I want to search for...
Permit #2021090049
Permit Details
Status: COED
| Parcel Id: 07-11-31-7012-00030-1500 |
| CONDITIONED SPACE: 2085 sqft |
| GARAGE: 595 sqft |
| OPENED PORCH (WITH ROOF) : 134 sqft |
| OPENED PORCH (WITH ROOF) : 41 sqft |
| Total Square Footage: 2855 sqft |
| Block: 00030 |
| Subdivision: 2187 - SECTION 12-BELLE TERRE |
| Job Phone: 321-271-9033 |
| Location Address: 63 BARRING PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 09/30/2021 |
| NOC: RECORDED |
| Applicant name: KEITH E TANNER |
| Owner: VINTAGE ESTATE HOMES LLC |
|
Address 4885 N WICKHAM ROAD MELBOURNE, FL 32940 |
| Lot: 1500 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
MERCEDES PREMIER HOMES, LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
4885 N WICKHAM RD MELBOURNE, FL 32940 |
STE 101 MELBOURNE, FL 32940 |
CGC1516602 (Exp: 08/31/2024) | 321-610-3924 |
Sub Contractors
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
JOSEPH C WRIGHT
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST, FL 32137 |
UNIT 3 D PALM COAST, FL 32137 |
EC13003278 (Exp: 08/31/2026) | 386-447-9644 | 386-447-9633 |
JASON LEE JAMES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
217 N WESTMONTE DR SUITE 1007 ALTAMONTE SPRINGS, FL 32714 |
CAC1820196 (Exp: 08/31/2026) | 407-404-4000 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 09/08/2022 | FINAL APPROVED | MKRASKI |
| BLD - BUILDING FINAL | 09/07/2022 | Disapproved -FEE REQUIRED | LMILLER |
| Note: 1. WORKING SPACE for electric equipment…. NEC110.26 A1 36in. MINIMUM DEPTH AND 30in. MINIMUM WIDTH OR THE WIDTH OF THE EQUIPMENT (WICH EVER IS GREATER) 2. No hot water at kitchen island. 3. TEST CAPS ON FUTURE DWV…. P3005.1.5 | |||
| ROW - STORMWATER FINAL | 09/07/2022 | FINAL APPROVED | EMADISON |
| Note: THIS IS A REINSPECTION ** 09/07/22 CORRECTIONS MADE ** 09/06/22 STILL NEED TO FIX LOW SPOT AT LEFT REAR CORNER OF HOUSE ** 09/02/22 LEFT SIDE OF PROPERTY LINE FROM REAR CORNER OF HOUSE TO THE FRONT IS TO LOW WATER IS LAYING NEED TO HAVE A POSITIVE FLOW TO THE FRONT. ** CULVERT ENDS NEED TO BE CLEANED OUT | |||
| U -UTILITY RESIDENTIAL FINAL | 09/06/2022 | FINAL APPROVED | JHARDING |
| ROW - STORMWATER FINAL | 09/06/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 09/06/22 STILL NEED TO FIX LOW SPOT AT LEFT REAR CORNER OF HOUSE ** 09/02/22 LEFT SIDE OF PROPERTY LINE FROM REAR CORNER OF HOUSE TO THE FRONT IS TO LOW WATER IS LAYING NEED TO HAVE A POSITIVE FLOW TO THE FRONT. ** CULVERT ENDS NEED TO BE CLEANED OUT | |||
| U-CROSS CONNECTION | 09/06/2022 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation, no cross connections. | |||
| ROW - FINAL APRON (AFTER POUR) | 09/02/2022 | APPROVED | EMADISON |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 09/02/2022 | APPROVED | EMADISON |
| Note: THIS IS A REINSPECTION AT THE BACK RIGHT OF HOUSE THE STORMWATER IS IMPACTING THE ADJACENT LOT NEED TO FIX THAT AREA SO IT DONT IMPACT THE ADJACENT LOT | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 09/02/2022 | APPROVED | EMADISON |
| Note: ** 09/02/22 LEFT SIDE OF PROPERTY LINE FROM REAR CORNER OF HOUSE TO THE FRONT IS TO LOW WATER IS LAYING NEED TO HAVE A POSITIVE FLOW TO THE FRONT. ** CULVERT ENDS NEED TO BE CLEANED OUT | |||
| TUB SET | 08/31/2022 | APPROVED | MGIBSON |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/22/2022 | Disapproved - NO FEE | PFLANAGAN |
| Note: AT THE BACK RIGHT OF HOUSE THE STORMWATER IS IMPACTING THE ADJACENT LOT NEED TO FIX THAT AREA SO IT DONT IMPACT THE ADJACENT LOT | |||
| ELECTRIC - EARLY POWER | 08/17/2022 | APPROVED | RMARTIN |
| ROW- PRE-APRON (PRE-POUR) | 07/15/2022 | CANCELLED BY APPLICANT | RGROSS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION ** SITE IS NOT READY TO POUR NOTHING IS FORMED UP AT THE TIME OF THE INSPECTIONS ** PHOTO ATTACHED 7/5/22 - * 22 degree elbow needed in the center. *Mitered end on the left side needs cut back. Currently it is nearly 4 ft from the top of the mitered cross cut to the top of the mitered end. Cut the pipe back to match or less than the right side. *Left side center of pipe needs set at 6 ft from road edge *Right side center of pipe needs set at 4 ft from road edge. On site with super. See paint marks for directions. 7/14/22 - Cancelled 8:21am | |||
| ROW- PRE-APRON (PRE-POUR) | 07/15/2022 | APPROVED - AS NOTED | RGROSS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION ** SITE IS NOT READY TO POUR NOTHING IS FORMED UP AT THE TIME OF THE INSPECTIONS ** PHOTO ATTACHED 7/5/22 - * 22 degree elbow needed in the center. *Mitered end on the left side needs cut back. Currently it is nearly 4 ft from the top of the mitered cross cut to the top of the mitered end. Cut the pipe back to match or less than the right side. *Left side center of pipe needs set at 6 ft from road edge *Right side center of pipe needs set at 4 ft from road edge. On site with super. See paint marks for directions. 7/14/22 - Cancelled 8:21am 7/15/22 - Culvert was rescheduled and approved the same day as a courtesy since builder was held up due to the installation of a 22 degree elbow and heavy rains that washed out the area. Builder should double check elevations of the culvert before pouring due to heavy rain in the forecast for the weekend. It is now READY TO POUR at the time of inspection. | |||
| ROW- PRE-APRON (PRE-POUR) | 07/14/2022 | CANCELLED BY APPLICANT | RGROSS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION ** SITE IS NOT READY TO POUR NOTHING IS FORMED UP AT THE TIME OF THE INSPECTIONS ** PHOTO ATTACHED 7/5/22 - * 22 degree elbow needed in the center. *Mitered end on the left side needs cut back. Currently it is nearly 4 ft from the top of the mitered cross cut to the top of the mitered end. Cut the pipe back to match or less than the right side. *Left side center of pipe needs set at 6 ft from road edge *Right side center of pipe needs set at 4 ft from road edge. On site with super. See paint marks for directions. 7/14/22 - Cancelled 8:21am | |||
| ROW- PRE-APRON (PRE-POUR) | 07/05/2022 | Disapproved - NO FEE | RGROSS |
| Note: THIS IS A REINSPECTION ** SITE IS NOT READY TO POUR NOTHING IS FORMED UP AT THE TIME OF THE INSPECTIONS ** PHOTO ATTACHED 7/5/22 - * 22 degree elbow needed in the center. *Mitered end on the left side needs cut back. Currently it is nearly 4 ft from the top of the mitered cross cut to the top of the mitered end. Cut the pipe back to match or less than the right side. *Left side center of pipe needs set at 6 ft from road edge *Right side center of pipe needs set at 4 ft from road edge. On site with super. See paint marks for directions. | |||
| ROW- PRE-APRON (PRE-POUR) | 06/27/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** SITE IS NOT READY TO POUR NOTHING IS FORMED UP AT THE TIME OF THE INSPECTIONS ** PHOTO ATTACHED | |||
| U - SEWER TIE IN | 06/03/2022 | APPROVED | MGIBSON |
| INSULATION | 04/21/2022 | APPROVED | FWILLIS |
| LATH/BRICK/ WATER BARRIER | 04/12/2022 | APPROVED | FWILLIS |
| ALL ROUGH | 03/28/2022 | APPROVED - AS NOTED | MKRASKI |
| Note: 1. Drain for washer needs a nail plate Check on insualtion | |||
| ALL ROUGH | 03/18/2022 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Kitchen floor needs to be sealed 2. Tub in master needs to be sealed at drain 3. Plumbing in garage wall is outside of wall | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/16/2022 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION SP FASTENERS MISSING AT TOP OF RIGHT SIDE, AS PER PLAN. BUILT UP COLUMN AT RIGHT REAR MISSING HTT5 AS PER PLAN. 2/16/22 - ITEMS CORRECTED | |||
| ROOF VALLEY & METAL | 02/14/2022 | APPROVED | FWILLIS |
| WALL SHEATHING | 02/14/2022 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/14/2022 | Disapproved - NO FEE | FWILLIS |
| Note: SP FASTENERS MISSING AT TOP OF RIGHT SIDE, AS PER PLAN. BUILT UP COLUMN AT RIGHT REAR MISSING HTT5 AS PER PLAN. | |||
| FOUND SURVEY APPROVED (OFFICE) | 12/01/2021 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 11/18/2021 | APPROVED | FWILLIS |
| MONOLITHIC SLAB | 11/03/2021 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 11/2/21 - Plans in construction box are not a stamped and approved set of plans. DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL. | |||
| MONOLITHIC SLAB | 11/02/2021 | Disapproved -FEE REQUIRED | FWILLIS |
| Note: THIS IS A REINSPECTION 11/2/21 - Plans in construction box are not a stamped and approved set of plans. DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL. | |||
| MONOLITHIC SLAB | 11/01/2021 | CANCELLED BY APPLICANT | FWILLIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 10/21/2021 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 10/21/2021 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 10/04/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 08/16/2022 | 08/16/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 08/03/2022 | 08/04/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 07/22/2022 | 07/22/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Design location on heatload needs to match the Energy calc. (St. Augustine) | |||
| MECH | HOLD | 07/21/2022 | 07/22/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Provide Entire heatload including manual J summary page. Resubmit entire Energy calc and heatload as one file | |||
| ENGIN1 | COMPLETE | 12/01/2021 | 12/01/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/01/2021 | 12/01/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 09/14/2021 | 09/14/2021 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | HOLD | 09/01/2021 | 09/03/2021 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM REVIEW COMMENTS: 1. Provide an updated City of Palm Coast Roofing Worksheet. 2. Properly identify ALL Exterior Doors with the specific Florida Product Approval Number (i.e. 14170.#); there are various types of approved doors under these numbers provided. | |||
| CUSVC | COMPLETE | 09/01/2021 | 09/08/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 09/01/2021 | 09/01/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/01/2021 | 09/01/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 09/01/2021 | 09/02/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 09/01/2021 | 09/02/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 09/01/2021 | 09/13/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/01/2021 | 09/03/2021 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 09/01/2021 | 11/17/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 09/07/2022 |
| PLAN REVIEW - REVISION | ¤32.50 | 09/07/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/07/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/07/2022 |
| CONTRACTOR CHANGE | ¤40.00 | 09/07/2022 |
| CONTRACTOR CHANGE | ¤40.00 | 09/07/2022 |
| SW ENG REINSPECTION 20 | ¤20.00 | 09/07/2022 |
| SW ENG REINSPECTION 30 | ¤30.00 | 09/07/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 09/30/2021 |
| SW ENG RES REVIEW 200 | ¤200.00 | 09/30/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 09/30/2021 |
| SEWER INSPECTION | ¤25.00 | 09/30/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 09/30/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 09/30/2021 |
| SITE PLAN 30 | ¤30.00 | 09/30/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 09/30/2021 |
| IMPACT FEE FIRE | ¤367.00 | 09/30/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 09/30/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 09/30/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 09/30/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 09/30/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 09/30/2021 |
| SURCHARGE FS 533.721 | ¤10.14 | 09/30/2021 |
| SURCHARGE - FS 468.631 | ¤15.21 | 09/30/2021 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 09/30/2021 |
| SW ENG INSPECTION 60 | ¤60.00 | 09/30/2021 |
| SW ENG PRE APRON | ¤30.00 | 09/30/2021 |
| CONNECTION FEES | ¤1,017.83 | 09/30/2021 |
| METER - DEPOSIT | ¤60.00 | 09/30/2021 |
| WATER- TURN ON | ¤25.00 | 09/30/2021 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 09/30/2021 |
| INSPECTION - RESIDENTIAL | ¤723.25 | 09/30/2021 |
| PLAN REVIEW - RESIDENTIAL | ¤205.14 | 09/30/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤17,646.17 |