Permit #2021090012
Permit Details
Status: COED
| Parcel Id: 07-11-31-7017-00010-0420 |
| CONDITIONED SPACE: 2001 sqft |
| GARAGE: 542 sqft |
| OPENED PORCH (WITH ROOF) : 410 sqft |
| OPENED PORCH (WITH ROOF) : 146 sqft |
| Total Square Footage: 3099 sqft |
| Block: 00010 |
| Subdivision: 2129 - SECTION 17-BELLE TERRE |
| Job Phone: 530-308-7323 |
| Location Address: 113 BOULDER ROCK DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 02/07/2022 |
| NOC: RECORDED |
| Applicant name: DONALD CABRAL |
| Owner: JUAN & ANA GOMEZ |
|
Address 7574 MANAKIN PLACE FORMILL, SC 29707 |
| Lot: 0420 |
| Contracted Stated Job Value: ¤294,000.00 |
| Job Description: Single Family Home |
| Type: CN |
Contractor
DC CONSTRUCTION PALM COAST LLC
| Status | Location Address | State License Number |
| ACTIVE |
109 UNIVERSAL TRAIL , |
CGC1531039 (Exp: 08/31/2026) |
Sub Contractors
SCOTT PATRICK RAYMOND
| Status | Location Address | State License Number |
| ACTIVE |
61 FRENEAU LN PALM COAST, FL 32137 |
RF11067787 (Exp: 08/31/2027) |
SCOTT R WOODARD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
51 PINEAPPLE DRIVE PALM COAST, FL 32164 |
ES12000383 (Exp: 08/31/2026) | 386-264-4964 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 04/30/2024 | FINAL APPROVED | JSTEWART |
| Note: 4/26/2024 - PREVIOUS INSPECTION NOTES 4/26/24- 1. Please seal all ceiling and wall penetrations in the Garage. R402.4, 2. Please seal Plenum ceiling penetration at AHU closet. R402.4, 3. Please install 3 Locking caps at ODU service ports. FBC.M 1411.6 4. Please Identify Heater installed for Breaker size. FBC.R. M1303.1 5. Please post Termite certificate. 105.11 6. Please Post Insulation certificate. R303.1.1.2 7. Please seal plumbing wall penetrations at Hot water tank. | |||
| BLD - BUILDING FINAL | 04/26/2024 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: 4/26/24- 1. Please seal all ceiling and wall penetrations in the Garage. R402.4, 2. Please seal Plenum ceiling penetration at AHU closet. R402.4, 3. Please install 3 Locking caps at ODU service ports. FBC.M 1411.6 4. Please Identify Heater installed for Breaker size. FBC.R. M1303.1 5. Please post Termite certificate. 105.11 6. Please Post Insulation certificate. R303.1.1.2 7. Please seal plumbing wall penetrations at Hot water tank. | |||
| U-CROSS CONNECTION | 04/26/2024 | APPROVED | DHANEY |
| PLUMBING FINAL | 04/26/2024 | CANCELLED BY INSPECTOR | JSTEWART |
| Note: 4/26/24- not needed. | |||
| U -UTILITY RESIDENTIAL FINAL | 04/26/2024 | FINAL APPROVED | DHANEY |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 04/25/2024 | APPROVED | PFLANAGAN |
| Note: CORRECTIONS MADE ----------------------------------------------------------------------- MEET WITH CONTRACTOR FOR FINAL SURVEY ISSUES AND THE CULVERT IS GOOD I SHOT IT ON 4/8/24 PER PARREN ----------------------------------------------------------------------- 4/3/2024 - PREVIOUS INSPECTION NOTES 1) THE CULVERT PIPE IS OUT OF TOLERANCE WITH THE PLAN DETAIL. Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan. 2) ALL ELEVATIONS AGAINST THE HOUSE NEEDS TO BE 4" BELOW FFE. Section 300.01 (A)(1)(C)(6) .Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for wood frame structures. 3) LEFT SIDE DRAINAGE PATTERN NEEDS TO HAVE POSITIVE FALL EVERY 20' TO THE FRONT ROADSIDE SWALE. Sec.300.01 (4,5,6) The tolerance along side lot lines is no more than 20 feet, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. 4) NEED TO CAPTURE THE HOUSE TO THE RIGHT OF YOURS THAT ITS IS IMPROVED AND CAPTURE THE CULVERT PIPE INVERTS. 5) THE FINAL SURVEY NEEDS TO HAVE 10' OFF SET ELEVATIONS IN THE LOT TO THE RIGHT OF YOURS AND IN THE RESERVE PARCEL TO DETEMINE IF WATER WILL IMPACT THE ADJACENT LOTS.Sec 300.01 D2 The elevations on all adjacent identified (e.g. vacant or improved etc.) properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. All undeveloped properties must be properly identified on the site plan and Final Survey. ------------------------------------------------------------------------------------------ 3/28/2024 - PREVIOUS INSPECTION NOTES 3/28/24 PLEASE CLEARLY DEPICT YOUR CULVERT PIPE ELEVATION WITH A CAPTION SO I CAN CHECK IT AGAINST THE COPC SWALE PLAN DIAGRAM. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/25/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. | |||
| ROW - STORMWATER FINAL | 04/25/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. | |||
| ROW - FINAL APRON (AFTER POUR) | 04/25/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. | |||
| ROW- PROJECT STATUS | 04/08/2024 | APPROVED | PFLANAGAN |
| Note: MEETING WITH CONTRACTOR ABOUT FINAL SURVEY | |||
| PLUMBING FINAL | 04/08/2024 | CANCELLED BY APPLICANT | WEB |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 04/03/2024 | Disapproved - NO FEE | PFLANAGAN |
| Note: 1) THE CULVERT PIPE IS OUT OF TOLERANCE WITH THE PLAN DETAIL. Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan. 2) ALL ELEVATIONS AGAINST THE HOUSE NEEDS TO BE 4" BELOW FFE. Section 300.01 (A)(1)(C)(6) .Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for wood frame structures. 3) LEFT SIDE DRAINAGE PATTERN NEEDS TO HAVE POSITIVE FALL EVERY 20' TO THE FRONT ROADSIDE SWALE. Sec.300.01 (4,5,6) The tolerance along side lot lines is no more than 20 feet, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. 4) NEED TO CAPTURE THE HOUSE TO THE RIGHT OF YOURS THAT ITS IS IMPROVED AND CAPTURE THE CULVERT PIPE INVERTS. 5) THE FINAL SURVEY NEEDS TO HAVE 10' OFF SET ELEVATIONS IN THE LOT TO THE RIGHT OF YOURS AND IN THE RESERVE PARCEL TO DETEMINE IF WATER WILL IMPACT THE ADJACENT LOTS.Sec 300.01 D2 The elevations on all adjacent identified (e.g. vacant or improved etc.) properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. All undeveloped properties must be properly identified on the site plan and Final Survey. ------------------------------------------------------------------------------------------ 3/28/2024 - PREVIOUS INSPECTION NOTES 3/28/24 PLEASE CLEARLY DEPICT YOUR CULVERT PIPE ELEVATION WITH A CAPTION SO I CAN CHECK IT AGAINST THE COPC SWALE PLAN DIAGRAM. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 03/28/2024 | Disapproved - NO FEE | FSLADISH |
| Note: 3/28/24 PLEASE CLEARLY DEPICT YOUR CULVERT PIPE ELEVATION WITH A CAPTION SO I CAN CHECK IT AGAINST THE COPC SWALE PLAN DIAGRAM. | |||
| ELECTRIC - EARLY POWER | 03/27/2024 | APPROVED - AS NOTED | MKRASKI |
| Note: Emailed FPL 10am | |||
| PLUMBING FINAL | 03/27/2024 | CANCELLED BY APPLICANT | WEB |
| Note: Inspector Notes from Inspection 9450 THIS WAS A VIRTUAL INSPECTION | |||
| ROW- PRE-APRON (PRE-POUR) | 10/26/2023 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION, THE CULVERT PIPE IS GOOD AND READY TO POUR; THE BUILDER SHOULD DOUBLE-CHECK THE CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300E RESIDENTIAL CULVERT DETAIL | |||
| U - SEWER TIE IN | 10/24/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| GRAVITY SEWER TEST | 10/24/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| LATH/BRICK/ WATER BARRIER | 08/24/2023 | APPROVED | JSTEWART |
| Note: 8/23/2023 - PREVIOUS INSPECTION NOTES 8/23/23- Previous note not rectified......Note to builder Door installer showed up as I was leaving, I explained what needed to be done to be in compliance. reschedule when Notes have been done. 8/21/2023 - PREVIOUS INSPECTION NOTES 8/21/23- Previous note not rectified......Front entry door needs Water barrier (flashing). R703.4 Flashing. Note to builder front entry door Missing anchors once fixed schedule window nailing inspection (front door and SGD). 8/16/2023 - PREVIOUS INSPECTION NOTES 8/16/23- Window Nailing Inspection (doors not installed at all rough) needs to be aproved prior to Lath/brick/water barrier. Front entry door Not installed to FL Product aproval code (No anchors, tacked with finsh nails). Front entry door top spacing is larger then 1/4" FBC 612.7.2.1 . Front entry door needs Water barrier (flashing). R703.4 Flashing. Please complete the requested Notes in order of the Inspections. | |||
| WINDOW NAILING | 08/24/2023 | APPROVED | JSTEWART |
| Note: 7/25/23- Front door, rear slider, and garage to house are onsite please install and have inspection prior to Insulation inspection. | |||
| INSULATION | 08/23/2023 | APPROVED | JSTEWART |
| Note: 8/15/2023 - PREVIOUS INSPECTION NOTES 8/15/23- Front door and garage to house doors are not installed. Please read notes on added window nailing inspection, this inspection was added for the doors not being installed at the all rough, notes also state need to have window nailing inspection prior to Insulation. Please install doors onsite, have inspection, then call in Insulation inspection. Anchors on garage door bucks not rectified. 8/1/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 7/25/23- Front door, rear slider, and garage to house doors are onsite. Added a window Nailing inspection. please install prior to insulation. Garage door bucks are not anchored per plan Will check at insulation. Please obtain revision on product aproval #'s for windows installed (latest revision submitted was rejected). 7/24/2023 - PREVIOUS INSPECTION NOTES 7/24/23 1. Repair ALL previous items before3 calling in re-inspection Stopped inspection 7/17/2023 - PREVIOUS INSPECTION NOTES 1. Windows missing anchoring (check all) 2. Garage door bucks not anchored per detail 3. Product approval does not match windows installed Stopped inspection not ready 8/1/23 - SGD IN THE REAR NOT INSTALLED FIRE FOAM IN TOP PLATE NOT APPROVED FIRE STOP. REMOVE AND REPLACE WITH APPROVED UL FIRE STOP. OR HAVE AN EMPTY TUBE OF WHAT WAS USED SHOWING APPROVED FIRE STOP. | |||
| LATH/BRICK/ WATER BARRIER | 08/23/2023 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: 8/23/23- Previous note not rectified......Note to builder Door installer showed up as I was leaving, I explained what needed to be done to be in compliance. reschedule when Notes have been done. 8/21/2023 - PREVIOUS INSPECTION NOTES 8/21/23- Previous note not rectified......Front entry door needs Water barrier (flashing). R703.4 Flashing. Note to builder front entry door Missing anchors once fixed schedule window nailing inspection (front door and SGD). 8/16/2023 - PREVIOUS INSPECTION NOTES 8/16/23- Window Nailing Inspection (doors not installed at all rough) needs to be aproved prior to Lath/brick/water barrier. Front entry door Not installed to FL Product aproval code (No anchors, tacked with finsh nails). Front entry door top spacing is larger then 1/4" FBC 612.7.2.1 . Front entry door needs Water barrier (flashing). R703.4 Flashing. Please complete the requested Notes in order of the Inspections. | |||
| LATH/BRICK/ WATER BARRIER | 08/21/2023 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: 8/21/23- Previous note not rectified......Front entry door needs Water barrier (flashing). R703.4 Flashing. Note to builder front entry door Missing anchors once fixed schedule window nailing inspection (front door and SGD). 8/16/2023 - PREVIOUS INSPECTION NOTES 8/16/23- Window Nailing Inspection (doors not installed at all rough) needs to be aproved prior to Lath/brick/water barrier. Front entry door Not installed to FL Product aproval code (No anchors, tacked with finsh nails). Front entry door top spacing is larger then 1/4" FBC 612.7.2.1 . Front entry door needs Water barrier (flashing). R703.4 Flashing. Please complete the requested Notes in order of the Inspections. | |||
| LATH/BRICK/ WATER BARRIER | 08/16/2023 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: 8/16/23- Window Nailing Inspection (doors not installed at all rough) needs to be aproved prior to Lath/brick/water barrier. Front entry door Not installed to FL Product aproval code (No anchors, tacked with finsh nails). Front entry door top spacing is larger then 1/4" FBC 612.7.2.1 . Front entry door needs Water barrier (flashing). R703.4 Flashing. Please complete the requested Notes in order of the Inspections. | |||
| INSULATION | 08/15/2023 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: 8/15/23- Front door and garage to house doors are not installed. Please read notes on added window nailing inspection, this inspection was added for the doors not being installed at the all rough, notes also state need to have window nailing inspection prior to Insulation. Please install doors onsite, have inspection, then call in Insulation inspection. Anchors on garage door bucks not rectified. 8/1/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 7/25/23- Front door, rear slider, and garage to house doors are onsite. Added a window Nailing inspection. please install prior to insulation. Garage door bucks are not anchored per plan Will check at insulation. Please obtain revision on product aproval #'s for windows installed (latest revision submitted was rejected). 7/24/2023 - PREVIOUS INSPECTION NOTES 7/24/23 1. Repair ALL previous items before3 calling in re-inspection Stopped inspection 7/17/2023 - PREVIOUS INSPECTION NOTES 1. Windows missing anchoring (check all) 2. Garage door bucks not anchored per detail 3. Product approval does not match windows installed Stopped inspection not ready 8/1/23 - SGD IN THE REAR NOT INSTALLED FIRE FOAM IN TOP PLATE NOT APPROVED FIRE STOP. REMOVE AND REPLACE WITH APPROVED UL FIRE STOP. OR HAVE AN EMPTY TUBE OF WHAT WAS USED SHOWING APPROVED FIRE STOP. | |||
| INSULATION | 08/01/2023 | Disapproved -FEE REQUIRED | FWILLIS |
| Note: Inspector Notes from Inspection 2420 7/25/23- Front door, rear slider, and garage to house doors are onsite. Added a window Nailing inspection. please install prior to insulation. Garage door bucks are not anchored per plan Will check at insulation. Please obtain revision on product aproval #'s for windows installed (latest revision submitted was rejected). 7/24/2023 - PREVIOUS INSPECTION NOTES 7/24/23 1. Repair ALL previous items before3 calling in re-inspection Stopped inspection 7/17/2023 - PREVIOUS INSPECTION NOTES 1. Windows missing anchoring (check all) 2. Garage door bucks not anchored per detail 3. Product approval does not match windows installed Stopped inspection not ready 8/1/23 - SGD IN THE REAR NOT INSTALLED FIRE FOAM IN TOP PLATE NOT APPROVED FIRE STOP. REMOVE AND REPLACE WITH APPROVED UL FIRE STOP. OR HAVE AN EMPTY TUBE OF WHAT WAS USED SHOWING APPROVED FIRE STOP. | |||
| ALL ROUGH | 07/25/2023 | APPROVED - AS NOTED | JSTEWART |
| Note: 7/25/23- Front door, rear slider, and garage to house doors are onsite. Added a window Nailing inspection. please install prior to insulation. Garage door bucks are not anchored per plan Will check at insulation. Please obtain revision on product aproval #'s for windows installed (latest revision submitted was rejected). 7/24/2023 - PREVIOUS INSPECTION NOTES 7/24/23 1. Repair ALL previous items before3 calling in re-inspection Stopped inspection 7/17/2023 - PREVIOUS INSPECTION NOTES 1. Windows missing anchoring (check all) 2. Garage door bucks not anchored per detail 3. Product approval does not match windows installed Stopped inspection not ready | |||
| ALL ROUGH | 07/24/2023 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 7/24/23 1. Repair ALL previous items before3 calling in re-inspection Stopped inspection 7/17/2023 - PREVIOUS INSPECTION NOTES 1. Windows missing anchoring (check all) 2. Garage door bucks not anchored per detail 3. Product approval does not match windows installed Stopped inspection not ready | |||
| ALL ROUGH | 07/17/2023 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 1. Windows missing anchoring (check all) 2. Garage door bucks not anchored per detail 3. Product approval does not match windows installed Stopped inspection not ready | |||
| WALL SHEATHING | 05/23/2023 | APPROVED | JSTEWART |
| ROOF VALLEY & METAL | 12/21/2022 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/12/2022 | APPROVED | FWILLIS |
| Note: 12/2/2022 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 11/29/2022 - PREVIOUS INSPECTION NOTES NEED TO SEE DETAIL FOR LEDGER BOARD SHOWING 2PLY 2X10 AND NO ANCHOR BOLTS. HEADERS IN BEARING WALL, NO STRAPPING AND HOW MANY JACKS AND STUDS. ARE SP'S NEEDED ON TOP AND BOTTOM OF BEARING WALL 12/2/22 - LEDGER BOARD LEFT SIDE IN GARAGE CALLS FOR ANCOR BOLTS. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/02/2022 | CANCELLED BY APPLICANT | WEB |
| Note: 11/29/2022 - PREVIOUS INSPECTION NOTES NEED TO SEE DETAIL FOR LEDGER BOARD SHOWING 2PLY 2X10 AND NO ANCHOR BOLTS. HEADERS IN BEARING WALL, NO STRAPPING AND HOW MANY JACKS AND STUDS. ARE SP'S NEEDED ON TOP AND BOTTOM OF BEARING WALL | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/02/2022 | Disapproved - NO FEE | FWILLIS |
| Note: New inspection due to canceled inspection 11/29/2022 - PREVIOUS INSPECTION NOTES NEED TO SEE DETAIL FOR LEDGER BOARD SHOWING 2PLY 2X10 AND NO ANCHOR BOLTS. HEADERS IN BEARING WALL, NO STRAPPING AND HOW MANY JACKS AND STUDS. ARE SP'S NEEDED ON TOP AND BOTTOM OF BEARING WALL 12/2/22 - LEDGER BOARD LEFT SIDE IN GARAGE CALLS FOR ANCOR BOLTS. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/29/2022 | Disapproved - NO FEE | FWILLIS |
| Note: NEED TO SEE DETAIL FOR LEDGER BOARD SHOWING 2PLY 2X10 AND NO ANCHOR BOLTS. HEADERS IN BEARING WALL, NO STRAPPING AND HOW MANY JACKS AND STUDS. ARE SP'S NEEDED ON TOP AND BOTTOM OF BEARING WALL | |||
| TIE BEAM / LINTEL | 09/19/2022 | APPROVED | FWILLIS |
| FOUND SURVEY APPROVED (OFFICE) | 04/05/2022 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 03/24/2022 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION Front left of garage footing at water valve depth is not as per plans. Seee 2/5. | |||
| MONOLITHIC SLAB | 03/23/2022 | Disapproved - NO FEE | AGAETANO |
| Note: Front left of garage footing at water valve depth is not as per plans. Seee 2/5. Soil caved in at the garage area. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 03/18/2022 | APPROVED | KSANDOE |
| WATER METER INSTALLATION REQUEST | 03/02/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 04/24/2024 | 04/24/2024 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM If these are final survey, you need to upload under 'final survey' and name your file 'final survey'. There is logic built into the database that can only occur with document type 'final survey' | |||
| BADMIN | INFORMATION | 03/27/2024 | 03/27/2024 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM please rename your file to final survey and upload under the final survey document type. | |||
| BLD | COMPLETE | 08/01/2023 | 08/01/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/21/2023 | 07/21/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | HOLD | 07/21/2023 | 07/24/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. The followiung number need to be updated to the most current revision number and code cycle. FL10456-R4, FL 16230-R6, FL15363-R2, FL158.1- R8 | |||
| BLD | HOLD | 07/18/2023 | 07/21/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Only submit the numbers that are changing. | |||
| BLD | COMPLETE | 12/07/2022 | 12/08/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | HOLD | 12/05/2022 | 12/06/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code PLAN REVIEW COMMENTS: 1. Engineers digital signature could not be verified. 2. Tapcons are called out to be used with the proposed Simpson hanger. Per thee manufacture, Titen HD screws are to be used. | |||
| BLD | COMPLETE | 11/14/2022 | 11/14/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/04/2022 | 04/05/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/04/2022 | 04/04/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 02/07/2022 | 02/07/2022 |
| Note: Released By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Held By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM NOC is not legible. Notice of Commencement Submittals October 7, 2021 We have seen an increase of incorrect Notice of Commencements submitted. It has typically been for the same issues and is causing frustrations for applicants. • DESCRIPTION OF PROPERTY - description sufficient for identification of the real property to be improved. The description should include the legal description of the property and also include the street address and tax folio number. • DESCRIPTION OF IMPROVEMENT - this should be a brief description of your project - single family residence, swimming pool, driveway, HVAC, screen enclosure, interior alterations, etc. • CONTRACTOR NAME - The name and address of the contractor – this is to match the application provided by the license holder. • NOTARIZATION – the signed name must be the name on the Notice of Commencement. The notary must print the name of the person’s signature (s) they are notarizing, identify if they are personally known or produce identification, sign their name and place their seal on the document. • NOT LEGIBLE – we are increasingly receiving documents that are not legible. We receive many blurry and / or dark copies. Please be sure your scanned copy is legible or it will not be accepted. The document submitted to the Building Division must match the document that has been recorded. Any changes to the document must be re-recorded. Changes to the recorded copy without being re-recorded are not acceptable. References: Florida Statute 713.13 Notice of Commencement http://www.leg.state.fl.us/Statutes/index.cfm?App_mode=Display_Statute&URL=0700-0799/0713/Sections/0713.13.html Florida Statute 117 Notaries Public http://www.leg.state.fl.us/statutes/index.cfm?App_mode=Display_Statute&URL=0100-0199/0117/0117.html | |||
| ZON | COMPLETE | 11/19/2021 | 11/22/2021 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/19/2021 | 11/22/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 11/19/2021 | 11/29/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KRUTH@PALMCOASTGOV.COM | |||
| BLD | HOLD | 11/10/2021 | 11/10/2021 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 11/10/2021 | 11/16/2021 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM As per email sent 11/16/21, please submit correct survey and site plan with both the original easement and the newly platted easement (to include pertinent legal description and recording information of the easement) which was created. City staff to show to Damaris once this is reviewed for her approval. If the proposed house is encroaching in either easement, a termination of easement wll have to be prepared. | |||
| ENGIN1 | COMPLETE | 11/10/2021 | 11/10/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 11/10/2021 | 11/17/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KRUTH@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 11/10/2021 | 11/10/2021 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 11/04/2021 | 11/04/2021 |
| Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Please submit a correct site plan and survey which shows the two easements that were created during the binding lot process When this comes in please showto Damaris for approval. | |||
| BLD | HOLD | 11/02/2021 | 11/03/2021 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code-Building Residential REVIEW COMMENTS: Third Request 1. Product Approval Sheet calls-out Plydeck. Roofing Worksheet calls-out Owens Corning underlayment. Provide which roofing underlayment will be used. | |||
| MECH | COMPLETE | 11/02/2021 | 11/03/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 11/02/2021 | 11/09/2021 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM Drainage being approved as is due to the positioning of the house. Therefore being approved as-noted. No drainage will be allowed to impact any adjacent improved properties. | |||
| ENGIN1 | COMPLETE | 11/02/2021 | 11/03/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 09/24/2021 | 09/24/2021 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM COMMENTS AS PER DAMARIS RAMIREZ: "I spoke to the builder that had some drainage easements questions for me and found that the survey and site plan submitted was incorrect. They are only showing portion of the property and not the whole property. I did the binding lot agreement for this property so I am familiar with it. The builder said he will be submitting the corrected survey and site plan so be on the lookout for it or make a note about it on the permit." | |||
| ELEC | COMPLETE | 09/20/2021 | 09/21/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/20/2021 | 09/20/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| MECH | HOLD | 09/20/2021 | 09/20/2021 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs and EPL card need to be signed by the builder (Second Request) | |||
| ZON | COMPLETE | 09/20/2021 | 09/20/2021 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | HOLD | 09/20/2021 | 09/20/2021 |
| Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM Repeat comment: All comments below per the 2020 Florida Building Code-Building Residential REVIEW COMMENTS: 1. Product Approval Sheet calls-out Plydeck. Roofing Worksheet calls-out Owens Corning underlayment. Provide which roofing underlayment will be used. | |||
| SW1 | HOLD | 09/20/2021 | 09/27/2021 |
| Note: Held By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM Left side drainage needs to drain to the front swale then into the ditch. Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) | |||
| SWALE | COMPLETE | 09/20/2021 | 11/16/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | HOLD | 09/01/2021 | 09/03/2021 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code-Building Residential REVIEW COMMENTS: 1. Product Approval Sheet calls-out Plydeck. Roofing Worksheet calls-out Owens Corning underlayment. Provide which roofing underlayment will be used. | |||
| CUSVC | COMPLETE | 09/01/2021 | 09/03/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | HOLD | 09/01/2021 | 09/01/2021 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Reference the 2017 NEC on the electric page. 2. Submit electric load calcs and riser diagram | |||
| ENGIN1 | HOLD | 09/01/2021 | 09/01/2021 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Existing spot grades in road are barely legible and should be carried to the nearest hundredth of a foot. | |||
| LOCATE | COMPLETE | 09/01/2021 | 09/02/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 09/01/2021 | 09/02/2021 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs and EPL card need to be signed by the builder | |||
| ZON | HOLD | 09/01/2021 | 09/02/2021 |
| Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM please provide measurements for the proosed drive way and the side walk When a permit comes in to build the house a termination of portion of the drainage easement will need to be executed. See Damaris if you have questions. Damaris Ramirez Planner : 386-986-3750 DRamirez@palmcoastgov.com |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 20 | ¤20.00 | 05/06/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/06/2024 |
| PLAN REVIEW - REVISION | ¤32.50 | 03/27/2024 |
| PLAN REVIEW - REVISION | ¤32.50 | 03/27/2024 |
| PLAN REVIEW - REVISION | ¤32.50 | 03/27/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/27/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/27/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/27/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/27/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/27/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/27/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/27/2024 |
| CONTRACTOR CHANGE | ¤40.00 | 03/27/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 03/27/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 03/27/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 03/27/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 03/27/2024 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 02/07/2022 |
| IMPACT FEE FIRE | ¤367.00 | 02/07/2022 |
| IMPACT FEE PARKS | ¤1,199.12 | 02/07/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 02/07/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 02/07/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 02/07/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 02/07/2022 |
| SURCHARGE FS 533.721 | ¤11.26 | 02/07/2022 |
| SURCHARGE - FS 468.631 | ¤16.89 | 02/07/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 02/07/2022 |
| SW ENG INSPECTION 60 | ¤60.00 | 02/07/2022 |
| SW ENG PRE APRON | ¤30.00 | 02/07/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 02/07/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 02/07/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 02/07/2022 |
| SEWER CREDIT | (¤1,147.00) | 02/07/2022 |
| SEWER INSPECTION | ¤25.00 | 02/07/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 02/07/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 02/07/2022 |
| SITE PLAN 30 | ¤30.00 | 02/07/2022 |
| CONNECTION FEES | ¤1,077.88 | 02/07/2022 |
| METER - DEPOSIT | ¤60.00 | 02/07/2022 |
| WATER- TURN ON | ¤25.00 | 02/07/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 02/07/2022 |
| INSPECTION - RESIDENTIAL | ¤808.50 | 02/07/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤229.32 | 02/07/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤17,431.21 |