 1. Windows missing anchoring (check all) 2. Garage door bucks not anchored per detail 3. Product approval does not match windows installed Stopped inspection not ready
ALL ROUGH 07/24/2023 Disapproved -FEE REQUIRED MKRASKI
Note: 7/24/23 1. Repair ALL previous items before3 calling in re-inspection Stopped inspection 7/17/2023 - PREVIOUS INSPECTION NOTES 1. Windows missing anchoring (check all) 2. Garage door bucks not anchored per detail 3. Product approval does not match windows installed Stopped inspection not ready
ALL ROUGH 07/17/2023 Disapproved -FEE REQUIRED MKRASKI
Note: 1. Windows missing anchoring (check all) 2. Garage door bucks not anchored per detail 3. Product approval does not match windows installed Stopped inspection not ready
WALL SHEATHING 05/23/2023 APPROVED JSTEWART
ROOF VALLEY & METAL 12/21/2022 APPROVED FWILLIS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/12/2022 APPROVED FWILLIS
Note: 12/2/2022 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 11/29/2022 - PREVIOUS INSPECTION NOTES NEED TO SEE DETAIL FOR LEDGER BOARD SHOWING 2PLY 2X10 AND NO ANCHOR BOLTS. HEADERS IN BEARING WALL, NO STRAPPING AND HOW MANY JACKS AND STUDS. ARE SP'S NEEDED ON TOP AND BOTTOM OF BEARING WALL 12/2/22 - LEDGER BOARD LEFT SIDE IN GARAGE CALLS FOR ANCOR BOLTS.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/02/2022 CANCELLED BY APPLICANT WEB
Note: 11/29/2022 - PREVIOUS INSPECTION NOTES NEED TO SEE DETAIL FOR LEDGER BOARD SHOWING 2PLY 2X10 AND NO ANCHOR BOLTS. HEADERS IN BEARING WALL, NO STRAPPING AND HOW MANY JACKS AND STUDS. ARE SP'S NEEDED ON TOP AND BOTTOM OF BEARING WALL
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/02/2022 Disapproved - NO FEE FWILLIS
Note: New inspection due to canceled inspection 11/29/2022 - PREVIOUS INSPECTION NOTES NEED TO SEE DETAIL FOR LEDGER BOARD SHOWING 2PLY 2X10 AND NO ANCHOR BOLTS. HEADERS IN BEARING WALL, NO STRAPPING AND HOW MANY JACKS AND STUDS. ARE SP'S NEEDED ON TOP AND BOTTOM OF BEARING WALL 12/2/22 - LEDGER BOARD LEFT SIDE IN GARAGE CALLS FOR ANCOR BOLTS.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/29/2022 Disapproved - NO FEE FWILLIS
Note: NEED TO SEE DETAIL FOR LEDGER BOARD SHOWING 2PLY 2X10 AND NO ANCHOR BOLTS. HEADERS IN BEARING WALL, NO STRAPPING AND HOW MANY JACKS AND STUDS. ARE SP'S NEEDED ON TOP AND BOTTOM OF BEARING WALL
TIE BEAM / LINTEL 09/19/2022 APPROVED FWILLIS
FOUND SURVEY APPROVED (OFFICE) 04/05/2022 APPROVED TBAKER
MONOLITHIC SLAB 03/24/2022 APPROVED FWILLIS
Note: THIS IS A REINSPECTION Front left of garage footing at water valve depth is not as per plans. Seee 2/5.
MONOLITHIC SLAB 03/23/2022 Disapproved - NO FEE AGAETANO
Note: Front left of garage footing at water valve depth is not as per plans. Seee 2/5. Soil caved in at the garage area.
PLUMBING 1ST ROUGH UNDERGROUND 03/18/2022 APPROVED KSANDOE
WATER METER INSTALLATION REQUEST 03/02/2022 APPROVED CSTONE

Review History

Department Status Date In Date Out
BADMIN INFORMATION 04/24/2024 04/24/2024
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM If these are final survey, you need to upload under 'final survey' and name your file 'final survey'. There is logic built into the database that can only occur with document type 'final survey'
BADMIN INFORMATION 03/27/2024 03/27/2024
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM please rename your file to final survey and upload under the final survey document type.
BLD COMPLETE 08/01/2023 08/01/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 07/21/2023 07/21/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD HOLD 07/21/2023 07/24/2023
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. The followiung number need to be updated to the most current revision number and code cycle. FL10456-R4, FL 16230-R6, FL15363-R2, FL158.1- R8
BLD HOLD 07/18/2023 07/21/2023
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Only submit the numbers that are changing.
BLD COMPLETE 12/07/2022 12/08/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
BLD HOLD 12/05/2022 12/06/2022
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code PLAN REVIEW COMMENTS: 1. Engineers digital signature could not be verified. 2. Tapcons are called out to be used with the proposed Simpson hanger. Per thee manufacture, Titen HD screws are to be used.
BLD COMPLETE 11/14/2022 11/14/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 04/04/2022 04/05/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 04/04/2022 04/04/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BADMIN COMPLETE 02/07/2022 02/07/2022
Note: Released By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Held By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM NOC is not legible. Notice of Commencement Submittals October 7, 2021 We have seen an increase of incorrect Notice of Commencements submitted. It has typically been for the same issues and is causing frustrations for applicants. • DESCRIPTION OF PROPERTY - description sufficient for identification of the real property to be improved. The description should include the legal description of the property and also include the street address and tax folio number. • DESCRIPTION OF IMPROVEMENT - this should be a brief description of your project - single family residence, swimming pool, driveway, HVAC, screen enclosure, interior alterations, etc. • CONTRACTOR NAME - The name and address of the contractor – this is to match the application provided by the license holder. • NOTARIZATION – the signed name must be the name on the Notice of Commencement. The notary must print the name of the person’s signature (s) they are notarizing, identify if they are personally known or produce identification, sign their name and place their seal on the document. • NOT LEGIBLE – we are increasingly receiving documents that are not legible. We receive many blurry and / or dark copies. Please be sure your scanned copy is legible or it will not be accepted. The document submitted to the Building Division must match the document that has been recorded. Any changes to the document must be re-recorded. Changes to the recorded copy without being re-recorded are not acceptable. References: Florida Statute 713.13 Notice of Commencement http://www.leg.state.fl.us/Statutes/index.cfm?App_mode=Display_Statute&URL=0700-0799/0713/Sections/0713.13.html Florida Statute 117 Notaries Public http://www.leg.state.fl.us/statutes/index.cfm?App_mode=Display_Statute&URL=0100-0199/0117/0117.html
ZON COMPLETE 11/19/2021 11/22/2021
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 11/19/2021 11/22/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 11/19/2021 11/29/2021
Note: Released By: KALEN RUTH - (386)566-1273 - KRUTH@PALMCOASTGOV.COM
BLD HOLD 11/10/2021 11/10/2021
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ZON HOLD 11/10/2021 11/16/2021
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM As per email sent 11/16/21, please submit correct survey and site plan with both the original easement and the newly platted easement (to include pertinent legal description and recording information of the easement) which was created. City staff to show to Damaris once this is reviewed for her approval. If the proposed house is encroaching in either easement, a termination of easement wll have to be prepared.
ENGIN1 COMPLETE 11/10/2021 11/10/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 11/10/2021 11/17/2021
Note: Released By: KALEN RUTH - (386)566-1273 - KRUTH@PALMCOASTGOV.COM
BLD COMPLETE 11/10/2021 11/10/2021
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ZON HOLD 11/04/2021 11/04/2021
Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Please submit a correct site plan and survey which shows the two easements that were created during the binding lot process When this comes in please showto Damaris for approval.
BLD HOLD 11/02/2021 11/03/2021
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code-Building Residential REVIEW COMMENTS: Third Request 1. Product Approval Sheet calls-out Plydeck. Roofing Worksheet calls-out Owens Corning underlayment. Provide which roofing underlayment will be used.
MECH COMPLETE 11/02/2021 11/03/2021
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 11/02/2021 11/09/2021
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM Drainage being approved as is due to the positioning of the house. Therefore being approved as-noted. No drainage will be allowed to impact any adjacent improved properties.
ENGIN1 COMPLETE 11/02/2021 11/03/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON HOLD 09/24/2021 09/24/2021
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM COMMENTS AS PER DAMARIS RAMIREZ: "I spoke to the builder that had some drainage easements questions for me and found that the survey and site plan submitted was incorrect. They are only showing portion of the property and not the whole property. I did the binding lot agreement for this property so I am familiar with it. The builder said he will be submitting the corrected survey and site plan so be on the lookout for it or make a note about it on the permit."
ELEC COMPLETE 09/20/2021 09/21/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/20/2021 09/20/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
MECH HOLD 09/20/2021 09/20/2021
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs and EPL card need to be signed by the builder (Second Request)
ZON COMPLETE 09/20/2021 09/20/2021
Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM
BLD HOLD 09/20/2021 09/20/2021
Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM Repeat comment: All comments below per the 2020 Florida Building Code-Building Residential REVIEW COMMENTS: 1. Product Approval Sheet calls-out Plydeck. Roofing Worksheet calls-out Owens Corning underlayment. Provide which roofing underlayment will be used.
SW1 HOLD 09/20/2021 09/27/2021
Note: Held By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM Left side drainage needs to drain to the front swale then into the ditch. Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6)
SWALE COMPLETE 09/20/2021 11/16/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD HOLD 09/01/2021 09/03/2021
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code-Building Residential REVIEW COMMENTS: 1. Product Approval Sheet calls-out Plydeck. Roofing Worksheet calls-out Owens Corning underlayment. Provide which roofing underlayment will be used.
CUSVC COMPLETE 09/01/2021 09/03/2021
Note: Released By: HALEIGH HAND - -
ELEC HOLD 09/01/2021 09/01/2021
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Reference the 2017 NEC on the electric page. 2. Submit electric load calcs and riser diagram
ENGIN1 HOLD 09/01/2021 09/01/2021
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Existing spot grades in road are barely legible and should be carried to the nearest hundredth of a foot.
LOCATE COMPLETE 09/01/2021 09/02/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH HOLD 09/01/2021 09/02/2021
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs and EPL card need to be signed by the builder
ZON HOLD 09/01/2021 09/02/2021
Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM please provide measurements for the proosed drive way and the side walk When a permit comes in to build the house a termination of portion of the drainage easement will need to be executed. See Damaris if you have questions. Damaris Ramirez Planner : 386-986-3750 DRamirez@palmcoastgov.com

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG REINSPECTION 20 ¤20.00 05/06/2024
REINSPECTION RESIDENTIAL ¤40.00 05/06/2024
PLAN REVIEW - REVISION ¤32.50 03/27/2024
PLAN REVIEW - REVISION ¤32.50 03/27/2024
PLAN REVIEW - REVISION ¤32.50 03/27/2024
REINSPECTION RESIDENTIAL ¤40.00 03/27/2024
REINSPECTION RESIDENTIAL ¤40.00 03/27/2024
REINSPECTION RESIDENTIAL ¤40.00 03/27/2024
REINSPECTION RESIDENTIAL ¤40.00 03/27/2024
REINSPECTION RESIDENTIAL ¤40.00 03/27/2024
REINSPECTION RESIDENTIAL ¤40.00 03/27/2024
REINSPECTION RESIDENTIAL ¤40.00 03/27/2024
CONTRACTOR CHANGE ¤40.00 03/27/2024
CONTRACTOR CHANGE ¤20.00 03/27/2024
CONTRACTOR CHANGE ¤20.00 03/27/2024
CONTRACTOR CHANGE ¤20.00 03/27/2024
CONTRACTOR CHANGE ¤20.00 03/27/2024
3% FIRE IMPACT FEE CREDIT (¤11.01) 02/07/2022
IMPACT FEE FIRE ¤367.00 02/07/2022
IMPACT FEE PARKS ¤1,199.12 02/07/2022
IMPACT FEE SCHOOL ¤3,600.00 02/07/2022
IMPACT FEE TRANSPORTATION ¤1,718.00 02/07/2022
WATER -IRRIGATION INSPECTION ¤25.00 02/07/2022
3% PARKS IMPACT FEE CREDIT (¤35.97) 02/07/2022
SURCHARGE FS 533.721 ¤11.26 02/07/2022
SURCHARGE - FS 468.631 ¤16.89 02/07/2022
SW ENG - FOUNDATION SURVEY ¤20.00 02/07/2022
SW ENG INSPECTION 60 ¤60.00 02/07/2022
SW ENG PRE APRON ¤30.00 02/07/2022
SW ENG - REVIEW 20 ¤20.00 02/07/2022
SW ENG RES REVIEW 200 ¤200.00 02/07/2022
3% TRANS IMPACT FEE CREDIT (¤51.54) 02/07/2022
SEWER CREDIT (¤1,147.00) 02/07/2022
SEWER INSPECTION ¤25.00 02/07/2022
SEWER CAPITAL FACILITY ¤4,939.76 02/07/2022
WATER CAPITAL FACILITY FEE ¤3,626.50 02/07/2022
SITE PLAN 30 ¤30.00 02/07/2022
CONNECTION FEES ¤1,077.88 02/07/2022
METER - DEPOSIT ¤60.00 02/07/2022
WATER- TURN ON ¤25.00 02/07/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 02/07/2022
INSPECTION - RESIDENTIAL ¤808.50 02/07/2022
PLAN REVIEW - RESIDENTIAL ¤229.32 02/07/2022
Fees Total Due: ¤0.00 Total Paid: ¤17,431.21